ML20211C495: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ - _ _
{{#Wiki_filter:_ _ _ _ _ _ _ _ _ - _ _
Georgia Fbwer Company
Georgia Fbwer Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 5264526 Maihng Address:
. '      333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 5264526 Maihng Address:
Post Office Box 4545
Post Office Box 4545
      . Atlanta, Georgia 30302 GeorgiaPower L T. Gucwa                                                                               the southem electoc system Manager Nuclear Safety and Licensing 0411C February 6, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST Gentlemen:
. Atlanta, Georgia 30302 GeorgiaPower L T. Gucwa the southem electoc system Manager Nuclear Safety and Licensing 0411C February 6, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.
Enclosed                         please find   an updated   listing   of those items             of correspondence with the NRC to which a written response is expected.                                       The enclosure is tabulated chronologically by Georgia Power Company's submittal date. Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you might have regarding these licensing issues.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST Gentlemen:
Enclosed please find an updated listing of those items of correspondence with the NRC to which a written response is expected.
The enclosure is tabulated chronologically by Georgia Power Company's submittal date.
Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you might have regarding these licensing issues.
Georgia Power Company acknowledges and appreciates the recent NRC efforts to complete licensing action on our submittals related to snubber operability and standby service water.
Georgia Power Company acknowledges and appreciates the recent NRC efforts to complete licensing action on our submittals related to snubber operability and standby service water.
If you have further questions, please contact this office at any time.
If you have further questions, please contact this office at any time.
Sincerely, c9 C r Q u L. T. Gucwa MJB/lc Enclosure c: Georgia Power Company                                     U. S. Nuclear Regulatory Commission Mr. s . P. O'Reilly                                   Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.                               Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr.                                     Inspector - Hatch GO-NORMS                                             Mr. G. Rivenbark, Licensing Project Manager
Sincerely, c9 r Q u C
                                                                                                                        ,005 0702200109 870206                                 1 I
L. T. Gucwa MJB/lc Enclosure c: Georgia Power Company U. S. Nuclear Regulatory Commission Mr. s. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.
* DR     ADOCK 0500
Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr.
Inspector - Hatch GO-NORMS Mr. G. Rivenbark, Licensing Project Manager
,005 0702200109 870206 I
DR ADOCK 0500 1


Page No,       1 02/06/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENfLOSURETOSL-1966 LETTER   UNIT       SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UFCOMING OUTAGE C NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N ITEM ADDED SINCE LAST REPORT 09/12/S4 321         PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 01/10/85 366         REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/85 321,366     REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/85 321,366     REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83                         SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366     PROPOSED CHANGES TO ISI PROGRAM 01/06/86 366         PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE   ~'
Page No, 1
REQUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366     PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366     PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS 01/07/86 321,366     PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL 02/17/86 321,366     PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION
02/06/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENfLOSURETOSL-1966 LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UFCOMING OUTAGE C NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N ITEM ADDED SINCE LAST REPORT 09/12/S4 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 PROPOSED CHANGES TO ISI PROGRAM 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE
                        - RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, OA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL 02/28/86 321,366     PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT I 03/13/86 321,366       REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS - GENERIC LETTER 83-08 03/27/06 321,366     PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS 03/31/86 321,366     PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15 L.
~'
REQUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS 01/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL 02/17/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION
- RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, OA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT I 03/13/86 321,366 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS - GENERIC LETTER 83-08 03/27/06 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15 L.


