ML20207F506: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 19: Line 19:
=Text=
=Text=
{{#Wiki_filter:'
{{#Wiki_filter:'
                                                                                              l
N
N                                                                                             I
'4
'4
                                  JUL 161986                                                 .
JUL 161986
  Docket No.   50-334
.
  Duquesne Light Company
Docket No.
  ATTN:   Mr. J. J. Carey
50-334
          Vice President
Duquesne Light Company
          Nuclear Group
ATTN:
  Post Office Box 4
Mr. J. J. Carey
  Shippingport, Pennsylvania 15077
Vice President
  Gentlemen:
Nuclear Group
  Subject:   Inspection Report No. 50-334/86-10
Post Office Box 4
  A routine safety inspection of the radiological protection program during an
Shippingport, Pennsylvania 15077
  outage at the Beaver Valley Power Station, Unit I was conducted on June 2-6,
Gentlemen:
  1986. The areas examined during the inspection are identified in the enclosed
Subject:
  inspection report and included: status of previously identified items, audits,
Inspection Report No. 50-334/86-10
  training and qualification, implementation of the radiation protection program,
A routine safety inspection of the radiological protection program during an
  ALARA, and worker concerns.
outage at the Beaver Valley Power Station, Unit I was conducted on June 2-6,
  The inspection findings indicated that there are inadequacies in your air samp-
1986. The areas examined during the inspection are identified in the enclosed
  ling program. This section is discussed in Section 6.0 of the attached report.
inspection report and included:
  You are requested to respond within 30 days of receipt of this letter.     In your
status of previously identified items, audits,
  response, you are requested to address your actions to strengthen your air
training and qualification, implementation of the radiation protection program,
  sampling program including Items A through G of Section 6 of the enclosed
ALARA, and worker concerns.
  inspection report.
The inspection findings indicated that there are inadequacies in your air samp-
  Your cooperation with us is appreciated.
ling program. This section is discussed in Section 6.0 of the attached report.
                                            Sincerely,
You are requested to respond within 30 days of receipt of this letter.
                                            0:iriml S!rn-4 ??:
In your
                                                  (   c
response, you are requested to address your actions to strengthen your air
                                                          -
sampling program including Items A through G of Section 6 of the enclosed
                                                                  M
inspection report.
                                            Th ps     . Martin, Director
Your cooperation with us is appreciated.
                                                ision of Radiation Safety and
Sincerely,
                                        (
0:iriml S!rn-4 ??:
                                                Safeguards
(
  Enclosure: NRC Region I Inspection Report No. 50-334/86-10
-
                      .
M
          8607220555 860716
c
          PDR
Th
          G
ps
                ADOCK 05000334
Martin, Director
                            PDR
.
                            OFFICIAL RECORD COPY       IR BV1 86-10 - 0001.0.0
ision of Radiation Safety and
                                                        07/14/86                   f},$b
(
                                                                                      U
Safeguards
                                                                                        / f
Enclosure: NRC Region I Inspection Report No. 50-334/86-10
.
8607220555 860716
PDR
ADOCK 05000334
G
PDR
f},$b
OFFICIAL RECORD COPY
IR BV1 86-10 - 0001.0.0
U
07/14/86
/ f
m
m


