Text
e OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY L,. P.Bregn i DATE December 12, 1986 TELEPHONE Q13)586-5313 OPERATING STATUS' 1.
UNIT NAME:
Fermi 2
_ l Notes l
- 2. ' REPORTING PERIOD: October, 1986 l
l 3
LICENSED THERMAL POWER (MWL): 3292 l
l 4.
NAMEPLATE RATING (GROSS MWe):
1215 l
l 5
DESIGN ELECT RATING (Net MWe): 1093 l
l 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
None 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
218.6
- 10. REASONS FOR RESTRICTION, IF fiNY: Fermi 2 is in the startup test phase and is currently authorized to operate not in excess of 20% of rated thermal power. (Ref. J. G. Keppler letter of September 12, 1986)
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 969.9 969.9
- 12. HRS REACTOR WAS CRITICAL 354.6 401.8 401.8
- 13. REACTOR RESERVE SHUTDOWN HHS 0
0 0
- 14. HOURS GENERATOR ON-LINE 61.25 69.75 69.75
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 121,536 131,472 131,472 d
- 17. GROSS ELECT ENERGY GEN (MWH) 4880 5620 5620
- 18. NET ELECT ENERGY GEN (MWH)
-8500
-14,184
-14,184 d'
- 19. UNIT SERVICE FACTOR N/A N/A N/A
- 20. UNIT AVAILABILITY FACTOR N/A N/A N/A
N/A N/A N/A
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MON (TYPE, DATE, DURATION OF EACH) NONE
- 25. IF SHUT DOWN AT END OF REPORT FERIOD, ESTIMATED DATE OF STARTUP N/A
- 26. UNITS IN TESf STATUS (PRI0tt TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY 06/20/85 06/21/85 INITIAL ELECTRICITY 10/01/86 09/21/86 COMMERCIAL OPERATION 05/01/87
- _ _..