DOCKET NO.         50-483 UNIT NAME           CALLAWAY LHIT 1 DATE               12/11/86 COMPLETED BY       S. R. EVANS TELEP110NE         314/676-8742 PART A     OPERATIONS  
DOCKET NO.
50-483 UNIT NAME CALLAWAY LHIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEP110NE 314/676-8742 PART A OPERATIONS  


==SUMMARY==
==SUMMARY==
The plant operated at approximately 80% power for the period between 11/1/86 and 11/11/86 for fuel management considerations. Power was then increased to near 100% due to system demand until 11/17/86 when power was again reduced to approximately 80%. On 11/29/86 power was reduced below P-9 setpoint (50%) for 21 hours to prevent an inadvertent turbine / reactor trip. Weekly turbine surveillance testing had resulted in an indeterminate position for the turbine limit switch and mechanical trip linkage.
The plant operated at approximately 80% power for the period between 11/1/86 and 11/11/86 for fuel management considerations. Power was then increased to near 100% due to system demand until 11/17/86 when power was again reduced to approximately 80%. On 11/29/86 power was reduced below P-9 setpoint (50%) for 21 hours to prevent an inadvertent turbine / reactor trip. Weekly turbine surveillance testing had resulted in an indeterminate position for the turbine limit switch and mechanical trip linkage.
PART B     PORY AND SAFETY VALVE SUlttARY On 11/30/86, PORY 455A opened for approximately two seconds as the result of an inadvertent isolation of the plant instrument air system. The loss of instrument air resulted in a temporary loss of the pressurizer spray valves and letdown leading to the momentary system pressure increase above the PORV setpoint. Normal pressure and instrument air conditions were restored within six minutes.
PART B PORY AND SAFETY VALVE SUlttARY On 11/30/86, PORY 455A opened for approximately two seconds as the result of an inadvertent isolation of the plant instrument air system. The loss of instrument air resulted in a temporary loss of the pressurizer spray valves and letdown leading to the momentary system pressure increase above the PORV setpoint. Normal pressure and instrument air conditions were restored within six minutes.
0703030g ppit      AD h',h03ppH Il CA #804 04/10/85 QDP ZZ 04204 Page 1 of 4
0703030g h',h03 ppit AD ppH Il CA #804 04/10/85 QDP ZZ 04204 Page 1 of 4
                                                                                                          /\
/\\


Part C AVERACE DAILY L' NIT POWER LEVEL DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 MONTH:                           NOVEMBER 1986 AVERACE DAILY POWER LEVEL                                                                                                                                                       AVERACE DAILY POWER LEVEL DAY                                                           (MWe-Net)                                                                                                         DAY                                               (MWe-Net) 1                                                                   800                                                                                                     17                                               932 2                                                                   798                                                                                                     18                                               899 3                                                                   892                                                                                                     19                                               897 l
Part C AVERACE DAILY L' NIT POWER LEVEL DOCKET NO.
4                                                                   918                                                                                                     20                                               892 5                                                                   920                                                                                                     21                                               855 6                                                                   918                                                                                                     22                                               679 7                                                                   908                                                                                                     23                                               840 8                                                                   920                                                                                                     24                                               895 4
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 MONTH:
9                                                                   883                                                                                                     25                                               891 1
NOVEMBER 1986 AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (MWe-Net)
10                                                                     901                                                                                                     26                                               894 11                                                                     903                                                                                                     17                                               910 12                                                                   1013                                                                                                       28                                               913 13                                                                   1153                                                                                                       29                                               688 14                                                                 1160                                                                                                       30                                               976 15                                                                   1155                                                                                                       31 16                                                                   1152 CA 8804 04/10/85 QDP-ZZ 04204 Page 2 of 4
DAY (MWe-Net) 1 800 17 932 2
798 18 899 3
892 19 897 l
4 918 20 892 5
920 21 855 6
918 22 679 7
908 23 840 8
920 24 895 4
9 883 25 891 1
10 901 26 894 11 903 17 910 12 1013 28 913 13 1153 29 688 14 1160 30 976 15 1155 31 16 1152 CA 8804 04/10/85 QDP-ZZ 04204 Page 2 of 4


Part D GPBATDC DATA REFORT D00'ET ND.     50-483 INIT ?WiE       CAllAWAY UNIT 1 DATE       12/11/86 QEPIRIE BY         S. R. EVANS TELEPI E E     314/676-6742 CPEPATDC STAIUS (YID     CtN )
Part D GPBATDC DATA REFORT D00'ET ND.
: 1. REPmTDU PERI @: Novmber 1986                     GROSS HOURS IN REPORTDC PERIW:                   720   (8016 17078.5)
50-483 INIT ?WiE CAllAWAY UNIT 1 DATE 12/11/86 QEPIRIE BY S. R. EVANS TELEPI E E 314/676-6742 CPEPATDC STAIUS (YID CtN )
: 2. CURRENILY AUD10RI22 IGTR LEVEL (Wt):                         3411         MAX DEPEND. CAPACITY (MWe-Net):         1120 DESIm FLEI'IRICAL RATDC 0$Mt):                       1171*
1.
              *At stretch power icvel dich is not currently authorized tnier the Operating License.
REPmTDU PERI @: Novmber 1986 GROSS HOURS IN REPORTDC PERIW:
: 3. IGTR IREL 10 k1IIQI RESIRICITD (IF ANY) owe-Net):                               100%
720 (8016 17078.5) 2.
: 4. RFASONS FDR RFSIRICTION (IF ANY):
CURRENILY AUD10RI22 IGTR LEVEL (Wt):
3411 MAX DEPEND. CAPACITY (MWe-Net):
1120 DESIm FLEI'IRICAL RATDC 0$Mt):
1171*
*At stretch power icvel dich is not currently authorized tnier the Operating License.
3.
IGTR IREL 10 k1IIQI RESIRICITD (IF ANY) owe-Net):
100%
4.
RFASONS FDR RFSIRICTION (IF ANY):
71IIS KN111 YR 10 DATE ODUIATIVE
71IIS KN111 YR 10 DATE ODUIATIVE
: 5. NUMBIR OF IKURS RFACIOR WAS GITICAL . . . . . . . . . . . . . . .                       720         6562.6         15026.1
: 5. NUMBIR OF IKURS RFACIOR WAS GITICAL...............
: 6. REACIUR RESFRVE SUIDOLN 100RS . . . . . . . . . . . . . . . . . . . . .                 0             0               0
720 6562.6 15026.1 6.
: 7. Il0URS CIMRATIR 0N LINE . . . . . . . . . . . . . . . . . . . . . . . . . . . .       720         6380.5         14567.9
REACIUR RESFRVE SUIDOLN 100RS.....................
: 8. INIT RESERVE SIUIDOWN llDURS . . . . . . . . . . . . . . . . . . . . . . . .           0             0               0
0 0
: 9. GROSS 71[D01AL INEGY GFMRATED OHI) . . . . . . . . . . . . . . .                   2,000,621     20,075,549   46,093,102
0 7.
: 10. GCSS ELECIRICAL ENERGY CFXERATID OWI) . . . . . . . . . . . .                         661,367     6,740,799     15,554,742
Il0URS CIMRATIR 0N LINE............................
: 11. NET EIECIRICAL ENERGY GINEAIID OWI) . . . . . . . . . . . . . .                       624,717     6,397,382     14,766,169
720 6380.5 14567.9 8.
: 12. RFACIUR SERVIG FACIUR . . . . . . . . . . . . . . . . . . . . . . . . . . . . .         100%         81.9%         88.0%
INIT RESERVE SIUIDOWN llDURS........................
: 13. RFACIm AVAIIABILITY FACIOR . . . . . . . . . . . . . . . . . . . . . . . .             100%         81.9%         88.0%
0 0
: 14. LNIT SERVIG FACIm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .       100%         79.6%         85.3%
0 9.
: 15. INFr AVAII ABILITY FACIOR . . . . . . . . . . . . . . . . . . . . . . . . . . .         100%         79.6%         85.3%
GROSS 71[D01AL INEGY GFMRATED OHI)...............
: 16. [ NIT CAPACITY FACIUR (Using MDC) . . . . . . . . . . . . . . . . . . .                 77.5%         71.3%         77.2%
2,000,621 20,075,549 46,093,102
: 17. LNIT CAPACITY FACIm (l'aing Design We) . . . . . . . . . . . .                         74.1%         68.2%         73.8%
: 10. GCSS ELECIRICAL ENERGY CFXERATID OWI)............
: 18. INIT IDRCFD OUTNZ RATE . . . . . . . . . . . . . . . . . . . . . . . . . . . .           0.0%         3.8%           5.1%
661,367 6,740,799 15,554,742
: 11. NET EIECIRICAL ENERGY GINEAIID OWI)..............
624,717 6,397,382 14,766,169
: 12. RFACIUR SERVIG FACIUR.............................
100%
81.9%
88.0%
: 13. RFACIm AVAIIABILITY FACIOR........................
100%
81.9%
88.0%
: 14. LNIT SERVIG FACIm................................
100%
79.6%
85.3%
: 15. INFr AVAII ABILITY FACIOR...........................
100%
79.6%
85.3%
: 16. [ NIT CAPACITY FACIUR (Using MDC)...................
77.5%
71.3%
77.2%
: 17. LNIT CAPACITY FACIm (l'aing Design We)............
74.1%
68.2%
73.8%
: 18. INIT IDRCFD OUTNZ RATE............................
0.0%
3.8%
5.1%
: 19. SlUIT10WNS SQlFIELED OVER NEXT 6 }tNIllS (1YPE, IW1E, AND IX'RATIW OF FAQI):
: 19. SlUIT10WNS SQlFIELED OVER NEXT 6 }tNIllS (1YPE, IW1E, AND IX'RATIW OF FAQI):
Planned rnnintenance cutage nelchdal to twgin 4/3/87. Durntion - 30 days.
Planned rnnintenance cutage nelchdal to twgin 4/3/87. Durntion - 30 days.
: 20. IF SIUT IGN AT DO OF RFIMITIC PERim, ESTDATD DA1E OF STAR'ItT CA-#804 04/10/85
: 20. IF SIUT IGN AT DO OF RFIMITIC PERim, ESTDATD DA1E OF STAR'ItT CA-#804 04/10/85
                                                                                                                          @NEA4204 Page 3 of 4
@NEA4204 Page 3 of 4


