05000368/LER-1987-003, Informs That Suppl to LER 87-003-00 Will Be Delayed Until 880501 Due to Preliminary Nature of Some Aspects of Permanent Repair Plan of Unit Pressurizer,Per 871026 Meeting: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 21: | Line 21: | ||
| Mode = | | Mode = | ||
| Docket = 05000368 | | Docket = 05000368 | ||
| LER year = | | LER year = 1987 | ||
| LER number = 3 | | LER number = 3 | ||
| LER revision = | | LER revision = 0 | ||
| Event date = | | Event date = | ||
| Report date = | | Report date = | ||
| Line 33: | Line 33: | ||
{{#Wiki_filter:._. | {{#Wiki_filter:._. | ||
n ARKANSAS POWER S LIGHT COMPANY October 28, 1987 | n ARKANSAS POWER S LIGHT COMPANY October 28, 1987 | ||
~ | |||
2CAN198711 l | 2CAN198711 l | ||
l U. S. Nuclear Regulatory Commission | l U. S. Nuclear Regulatory Commission l | ||
~' | |||
Document Control Desk Washington, D.C. 20555 1 | Document Control Desk Washington, D.C. | ||
20555 1 | |||
==SUBJECT:== | ==SUBJECT:== | ||
Arkansas Nuclear One - Unit 2 | Arkansas Nuclear One - Unit 2 1 | ||
Our letter dated May 27, 1987 (2CAN058707) submitted Licensee Event Report No. 368/87-003-00 in accordance with 10CFR50.73. In the report we indicated a supplemental report was planned to be submitted by November 1, 1987. On October 26, 1987, representatives of | Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 368/87-003 Gentlemen: | ||
Arkansas Power and Light met with members of your staff to discuss our plans for a permanent repair to the ANO-2 pressurizer during the | Our letter dated May 27, 1987 (2CAN058707) submitted Licensee Event Report No. 368/87-003-00 in accordance with 10CFR50.73. | ||
the preliminary nature of some aspects of our permanent repair plan, | In the report we indicated a supplemental report was planned to be submitted by November 1, 1987. | ||
it is our intention to delay submission of the' supplemental LER | On October 26, 1987, representatives of Arkansas Power and Light met with members of your staff to discuss our plans for a permanent repair to the ANO-2 pressurizer during the 1 | ||
Sincerely, | 2R6 refueling outage scheduled to begin'in February, '1988. | ||
J. M. Levine Executive Director Site Operations JML: LAT:djm cc: | Due to the preliminary nature of some aspects of our permanent repair plan, it is our intention to delay submission of the' supplemental LER | ||
MEMBER MIDDLE SOUTH UTiUTIES SYSTEM - | :- i report until after final repairs are made to the pressurizer during J | ||
the refueling outage. | |||
The expected submission date of the report is May 1, 1988. | |||
Sincerely, l | |||
J. m.h% | |||
J. M. Levine Executive Director Site Operations JML: LAT:djm cc: | |||
Regional Administrator INP0 Records. Center Region.IV Suite 1500' U. S. Nuclear Regulatory Commission 1100 Circle, 75 Parkway 611 Ryan Plaza Drive,. Suite 1000 Atlanta, GA 30039 Arlington, TX 76011 8711060243 87102B PDR ADOCK 05000360 | |||
,$p cl 5 ' | |||
S PDR i,: | |||
MEMBER MIDDLE SOUTH UTiUTIES SYSTEM - | |||
i | |||
}} | }} | ||
{{LER-Nav}} | {{LER-Nav}} | ||
Revision as of 01:36, 3 December 2024
| ML20236J718 | |
| Person / Time | |
|---|---|
| Site: | |
| Issue date: | 10/28/1987 |
| From: | James M. Levine ARKANSAS POWER & LIGHT CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| 2CAN108711, NUDOCS 8711060243 | |
| Download: ML20236J718 (1) | |
| Event date: | |
|---|---|
| Report date: | |
| 3681987003R00 - NRC Website | |
text
._.
n ARKANSAS POWER S LIGHT COMPANY October 28, 1987
~
l U. S. Nuclear Regulatory Commission l
~'
Document Control Desk Washington, D.C.
20555 1
SUBJECT:
Arkansas Nuclear One - Unit 2 1
Docket No. 50-368 License No. NPF-6 Licensee Event Report No. 368/87-003 Gentlemen:
Our letter dated May 27, 1987 (2CAN058707) submitted Licensee Event Report No. 368/87-003-00 in accordance with 10CFR50.73.
In the report we indicated a supplemental report was planned to be submitted by November 1, 1987.
On October 26, 1987, representatives of Arkansas Power and Light met with members of your staff to discuss our plans for a permanent repair to the ANO-2 pressurizer during the 1
2R6 refueling outage scheduled to begin'in February, '1988.
Due to the preliminary nature of some aspects of our permanent repair plan, it is our intention to delay submission of the' supplemental LER
- - i report until after final repairs are made to the pressurizer during J
the refueling outage.
The expected submission date of the report is May 1, 1988.
Sincerely, l
J. m.h%
J. M. Levine Executive Director Site Operations JML: LAT:djm cc:
Regional Administrator INP0 Records. Center Region.IV Suite 1500' U. S. Nuclear Regulatory Commission 1100 Circle, 75 Parkway 611 Ryan Plaza Drive,. Suite 1000 Atlanta, GA 30039 Arlington, TX 76011 8711060243 87102B PDR ADOCK 05000360
,$p cl 5 '
S PDR i,:
MEMBER MIDDLE SOUTH UTiUTIES SYSTEM -
i