{{#Wiki_filter:_
{{#Wiki_filter:.
.
_
  '
i*
            i*                                            AUG 2 81987
'
                      In Reply Refer To:                                                                     1
AUG 2 81987
                                                                                                            l
1
                      Docket:   50-267/07-20
In Reply Refer To:
                      Public Service Company of Colorado
l
                      ATTN:   Robert O. Williams, Jr.
Docket:
                              Vice President, Nuclear Operations                                             l
50-267/07-20
                      P. O. Box 840                                                                         '
Public Service Company of Colorado
                      Denver, Colorado     80201-0840
ATTN:
                      Gentlemen:
Robert O. Williams, Jr.
                                                                                                            I
Vice President, Nuclear Operations
                      This refers to the inspection conducted by Mr. G. L. Madsen of this of fice
P. O. Box 840
                      during the period August 3-7, 1987, of activities authorized by NRC Operating
'
                      License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the
Denver, Colorado
                      discussion of our findings with you and other members of your staff at the             1
80201-0840
                      conclusion of the inspection.
Gentlemen:
                                                                                                            l
I
                      Areas examined during the inspection includeo the design change and                   j
This refers to the inspection conducted by Mr. G. L. Madsen of this of fice
                      modification programs. Within these areas, the inspection consisted of                 l
during the period August 3-7, 1987, of activities authorized by NRC Operating
                      selective examination of procedures and representative records, interviews with       l
License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the
                      personnel, and observations by the NRC inspector. The inspection findings are         i
discussion of our findings with you and other members of your staff at the
                      documented in the enclosed inspection report.
1
                                                                                                            {
conclusion of the inspection.
                      During this inspection, it was found that certain of your activities were in
Areas examined during the inspection includeo the design change and
                      violation of NRC requirements.     Consequently, you are required to respond to
j
                      this violation, in writing, in accordance with the provisions of Section 2.201         !
modification programs.
                      of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Within these areas, the inspection consisted of
                      Regulations.   Your response should be based on the specifics contained in the       l
selective examination of procedures and representative records, interviews with
                      Notice of Violation enclosed with this letter.
personnel, and observations by the NRC inspector.
                      The response directed by this letter and the accompanying Notice is not subject       l
The inspection findings are
                      to the clearance procedures of the Office of Management and Budget as required         {
documented in the enclosed inspection report.
                      by the Paperwork Reduction Act of 1980, PL 96-511.                                     I
{
                                                                                                            1
During this inspection, it was found that certain of your activities were in
                      Should you have any questions concerning this inspection, we will be pleased to       l
violation of NRC requirements.
                      discuss them with you.
Consequently, you are required to respond to
                                                                                                            !
this violation, in writing, in accordance with the provisions of Section 2.201
                                                                Sincerely,
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
                                                                  O.dataa! st,ned Oy
Regulations.
                                                                  3. E. Gagilcrdo
Your response should be based on the specifics contained in the
                                                                J. E. Gagliardo, Chief
Notice of Violation enclosed with this letter.
                                                                Reactor Projects Branch                     i
The response directed by this letter and the accompanying Notice is not subject
                      Enclosures:   (see next page)       j
to the clearance procedures of the Office of Management and Budget as required
                                                      / /'              ('//$$                   /
{
                      RIV:RSB/05
by the Paperwork Reduction Act of 1980, PL 96-511.
                      GLMadsen6 #~,   C:05 @ tt
Should you have any questions concerning this inspection, we will be pleased to
                                      DMHunnicu
discuss them with you.
                                                      '1  B/A
Sincerely,
                                                      JJ udon
O.dataa! st,ned Oy
                                                                        :RSB
3. E. Gagilcrdo
                                                                        TFWesterman
J. E. Gagliardo, Chief
                                                                                      RPB      [
Reactor Projects Branch
                                                                                      JEGagli 'do
i
                      7 /Lb/87   1   ? /G/87         flg/87           [/].]/87     yN7/
Enclosures:
                                                                                                      0\
(see next page)
                      8709010262 870028
j
                      PDR
('//$$
                      G      ADDCK 05000267
/'
                                          PDR                                                         I I
/
    _ _ _ _ _ _ _ _ _
/
RIV:RSB/05
'1
B/A
:RSB
RPB
[
GLMadsen6 #~,
C:05 @ tt
DMHunnicu
JJ udon
TFWesterman
JEGagli 'do
7 /Lb/87
1
? /G/87
flg/87
[/].]/87
yN7/
0\\
8709010262 870028
PDR
ADDCK 05000267
G
PDR
I
I
_ _ _ _ _ _ _ _ _


