{{#Wiki_filter:_ _ - - _ | {{#Wiki_filter:_ _ - - _ | ||
' /.- | |||
ATTACHMENT 2 | g ATTACHMENT 2 | ||
(]y Frequency: | . Test Number RT-1 Revision Number /Date: | ||
II. REFERENCES | 01. | ||
10/01/88 | |||
(]y Frequency: | |||
I | Ardinal PWR SIMULATOR REAL TIME TEST I. | ||
OBJECTIVE The purpose of this procedure is to verify that the simulator is capable of operating in real time As required by ANSI /ANS 3.5-1985 " Nuclear Power Plant Simul, tor's for Use in Operator Training." | |||
O | II. REFERENCES 1. | ||
. ANSI /ANS 3.5-1985: Nuclear Power Plant Simulator's for Use in Operator Training. | |||
2. | |||
Reg Guide 1.149: Nuclear Power Plant Simulation Fecilities for Use in Operator License Examinations. | |||
I 3. | |||
PWR Operations Guideline #12: Simulator Testing Program. | |||
O 34t/1 5/89 8908020225 890727 ADOCK0500g{4 DR Q-_______-_________ | |||
g. | g. | ||
PWR SIMULATOR | PWR SIMULATOR l'h REAL TIME TEST | ||
, k.,0 III. INITIAL CONDITIONS 1. | |||
The plant is at zero power, normal operating pressure and no-load temperature. | |||
IV. DATA COLLECTION 1. | |||
IV. DATA COLLECTION | See test instructions, step 5. | ||
V. | |||
V. TEST INSTRUCTIONS | TEST INSTRUCTIONS 1. | ||
Initialize at a zero power, normal operating pressure, no-load temperature condition (IC-7). | |||
2. | |||
Verify / withdraw the shutdown banks. | |||
4 | 3. | ||
g | Verify / place rod control in manual. | ||
4 Using a stopwatch, time the interval between Control Bank A at 0 steps until Control Bank A reaches 228 steps. | |||
g 5. | |||
Record the time from Step 4. | |||
seconds | |||
{ | { | ||
y,) | |||
VI. ACCEPTANCE CRITERIA | VI. ACCEPTANCE CRITERIA 1. | ||
The simulator shall take 285 seconds i 1 second to move Control Bank A from 0 steps to 228 steps. | |||
p. | p. | ||
i | i | ||
) | |||
34t/2 5/89 | |||
34t/2 5/89 L- | ~' | ||
L- | |||
_ _ _ _ _ _ _ _ _}} | |||
Latest revision as of 19:36, 1 December 2024
| ML20247M766 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/01/1988 |
| From: | COMMONWEALTH EDISON CO. |
| To: | |
| Shared Package | |
| ML20247M747 | List: |
| References | |
| RT-1, NUDOCS 8908020225 | |
| Download: ML20247M766 (2) | |
Text
_ _ - - _
' /.-
g ATTACHMENT 2
. Test Number RT-1 Revision Number /Date:
01.
10/01/88
(]y Frequency:
Ardinal PWR SIMULATOR REAL TIME TEST I.
OBJECTIVE The purpose of this procedure is to verify that the simulator is capable of operating in real time As required by ANSI /ANS 3.5-1985 " Nuclear Power Plant Simul, tor's for Use in Operator Training."
II. REFERENCES 1.
. ANSI /ANS 3.5-1985: Nuclear Power Plant Simulator's for Use in Operator Training.
2.
Reg Guide 1.149: Nuclear Power Plant Simulation Fecilities for Use in Operator License Examinations.
I 3.
PWR Operations Guideline #12: Simulator Testing Program.
O 34t/1 5/89 8908020225 890727 ADOCK0500g{4 DR Q-_______-_________
g.
PWR SIMULATOR l'h REAL TIME TEST
, k.,0 III. INITIAL CONDITIONS 1.
The plant is at zero power, normal operating pressure and no-load temperature.
IV. DATA COLLECTION 1.
See test instructions, step 5.
V.
TEST INSTRUCTIONS 1.
Initialize at a zero power, normal operating pressure, no-load temperature condition (IC-7).
2.
Verify / withdraw the shutdown banks.
3.
Verify / place rod control in manual.
4 Using a stopwatch, time the interval between Control Bank A at 0 steps until Control Bank A reaches 228 steps.
g 5.
Record the time from Step 4.
seconds
{
y,)
VI. ACCEPTANCE CRITERIA 1.
The simulator shall take 285 seconds i 1 second to move Control Bank A from 0 steps to 228 steps.
p.
i
)
34t/2 5/89
~'