9 Part E UNIT SHUTIXA'NS AND POWER REDUCIIONS DOCKET NO.     50-483 UNIT NAME       CALLAWAY UNIT 1 DATE     12/11/86 COMPLETED BY       S. R. EVANS TELEPHONE       314/676-8742 REPORT MONTH: NOVEMBER 1986 METHOD OF TYPE                               SIPJTTING IXAN T: FORCED       DURATION               THE REACTOR OR
9 Part E UNIT SHUTIXA'NS AND POWER REDUCIIONS DOCKET NO.
&        DATE     S: SCHEDULED     (HOURS)     REASON   REDUCINC POLTR                         CORRECTIVE ACTIONS / COMMENTS
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 REPORT MONTH: NOVEMBER 1986 METHOD OF TYPE SIPJTTING IXAN T: FORCED DURATION THE REACTOR OR DATE S: SCHEDULED (HOURS)
: 21.       11/29/86       S             0         H               4             Reduced power below P-9 (50%) to prevent an inadvertent turbine trip / reactor trip until turbine mechanical trip linkage was restored to nonnal.
REASON REDUCINC POLTR CORRECTIVE ACTIONS / COMMENTS 21.
11/29/86 S
0 H
4 Reduced power below P-9 (50%) to prevent an inadvertent turbine trip / reactor trip until turbine mechanical trip linkage was restored to nonnal.
SL'MMARY:
SL'MMARY:
FJASON                                         P'ETHOD A: EQUIPMENT FAILURE (EXPLAIN)                 1: NANUAL B: MAINT. OR TEST                               2: MANUAL SCRAM C: REITELING                                   3: AUTOMATIC SCRAM D: REC'JLATORY RESTRICTION                     4: OTHER (EXPLAIN)
FJASON P'ETHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: NANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REITELING 3: AUTOMATIC SCRAM D: REC'JLATORY RESTRICTION 4: OTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN)                                                                       CA-#804 H: OTHER (EXPLAIN)                                                                                   04/10/85 QDP-ZZ-04204 Page 4 of 4
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN)
CA-#804 H: OTHER (EXPLAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4


r-
r-Union Etscraic a
* Union Etscraic a
Odaway Pfant December 12, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1418
Odaway Pfant                                                       December 12, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1418


==Dear Sir:==
==Dear Sir:==
 
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1986 The enclosed Monthly Operating Report for November 1986 is subcitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1986                           .
G.L.Randolp/h Manager, Callaway Plant Y W
The enclosed Monthly Operating Report for November 1986 is subcitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
/drs MET /RDA/TPS/DBP Enclosure ccr Distribution attached 5
G.L.Randolp/h Manager, Callaway Plant
+
                $          YW MET /RDA/TPS/DBP           . /drs Enclosure ccr Distribution attached 5
                                                                                +
Mwkng AWress PO. Box 62G Tdton, MO 65251
Mwkng AWress PO. Box 62G Tdton, MO 65251


cc distribution for ULNRC-1418 v,ith enclosures Mr. W. F. Forney, Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nucicar Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102
cc distribution for ULNRC-1418 v,ith enclosures Mr. W. F. Forney, Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nucicar Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102
__ __    _          _ _    _ . _ _ . _ . _ , ._.}}
._.}}

Latest revision as of 21:14, 5 December 2024

Monthly Operating Rept for Nov 1986
ML20211Q335
Person / Time
Site: Callaway 
Issue date: 11/30/1986
From: Evans S, Randolph G
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1418, NUDOCS 8703030067
Download: ML20211Q335 (6)


Text

DOCKET NO.

50-483 UNIT NAME CALLAWAY LHIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEP110NE 314/676-8742 PART A OPERATIONS

SUMMARY

The plant operated at approximately 80% power for the period between 11/1/86 and 11/11/86 for fuel management considerations. Power was then increased to near 100% due to system demand until 11/17/86 when power was again reduced to approximately 80%. On 11/29/86 power was reduced below P-9 setpoint (50%) for 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> to prevent an inadvertent turbine / reactor trip. Weekly turbine surveillance testing had resulted in an indeterminate position for the turbine limit switch and mechanical trip linkage.

PART B PORY AND SAFETY VALVE SUlttARY On 11/30/86, PORY 455A opened for approximately two seconds as the result of an inadvertent isolation of the plant instrument air system. The loss of instrument air resulted in a temporary loss of the pressurizer spray valves and letdown leading to the momentary system pressure increase above the PORV setpoint. Normal pressure and instrument air conditions were restored within six minutes.

0703030g h',h03 ppit AD ppH Il CA #804 04/10/85 QDP ZZ 04204 Page 1 of 4

/\\

Part C AVERACE DAILY L' NIT POWER LEVEL DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 MONTH:

NOVEMBER 1986 AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (MWe-Net)

DAY (MWe-Net) 1 800 17 932 2

798 18 899 3

892 19 897 l

4 918 20 892 5

920 21 855 6

918 22 679 7

908 23 840 8

920 24 895 4

9 883 25 891 1

10 901 26 894 11 903 17 910 12 1013 28 913 13 1153 29 688 14 1160 30 976 15 1155 31 16 1152 CA 8804 04/10/85 QDP-ZZ 04204 Page 2 of 4

Part D GPBATDC DATA REFORT D00'ET ND.

