    Docket No. 50-346
Docket No. 50-346
    Toledo Edison Company
Toledo Edison Company
    ATTN: Mr. Donald C. Shelton,
ATTN: Mr. Donald C. Shelton,
              Vice President
Vice President
              Nuclear
Nuclear
    Edison Plaza
Edison Plaza
    300 Madison Avenue
300 Madison Avenue
    Toledo, OH 43652
Toledo, OH 43652
    Gentlemen:
Gentlemen:
    This refers to the routine safety inspection conducted by Messrs. P. M. Byron
This refers to the routine safety inspection conducted by Messrs. P. M. Byron
    and D. C. Kosloff of this office on October 1 through November 15, 1987, of
and D. C. Kosloff of this office on October 1 through November 15, 1987, of
    activities at Davis-Besse Nuclear Power Station authorized by Facility
activities at Davis-Besse Nuclear Power Station authorized by Facility
    Operating License No. NPF-3 and to the discussion of our findings with
Operating License No. NPF-3 and to the discussion of our findings with
    Mr. L. Storz at the conclusion of the inspection.
Mr. L. Storz at the conclusion of the inspection.
    The enclosed copy of our inspection report identifies areas examined during
The enclosed copy of our inspection report identifies areas examined during
    the inspection. Within these areas, the inspection consisted of a selective
the inspection. Within these areas, the inspection consisted of a selective
    examination of procedures and representative records, observations, and                           d
examination of procedures and representative records, observations, and
    interviews with personnel.                                                                       '
d
    No violations of NRC requirements were identified during the course of this
interviews with personnel.
    i_nspection.
'
                                                                                                      ]
No violations of NRC requirements were identified during the course of this
                                                                  .
i_nspection.
                                                                                                      1
]
    In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of                       {
.
    this letter, the enclosure, and your response to this letter will.be placed in                     1
1
    the NRC Public Document Room.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
    We will gladly discuss any questions you have concerning-this inspection.
{
                                                Sincerely,
this letter, the enclosure, and your response to this letter will.be placed in
                                                OLG1NAL SIGNED BY W. G. GULDEMOND
1
                                                W. G. Guldemond, Chief
the NRC Public Document Room.
                                                ReactorProjectsBranch2                                 .
We will gladly discuss any questions you have concerning-this inspection.
                                                                                                      a
Sincerely,
    Enclosure: Inspection Report
OLG1NAL SIGNED BY W. G. GULDEMOND
      No. 50-346/87026(DRP)
W. G. Guldemond, Chief
    See Attached Distribution
ReactorProjectsBranch2
                                                                                                        !
.
    RI
a
            o   1
Enclosure:
                                I
Inspection Report
                              ea    e
No. 50-346/87026(DRP)
                                      /^
See Attached Distribution
                                                RII
/
                                                      ond
RI
                                                                                                      1
I
                                                                                                      j
RII
                                                                                                      .
.
      (& {f(f
1
                            '
o
                              /  (/$           YIh
1
                                                                                }.
ea
                                                                                                    -
e
                                          . , .
ond
                    8712280277 871221
j
                    PDR
^
                    a
(& {f(f
                          ADOCK 05000346
'
                                      PDRr
(/$
                                                                              g
YIh
                                                                                (( _ $56/ -
/
}.
-
. , .
g((
8712280277 871221
PDR
ADOCK 05000346
_ $56/ -
a
PDRr


                                                  -
-
  .
.
  .
.
    Toledo Edison Company           2
Toledo Edison Company
                                      DEC 211987
2
    Distribution
DEC 211987
    cc w/ enclosure:
Distribution
    L. Storz, Plant Manager
cc w/ enclosure:
    DCD/DCB (RIDS)
L. Storz, Plant Manager
    Licensing. Fee Management Branch
DCD/DCB (RIDS)
    Resident Inspector, RIII
Licensing. Fee Management Branch
    Harold W. Kohn, Ohio EPA
Resident Inspector, RIII
    James W. Harris, State of Ohio
Harold W. Kohn, Ohio EPA
    Robert M. Quillin, Ohio
James W. Harris, State of Ohio
      Department of Health
Robert M. Quillin, Ohio
    State of Ohio, Public
Department of Health
      Utilities Commission
State of Ohio, Public
Utilities Commission
i
i
                                                    !
!
                                                    l
l
                                                    l
l
}}
}}

Latest revision as of 07:50, 2 December 2024

Forwards Safety Insp Rept 50-346/87-26 on 871001-1115.No Violations Noted
ML20237E334
Person / Time
Site: Davis Besse 
Issue date: 12/21/1987
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shelton D
TOLEDO EDISON CO.
Shared Package
ML20237E335 List:
References
NUDOCS 8712280277
Download: ML20237E334 (2)


See also: IR 05000346/1987026

Text

,

- __- _-_

p

'3 g g

reg

DEC 211987

Docket No. 50-346

Toledo Edison Company

ATTN: Mr. Donald C. Shelton,

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. P. M. Byron

and D. C. Kosloff of this office on October 1 through November 15, 1987, of

activities at Davis-Besse Nuclear Power Station authorized by Facility

Operating License No. NPF-3 and to the discussion of our findings with

Mr. L. Storz at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

d

interviews with personnel.

'

No violations of NRC requirements were identified during the course of this

i_nspection.

]

.

1

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

{

this letter, the enclosure, and your response to this letter will.be placed in

1

the NRC Public Document Room.

We will gladly discuss any questions you have concerning-this inspection.

Sincerely,

OLG1NAL SIGNED BY W. G. GULDEMOND

W. G. Guldemond, Chief

ReactorProjectsBranch2

.

a

Enclosure:

Inspection Report

No. 50-346/87026(DRP)

See Attached Distribution

/

RI

I

RII

.

1

o

1

ea

e

ond

j

^

(& {f(f

'

(/$

YIh

/

}.

-

. , .

g((

8712280277 871221

PDR

ADOCK 05000346

_ $56/ -

a

PDRr

-

.

.

Toledo Edison Company

2

DEC 211987

Distribution

cc w/ enclosure:

L. Storz, Plant Manager

DCD/DCB (RIDS)

Licensing. Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission

i

!

l

l