ML20236F309: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot change
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:-_  _ _ - _ _ _ _ _ _ _ _ _ __              . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
{{#Wiki_filter:-_
fD @ 0) h l                                                                                         '
fD @ 0) h l LlI,]
LlI,]         y, f'                     .
y, f'
                                                                                                                                                                                                        }
}
w  > ;W]t I,
h
                                                                                                                            'p       .t                                                      h U
;W]t I,
PRELIMINARY NOTIFICATION December 30, 1976 l                                   (
.t w
l                                   PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-226 l                                                                                                               .
'p U
This preliminary notification constitutes EARLY notice of an eventoof POSSIBLE safety or public interest significance. The information p_ r resented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.
PRELIMINARY NOTIFICATION December 30, 1976 l
Facility:                                         Salem Unit No. 1 (DN 50-272)
(
Subj ect:                                         HYDRAULIC OIL FIRE AND SUBSEQUEh"I INADVERTENT ACTUATION OF ECCS At 9:35 p.m. on December 29, 1976, a 1/4" hydraulic oil line on #12                                                                                                           {
l PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-226 l
Main Steam Isolation Valve (MSIV) severed during attempts to open the valve with the reactor critical in the startup mode (Mode II). Oil                                                                                               c was sprayed on hot piping in the immediate area, which resulted in                                                                                               ..
This preliminary notification constitutes EARLY notice of an eventoof POSSIBLE safety or public interest significance. The information p_ resented is as initially received without verification or evaluation r
smoldering insulation. The insulation sevenminutesusingdrychemicalandCO{irewasextinguishedinabout                        extinguisher. After the fire was+ extinguished, the reactor was shutdown. Pressure and temperature                                                                                                       '
and is basically all that is known by IE staff on this date.
were reduced to 1500 psig and 3900F,.respectively (Mode III) while repairs to the MSIV were made.
Facility:
Salem Unit No. 1 (DN 50-272)
Subj ect:
HYDRAULIC OIL FIRE AND SUBSEQUEh"I INADVERTENT ACTUATION OF ECCS At 9:35 p.m. on December 29, 1976, a 1/4" hydraulic oil line on #12
{
Main Steam Isolation Valve (MSIV) severed during attempts to open the valve with the reactor critical in the startup mode (Mode II). Oil c
was sprayed on hot piping in the immediate area, which resulted in sevenminutesusingdrychemicalandCO{irewasextinguishedinabout smoldering insulation. The insulation extinguisher. After the fire was+ extinguished, the reactor was shutdown. Pressure and temperature were reduced to 1500 psig and 3900F,.respectively (Mode III) while repairs to the MSIV were made.
Due to operator error, the MSIV inadvertently opened after the hydraulic system was repaired, reducing the pressure in #12 Steam Generator suf-ficiently to actuate ECCS. The recovery from inadvertent safety injec-tion and cleanup after the fire are proceeding routinely.
Due to operator error, the MSIV inadvertently opened after the hydraulic system was repaired, reducing the pressure in #12 Steam Generator suf-ficiently to actuate ECCS. The recovery from inadvertent safety injec-tion and cleanup after the fire are proceeding routinely.
i Media interest is expected because of previous inadvertent actuations of ECCS and close attention being given to problems at nuclear facili-ties. The State of New Jersey has been informed. A press release is not planned at this time.
i Media interest is expected because of previous inadvertent actuations of ECCS and close attention being given to problems at nuclear facili-ties. The State of New Jersey has been informed. A press release is not planned at this time.
Line 35: Line 41:


