ML20237J928: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-                      __ .-.    -. - _ _ - . - . _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - .
{{#Wiki_filter:,.
      .. ; . .                                                                                                                                          i l
i l
                                                                                                                                                        )
).l
                                                                                                                                                    .l
)
                                                                                                                                                        )
1 1
1 1
1 I
1 I
Line 32: Line 31:
l 1
l 1
d s
d s
                                                                                                                                                        )
)
8708190004 B70012 PDR                     ADOCK 05000354 R                                 PDR
8708190004 B70012 PDR ADOCK 05000354 R
                  - _ _ _ _ - - _ _ _ . - .                                                                                                            i
PDR i


1 RCE           Description 91 Change / Safety Evaluation 4-HCM-86-0338A This DCP   provided a locking pin to maintain the   Undervessel Platform in the                                   storage position. This DCP did not ; create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.                                   It did not change the plant effluent releases and did not alter   the existing environmental                                   impact.
1 RCE Description 91 Change / Safety Evaluation 4-HCM-86-0338A This DCP provided a locking pin to maintain the Undervessel Platform in the storage position.
Therefore,     no   unreviewed                                   safety       or environmental questions are involved.
This DCP did not ; create a
(This DCP was previously reported as 4-HCM                     03338A).
new safety hazard to the plant nor did it affect the safe shutdown of the reactor.
                                                                                                                        )
It did not change the plant effluent releases and did not alter the existing environmental impact.
Therefore, no unreviewed safety or environmental questions are involved.
(This DCP was previously reported as 4-HCM 03338A).
)
b l
b l
l j
l j


I
I
  ~
~
Safety Eyn1gatisn Description   of   Temporary   Modification Esquest ITMR) 86-0003           The Temporary Modification Request         (TMR) associated with this Safety Evaluation           ,
Safety Eyn1gatisn Description of Temporary Modification Esquest ITMR) 86-0003 The Temporary Modification Request (TMR) associated with this Safety Evaluation added a temporary hose to route effluent from an oil interceptor to an emergency sump.
added a temporary hose to route effluent from an oil interceptor to an emergency sump. This TMR will reduce the number of barrels being used to collect turbine building oil waste.     Adding the hose did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.       It did not change the plant effluent releases and did not alter the     existing     environmental     impact.
This TMR will reduce the number of barrels being used to collect turbine building oil waste.
Therefore,   no     unreviewed     safety     or environmental questions are involved.
Adding the hose did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.
H-1-SPXX-CSE-0482 The Temporary Modification Request (TMR) associated with this Safety Evaluation installed a 2 millirem / hour source on two detectors   in     the Off-gas       Radiation Monitoring   System.       The source       was required to keep the detector operable until     background     radiation       levels increased. The temporary installation of these sources did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.         This TMR did   not change the         plant   effluent releases and did not alter the existing environmental impact.         Therefore,     no unreviewed     safety     or   environmental questions are involved.
It did not change the plant effluent releases and did not alter the existing environmental impact.
H-1-GSXX-MSE-0495 The Temporary Modification Request (TMR) associated with this Safety Evaluation installed blind flanges as required to support leak rate testing. The leak rate testing dealt with drywell purge valves, suppression chamber purge valves, and nitrogen supply valves.         The temporary installation of the flanges did             not create a new safety hazard to the plant nor did   it affect the safe shutdown of the reactor. This TMR did not change the plant effluent releases and did               not alter the existing environmental impact.
Therefore, no unreviewed safety or environmental questions are involved.
Therefore,   no     unreviewed safety         or environmental questions are involved.}}
H-1-SPXX-CSE-0482 The Temporary Modification Request (TMR) associated with this Safety Evaluation installed a 2 millirem / hour source on two detectors in the Off-gas Radiation Monitoring System.
The source was required to keep the detector operable until background radiation levels increased.
The temporary installation of these sources did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.
This TMR did not change the plant effluent releases and did not alter the existing environmental impact.
Therefore, no unreviewed safety or environmental questions are involved.
H-1-GSXX-MSE-0495 The Temporary Modification Request (TMR) associated with this Safety Evaluation installed blind flanges as required to support leak rate testing.
The leak rate testing dealt with drywell purge valves, suppression chamber purge
: valves, and nitrogen supply valves.
The temporary installation of the flanges did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.
This TMR did not change the plant effluent releases and did not alter the existing environmental impact.
Therefore, no unreviewed safety or environmental questions are involved.}}

Latest revision as of 07:01, 2 December 2024

Amend 1 to Summary of Changes,Tests & Experiments Apr 1986 - Apr 1987
ML20237J928
Person / Time
Site: Hope Creek 
Issue date: 04/30/1987
From:
Public Service Enterprise Group
To:
Shared Package
ML20237J580 List:
References
NUDOCS 8708190004
Download: ML20237J928 (3)


Text

,.

i l

).l

)

1 1

1 I

i i

AMENDMENT 1 TO

SUMMARY

OF CHANGES, TESTS, AND EXPERIMENTS i

POR THE HOPE CREEK GENERATING STATION APRIL 1986 THRU APRIL 1987 i

l 1

d s

)

8708190004 B70012 PDR ADOCK 05000354 R

PDR i

1 RCE Description 91 Change / Safety Evaluation 4-HCM-86-0338A This DCP provided a locking pin to maintain the Undervessel Platform in the storage position.

This DCP did not ; create a

new safety hazard to the plant nor did it affect the safe shutdown of the reactor.

It did not change the plant effluent releases and did not alter the existing environmental impact.

Therefore, no unreviewed safety or environmental questions are involved.

(This DCP was previously reported as 4-HCM 03338A).

)

b l

l j

I

~

Safety Eyn1gatisn Description of Temporary Modification Esquest ITMR) 86-0003 The Temporary Modification Request (TMR) associated with this Safety Evaluation added a temporary hose to route effluent from an oil interceptor to an emergency sump.

This TMR will reduce the number of barrels being used to collect turbine building oil waste.

Adding the hose did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.

It did not change the plant effluent releases and did not alter the existing environmental impact.

Therefore, no unreviewed safety or environmental questions are involved.

H-1-SPXX-CSE-0482 The Temporary Modification Request (TMR) associated with this Safety Evaluation installed a 2 millirem / hour source on two detectors in the Off-gas Radiation Monitoring System.

The source was required to keep the detector operable until background radiation levels increased.

The temporary installation of these sources did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.

This TMR did not change the plant effluent releases and did not alter the existing environmental impact.

Therefore, no unreviewed safety or environmental questions are involved.

H-1-GSXX-MSE-0495 The Temporary Modification Request (TMR) associated with this Safety Evaluation installed blind flanges as required to support leak rate testing.

The leak rate testing dealt with drywell purge valves, suppression chamber purge

valves, and nitrogen supply valves.

The temporary installation of the flanges did not create a new safety hazard to the plant nor did it affect the safe shutdown of the reactor.

This TMR did not change the plant effluent releases and did not alter the existing environmental impact.

Therefore, no unreviewed safety or environmental questions are involved.