March 24, 1998 LICENSEE: lilinois Power Company FACILITY:       Clinton Power Station
March 24, 1998 LICENSEE: lilinois Power Company FACILITY:
Clinton Power Station


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and' staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the -
OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and' staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the -
potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting -
potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting -
participants is included as Attachment 1, and a copy of the meeting handout is provided as Attachment 2.
participants is included as Attachment 1, and a copy of the meeting handout is provided as.
The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect agaimt the new failure mode. The licensee intends to submit a license amendment in April 19tns concerning the addition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.
The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect agaimt the new failure mode. The licensee intends to submit a license amendment in April 19tns concerning the addition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.
Original signed by:
Original signed by:
Jon B. Hopkins, Senior Project Manager Project Directorate lil-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants
Jon B. Hopkins, Senior Project Manager Project Directorate lil-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants
: 2. Meeting Handout                                                                   1 cc w/atts: See next page NBC RLE ggMi CDM                                           !
: 2. Meeting Handout 1
DOCUMENT NAME: G:\CLINTON\0319.MTS                                                           f OFFICE -   PD3-3:PM         E   PD3-3:LA       d NAME       JHopkins My EBamhill f/L                                                   9 bg      ,
cc w/atts: See next page NBC RLE ggMi CDM f
DATE       )W98       41       34498 l
DOCUMENT NAME: G:\\CLINTON\\0319.MTS OFFICE -
r                            OFFICIAL RECORD COPY -
PD3-3:PM E
9803270194'980324                                                                                 -
PD3-3:LA d
PDR     ADOCK 05000461                                                                           l P.                     'PDR
bg NAME JHopkins My EBamhill f/L 9
DATE
)W98 41 34498 r
OFFICIAL RECORD COPY -
9803270194'980324 PDR ADOCK 05000461 P.
'PDR


vn Cs%q
vn Cs%q g
              ~''
UNITED STATES l
g            &                              UNITED STATES                                              l fo j
~ ' '
NUCLEAR REGULATORY COMMISSION WASHINGTON, I.' C. 20665 4001
f j
                          *****                                        March 24, 1998 LICENSEE: Illinois Power Company                                                                   ,
NUCLEAR REGULATORY COMMISSION WASHINGTON, I.' C. 20665 4001 o
FACILITY:       Clinton Power Station                                                               -
March 24, 1998 LICENSEE: Illinois Power Company FACILITY:
Clinton Power Station


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting participants is included as Attachment 1, and a copy o;ihe meeting handout is provided as Attachment 2.
OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting participants is included as Attachment 1, and a copy o;ihe meeting handout is provided as.
The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect against the new failure mode. The licensee intends to submit a license amendment in Apr;l 1998 concerning the aodition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.
The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect against the new failure mode. The licensee intends to submit a license amendment in Apr;l 1998 concerning the aodition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.
                                                                                      /f       ,    ,
/f on B. Hopkins, Senior roject Manager Project Directorate 111-3 Division of Reactor Projects lil/IV j
on B. Hopkins, Senior roject Manager Project Directorate 111-3 Division of Reactor Projects lil/IV                   j Office of Nuclear Reactor Regulation                 l Docket No. 50-461 Attachments: 1. List of Meeting Participants
Office of Nuclear Reactor Regulation l
Docket No. 50-461 Attachments: 1. List of Meeting Participants
: 2. Meeting Handout cc w/atts: See next page 6
: 2. Meeting Handout cc w/atts: See next page 6
                    -3
-3


DISTRIBUTION FOR  
DISTRIBUTION FOR  


==SUMMARY==
==SUMMARY==
OF MARCH 19,1998, MEETING WITH ILLINOIS POWER COMPANY Hard Cony w/atts Docket File PD 111-3 Reading PUBLIC                                                                 ,
OF MARCH 19,1998, MEETING WITH ILLINOIS POWER COMPANY Hard Cony w/atts Docket File PD 111-3 Reading PUBLIC GGrant, Rlli
GGrant, Rlli JHopkins
]
                                                                                ]
JHopkins Hard Coov w/Att 1 OGC
l I
)
Hard Coov w/Att 1                                                      1 OGC                                                                   )
ACRS E-mail w/Att 1 1
ACRS                                                                   !
SCollins (SJC1)
E-mail w/Att 1                                                         1 SCollins (SJC1)
FMiraglia (FJM)
FMiraglia (FJM)
THiltz
THiltz
        ' BBoger EAdensam (EGA1)
' BBoger EAdensam (EGA1)
RSavio Dross (SLM3)
RSavio Dross (SLM3)
OChopra JLazevnick JCalvo DThatcher I
OChopra JLazevnick JCalvo DThatcher


