Forwards Insp Rept 50-267/87-20 on 870803-07 & Notice of Violation
ML20238B525
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 08/28/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20238B528 List:
References
NUDOCS 8709010262
Download: ML20238B525 (2)


See also: IR 05000267/1987020

Text

_

.

'

i* AUG 2 81987

In Reply Refer To: 1

l

Docket: 50-267/07-20

Public Service Company of Colorado

ATTN: Robert O. Williams, Jr.

Vice President, Nuclear Operations l

P. O. Box 840 '

Denver, Colorado 80201-0840

Gentlemen:

I

This refers to the inspection conducted by Mr. G. L. Madsen of this of fice

during the period August 3-7, 1987, of activities authorized by NRC Operating

License DPR-34 for Fort St. Vrain Nuclear Generating Station, and to the

discussion of our findings with you and other members of your staff at the 1

conclusion of the inspection.

l

Areas examined during the inspection includeo the design change and j

modification programs. Within these areas, the inspection consisted of l

selective examination of procedures and representative records, interviews with l

personnel, and observations by the NRC inspector. The inspection findings are i

documented in the enclosed inspection report.

{

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201  !

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the l

Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject l

to the clearance procedures of the Office of Management and Budget as required {

by the Paperwork Reduction Act of 1980, PL 96-511. I

1

Should you have any questions concerning this inspection, we will be pleased to l

discuss them with you.

!

Sincerely,

O.dataa! st,ned Oy

3. E. Gagilcrdo

J. E. Gagliardo, Chief

Reactor Projects Branch i

Enclosures: (see next page) j

/ /' ('//$$ /

RIV:RSB/05

GLMadsen6 #~, C:05 @ tt

DMHunnicu

'1 B/A

JJ udon

RSB

TFWesterman

RPB [

JEGagli 'do

7 /Lb/87 1  ? /G/87 flg/87 [/].]/87 yN7/

0\

8709010262 870028

PDR

G ADDCK 05000267

PDR I I

_ _ _ _ _ _ _ _ _

.4,

1

Public Service of Colorado -2- l

Enclosures:

1. Appendix A - Notice of Violation j

2. Appendix B - NRC Inspection Report 1

50-267/87-20 1

1

cc W/ enclosures:

l Manager, Nuclear Production Division i

Fort St. Vrain Nuclear Station l

16805 WCR 19 {

Platteville, Colorado 80651

P. Tomlinson, Manager, Quality

Assurance Division

(same address) j

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

l

l bcc to DMB (IE01)

( bcc distrib. by RIV:

  • RPB DRSP
  • RRI R. D. Martin, RA
  • Section Chief (RPB/A) *RSB
  • Section Chief (RSB/ES) * Project Inspector, RPB

RPSB *D. Weiss, RM/ALF

  • MIS System *R. Hall
  • RSTS Operator *K. Heitner, NRR Project Manager I
  • RIV File "M. E. Skow

Public Utilities Commission Enforcement Officer

G. Madsen ]

Section Chief (RSB/05) l

!

  • w/766 I

1

!

l

)

l

l

i

_ - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ .