DOCKET NO.
50-483 UNIT NAME CALLAWAY LHIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEP110NE 314/676-8742 PART A OPERATIONS
SUMMARY
The plant operated at approximately 80% power for the period between 11/1/86 and 11/11/86 for fuel management considerations. Power was then increased to near 100% due to system demand until 11/17/86 when power was again reduced to approximately 80%. On 11/29/86 power was reduced below P-9 setpoint (50%) for 21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br /> to prevent an inadvertent turbine / reactor trip. Weekly turbine surveillance testing had resulted in an indeterminate position for the turbine limit switch and mechanical trip linkage.
PART B PORY AND SAFETY VALVE SUlttARY On 11/30/86, PORY 455A opened for approximately two seconds as the result of an inadvertent isolation of the plant instrument air system. The loss of instrument air resulted in a temporary loss of the pressurizer spray valves and letdown leading to the momentary system pressure increase above the PORV setpoint. Normal pressure and instrument air conditions were restored within six minutes.
0703030g h',h03 ppit AD ppH Il CA #804 04/10/85 QDP ZZ 04204 Page 1 of 4
/\\
Part C AVERACE DAILY L' NIT POWER LEVEL DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 MONTH:
NOVEMBER 1986 AVERACE DAILY POWER LEVEL AVERACE DAILY POWER LEVEL DAY (MWe-Net)
DAY (MWe-Net) 1 800 17 932 2
798 18 899 3
892 19 897 l
4 918 20 892 5
920 21 855 6
918 22 679 7
908 23 840 8
920 24 895 4
9 883 25 891 1
10 901 26 894 11 903 17 910 12 1013 28 913 13 1153 29 688 14 1160 30 976 15 1155 31 16 1152 CA 8804 04/10/85 QDP-ZZ 04204 Page 2 of 4
Part D GPBATDC DATA REFORT D00'ET ND.
50-483 INIT ?WiE CAllAWAY UNIT 1 DATE 12/11/86 QEPIRIE BY S. R. EVANS TELEPI E E 314/676-6742 CPEPATDC STAIUS (YID CtN )
1.
REPmTDU PERI @: Novmber 1986 GROSS HOURS IN REPORTDC PERIW:
720 (8016 17078.5) 2.
CURRENILY AUD10RI22 IGTR LEVEL (Wt):
3411 MAX DEPEND. CAPACITY (MWe-Net):
1120 DESIm FLEI'IRICAL RATDC 0$Mt):
1171*
- At stretch power icvel dich is not currently authorized tnier the Operating License.
3.
IGTR IREL 10 k1IIQI RESIRICITD (IF ANY) owe-Net):
100%
4.
RFASONS FDR RFSIRICTION (IF ANY):
71IIS KN111 YR 10 DATE ODUIATIVE
- 5. NUMBIR OF IKURS RFACIOR WAS GITICAL...............
720 6562.6 15026.1 6.
REACIUR RESFRVE SUIDOLN 100RS.....................
0 0
0 7.
Il0URS CIMRATIR 0N LINE............................
720 6380.5 14567.9 8.
INIT RESERVE SIUIDOWN llDURS........................
0 0
0 9.
GROSS 71[D01AL INEGY GFMRATED OHI)...............
2,000,621 20,075,549 46,093,102
- 10. GCSS ELECIRICAL ENERGY CFXERATID OWI)............
661,367 6,740,799 15,554,742
- 11. NET EIECIRICAL ENERGY GINEAIID OWI)..............
624,717 6,397,382 14,766,169
- 12. RFACIUR SERVIG FACIUR.............................
100%
81.9%
88.0%
- 13. RFACIm AVAIIABILITY FACIOR........................
100%
81.9%
88.0%
- 14. LNIT SERVIG FACIm................................
100%
79.6%
85.3%
- 15. INFr AVAII ABILITY FACIOR...........................
100%
79.6%
85.3%
77.5%
71.3%
77.2%
- 17. LNIT CAPACITY FACIm (l'aing Design We)............
74.1%
68.2%
73.8%
- 18. INIT IDRCFD OUTNZ RATE............................
0.0%
3.8%
5.1%
- 19. SlUIT10WNS SQlFIELED OVER NEXT 6 }tNIllS (1YPE, IW1E, AND IX'RATIW OF FAQI):
Planned rnnintenance cutage nelchdal to twgin 4/3/87. Durntion - 30 days.
- 20. IF SIUT IGN AT DO OF RFIMITIC PERim, ESTDATD DA1E OF STAR'ItT CA-#804 04/10/85
@NEA4204 Page 3 of 4
9 Part E UNIT SHUTIXA'NS AND POWER REDUCIIONS DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 12/11/86 COMPLETED BY S. R. EVANS TELEPHONE 314/676-8742 REPORT MONTH: NOVEMBER 1986 METHOD OF TYPE SIPJTTING IXAN T: FORCED DURATION THE REACTOR OR DATE S: SCHEDULED (HOURS)
REASON REDUCINC POLTR CORRECTIVE ACTIONS / COMMENTS 21.
11/29/86 S
0 H
4 Reduced power below P-9 (50%) to prevent an inadvertent turbine trip / reactor trip until turbine mechanical trip linkage was restored to nonnal.
SL'MMARY:
FJASON P'ETHOD A: EQUIPMENT FAILURE (EXPLAIN) 1: NANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REITELING 3: AUTOMATIC SCRAM D: REC'JLATORY RESTRICTION 4: OTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE C: OPERATIONAL ERROR (EXPLAIN)
CA-#804 H: OTHER (EXPLAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4
r-Union Etscraic a
Odaway Pfant December 12, 1986 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1418
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT NOVEMBER 1986 The enclosed Monthly Operating Report for November 1986 is subcitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
G.L.Randolp/h Manager, Callaway Plant Y W
/drs MET /RDA/TPS/DBP Enclosure ccr Distribution attached 5
+
Mwkng AWress PO. Box 62G Tdton, MO 65251
cc distribution for ULNRC-1418 v,ith enclosures Mr. W. F. Forney, Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 Director Office of Inspection & Enforcement U. S. Nucicar Regulatory Commission Washington, DC 20555 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102