Clinton Power Station, Unit 1 Illinois Power Company cc:
Clinton Power Station, Unit 1 Illinois Power Company cc:
John G. Cook                           lilinois Department of Nuclear Safety Senior Vice President                   Office of Nuclear Facility Safety Clinton Power Station                   1035 Outer Park Drive
John G. Cook lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station 1035 Outer Park Drive
      ' P.O. Box 678                             Springfield,IL 62704                     i
' P.O. Box 678 Springfield,IL 62704 i
    , Clinton,IL 61727 Joseph V. Sipek                           .
, Clinton,IL 61727 Joseph V. Sipek Larry Wigley Director-Licensing Manager Nuclear Station Clinton Power Station l
Larry Wigley                           Director- Licensing Manager Nuclear Station                 Clinton Power Station                   l Engineering Department               P.O. Box 678                             q Clinton Power Station                   Mail Code V920                           1 P.O. Box 678                           Clinton,IL 61727                       j Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125                                                                 ;
Engineering Department P.O. Box 678 q
Regional Administrsstor, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road                                                               I Lisle, IL 60532-4351                                                             j l
Clinton Power Station Mail Code V920 1
Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727                       .
P.O. Box 678 Clinton,IL 61727 j
J. W. Blattner Project Manager .                                                                 I Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL S0603 I
Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrsstor, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road I
Lisle, IL 60532-4351 j
Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager.
Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL S0603


MEETING ATTENDEES NRC AND ILLINOIS POWER COMPANY DISCUSSION OF DEGRADED VOLTAGE MARCH 19,1998 NB.C J. Hopkins J. Calvo                                                             4 O. Chopra J. Lazevnick                                                         j D. Thatcher Illinois Power Comoany J. Ray R. Phares J. Sipek                                                               ,
MEETING ATTENDEES NRC AND ILLINOIS POWER COMPANY DISCUSSION OF DEGRADED VOLTAGE MARCH 19,1998 NB.C J. Hopkins J. Calvo 4
T. Elwood                                                             ll l
O. Chopra J. Lazevnick j
Duke Enaineerina (consultant to Illinois Power Company)
D. Thatcher Illinois Power Comoany J. Ray R. Phares J. Sipek T. Elwood l
R. Sharpe Attachment 1
l Duke Enaineerina (consultant to Illinois Power Company)
R. Sharpe


I   -
I 1
l 1
)
1 1                                                                                                          )
4 Degraded Voltage Project
4 Degraded Voltage Project
?                             at Clinton Power Station i
?
at Clinton Power Station i
March 19,1998 f
March 19,1998 f
l I
I i
I i                                                                                                         ;
E 1
1
                            .                                                                              l E
1 l
l 1
IP Representatives:
IP Representatives:
R. F. Phares         Manager-Nuclear Safety and Performance Improvement
R. F. Phares Manager-Nuclear Safety and Performance Improvement
                                                                                                          )
)
J. V. Sipek                                               Director-Ucensing T. B. Elwood                               Supervisor-Licensing Operations
J. V. Sipek Director-Ucensing T. B. Elwood Supervisor-Licensing Operations J.L. Ray Project Engineer R. Sharpe Duke Engineering and Services j
-        J.L. Ray                                                   Project Engineer
1 i
,        R. Sharpe                                   Duke Engineering and Services                         j 1
I k
i I
U h
k    U   h                                                           Attachinent 2 gp I
Attachinent 2 gp I
i
i u
                                                                                . _ _ _ __-------- _ ____ u


('     .
('
l    .
l
l
\-
\\-
i Agenda l
i Agenda a
a f
f introduction R. F. Phares i
i        -
i, 1
introduction                 R. F. Phares i,                                                   l 1
Project Update J.L. Ray I.
Project Update               J.L. Ray     l I.
Initial USQ Submittal T. B. Elwood l
Initial USQ Submittal       T. B. Elwood l l
Follow-up Submittals T. B. Elwood e
I
r I
  ,!      e  Follow-up Submittals         T. B. Elwood r
Project Schedule / Projected
I       -
Project Schedule / Projected Completion Date              J. V. Sipek
[
[
Summer Situation             J.L. Ray l         -
Completion Date J. V. Sipek Summer Situation J.L. Ray l
Summary         ,
Summary J. V. Sipek 1
J. V. Sipek 1
i t
i t
  ,l   ELMEMES 0
,l ELMEMES 1%>MR 0
1%>MR


