{{#Wiki_filter:s JUN   9 1987
{{#Wiki_filter:s JUN 9 1987
                    ! Docket No,'50-263J
! Docket No,'50-263J
                                        ~
~
i
i
                  ' Northern' States-Power Company.
' Northern' States-Power Company.
                  ' ATTN: -Mr. C. E. Larson
' ATTN: -Mr. C. E. Larson
                              ~Vice President, Nuclear Generation International Centre Building
~Vice President, Nuclear Generation International Centre Building
                  >920 Second Avenue South Minneapolis, MN 55401-
>920 Second Avenue South Minneapolis, MN 55401-
 
==Dear Mr. . Larson:==


==Dear Mr.. Larson:==
J
J


Line 33: Line 32:
In a telephone conversation between Mr. Eugene Earney, Superintendent, Training
In a telephone conversation between Mr. Eugene Earney, Superintendent, Training
:at'Monticello, and Mr. T. Burdick, Region III, arrangements were made'for an
:at'Monticello, and Mr. T. Burdick, Region III, arrangements were made'for an
                  . evaluation.of the requalification program at the Monticello Nuclear Plant. The evaluation visit?is scheduled for the weeks of August 31, September 7 and 14, 1987..
. evaluation.of the requalification program at the Monticello Nuclear Plant. The evaluation visit?is scheduled for the weeks of August 31, September 7 and 14, 1987..
                  . For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator' examinations. ;When the NRC' examiner arrives at the site,-he will meet with the" appropriate' facility. personnel to Lreview the- schedule for those examinations-.~ For the examiner to adequately prepare for this visit, it will be-
. For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator' examinations. ;When the NRC' examiner arrives at the site,-he will meet with the" appropriate' facility. personnel to Lreview the-schedule for those examinations-.~
                                                                                                ~
For the examiner to adequately prepare for this visit, it will be-
:-necessary.for.the: facility to furnish the approved reference material-listed in Enclosure 1, " Reference Material Requirements for Requalification Program-
~
: q.              Evaluations,".at least 60 days' prior to the examination'date. .Mr. Earney has been
:-necessary.for.the: facility to furnish the approved reference material-listed in
                  . advised of our reference material re'quirements and where they.a're to be-sent.
>, " Reference Material Requirements for Requalification Program-Evaluations,".at least 60 days' prior to the examination'date..Mr. Earney has been q.
                  "This: request for information was approved by the Office of Management and Budget 1 under: Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden
. advised of our reference material re'quirements and where they.a're to be-sent.
((                   and-duplication may be directed to the Office of Management and Budget, Reports-Management' Room 3208,'New Executive Office Building, Washington,-D. C. 20503.
"This: request for information was approved by the Office of Management and Budget 1 under: Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden
Thank you for your consideration in this matter.       If you have any questions.
((
and-duplication may be directed to the Office of Management and Budget, Reports-Management' Room 3208,'New Executive Office Building, Washington,-D. C. 20503.
Thank you for your consideration in this matter.
If you have any questions.
on:the. evaluation process, please contact Mr. T. Burdick at (312) 790-5566..
on:the. evaluation process, please contact Mr. T. Burdick at (312) 790-5566..
Sincerely,
Sincerely, Origind Signed By C. W. Hehl 3 8706170237 870euv i
                                              ,                      Origind Signed By C. W. Hehl 3 8706170237 870euv                                     Charles W. Hehl, Chief i
PDR ADOCK 05000263 Charles W. Hehl, Chief i
PDR      ADOCK 05000263                                                                        i V'
V' P.
P.                   PDR       k                 Operations Branch                           i
PDR k
Operations Branch i