==Contact:==
==Contact:==
RFWarnick, IE x27261                                             GWRoy, IE x27261 <DThompson, IE x27541 Distribution:
RFWarnick, IE x27261 GWRoy, IE x27261 <DThompson, IE x27541 Distribution:
Chairman Rowden-                                                       Commissioner Mason         S. J. Chilk, SECY Commissioner Gilinsky                                         -        C. C. Kammerer, CA       G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO                                                     K. R. Chapman, NMSS       R. G. Ryan, OSP S. H. Hanauer, EDO                                                     E. Volgenau, OIE           J. A. Harris, PA B. C. Rusche, NRR                                                       H. K. Shapar, ELD         T. J. McTiernan, OIA Transmitted: PBldg                                                 ; H St.         ; MNBB         ; Luge                   ;                            L'/
Chairman Rowden-Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO K. R. Chapman, NMSS R. G. Ryan, OSP S. H. Hanauer, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, OIA Transmitted: PBldg
PRELIMINARY NOTIFICATION 9/O' 9807020110 761230 FDR   I&E PNO-76--226                                             PDR
; H St.
_ _ _ _ _ _        _ _ _ _ _ _ _ _ _ _ _ _ _}}
; MNBB
; Luge L'/
PRELIMINARY NOTIFICATION 9/O' 9807020110 761230 FDR I&E PNO-76--226 PDR
_ _ _ _ _ _ _ _ _ _ _ _ _}}

Latest revision as of 03:13, 3 December 2024

PNO-76-226:on 761229,hydraulic Oil Line on 12 MSIV Severed During Attempts to Open Valve W/Reactor Critical in Startup Mode.Recovery from Inadvertent Safety Injection & Cleanup After Fire Proceeding Routinely.State of Nj Informed
ML20236F309
Person / Time
Site: Salem 
Issue date: 12/30/1976
From: Roy G, Thompson D, Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
PNO-76-226, NUDOCS 9807020110
Download: ML20236F309 (1)


Text

-_

fD @ 0) h l LlI,]

y, f'

}

h

W]t I,

.t w

'p U

PRELIMINARY NOTIFICATION December 30, 1976 l

(

l PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO-76-226 l

This preliminary notification constitutes EARLY notice of an eventoof POSSIBLE safety or public interest significance. The information p_ resented is as initially received without verification or evaluation r

and is basically all that is known by IE staff on this date.

Facility:

Salem Unit No. 1 (DN 50-272)

Subj ect:

HYDRAULIC OIL FIRE AND SUBSEQUEh"I INADVERTENT ACTUATION OF ECCS At 9:35 p.m. on December 29, 1976, a 1/4" hydraulic oil line on #12

{

Main Steam Isolation Valve (MSIV) severed during attempts to open the valve with the reactor critical in the startup mode (Mode II). Oil c

was sprayed on hot piping in the immediate area, which resulted in sevenminutesusingdrychemicalandCO{irewasextinguishedinabout smoldering insulation. The insulation extinguisher. After the fire was+ extinguished, the reactor was shutdown. Pressure and temperature were reduced to 1500 psig and 3900F,.respectively (Mode III) while repairs to the MSIV were made.

Due to operator error, the MSIV inadvertently opened after the hydraulic system was repaired, reducing the pressure in #12 Steam Generator suf-ficiently to actuate ECCS. The recovery from inadvertent safety injec-tion and cleanup after the fire are proceeding routinely.

i Media interest is expected because of previous inadvertent actuations of ECCS and close attention being given to problems at nuclear facili-ties. The State of New Jersey has been informed. A press release is not planned at this time.

NRC, Region I, (Philadelphia) receired notification of this occurrence by telephone from the station superintendent at 10:00 a.m. on December 30, 1976.

Contact:

RFWarnick, IE x27261 GWRoy, IE x27261 <DThompson, IE x27541 Distribution:

Chairman Rowden-Commissioner Mason S. J. Chilk, SECY Commissioner Gilinsky C. C. Kammerer, CA G. F. Murphy, JCAE Commissioner Kennedy L. V. Gossick, EDO K. R. Chapman, NMSS R. G. Ryan, OSP S. H. Hanauer, EDO E. Volgenau, OIE J. A. Harris, PA B. C. Rusche, NRR H. K. Shapar, ELD T. J. McTiernan, OIA Transmitted: PBldg

H St.
MNBB
Luge L'/

PRELIMINARY NOTIFICATION 9/O' 9807020110 761230 FDR I&E PNO-76--226 PDR

_ _ _ _ _ _ _ _ _ _ _ _ _