ML20214T547: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:-
{{#Wiki_filter:0FReiq t
                                                                            0FReiq t
-
                                June 2 1987
June 2 1987
    Docket Nos. 50-348, 50-364
Docket Nos. 50-348, 50-364
    License Nos. NPF-2 and NPF-8
License Nos. NPF-2 and NPF-8
    Alabama Power Company
Alabama Power Company
    ATTN:   Mr. R. P. Mcdonald
ATTN:
            Senior Vice President
Mr. R. P. Mcdonald
    P. O. Box 2641
Senior Vice President
    Birmingham, AL 35291-0400
P. O. Box 2641
    Gentlemen:
Birmingham, AL 35291-0400
    SUBJECT:   NRC INSPECTION REPORT NOS. 50-348/87-12 AND 50-364/87-12
Gentlemen:
    This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
SUBJECT:
    A. R. Long on May 19-21, 1987. The inspection included a review of activities
NRC INSPECTION REPORT NOS. 50-348/87-12 AND 50-364/87-12
    authorized for your Farley facility. At the conclusion of the inspection, the
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
    findings were discussed with those members of your staff identified in the
A. R. Long on May 19-21, 1987. The inspection included a review of activities
    enclosed inspection report.
authorized for your Farley facility. At the conclusion of the inspection, the
    Areas examined during the inspection are identified in the report. Within
findings were discussed with those members of your staff identified in the
    these areas, the inspection consisted of selective examinations of procedures
enclosed inspection report.
    and representative records, interviews with personnel, and observation of
Areas examined during the inspection are identified in the report. Within
    activities in progress.
these areas, the inspection consisted of selective examinations of procedures
    Within the scope of the inspection, no violations or deviations were
and representative records, interviews with personnel, and observation of
    identified.
activities in progress.
    In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Within the scope of the inspection, no violations or deviations were
    Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
identified.
    will be placed in the NRC Public Document Room.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
    Should you have any questions concerning this letter, please contact us.
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
                                            Sincerely,
will be placed in the NRC Public Document Room.
                                              (0RIGINAL SIGNED BY C. A. JULIAN)
Should you have any questions concerning this letter, please contact us.
                                            Caudie A. Julian, Chief
Sincerely,
                                            Operations Branch
(0RIGINAL SIGNED BY C. A. JULIAN)
                                            Division of Reactor Safety
Caudie A. Julian, Chief
    Enclosure:
Operations Branch
    NRC Inspection Report
Division of Reactor Safety
    cc w/ encl:   (See page 2)
Enclosure:
            0706100314 070602 8
NRC Inspection Report
            PDH   ADOCK 0500
cc w/ encl:
            0
(See page 2)
                                                                              I
0706100314 070602
(                                                                            /l IEc/
PDH
ADOCK 0500
8
0
I/l IEc/
(


.    W
W
  ..
.
      <'
<'
          Alabama Power Company                 2       June 2, 1987
..
          cc w/ encl:
Alabama Power Company
          W. O. Whitt, Executive Vice President
2
          J. D. Woodard, General Manager -
June 2, 1987
            Nuclear Plant
cc w/ encl:
          W. G. Hairston, III, General Manager -
W. O. Whitt, Executive Vice President
            Nuclear Support
J. D. Woodard, General Manager -
          J. W. McGowan, Manager-Safety Audit
Nuclear Plant
            and Engineering Review
W. G. Hairston, III, General Manager -
          J. K. Osterholtz, Supervisor-Safety
Nuclear Support
            Audit and Engineering Review
J. W. McGowan, Manager-Safety Audit
          bec w/ encl:
and Engineering Review
          D. Verrelli
J. K. Osterholtz, Supervisor-Safety
          E. Reeves, Project Manager, NRR
Audit and Engineering Review
          NRC Resident Inspector
bec w/ encl:
          Document Control Desk
D. Verrelli
          State of Alabama
E. Reeves, Project Manager, NRR
                                                                      >
NRC Resident Inspector
                                                                      1
Document Control Desk
          RII                       RII \        RII
State of Alabama
            c t y:d
>
          ARCtni                    MBSg y
1
                                        yq l k
RII \\ y
                                                    so
RII
                                                  HDance
RII
          05/$8:/                   05/ /         05/q/87
ARCtni y:d
so
MBSg l
c
yq
k
HDance
t
05/$8:/
05/ /
05/q/87
}}
}}

Latest revision as of 00:25, 4 December 2024

Forwards Insp Repts 50-348/87-12 & 50-364/87-12 on 870519-21.No Violations or Deviations Noted
ML20214T547
Person / Time
Site: Farley  
Issue date: 06/02/1987
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20214T550 List:
References
NUDOCS 8706100314
Download: ML20214T547 (2)


See also: IR 05000348/1987012

Text

0FReiq t

-

June 2 1987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN:

Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT:

NRC INSPECTION REPORT NOS. 50-348/87-12 AND 50-364/87-12

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. R. Long on May 19-21, 1987. The inspection included a review of activities

authorized for your Farley facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(0RIGINAL SIGNED BY C. A. JULIAN)

Caudie A. Julian, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ encl:

(See page 2)

0706100314 070602

PDH

ADOCK 0500

8

0

I/l IEc/

(

W

.

<'

..

Alabama Power Company

2

June 2, 1987

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

D. Verrelli

E. Reeves, Project Manager, NRR

NRC Resident Inspector

Document Control Desk

State of Alabama

>

1

RII \\ y

RII

RII

ARCtni y:d

so

MBSg l

c

yq

k

HDance

t

05/$8:/

05/ /

05/q/87