==Enclosure:==
==Enclosure:==
  -As stated See Attached Distribution
  -As stated See Attached Distribution
                  .RI                     RI Buiadick/ jaw         He 1 fhk                     b
.RI RI Buiadick/ jaw He 1 fhk b
                                                                                                    > 1 16 9 i
i 1 16 9


a.
a.
t                                   ,
t v..;
v..;             - c. ,
- c.,
                    ,          ' , -l c
', -l c
30U '9I907I
' Northern-States Power, Company.
-2 1
I i
'Distrib'ution j
1
1
                              ' Northern-States Power, Company.        -2 30U '9I907I I
?cc:w/enclosurei
                                    ..                                                    i
.W.'A. Shamla,.P.lant Manager
                              'Distrib'ution 1
j
                              ?cc:w/enclosurei
                              .W.'A. Shamla,.P.lant Manager
:DCS/RSB(RIDS)
:DCS/RSB(RIDS)
J Licensing Fee Management Branch
J Licensing Fee Management Branch
                              . Resident? Inspector, RIII'Monticello
. Resident? Inspector, RIII'Monticello
                                . Resident Inspector, RIII-Prairie
. Resident Inspector, RIII-Prairie
                                . Island John W.~     Ferman, Ph.D.,
. Island John W.~ Ferman, Ph.D.,
Nuclear Engineer, MPCAL
Nuclear Engineer, MPCAL
                              'E. Earney, Training' Supervisor n'                               cc w/o. enclosure:-
'E. Earney, Training' Supervisor n'
cc w/o. enclosure:-
D. Scaletti, Project Manager, NRR J. N. Hannon, Branch Chief,.0LB I.. N. -Jackiw,' Section Chief, DRP -
D. Scaletti, Project Manager, NRR J. N. Hannon, Branch Chief,.0LB I.. N. -Jackiw,' Section Chief, DRP -
i k
i k
Line 76: Line 81:
d
d


4 g
g 4
j 1
j 1
1 J
J ENCLOSURE 1 i
ENCLOSURE 1                                 i Reference Material Requirements for Requalification Program Evaluation     i h
Reference Material Requirements for Requalification Program Evaluation i
: 1. All administrative procedures (as applicable to reactor operation or safety)
h 1.
I
All administrative procedures (as applicable to reactor operation or safety)
: 2. All integrated plant procedures (n'ormal or general operating procedures) {
I 2.
All integrated plant procedures (n'ormal or general operating procedures)
{
J
J
: 3. . Emergency procedures (emergency instructions, abnormal, or special procedures)
: 3..
Emergency procedures (emergency instructions, abnormal, or special procedures)
. 4.
Standing orders (important orders which are safety-related to and
Standing orders (important orders which are safety-related to and
                                        ~
~
      . 4.
may supersede the regular procedures) 5.
may supersede the regular procedures)
Fuel-handling and core-loading procedures (initial core-loading g
: 5. Fuel-handling and core-loading procedures (initial core-loading           g procedure, when appropriate)                                               ]
procedure, when appropriate)
]
l J
l J
: 6. Annunciator procedures (alarm procedures, including set points)
6.
: 7. Radiation protection manual (radiation control manual or procedures)       1 i
Annunciator procedures (alarm procedures, including set points) 7.
: 8. Emergency plan
Radiation protection manual (radiation control manual or procedures) 1 i
: 9. Technical Specifications
8.
: 10. Lesson plans (training manuals, plant orientation manual, systems descriptions) l
Emergency plan 9.
: 11. Systems' operating procedures
Technical Specifications 10.
: 12. Piping and instrumentation diagrams, electrical single-line diagrams,     ,
Lesson plans (training manuals, plant orientation manual, systems descriptions)
or flow diagrams                                                         l
: 11. Systems' operating procedures 12.
: 13. Copies of facility RO and SRO requalification examinations administered during the past 2 years                                                   )
Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
: 13. Copies of facility RO and SRO requalification examinations administered
)
during the past 2 years
: 14. A synopsis of the subjects and material covered in the requalification program for the past two years
: 14. A synopsis of the subjects and material covered in the requalification program for the past two years
: 15. An index of administrative, operating, abnormal and emergency procedures
: 15. An index of administrative, operating, abnormal and emergency procedures
: 16. Plant technical dath (curve) book                                           ,
: 16. Plant technical dath (curve) book i
i l
l
: 17. Simulator malfunction list with descriptive summary of malfunction effects.
: 17. Simulator malfunction list with descriptive summary of malfunction effects.
All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.
I e                                                                                       :}}
e
:}}

Latest revision as of 23:17, 3 December 2024

Notifies That Evaluation of Requalification Program Scheduled for Wks of 870831,0907 & 14.NRC Will Administer Written,Oral & Simulator Exams.Encl Ref Matl Requested to Assist Examiner in Preparing for Visit
ML20215B149
Person / Time
Site: Monticello 
Issue date: 06/09/1987
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
References
NUDOCS 8706170237
Download: ML20215B149 (3)


Text

s JUN 9 1987

! Docket No,'50-263J

~

i

' Northern' States-Power Company.