Papa No.       2 02/06/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-1966 LETTER   UNIT       SUBJECT DATE                       ,
Papa No.
04/04/86 366         PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCCRPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 05/16/86 321,366     PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSITION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT REPORTING RELATIONSHIPS 06/20/86 321,366     CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 08/19/86 366         CHANGE TO TECHNICAL SPECIFICATION - BATTERY LOAD PROFILE 06/.25/86 321,366   CHANGE TO RWCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS -
2 02/06/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-1966 LETTER UNIT SUBJECT DATE 04/04/86 366 PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCCRPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 05/16/86 321,366 PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSITION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT REPORTING RELATIONSHIPS 06/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 08/19/86 366 CHANGE TO TECHNICAL SPECIFICATION - BATTERY LOAD PROFILE 06/.25/86 321,366 CHANGE TO RWCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS -
HIGH TEMPERATURE ISOLATION 09/09/06 321,366     CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 09/09/86 321         PROPOSED TECHNICAL SPECIFICATION CHANGE - REFUELING INTERLOCK SURVEILLANCE                               ..
HIGH TEMPERATURE ISOLATION 09/09/06 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 09/09/86 321 PROPOSED TECHNICAL SPECIFICATION CHANGE - REFUELING INTERLOCK SURVEILLANCE 10/24/06 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE - ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 10/27/86 321,366 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS - DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/06/06 321 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION - COMMENTS REGARDING IGSCC INSPECTION AND REPAIR - UT SUBCONTRACTORS 11/14/86 321 INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL 11/14/86 321,366 RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION -
10/24/06 321,366     PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE - ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 10/27/86 321,366     PROPOSED REVISION TO TECHNICAL SPECIFICATIONS - DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/06/06 321         RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION - COMMENTS REGARDING IGSCC INSPECTION AND REPAIR - UT SUBCONTRACTORS 11/14/86 321         INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL 11/14/86 321,366     RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION -
CABLE TRAY SUPPORTS 11/20/86 321,366 C PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SNUBBER OPERABILITY 12/23/G6 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 01/27/87 366 C REQUEST FOR EMERGENCY TECHNICAL SPECIFICATION RELIEF - 3.0.4 EXEMPTION FOR STANDBY SERVICE WATER
CABLE TRAY SUPPORTS 11/20/86 321,366 C PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SNUBBER OPERABILITY 12/23/G6 321,366   DETAILED CONTROL ROOM DESIGN REVIEW 01/27/87 366       C REQUEST FOR EMERGENCY TECHNICAL SPECIFICATION RELIEF - 3.0.4 EXEMPTION FOR STANDBY SERVICE WATER
. _ _ _}}
                                              . _ _ _}}

Latest revision as of 00:15, 6 December 2024

Forwards Updated Listing of Outstanding Licensing Issues. Efforts to Complete Licensing Actions Re Snubber Operability & Standby Svc Water Appreciated
ML20211C495
Person / Time
Site: Hatch  
Issue date: 02/06/1987
From: Gucwa L
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-83-08, GL-83-28, GL-83-8, GL-84-15, SL-1966, NUDOCS 8702200109
Download: ML20211C495 (3)


Text

_ _ _ _ _ _ _ _ _ - _ _

Georgia Fbwer Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 5264526 Maihng Address:

Post Office Box 4545

. Atlanta, Georgia 30302 GeorgiaPower L T. Gucwa the southem electoc system Manager Nuclear Safety and Licensing 0411C February 6, 1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.

20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 OUTSTANDING SUBMITTALS LIST Gentlemen:

Enclosed please find an updated listing of those items of correspondence with the NRC to which a written response is expected.

The enclosure is tabulated chronologically by Georgia Power Company's submittal date.

Georgia Power is prepared to discuss modifications to this status report and will promptly address any questions you might have regarding these licensing issues.

Georgia Power Company acknowledges and appreciates the recent NRC efforts to complete licensing action on our submittals related to snubber operability and standby service water.

If you have further questions, please contact this office at any time.

Sincerely, c9 r Q u C

L. T. Gucwa MJB/lc Enclosure c: Georgia Power Company U. S. Nuclear Regulatory Commission Mr. s. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.

Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr.

Inspector - Hatch GO-NORMS Mr. G. Rivenbark, Licensing Project Manager

,005 0702200109 870206 I

DR ADOCK 0500 1

Page No, 1

02/06/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENfLOSURETOSL-1966 LETTER UNIT SUBJECT DATE O APPROVAL OF ITEM REQUIRED FOR UFCOMING OUTAGE C NRC ACTION COMPLETE ON ITEM SINCE LAST REPORT N ITEM ADDED SINCE LAST REPORT 09/12/S4 321 PROPOSED TECHNICAL SPECIFICATIONS - OPERABILITY DEFINITION 01/10/85 366 REQUEST TO RESCIND CONFIRMATORY ORDER ON REACTOR COOLANT SYSTEM STAINLESS STEEL PIPE 05/13/85 321,366 REQUEST FOR ADDITIONAL INFORMATION - SEISMIC SPECTRA BROADENING 06/03/85 321,366 REQUEST FOR ADDITIONAL INFORMATION GENERIC LETTER 83 SALEM EVENT - SCRAM BREAKER FAILURE 06/25/85 321,366 PROPOSED CHANGES TO ISI PROGRAM 01/06/86 366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - DELETE

~'

REQUIREMENT FOR HYDROGEN RECOMBINERS 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - 45 SECONDS ON SCRAM DISCHARGE VOLUME VENT AND DRAIN VALVE CLOSURE TIME 01/06/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SHIFT OVERTIME REQUIREMENTS 01/07/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - AUTOMATIC ISOLATION OF PURGE AND VENT ON HIGH RADIATION SIGNAL 02/17/86 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - REORGANIZATION

- RESPONSIBILITY FOR RADIOLOGICAL ENVIRONMENTAL MONITORING, ENVIRONMENTAL TECHNICAL SPECIFICATIONS, MET TOWER LOCATION, OA RECORDS, DELETE EPDD, ETS PROCEDURE APPROVAL 02/28/86 321,366 PROPOSED LICENSE EXTENSION TO 40 YEARS FROM OPERATING LICENSE VICE CONSTRUCTION PERMIT I 03/13/86 321,366 REQUEST FOR ADDITIONAL INFORMATION - MODIFICATION OF VACUUM BREAKERS ON MARK 1 CONTAINMENTS - GENERIC LETTER 83-08 03/27/06 321,366 PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - EQUALIZING REACTOR PROTECTION SYSTEM SPECIFICATIONS BETWEEN UNITS 03/31/86 321,366 PROPOSED CHANGES TO TECHNICAL SPECIFICATIONS - EMERGENCY POWER - DIESEL GENERATOR TESTING - GENERIC LETTER 84-15 L.

Papa No.

2 02/06/87 OUTSTANDING LICENSING ISSUES WITH SUBMITTAL AT NRC ENCLOSURE TO SL-1966 LETTER UNIT SUBJECT DATE 04/04/86 366 PROPOSED DELETION OF BUILDING SETTLEMENT TECHNICAL SPECIFICATIONS WITH INCCRPORATION OF SETTLEMENT CRITERIA FROM OUR 12/1/78 LETTER INTO PLANT PROCEDURES 05/16/86 321,366 PROPOSED TECHNICAL SPECIFICATIONS - PLANT REVIEW BOARD AND SAFETY REVIEW BOARD COMPOSITION AND QUORUM, AUDIT REQUIREMENTS, MANAGEMENT REPORTING RELATIONSHIPS 06/20/86 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - SINGLE LOOP OPERATION AND JET PUMP SURVEILLANCE 08/19/86 366 CHANGE TO TECHNICAL SPECIFICATION - BATTERY LOAD PROFILE 06/.25/86 321,366 CHANGE TO RWCU LEAKAGE DETECTION TECHNICAL SPECIFICATIONS -

HIGH TEMPERATURE ISOLATION 09/09/06 321,366 CHANGE TO TECHNICAL SPECIFICATIONS - RIVER LEVEL 09/09/86 321 PROPOSED TECHNICAL SPECIFICATION CHANGE - REFUELING INTERLOCK SURVEILLANCE 10/24/06 321,366 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR FIRE PROTECTION COMPLIANCE - ADD REQUIREMENT OF PERFORMING EVERY THIRD TEST OF EQUIPMENT CONTROLLED FROM REMOTE SHUTDOWN PANELS FROM SAID PANELS 10/27/86 321,366 PROPOSED REVISION TO TECHNICAL SPECIFICATIONS - DELETION OF ORGANIZATIONAL FIGURES, REALIGNMENT OF HNP STRUCTURE 11/06/06 321 RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION - COMMENTS REGARDING IGSCC INSPECTION AND REPAIR - UT SUBCONTRACTORS 11/14/86 321 INSERVICE INSPECTION RELIEF REQUEST TO CLOSE OUT FIRST 10 YEAR ISI INTERVAL 11/14/86 321,366 RESPONSE TO VERBAL REQUEST FOR ADDITIONAL INFORMATION -

CABLE TRAY SUPPORTS 11/20/86 321,366 C PROPOSED CHANGE TO TECHNICAL SPECIFICATIONS - SNUBBER OPERABILITY 12/23/G6 321,366 DETAILED CONTROL ROOM DESIGN REVIEW 01/27/87 366 C REQUEST FOR EMERGENCY TECHNICAL SPECIFICATION RELIEF - 3.0.4 EXEMPTION FOR STANDBY SERVICE WATER

. _ _ _