ML20214T547

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-348/87-12 & 50-364/87-12 on 870519-21.No Violations or Deviations Noted
ML20214T547
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/02/1987
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20214T550 List:
References
NUDOCS 8706100314
Download: ML20214T547 (2)


See also: IR 05000348/1987012

Text

-

0FReiq t

June 2 1987

Docket Nos. 50-348, 50-364

License Nos. NPF-2 and NPF-8

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Senior Vice President

P. O. Box 2641

Birmingham, AL 35291-0400

Gentlemen:

SUBJECT: NRC INSPECTION REPORT NOS. 50-348/87-12 AND 50-364/87-12

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. R. Long on May 19-21, 1987. The inspection included a review of activities

authorized for your Farley facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed inspection report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observation of

activities in progress.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

(0RIGINAL SIGNED BY C. A. JULIAN)

Caudie A. Julian, Chief

Operations Branch

Division of Reactor Safety

Enclosure:

NRC Inspection Report

cc w/ encl: (See page 2)

0706100314 070602 8

PDH ADOCK 0500

0

I

( /l IEc/

. W

..

<'

Alabama Power Company 2 June 2, 1987

cc w/ encl:

W. O. Whitt, Executive Vice President

J. D. Woodard, General Manager -

Nuclear Plant

W. G. Hairston, III, General Manager -

Nuclear Support

J. W. McGowan, Manager-Safety Audit

and Engineering Review

J. K. Osterholtz, Supervisor-Safety

Audit and Engineering Review

bec w/ encl:

D. Verrelli

E. Reeves, Project Manager, NRR

NRC Resident Inspector

Document Control Desk

State of Alabama

>

1

RII RII \ RII

c t y:d

ARCtni MBSg y

yq l k

so

HDance

05/$8:/ 05/ / 05/q/87