' ATTN: -Mr. C. E. Larson

~Vice President, Nuclear Generation International Centre Building

>920 Second Avenue South Minneapolis, MN 55401-

Dear Mr.. Larson:

J

SUBJECT:

REQUALIFICATION PROGRAM EVALUATION.

In a telephone conversation between Mr. Eugene Earney, Superintendent, Training

at'Monticello, and Mr. T. Burdick, Region III, arrangements were made'for an

. evaluation.of the requalification program at the Monticello Nuclear Plant. The evaluation visit?is scheduled for the weeks of August 31, September 7 and 14, 1987..

. For this visit, the NRC examiner will administer NRC prepared written, oral, and simulator' examinations. ;When the NRC' examiner arrives at the site,-he will meet with the" appropriate' facility. personnel to Lreview the-schedule for those examinations-.~

For the examiner to adequately prepare for this visit, it will be-

~

-necessary.for.the: facility to furnish the approved reference material-listed in

>, " Reference Material Requirements for Requalification Program-Evaluations,".at least 60 days' prior to the examination'date..Mr. Earney has been q.

. advised of our reference material re'quirements and where they.a're to be-sent.

"This: request for information was approved by the Office of Management and Budget 1 under: Clearance Number 3150-0101, which expires May 31, 1989. Comments on burden

((

and-duplication may be directed to the Office of Management and Budget, Reports-Management' Room 3208,'New Executive Office Building, Washington,-D. C. 20503.

Thank you for your consideration in this matter.

If you have any questions.

on:the. evaluation process, please contact Mr. T. Burdick at (312) 790-5566..

Sincerely, Origind Signed By C. W. Hehl 3 8706170237 870euv i

PDR ADOCK 05000263 Charles W. Hehl, Chief i

V' P.

PDR k

Operations Branch i

Enclosure:

-As stated See Attached Distribution

.RI RI Buiadick/ jaw He 1 fhk b

i 1 16 9

a.

t v..;

- c.,

', -l c

30U '9I907I

' Northern-States Power, Company.

-2 1

I i

'Distrib'ution j

1

?cc:w/enclosurei

.W.'A. Shamla,.P.lant Manager

DCS/RSB(RIDS)

J Licensing Fee Management Branch

. Resident? Inspector, RIII'Monticello

. Resident Inspector, RIII-Prairie

. Island John W.~ Ferman, Ph.D.,

Nuclear Engineer, MPCAL

'E. Earney, Training' Supervisor n'

cc w/o. enclosure:-

D. Scaletti, Project Manager, NRR J. N. Hannon, Branch Chief,.0LB I.. N. -Jackiw,' Section Chief, DRP -

i k

l i

d

g 4

j 1

J ENCLOSURE 1 i

Reference Material Requirements for Requalification Program Evaluation i

h 1.

All administrative procedures (as applicable to reactor operation or safety)

I 2.

All integrated plant procedures (n'ormal or general operating procedures)

{

J

3..

Emergency procedures (emergency instructions, abnormal, or special procedures)

. 4.

Standing orders (important orders which are safety-related to and

~

may supersede the regular procedures) 5.

Fuel-handling and core-loading procedures (initial core-loading g

procedure, when appropriate)

]

l J

6.

Annunciator procedures (alarm procedures, including set points) 7.

Radiation protection manual (radiation control manual or procedures) 1 i

8.

Emergency plan 9.

Technical Specifications 10.

Lesson plans (training manuals, plant orientation manual, systems descriptions)

11. Systems' operating procedures 12.

Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams

13. Copies of facility RO and SRO requalification examinations administered

)

during the past 2 years

14. A synopsis of the subjects and material covered in the requalification program for the past two years
15. An index of administrative, operating, abnormal and emergency procedures
16. Plant technical dath (curve) book i

l

17. Simulator malfunction list with descriptive summary of malfunction effects.

All of the above referenced material should be approved, final issues and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable. All procedures and reference material should be bound or in the form used by the control room operators, with appropriate indexes or tables of contents to ensure efficient use.

e