{{#Wiki_filter:_ .  -                  -    ..                _        _.      . ..        __          ..    . _ _ _ _ .          _
{{#Wiki_filter:_
OPERATING DATA REPORT DutMET NO. 50-341                             COMPLETED BY L.P.Bregni                                     ;
OPERATING DATA REPORT DutMET NO. 50-341 COMPLETED BY L.P.Bregni DATE December 12, 1986 TELEPHONE (313)586-5313 OPEHATING STATUS 1.
DATE         December 12, 1986               TELEPHONE             (313)586-5313             _
UNIT NAME:
OPEHATING STATUS                                                                         ,_ _
Fermi 2 l Notes l
: 1. UNIT NAME:     Fermi 2                             l Notes                                   l
2.
: 2. REPORTING PERIOD: November-                       l                                         l 3     LICENSED THERMAL POWER ( pt):     3292           l                                         l
REPORTING PERIOD: November-l l
: 4. NAMEPLATE RATING (GROSS MWe):     1215           l                                         l
3 LICENSED THERMAL POWER ( pt):
,                5. DESIGN ELECT RATING (Net We): 1093                 1                                         l 4                                                             #
3292 l
                - 6. . MAX DEPENDABLE CAP (GROSS We):                     l                                         l 7     MAX DEPENDABLE CAP (Net MWE):         #            l                                         l     l
l 4.
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE                               !
NAMEPLATE RATING (GROSS MWe):
LAST REPORT, GIVE REASONS:       None
1215 l
: 9. POWER LEVEL 10 NHICH RESTRICTED, IF ANY (MWe Net):                   218.6
l 5.
: 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power.   (Ref. J. G. Keppler letter of September- 12, 1986)
DESIGN ELECT RATING (Net We): 1093 1
THIS MONTH         YR TO DATE         CUMULATIVE
l 4
: 11. HRS IN REPORTING PERIOD                       720             1,689.9             1,689 9
- 6.. MAX DEPENDABLE CAP (GROSS We):
: 12. HRS REACTOR WAS CRITICAL                       159.1               560.9                 560 9
l l
: 13. REACTOR RESERVE SHUTDOWN HRS                     0                   0                       0
7 MAX DEPENDABLE CAP (Net MWE):
: 14. HOURS GENERATOR ON-LINE                         26.0               95.8                     95.8
l l
: 15. UNIT RESERVE SHUTDOWN HOURS                       0                   0                       0
l 8.
: 16. GROSS THERMAL ENERGY GEN (MWH)             36,096           167,568           167,568-
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
: 17. GROSS ELECT ENERGY GEN (WH)                 2,020               7,640             7,640
None 9.
: 18. NET ELECT ENERGY GEN (MWH)                 -6,723           -20,907-         -20,907
POWER LEVEL 10 NHICH RESTRICTED, IF ANY (MWe Net):
: 19. UNIT SERVICE FACTOR                         N/A                 N/A               N/A                 ,
218.6
: 20. UNIT AVAILABILITY FACTOR                     N/A                 N/A               N/A
: 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power.
: 21. UNIT CAP FACTOR (USING MDC NET)             N/A                 N/A               N/A l               22. 'JNIT CAP FACTOR (USING DER NET)             N/A                 N/A               N/A i               23. UNIT FORCED OUTAGE RATE                     N/A                 N/A               N/A
(Ref. J. G. Keppler letter of September-12, 1986)
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH): NONE                             s
THIS MONTH YR TO DATE CUMULATIVE
: 11. HRS IN REPORTING PERIOD 720 1,689.9 1,689 9
: 12. HRS REACTOR WAS CRITICAL 159.1 560.9 560 9
: 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
: 14. HOURS GENERATOR ON-LINE 26.0 95.8 95.8
: 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
: 16. GROSS THERMAL ENERGY GEN (MWH) 36,096 167,568 167,568-
: 17. GROSS ELECT ENERGY GEN (WH) 2,020 7,640 7,640
: 18. NET ELECT ENERGY GEN (MWH)
-6,723
-20,907-
-20,907
: 19. UNIT SERVICE FACTOR N/A N/A N/A
: 20. UNIT AVAILABILITY FACTOR N/A N/A N/A
: 21. UNIT CAP FACTOR (USING MDC NET)
N/A N/A N/A l
: 22. 'JNIT CAP FACTOR (USING DER NET)
N/A N/A N/A i
: 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
: 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH): NONE s
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/16/86
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/16/86
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST               ACHIEVED                           ,
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 i
INITIAL CRITICALITY                       06/20/85               06/21/85 i                     INITIAL ELECTRICITY                       10/01/86               09/21/86 l                     COMMERCIAL OPERATION                       05/01/87
INITIAL ELECTRICITY 10/01/86 09/21/86 l
                          ~
COMMERCIAL OPERATION 05/01/87
                                        ~
'8703040025 B61212
          '8703040025 B61212                                                                                                '
~
PDR ADOCK 05000341
~
                                                                                                                      '{(   l
PDR ADOCK 05000341
'{(