      _         _.     __         _     _   --   ...__
_
    *
_.
                                                                                              I
__
    i
_
        Duquesne Light Company                     2
_
        cc w/ encl:
--
        H. M. Siegel, Manager, Nuclear Engineering Department
...__
        C. E. Ewing, QA Manager
*
        W. S. Lacey, Station Superintendent
i
        R. Druga, Chief Engineer
Duquesne Light Company
        R. Martin, Nuclear Engineer
2
        J. Sieber, Manager, Nuclear Safety and Licensing
cc w/ encl:
        T. D. Jones, Manager, Nuclear Operations
H. M. Siegel, Manager, Nuclear Engineering Department
        N. R. Tonet, Manager, Nuclear Engineering
C. E. Ewing, QA Manager
        Public Document Room (PDR)
W. S. Lacey, Station Superintendent
        local Public Document Room (LPDR)
R. Druga, Chief Engineer
        Nuclear Safety Information Center (NSIC)
R. Martin, Nuclear Engineer
        NRC Resident Inspector
J. Sieber, Manager, Nuclear Safety and Licensing
        Commonwealth of Pennsylvania
T. D. Jones, Manager, Nuclear Operations
j       bec w/ encl:
N. R. Tonet, Manager, Nuclear Engineering
        Region I Docket Room (with concurrences)
Public Document Room (PDR)
        Management Assistant, DRMA (w/o enc 1)
local Public Document Room (LPDR)
        Section Chief, DRP
Nuclear Safety Information Center (NSIC)
        M. McBride, RI, Pilgrim
NRC Resident Inspector
        G. Walton, SRI, BV-2
Commonwealth of Pennsylvania
        P. Tam, LPM, NRR
j
        RI:DRSS           RI:DRSS       RI:DRSS           RI:DRSS
bec w/ encl:
                                                                              M
Region I Docket Room (with concurrences)
                                                                            RI:DRSS   RI: SS
Management Assistant, DRMA (w/o enc 1)
          c
Section Chief, DRP
              dgen/mjd       e
M. McBride, RI, Pilgrim
                                          Tgilardi           Shan           Bellamy   Mar in
G. Walton, SRI, BV-2
        7/16/86           7//f/86       7/fs/ 6           7//5786       7/)[/86   7/ /86
P. Tam, LPM, NRR
                                    0FFICIAL RECORD COPY           IR BV1 86-10 - 0002.0.0
M
                                                                  07/14/86
RI:DRSS
  I
RI:DRSS
    O
RI:DRSS
RI:DRSS
RI:DRSS
RI:
SS
dgen/mjd
Tgilardi
Shan
Bellamy
Mar in
c
e
7/16/86
7//f/86
7/fs/ 6
7//5786
7/)[/86
7/ /86
0FFICIAL RECORD COPY
IR BV1 86-10 - 0002.0.0
07/14/86
I
O
}}
}}

Latest revision as of 21:37, 6 December 2024

Forwards Safety Insp Rept 50-334/86-10 on 860602-06. Inadequacies Re Air Sampling Program Noted.Response Requested within 30 Days of Ltr Receipt
ML20207F506
Person / Time
Site: Beaver Valley
Issue date: 07/16/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Carey J
DUQUESNE LIGHT CO.
Shared Package
ML20207F511 List:
References
NUDOCS 8607220555
Download: ML20207F506 (2)


See also: IR 05000334/1986010

Text

'

N

'4

JUL 161986

.

Docket No.

50-334

Duquesne Light Company

ATTN:

Mr. J. J. Carey

Vice President

Nuclear Group

Post Office Box 4

Shippingport, Pennsylvania 15077

Gentlemen:

Subject:

Inspection Report No. 50-334/86-10

A routine safety inspection of the radiological protection program during an

outage at the Beaver Valley Power Station, Unit I was conducted on June 2-6,

1986. The areas examined during the inspection are identified in the enclosed

inspection report and included:

status of previously identified items, audits,

training and qualification, implementation of the radiation protection program,

ALARA, and worker concerns.

The inspection findings indicated that there are inadequacies in your air samp-

ling program. This section is discussed in Section 6.0 of the attached report.

You are requested to respond within 30 days of receipt of this letter.

In your

response, you are requested to address your actions to strengthen your air

sampling program including Items A through G of Section 6 of the enclosed

inspection report.

Your cooperation with us is appreciated.

Sincerely,

0:iriml S!rn-4 ??:

(

-

M

c

Th

ps

Martin, Director

.

ision of Radiation Safety and

(

Safeguards

Enclosure: NRC Region I Inspection Report No. 50-334/86-10

.

8607220555 860716

PDR

ADOCK 05000334

G

PDR

f},$b

OFFICIAL RECORD COPY

IR BV1 86-10 - 0001.0.0

U

07/14/86

/ f

m

_

_.

__

_

_

--

...__

i

Duquesne Light Company

2

cc w/ encl:

H. M. Siegel, Manager, Nuclear Engineering Department

C. E. Ewing, QA Manager

W. S. Lacey, Station Superintendent

R. Druga, Chief Engineer

R. Martin, Nuclear Engineer

J. Sieber, Manager, Nuclear Safety and Licensing

T. D. Jones, Manager, Nuclear Operations

N. R. Tonet, Manager, Nuclear Engineering

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

j

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

M. McBride, RI, Pilgrim

G. Walton, SRI, BV-2

P. Tam, LPM, NRR

M

RI:DRSS

RI:DRSS

RI:DRSS

RI:DRSS

RI:DRSS

RI:

SS

dgen/mjd

Tgilardi

Shan

Bellamy

Mar in

c

e

7/16/86

7//f/86

7/fs/ 6

7//5786

7/)[/86

7/ /86

0FFICIAL RECORD COPY

IR BV1 86-10 - 0002.0.0

07/14/86

I

O