I f
I f
Project Update l
Project Update 1
1 r
r c
c l             . Priority Project at CPS 1
l
5
. Priority Project at CPS 5
  -                - Multiple Modification Packages: RAT Tap l
- Multiple Modification Packages: RAT Tap l
Setting, Regulating Transformers, RAT and ERAT SVCs, ERAT LTC l                                                                 '
Setting, Regulating Transformers, RAT and ERAT SVCs, ERAT LTC l
                    - Construction Activities Begun i
- Construction Activities Begun i
              -    SVC Design Changes (Relocated Breaker) i
SVC Design Changes (Relocated Breaker) i Completion of SVC and Protection System Testing
  ~
~
Completion of SVC and Protection System Testing '
l at ABB l
l               at ABB           -
Ongoing Calculations EC.E.EC&GES POWER
Ongoing Calculations l
EC.E.EC&GES POWER


y         . -
y L
L Initial USQ Submittal
Initial USQ Submittal Initial submittalin April 1998.
  !            - Initial submittalin April 1998.
I Will be submitted as a USQ with determination of No Significant Hazards Consideration.
I Will be submitted as a USQ with determination of No Significant Hazards Consideration.
1 I
1 I
                - Will focus on SVC design and operation, associated       )
Will focus on SVC design and operation, associated
i               protection system (s), and associated FMEA and         i PRA.
)
?                     .Will show that SVC failure probability coupled with failure of protection systems is acceptably small.
i protection system (s), and associated FMEA and i
                - Will include initial TS Bases and USAR changes.         l l
PRA.
?
.Will show that SVC failure probability coupled with failure of protection systems is acceptably small.
l Will include initial TS Bases and USAR changes.
f l^
f l^
                - Will acknowledge required follow-up submittals.
Will acknowledge required follow-up submittals.
ILERMES PCMR
ILERMES PCMR


I       .
I Follow-up Submittal (sD Ongoing calculations take SVC operation into account and will allow for improved margins for required voltages for loads via changes to degraded voltage relay setpoints (Technical Specifications to be changed).
Follow-up Submittal (sD Ongoing calculations take SVC operation into account and will allow for improved margins for required voltages for loads via changes to degraded voltage relay setpoints (Technical Specifications to be changed).
Calculations use ETAP methodology (versus previously used ACELMS).
            - Calculations use ETAP methodology (versus           l previously used ACELMS).
I i
I i
            - Will need to address startup testing (tying SVCs to i             busses).
Will need to address startup testing (tying SVCs to i
busses).
i
i
't
't
Line 166: Line 165:
Project Schedule /
Project Schedule /
l Projected Completion Date m
l Projected Completion Date m
Il
Il Initial submittal will refer to projected date of when startup testing will begin.
              -  Initial submittal will refer to projected date of when startup testing will begin.
A 1
A 1
2 Project estimated to be completed late i               summer /early fall.
2 Project estimated to be completed late i
1 i
summer /early fall.
i
i i
?
?
t i
t i
Line 180: Line 178:
i (LLtMGES PCeWER
i (LLtMGES PCeWER


                                                        . ,      s                      v-   -
v-s
                                                                                  ^
^
a .,   .
b a.,
                                                      -                                          b
e.
: e.                                                   March 24', 1998                   -
March 24', 1998 LICENSEE: lilinois Power Company I
LICENSEE: lilinois Power Company I
FACILITY:
FACILITY:       Clinton Power Station
Clinton Power Station
                                                                                                                        ]
]


==SUBJECT:==
==SUBJECT:==
==SUMMARY==
==SUMMARY==
OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE I
OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and staff met in Rockville, Maryland, with -
On March 19,1998, NRC management and staff met in Rockville, Maryland, with -                         {
{
representatives of Illinois Power Company. The purpose of the meeting was to discuss the
representatives of Illinois Power Company. The purpose of the meeting was to discuss the
                . potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting   .,
. potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting participants is included as Attachment 1, and a copy of the meeting handout is provided 'as 1.
participants is included as Attachment 1, and a copy of the meeting handout is provided 'as           1 Attachment 2.
The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect against the new failure mode. The licensee intends to submit a license amendment in April 1998 conceming the addition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.
The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect against the new failure mode. The licensee intends to submit a license amendment in April 1998 conceming the addition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.
Original signed by:
Original signed by:
Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants
Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants
: 2. Meeting Handout cc w/atts: See next page DOCUMENT NAME:: G:\CLINTON\0319.MTS OFFICE       PD3-3:PM         -- E       PD3-3:LA         [
: 2. Meeting Handout cc w/atts: See next page DOCUMENT NAME:: G:\\CLINTON\\0319.MTS OFFICE PD3-3:PM
NAME-       JHopkins M f EBarnhill - f'fl.
-- E PD3-3:LA
DATE       D14. 98     JTl           34$98 m                            OFFICIAL RECORD COPY r                                                                   .
[
3r,
NAME-JHopkins M f EBarnhill - f'fl.
                                                                  - ^
DATE D14. 98 JTl 34$98 OFFICIAL RECORD COPY m
                                                                                    }                    1}}
r 3r, 1
}
- ^}}

Latest revision as of 09:18, 3 December 2024

Summary of 980319 Meeting W/Util in Rockville,Md Re Potential Fix for Issues of Degraded Voltage at Plant.List of Meeting Participants & Meeting Handout Encl
ML20217C836
Person / Time
Site: Clinton 
Issue date: 03/24/1998
From: Hopkins J
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
NUDOCS 9803270194
Download: ML20217C836 (13)


Text

-

March 24, 1998 LICENSEE: lilinois Power Company FACILITY:

Clinton Power Station

SUBJECT:

SUMMARY

OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and' staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the -

potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting -

participants is included as Attachment 1, and a copy of the meeting handout is provided as.

The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect agaimt the new failure mode. The licensee intends to submit a license amendment in April 19tns concerning the addition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.

Original signed by:

Jon B. Hopkins, Senior Project Manager Project Directorate lil-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants

2. Meeting Handout 1

cc w/atts: See next page NBC RLE ggMi CDM f

DOCUMENT NAME: G:\\CLINTON\\0319.MTS OFFICE -

PD3-3:PM E

PD3-3:LA d

bg NAME JHopkins My EBamhill f/L 9

DATE

)W98 41 34498 r

OFFICIAL RECORD COPY -

9803270194'980324 PDR ADOCK 05000461 P.

'PDR

vn Cs%q g

UNITED STATES l

~ ' '

f j

NUCLEAR REGULATORY COMMISSION WASHINGTON, I.' C. 20665 4001 o

March 24, 1998 LICENSEE: Illinois Power Company FACILITY:

Clinton Power Station

SUBJECT:

SUMMARY

OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and staff met in Rockville, Maryland, with representatives of Illinois Power Company. The purpose of the meeting was to discuss the potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting participants is included as Attachment 1, and a copy o;ihe meeting handout is provided as.

The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect against the new failure mode. The licensee intends to submit a license amendment in Apr;l 1998 concerning the aodition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.

/f on B. Hopkins, Senior roject Manager Project Directorate 111-3 Division of Reactor Projects lil/IV j

Office of Nuclear Reactor Regulation l

Docket No. 50-461 Attachments: 1. List of Meeting Participants

2. Meeting Handout cc w/atts: See next page 6

-3

DISTRIBUTION FOR

SUMMARY

OF MARCH 19,1998, MEETING WITH ILLINOIS POWER COMPANY Hard Cony w/atts Docket File PD 111-3 Reading PUBLIC GGrant, Rlli

]

JHopkins Hard Coov w/Att 1 OGC

)

ACRS E-mail w/Att 1 1

SCollins (SJC1)

FMiraglia (FJM)

THiltz

' BBoger EAdensam (EGA1)

RSavio Dross (SLM3)

OChopra JLazevnick JCalvo DThatcher

Clinton Power Station, Unit 1 Illinois Power Company cc:

John G. Cook lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety Clinton Power Station 1035 Outer Park Drive

' P.O. Box 678 Springfield,IL 62704 i

, Clinton,IL 61727 Joseph V. Sipek Larry Wigley Director-Licensing Manager Nuclear Station Clinton Power Station l

Engineering Department P.O. Box 678 q

Clinton Power Station Mail Code V920 1

P.O. Box 678 Clinton,IL 61727 j

Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrsstor, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road I

Lisle, IL 60532-4351 j

Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner Project Manager.

Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL S0603

MEETING ATTENDEES NRC AND ILLINOIS POWER COMPANY DISCUSSION OF DEGRADED VOLTAGE MARCH 19,1998 NB.C J. Hopkins J. Calvo 4

O. Chopra J. Lazevnick j

D. Thatcher Illinois Power Comoany J. Ray R. Phares J. Sipek T. Elwood l

l Duke Enaineerina (consultant to Illinois Power Company)

R. Sharpe

I 1

)

4 Degraded Voltage Project

?

at Clinton Power Station i

March 19,1998 f

I i

E 1

IP Representatives:

R. F. Phares Manager-Nuclear Safety and Performance Improvement

)

J. V. Sipek Director-Ucensing T. B. Elwood Supervisor-Licensing Operations J.L. Ray Project Engineer R. Sharpe Duke Engineering and Services j

1 i

I k

U h

Attachinent 2 gp I

i u

('

l

\\-

i Agenda a

f introduction R. F. Phares i

i, 1

Project Update J.L. Ray I.

Initial USQ Submittal T. B. Elwood l

Follow-up Submittals T. B. Elwood e

r I

Project Schedule / Projected

[

Completion Date J. V. Sipek Summer Situation J.L. Ray l

Summary J. V. Sipek 1

i t

,l ELMEMES 1%>MR 0

I f

Project Update 1

r c

l

. Priority Project at CPS 5

- Multiple Modification Packages: RAT Tap l

Setting, Regulating Transformers, RAT and ERAT SVCs, ERAT LTC l

- Construction Activities Begun i

SVC Design Changes (Relocated Breaker) i Completion of SVC and Protection System Testing

~

l at ABB l

Ongoing Calculations EC.E.EC&GES POWER

y L

Initial USQ Submittal Initial submittalin April 1998.

I Will be submitted as a USQ with determination of No Significant Hazards Consideration.

1 I

Will focus on SVC design and operation, associated

)

i protection system (s), and associated FMEA and i

PRA.

?

.Will show that SVC failure probability coupled with failure of protection systems is acceptably small.

l Will include initial TS Bases and USAR changes.

f l^

Will acknowledge required follow-up submittals.

ILERMES PCMR

I Follow-up Submittal (sD Ongoing calculations take SVC operation into account and will allow for improved margins for required voltages for loads via changes to degraded voltage relay setpoints (Technical Specifications to be changed).

Calculations use ETAP methodology (versus previously used ACELMS).

I i

Will need to address startup testing (tying SVCs to i

busses).

i

't

'l taLERGES bbYKiR

Project Schedule /

l Projected Completion Date m

Il Initial submittal will refer to projected date of when startup testing will begin.

A 1

2 Project estimated to be completed late i

summer /early fall.

i i

?

t i

EC.MMCES E8tNJi3R

Summer Situation Projected Offsite Circuit Voltages for RAT and ERAT.

dI 1

i (LLtMGES PCeWER

v-s

^

b a.,

e.

March 24', 1998 LICENSEE: lilinois Power Company I

FACILITY:

Clinton Power Station

]

SUBJECT:

SUMMARY

OF MARCH 19,1998, MEETING ON DEGRADED VOLTAGE On March 19,1998, NRC management and staff met in Rockville, Maryland, with -

{

representatives of Illinois Power Company. The purpose of the meeting was to discuss the

. potential fix for the issue of degraded voltage at the Clinton Power Station. A list of the meeting participants is included as Attachment 1, and a copy of the meeting handout is provided 'as 1.

The licensee stated that due to previously expressed NRC staff interest, they had reviewed the possible failure modes of the static var compensators (SVCs) and had identified a new failure mode. The licensee revised the SVC design to protect against the new failure mode. The licensee intends to submit a license amendment in April 1998 conceming the addition of the SVCs to the electrical system. The schedule is to have the modification in place prior to plant startup.

Original signed by:

Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation Docket No. 50-461 Attachments: 1. List of Meeting Participants

2. Meeting Handout cc w/atts: See next page DOCUMENT NAME:: G:\\CLINTON\\0319.MTS OFFICE PD3-3:PM

-- E PD3-3:LA

[

NAME-JHopkins M f EBarnhill - f'fl.

DATE D14. 98 JTl 34$98 OFFICIAL RECORD COPY m

r 3r, 1

}

- ^