  ~
~
AVERAGE DAILY UNIT POWER LEVEL a
AVERAGE DAILY UNIT POWER LEVEL a
DOCKET NO.               50-341 ___
DOCKET NO.
UNIT                     FERMI 2                   _ _ _ _
50-341 ___
DATE                     December 12,_1986
UNIT FERMI 2 DATE December 12,_1986
                                                  . COMPLETED BY             L. P. Bregni TELEPHONE                 (313) 586-5313 MONTH     November DAY AVERAGE DAILY POWER LEVEL           DAY AVERAGE DAILY POWER LEVEL (MWe-Net)                                   (MWe-Net) 1           75.1                       17                     3 2'           75                         18                     0 3                 0                     19                     0 4-               0                     20                     0 S                 0                     21                       0 6                 0                     22                       0 7               0                     23                       0 8               0                     24                       0-l i
. COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
9               0-                     25 -                     0 l         10               0                     26                       0 l         11               0                     27                       0 l
(MWe-Net) 1 75.1 17 3
l          12             0                       28                       0
2' 75 18 0
          .13             0                       29                       0 l
3 0
14             0                       30                       0 15             0                       31                     N/A 16             0 l
19 0
4-0 20 0
S 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0-l i
9 0-25 -
0 l
10 0
26 0
l 11 0
27 0
l l
12 0
28 0
l
.13 0
29 0
14 0
30 0
15 0
31 N/A 16 0
l


UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO. 50-341                                                                       DATE           . December 12     1996 UNIT'NAME     Fermi 2-                                                                     COMPLETED BY'   L. P. Broon t -
UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.
TELEPHONE       (313)586-5313 REPORT MONTH November I-METHOD OF         LER     SYS     COMP                 CAUSE & CORRECTIVE           !
50-341 DATE
NO.     DATE     TYPE       DUR REASON     SHUTTING DOWN   NO.     CODE   CODE                   ACTION TO PREVENT (1)       (HRS)   (2)     THE REACTOR               (4)     (5)                       RECURRLNCE               !
. December 12 1996 UNIT'NAME Fermi 2-COMPLETED BY' L.
(3) 86-06     861107     F       560.9   A             2       N/A       HC     HTEXCHD   Shutdown to repair the cause of excessive air.in-leakage into the condenser. Outage scope has been expanded to include installation of I new relief valves to prevent future overpressurization of the condensate return line. On November 17, 1986 overpressurization of thi s -. l i ne caused an expansion joint to rupture and damaged a penetration in the         ]
P.
Condensate Storage Tank,                 l d
Broon t -
I (1) F: FORCED     (2) REASON:                                         (3) METHOD:               (4) EXHIBIT G - INSTRUCTIOh5 S: SCHEDULED       A - EQUIPMENT FAILURE (EXPLAIN)                     1 - MANUAL                 FOR PREPARATION OF DATA B - MAINTENANCE OR TEST                             2 - MANUAL SCRAM           ENTRY SHEETS FOk LICENSEE C - REFUELING                                       3 - AUTOMATIC SCRAM       EVENT REPORT (LER) FILL D - REGULATORY RESTRICTION                         4 - CONTINUED             (NUREG-0161)'
TELEPHONE (313)586-5313 REPORT MONTH November I-METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.
E - OPERATOR TRAINING & LICENSE EXAMINATION         5 - REDUCED LOAD F - ADMINISTRATIVE                                 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
DATE TYPE DUR REASON SHUTTING DOWN NO.
H - OTHER (EXPLAIN)                                                       (5) EXHIBIT I - SAME SOURCE O}}
CODE CODE ACTION TO PREVENT (1)
(HRS)
(2)
THE REACTOR (4)
(5)
RECURRLNCE (3) 86-06 861107 F
560.9 A
2 N/A HC HTEXCHD Shutdown to repair the cause of excessive air.in-leakage into the condenser. Outage scope has been expanded to include installation of I new relief valves to prevent future overpressurization of the condensate return line.
On November 17, 1986 overpressurization of thi s -. l i ne caused an expansion joint to rupture and damaged a penetration in the
]
Condensate Storage Tank, l
d I
(1) F: FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIOh5 S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOk LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILL D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)'
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
(5) EXHIBIT I - SAME SOURCE O}}

Latest revision as of 06:42, 4 December 2024

Monthly Operating Rept for Nov 1986
ML20212C914
Person / Time
Site: Fermi 
Issue date: 11/30/1986
From: Bregni L
DETROIT EDISON CO.
To:
Shared Package
ML20211Q132 List:
References
NUDOCS 8703040025
Download: ML20212C914 (3)


Text

_

OPERATING DATA REPORT DutMET NO. 50-341 COMPLETED BY L.P.Bregni DATE December 12, 1986 TELEPHONE (313)586-5313 OPEHATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes l

2.

REPORTING PERIOD: November-l l

3 LICENSED THERMAL POWER ( pt):

3292 l

l 4.

NAMEPLATE RATING (GROSS MWe):

1215 l

l 5.

DESIGN ELECT RATING (Net We): 1093 1

l 4

- 6.. MAX DEPENDABLE CAP (GROSS We):

l l

7 MAX DEPENDABLE CAP (Net MWE):

l l

l 8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

None 9.

POWER LEVEL 10 NHICH RESTRICTED, IF ANY (MWe Net):

218.6

10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power.

(Ref. J. G. Keppler letter of September-12, 1986)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 720 1,689.9 1,689 9
12. HRS REACTOR WAS CRITICAL 159.1 560.9 560 9
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 26.0 95.8 95.8
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 36,096 167,568 167,568-
17. GROSS ELECT ENERGY GEN (WH) 2,020 7,640 7,640
18. NET ELECT ENERGY GEN (MWH)

-6,723

-20,907-

-20,907

19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET)

N/A N/A N/A l

22. 'JNIT CAP FACTOR (USING DER NET)

N/A N/A N/A i

23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH): NONE s
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/16/86
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 i

INITIAL ELECTRICITY 10/01/86 09/21/86 l

COMMERCIAL OPERATION 05/01/87

'8703040025 B61212

~

~

PDR ADOCK 05000341

'{(

~

AVERAGE DAILY UNIT POWER LEVEL a

DOCKET NO.

50-341 ___

UNIT FERMI 2 DATE December 12,_1986

. COMPLETED BY L. P. Bregni TELEPHONE (313) 586-5313 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 75.1 17 3

2' 75 18 0

3 0

19 0

4-0 20 0

S 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0-l i

9 0-25 -

0 l

10 0

26 0

l 11 0

27 0

l l

12 0

28 0

l

.13 0

29 0

14 0

30 0

15 0

31 N/A 16 0

l

UNIT SHUTDOWNS AND POWER REDUCTIONS' DOCKET NO.

50-341 DATE

. December 12 1996 UNIT'NAME Fermi 2-COMPLETED BY' L.

P.

Broon t -

TELEPHONE (313)586-5313 REPORT MONTH November I-METHOD OF LER SYS COMP CAUSE & CORRECTIVE NO.

DATE TYPE DUR REASON SHUTTING DOWN NO.

CODE CODE ACTION TO PREVENT (1)

(HRS)

(2)

THE REACTOR (4)

(5)

RECURRLNCE (3) 86-06 861107 F

560.9 A

2 N/A HC HTEXCHD Shutdown to repair the cause of excessive air.in-leakage into the condenser. Outage scope has been expanded to include installation of I new relief valves to prevent future overpressurization of the condensate return line.

On November 17, 1986 overpressurization of thi s -. l i ne caused an expansion joint to rupture and damaged a penetration in the

]

Condensate Storage Tank, l

d I

(1) F: FORCED (2) REASON:

(3) METHOD:

(4) EXHIBIT G - INSTRUCTIOh5 S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOk LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILL D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)'

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)