50-483 INIT ?WiE CAllAWAY UNIT 1 DATE 12/11/86 QEPIRIE BY S. R. EVANS TELEPI E E 314/676-6742 CPEPATDC STAIUS (YID CtN )

1.

REPmTDU PERI @: Novmber 1986 GROSS HOURS IN REPORTDC PERIW:

720 (8016 17078.5) 2.

CURRENILY AUD10RI22 IGTR LEVEL (Wt):

3411 MAX DEPEND. CAPACITY (MWe-Net):

1120 DESIm FLEI'IRICAL RATDC 0$Mt):

1171*

  • At stretch power icvel dich is not currently authorized tnier the Operating License.

3.

IGTR IREL 10 k1IIQI RESIRICITD (IF ANY) owe-Net):

100%

4.

RFASONS FDR RFSIRICTION (IF ANY):

71IIS KN111 YR 10 DATE ODUIATIVE

5. NUMBIR OF IKURS RFACIOR WAS GITICAL...............

720 6562.6 15026.1 6.

REACIUR RESFRVE SUIDOLN 100RS.....................

0 0

0 7.

Il0URS CIMRATIR 0N LINE............................

720 6380.5 14567.9 8.

INIT RESERVE SIUIDOWN llDURS........................

0 0

0 9.

GROSS 71[D01AL INEGY GFMRATED OHI)...............

2,000,621 20,075,549 46,093,102

10. GCSS ELECIRICAL ENERGY CFXERATID OWI)............

661,367 6,740,799 15,554,742

11. NET EIECIRICAL ENERGY GINEAIID OWI)..............

624,717 6,397,382 14,766,169

12. RFACIUR SERVIG FACIUR.............................

100%

81.9%

88.0%

13. RFACIm AVAIIABILITY FACIOR........................

100%

81.9%

88.0%

14. LNIT SERVIG FACIm................................

100%

79.6%

85.3%

15. INFr AVAII ABILITY FACIOR...........................

100%

79.6%

85.3%

16. [ NIT CAPACITY FACIUR (Using MDC)...................

77.5%

71.3%

77.2%

17. LNIT CAPACITY FACIm (l'aing Design We)............

74.1%

68.2%

73.8%

18. INIT IDRCFD OUTNZ RATE............................

0.0%

3.8%

5.1%

19. SlUIT10WNS SQlFIELED OVER NEXT 6 }tNIllS (1YPE, IW1E, AND IX'RATIW OF FAQI):

Planned rnnintenance cutage nelchdal to twgin 4/3/87. Durntion - 30 days.

20. IF SIUT IGN AT DO OF RFIMITIC PERim, ESTDATD DA1E OF STAR'ItT CA-#804 04/10/85

@NEA4204 Page 3 of 4

9 Part E UNIT SHUTIXA'NS AND POWER REDUCIIONS DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 REPORT MONTH: NOVEMBER 1986 METHOD OF TYPE SIPJTTING IXAN T: FORCED DURATION THE REACTOR OR DATE S: SCHEDULED (HOURS)

REASON REDUCINC POLTR CORRECTIVE ACTIONS / COMMENTS 21.

11/29/86 S

0 H

4 Reduced power below P-9 (50%) to prevent an inadvertent turbine trip / reactor trip until turbine mechanical trip linkage was restored to nonnal.

SL'MMARY:

FJASON P'ETHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: NANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REITELING 3: AUTOMATIC SCRAM D: REC'JLATORY RESTRICTION 4: OTHER (EXPLAIN)

E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN)

CA-#804 H: OTHER (EXPLAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4

r-Union Etscraic a

Odaway Pfant December 12, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1418

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1986 The enclosed Monthly Operating Report for November 1986 is subcitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

G.L.Randolp/h Manager, Callaway Plant Y W

/drs MET /RDA/TPS/DBP Enclosure ccr Distribution attached 5

+

Mwkng AWress PO. Box 62G Tdton, MO 65251

cc distribution for ULNRC-1418 v,ith enclosures Mr. W. F. Forney, Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nucicar Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102