ML22136A069: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 | {{#Wiki_filter:ES-301 Administrative Topics Outline Form ES-301-1 Facility: | ||
Point Beach Date of Examination: | |||
Facility: Point Beach Date of Examination: 7/15/2019 Examination Level: RO SRO Operating Test Number: 2019 | 7/15/2019 Examination Level: RO SRO Operating Test Number: | ||
2019 Administrative Topic (see Note) | |||
Administrative Topic (see Note) Type Describe activity to be performed | Type Code* | ||
Describe activity to be performed Conduct of Operations D | |||
Respond to Quadrant Power Tilt in Excess | S Respond to Quadrant Power Tilt in Excess of Technical Specifications 2.1.7 (4.4/4.7) | ||
Conduct of Operations D | |||
Perform a Pressurizer Heater Group Input | R Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2) | ||
Equipment Control S | |||
Equipment Control S N Auxiliary Feedwater Lineup 2.2.15, (3.9/4.3) | N Auxiliary Feedwater Lineup 2.2.15, (3.9/4.3) | ||
Radiation Control D | |||
R P | |||
Determine a Stay Time for a High Radiation Area 2.3.7 (3.5/3.6) 2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan N/A Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). | |||
Emergency Plan N/A Not Applicable | * Type Codes and Criteria: | ||
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) | |||
(N)ew or (M)odified from bank ( 1) | |||
(P)revious 2 exams ( 1, randomly selected) | |||
ES-301 Administrative Topics Outline Form ES-301-1 Facility: | |||
Point Beach Date of Examination: | |||
7/15/2019 Examination Level: RO SRO Operating Test Number: | |||
2019 Administrative Topic (see Note) | |||
Type Code* | |||
Describe activity to be performed Conduct of Operations D | |||
R Review Quadrant Power Tilt Manual Calculation 2.1.37 (4.3/4.6) | |||
Conduct of Operations N | |||
R Review a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2) | |||
Equipment Control D | |||
R Review Tagout 2.2.13, (4.1/4.3) | |||
Radiation Control M | |||
R Remove RMS Channel from Service 2.3.13 (3.4/3.8) | |||
Emergency Plan D | |||
R S | |||
Formulate Protective Action Recommendations 2.4.44 (2.4/4.4) | |||
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). | NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). | ||
* Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) | * Type Codes and Criteria: | ||
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) | |||
(N)ew or (M)odified from bank ( 1) | (N)ew or (M)odified from bank ( 1) | ||
(P)revious 2 exams ( 1, randomly selected | (P)revious 2 exams ( 1, randomly selected) | ||
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). | ES-301 Administrative Topics Outline Form ES-301-1 Facility: | ||
* Type Codes and Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) | Point Beach Date of Examination: | ||
7/15/2019 Examination Level: RO SRO Operating Test Number: | |||
2019 Administrative Topic (see Note) | |||
Type Code* | |||
Describe activity to be performed Conduct of Operations Conduct of Operations D | |||
R Determination of Maximum Venting Time per Attachment B of CSP-I.3 2.1.25 (3.9/4.2) | |||
Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items). | |||
* Type Codes and Criteria: | |||
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes) | |||
(N)ew or (M)odified from bank ( 1) | (N)ew or (M)odified from bank ( 1) | ||
(P)revious 2 exams ( 1, randomly selected) | (P)revious 2 exams ( 1, randomly selected) | ||
- Added for Lohse-RO}} | |||
Latest revision as of 17:06, 27 November 2024
| ML22136A069 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/19/2019 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Florida Power & Light Energy Point Beach |
| Baker R | |
| Shared Package | |
| ML17215A928 | List: |
| References | |
| Download: ML22136A069 (3) | |
Text
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Point Beach Date of Examination:
7/15/2019 Examination Level: RO SRO Operating Test Number:
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations D
S Respond to Quadrant Power Tilt in Excess of Technical Specifications 2.1.7 (4.4/4.7)
Conduct of Operations D
R Perform a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)
Equipment Control S
N Auxiliary Feedwater Lineup 2.2.15, (3.9/4.3)
Radiation Control D
R P
Determine a Stay Time for a High Radiation Area 2.3.7 (3.5/3.6) 2.3.12 (3.2/3.7) 2015 NRC Exam Emergency Plan N/A Not Applicable NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Point Beach Date of Examination:
7/15/2019 Examination Level: RO SRO Operating Test Number:
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations D
R Review Quadrant Power Tilt Manual Calculation 2.1.37 (4.3/4.6)
Conduct of Operations N
R Review a Pressurizer Heater Group Input Test Calculation 2.1.25 (3.9/4.2)
Equipment Control D
R Review Tagout 2.2.13, (4.1/4.3)
Radiation Control M
R Remove RMS Channel from Service 2.3.13 (3.4/3.8)
R S
Formulate Protective Action Recommendations 2.4.44 (2.4/4.4)
NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
ES-301 Administrative Topics Outline Form ES-301-1 Facility:
Point Beach Date of Examination:
7/15/2019 Examination Level: RO SRO Operating Test Number:
2019 Administrative Topic (see Note)
Type Code*
Describe activity to be performed Conduct of Operations Conduct of Operations D
R Determination of Maximum Venting Time per Attachment B of CSP-I.3 2.1.25 (3.9/4.2)
Equipment Control Radiation Control Emergency Plan NOTE: All items (five total) are required for SROs. RO applicants require only four items unless they are retaking only the administrative topics (which would require all five items).
- Type Codes and Criteria:
(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs; 4 for SROs and RO retakes)
(N)ew or (M)odified from bank ( 1)
(P)revious 2 exams ( 1, randomly selected)
- Added for Lohse-RO