  .4,
.4,
                                                                                                                        1
1
                                              Public Service of Colorado                 -2-                             l
l
                                              Enclosures:
Public Service of Colorado
                                              1.   Appendix A - Notice of Violation                                     j
-2-
                                              2.   Appendix B - NRC Inspection Report                                   1
Enclosures:
                                                    50-267/87-20                                                       1
1.
                                                                                                                        1
Appendix A - Notice of Violation
                                              cc W/ enclosures:
j
l                                            Manager, Nuclear Production Division                                     i
2.
                                              Fort St. Vrain Nuclear Station                                           l
Appendix B - NRC Inspection Report
                                              16805 WCR 19                                                             {
1
                                              Platteville, Colorado     80651
50-267/87-20
                                              P. Tomlinson, Manager, Quality
1
                                                Assurance Division
1
                                              (same address)                                                           j
cc W/ enclosures:
                                              Colorado Radiation Control Program Director
Manager, Nuclear Production Division
                                              Colorado Public Utilities Commission
i
l
Fort St. Vrain Nuclear Station
l
16805 WCR 19
{
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
Assurance Division
(same address)
j
Colorado Radiation Control Program Director
Colorado Public Utilities Commission
l
l
bcc to DMB (IE01)
(
bcc distrib. by RIV:
*RPB
DRSP
*RRI
R. D. Martin, RA
*Section Chief (RPB/A)
*RSB
*Section Chief (RSB/ES)
* Project Inspector, RPB
RPSB
*D. Weiss, RM/ALF
* MIS System
*R. Hall
I
*RSTS Operator
*K. Heitner, NRR Project Manager
*RIV File
"M.
E. Skow
Public Utilities Commission
Enforcement Officer
]
G. Madsen
Section Chief (RSB/05)
l
!
*w/766
I
1
!
l
)
l
l
l                                            bcc to DMB (IE01)
(                                            bcc distrib. by RIV:
                                              *RPB                                  DRSP
                                              *RRI                                  R. D. Martin, RA
                                              *Section Chief (RPB/A)                *RSB
                                              *Section Chief (RSB/ES)              * Project Inspector, RPB
                                                RPSB                                *D.  Weiss, RM/ALF
                                              * MIS System                          *R.  Hall
                                              *RSTS Operator                        *K.  Heitner, NRR Project Manager  I
                                              *RIV File                            "M.  E. Skow
                                                Public Utilities Commission          Enforcement Officer
                                                G. Madsen                                                              ]
                                                                                    Section Chief (RSB/05)              l
                                                                                                                        !
                                              *w/766                                                                    I
                                                                                                                        1
                                                                                                                        !
l
l
                                                                                                                      )
i
                                                                                                                        l
_ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ .
                                                                                                                        l
                                                                                                                        i
      _ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ .
}}
}}

Latest revision as of 05:56, 2 December 2024

Forwards Insp Rept 50-267/87-20 on 870803-07 & Notice of Violation
ML20238B525
Person / Time
Site: Fort Saint Vrain 
Issue date: 08/28/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20238B528 List:
References
NUDOCS 8709010262
Download: ML20238B525 (2)


See also: IR 05000267/1987020

Text

.

_

i*

'

AUG 2 81987

1

In Reply Refer To:

l

Docket:

50-267/07-20

Public Service Company of Colorado

ATTN:

Robert O. Williams, Jr.

Vice President, Nuclear Operations

P. O. Box 840

'

Denver, Colorado

80201-0840

Gentlemen:

I

This refers to the inspection conducted by Mr. G. L. Madsen of this of fice

during the period August 3-7, 1987, of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the

discussion of our findings with you and other members of your staff at the

1

conclusion of the inspection.

Areas examined during the inspection includeo the design change and

j

modification programs.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspector.

The inspection findings are

documented in the enclosed inspection report.

{

During this inspection, it was found that certain of your activities were in

violation of NRC requirements.

Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

{

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

O.dataa! st,ned Oy

3. E. Gagilcrdo

J. E. Gagliardo, Chief

Reactor Projects Branch

i

Enclosures:

(see next page)

j

('//$$

/'

/

/

RIV:RSB/05

'1

B/A

RSB

RPB

[

GLMadsen6 #~,

C:05 @ tt

DMHunnicu

JJ udon

TFWesterman

JEGagli 'do

7 /Lb/87

1

? /G/87

flg/87

[/].]/87

yN7/

0\\

8709010262 870028

PDR

ADDCK 05000267

G

PDR

I

I

_ _ _ _ _ _ _ _ _

.4,

1

l

Public Service of Colorado

-2-

Enclosures:

1.

Appendix A - Notice of Violation

j

2.

Appendix B - NRC Inspection Report

1

50-267/87-20

1

1

cc W/ enclosures:

Manager, Nuclear Production Division

i

l

Fort St. Vrain Nuclear Station

l

16805 WCR 19

{

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

Assurance Division

(same address)

j

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

l

l

bcc to DMB (IE01)

(

bcc distrib. by RIV:

  • RPB

DRSP

  • RRI

R. D. Martin, RA

  • Section Chief (RPB/A)
  • RSB
  • Section Chief (RSB/ES)
  • Project Inspector, RPB

RPSB

  • D. Weiss, RM/ALF
  • MIS System
  • R. Hall

I

  • RSTS Operator
  • K. Heitner, NRR Project Manager
  • RIV File

"M.

E. Skow

Public Utilities Commission

Enforcement Officer

]

G. Madsen

Section Chief (RSB/05)

l

!

  • w/766

I

1

!

l

)

l

l

i

_ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ .