ML24159A217: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:...\\RLR\\fsar-fig-8.1-2a_27.dgn 11/6/2017 9:18:19 AM
{{#Wiki_filter:UFSAR Revision 32.0
...\\fsar-fig-8.1-2B_27.dgn 8/28/2017 3:18:27 PM VITAL INSTRUMENT BUS DISTRIBUTION SYSTEM


FSAR FIG. 8.3 - 1 A B C D E F G H J K L M N O
UFSAR Revision 32.0


600V AUX. BUS 600V AUX. BUS 250V DC DISTRIBUTION 600V AUX. BUS 600V AUX. BUS
...\\RLR\\fsar-fig-8.1-2a_27.dgn 11/6/2017 9:18:19 AM UFSAR Revision 32.0


1 1 FED FROM BUS '11A' FED FROM BUS '11B' FED FROM BUS '11C' FED FROM BUS '11D'
...\\fsar-fig-8.1-2B_27.dgn 8/28/2017 3:18:27 PM UFSAR Revision 32.0


2 2
FSAR FIG. 8.3 - 1 VITAL INSTRUMENT BUS DISTRIBUTION SYSTEM UFSAR Revision 32.0


3 BATTERY "AB" CHARGER BATTERY "CD" CHARGER 3 TRANSF. CABINET TRANSF. CABINET
NONE FSAR FIG. 8.3-2 600V AUX. BUS FED FROM BUS '11A' BATTERY "AB" CHARGER TRANSF. CABINET 600V AUX. BUS FED FROM BUS '11B' 600V AUX. BUS FED FROM BUS '11C' 600V AUX. BUS FED FROM BUS '11D' 250V DC DISTRIBUTION BATTERY '1AB' BATTERY '1CD' BATTERY "CD" CHARGER TRANSF. CABINET REVISED: PER UCR-1603.
 
A B
4 4
C 1
 
2 D
5 5
E F
G H
J K
L M
N O
1 2
3 4
5 6
7 DATE NO.
DESCRIPTION APPD.
REVISIONS 8
9 O
N M
H L
G F
E D
C B
A 9
8 7
6 5
4 3
DATE:
SCALE:
DR:
CH:
INDIANA MICHIGAN POWER COMPANY BRIDGMAN MICHIGAN NUCLEAR PLANT DONALD C. COOK "THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP AND IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR COPIED, IN WHOLE OR IN PART, OR USED FOR FURNISHING INFORMATION TO ANY PERSON WITHOUT THE CONSENT OF THE AEP SERVICE CORP, OR FOR ANY PURPOSE DETRIMENTAL TO THEIR INTEREST, AND IS TO BE RETURNED UPON REQUEST" FILENAME : fsar-fig-8-3-2_18-0.dwg 316 INCH 4
12 16 CM 1
2 3
4 5
6 7
TENTHS 10 K
20 30 3
2 1
INCHES


==REFERENCES:==
==REFERENCES:==
OP-1-12003
OP-1-12003 18.0 18.0 18.0 18.0 18.0 18.0 UFSAR Revision 32.0
 
18.0 18.0
 
6 6
 
18.0 18.0 18.0
 
7 7
 
18.0REVISED: PER UCR-1603.
 
DATE NO. DESCRIPTION APPD.
REVISIONS FILENAME : fsar-fig-8-3-2_18-0.dwg
 
"THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP AND IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR 8 COPIED, IN WHOLE OR IN PART, OR USED FOR 8 FURNISHING INFORMATION TO ANY PERSON WITHOUT THE CONSENT OF THE AEP SERVICE CORP, OR FOR ANY PURPOSE DETRIMENTAL TO THEIR INTEREST, AND IS TO BE RETURNED UPON REQUEST" INDIANA MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT BRIDGMAN MICHIGAN
 
9 9
 
SCALE: DR:NONE
 
DATE: CH:
BATTERY '1AB' BATTERY '1CD'
 
A B C D E CM 1 2 3 4 5 6 7FG 316INCH 4 H 12 16 TENTHS 10 K 20 30 3LINCHES1M2NO 600 V AUX BUS 600 V AUX BUS
 
FED FROM BUS "IID" 250 V DC FED FROM BUS "IIB"
 
BATTERY "I N"
 
BATTERY BATTERY CHARGER CHARGER TRAIN A TRAIN B FRV - 256 POSITION INDICATION CTL BUS FAILURE


250 V DC DISTRIBUTION CAB.
DONALD C. COOK BRIDGMAN ARCH FSAR FIG. 8.3 - 3 AEP SERVICE CORP.
"DCN"
COLUMBUS, OH 43215 1 RIVERSIDE PLAZA ELEC MECH STR NUCLEAR PLANT UNITS NO. 1 & 2 250 V Distribution "IN" N Battery MICHIGAN 17 INDIANA MICHIGAN POWER COMPANY REVISED PER UCR 620 250 V DC BATTERY "I N" BATTERY CHARGER TRAIN A BATTERY CHARGER TRAIN B AMSAC INVERTER 250 V DC DISTRIBUTION CAB.
"DCN" FRV - 256 POSITION INDICATION CTL BUS FAILURE 600 V AUX BUS BUS "IID" FED FROM 600 V AUX BUS FED FROM BUS "IIB" TURBINE DRIVEN AUX FEED WATER CONTROL BUS VCC "AB-N" FMO-211 FMO-221 FMO-231 FMO-241 QT-506 UFSAR Revision 32.0


VCC "AB-N"
NOTE:
 
17 REVISED PER UCR 620 FMO-211 TURBINE DRIVEN AMSAC FMO-221 AUX FEED WATER INVERTER CONTROL BUS FMO-231
 
FMO-241
 
INDIANA MICHIGAN POWER COMPANY QT-506 DONALD C. COOK NUCLEAR PLANT
 
BRIDGMAN MICHIGAN UNITS NO. 1 & 2 250 V Distribution "IN" N Battery
 
FSAR FIG. 8.3 - 3
 
ARCH ELEC MECH STR
 
AEP SERVICE CORP.1 RIVERSIDE PLAZA COLUMBUS, OH 43215 NOTE:
VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).
VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).
 
FSAR FIG. 8.4 - 1 EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY UNITS NO. 1 & 2 Revised Per UCR 98-UFSAR-0458 16.6 DIESEL FUEL OIL DAY TANKS (WHEN FULL, EACH DAY TANK CONTAINS FUEL FOR APPROXIMATELY 87 MINUTES OF DIESEL GENERATOR OPERATION AT FULL LOAD) 16.6 DIESEL FUEL OIL DAY TANKS (WHEN FULL, EACH DAY TANK CONTAINS FUEL FOR APPROXIMATELY 87 MINUTES OF DIESEL GENERATOR OPERATION AT FULL LOAD) 16.6 UFSAR Revision 32.0}}
16.6Revised Per UCR 98-UFSAR-0458
 
DIESEL FUEL OIL DAY TANKS DIESEL FUEL OIL DAY TANKS (WHEN FULL, EACH DAY TANK (WHEN FULL, EACH DAY TANK CONTAINS FUEL FOR CONTAINS FUEL FOR APPROXIMATELY 87 MINUTES OF APPROXIMATELY 87 MINUTES OF DIESEL GENERATOR OPERATION AT DIESEL GENERATOR OPERATION AT FULL LOAD) FULL LOAD) 16.6 16.6
 
EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY UNITS NO. 1 & 2 FSAR FIG. 8.4 - 1}}

Revision as of 18:03, 24 November 2024

Updated Final Safety Analysis Report (Ufsar), Revision 32, Chapter 8, Figures
ML24159A217
Person / Time
Site: Cook  
Issue date: 05/30/2024
From:
Indiana Michigan Power Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML24159A261 List: ... further results
References
AEP-NRC-2024-20
Download: ML24159A217 (1)


Text

UFSAR Revision 32.0

UFSAR Revision 32.0

...\\RLR\\fsar-fig-8.1-2a_27.dgn 11/6/2017 9:18:19 AM UFSAR Revision 32.0

...\\fsar-fig-8.1-2B_27.dgn 8/28/2017 3:18:27 PM UFSAR Revision 32.0

FSAR FIG. 8.3 - 1 VITAL INSTRUMENT BUS DISTRIBUTION SYSTEM UFSAR Revision 32.0

NONE FSAR FIG. 8.3-2 600V AUX. BUS FED FROM BUS '11A' BATTERY "AB" CHARGER TRANSF. CABINET 600V AUX. BUS FED FROM BUS '11B' 600V AUX. BUS FED FROM BUS '11C' 600V AUX. BUS FED FROM BUS '11D' 250V DC DISTRIBUTION BATTERY '1AB' BATTERY '1CD' BATTERY "CD" CHARGER TRANSF. CABINET REVISED: PER UCR-1603.

A B

C 1

2 D

E F

G H

J K

L M

N O

1 2

3 4

5 6

7 DATE NO.

DESCRIPTION APPD.

REVISIONS 8

9 O

N M

H L

G F

E D

C B

A 9

8 7

6 5

4 3

DATE:

SCALE:

DR:

CH:

INDIANA MICHIGAN POWER COMPANY BRIDGMAN MICHIGAN NUCLEAR PLANT DONALD C. COOK "THIS DRAWING IS THE PROPERTY OF THE AMERICAN ELECTRIC POWER SERVICE CORP AND IS LOANED UPON CONDITION THAT IT IS NOT TO BE REPRODUCED OR COPIED, IN WHOLE OR IN PART, OR USED FOR FURNISHING INFORMATION TO ANY PERSON WITHOUT THE CONSENT OF THE AEP SERVICE CORP, OR FOR ANY PURPOSE DETRIMENTAL TO THEIR INTEREST, AND IS TO BE RETURNED UPON REQUEST" FILENAME : fsar-fig-8-3-2_18-0.dwg 316 INCH 4

12 16 CM 1

2 3

4 5

6 7

TENTHS 10 K

20 30 3

2 1

INCHES

REFERENCES:

OP-1-12003 18.0 18.0 18.0 18.0 18.0 18.0 UFSAR Revision 32.0

DONALD C. COOK BRIDGMAN ARCH FSAR FIG. 8.3 - 3 AEP SERVICE CORP.

COLUMBUS, OH 43215 1 RIVERSIDE PLAZA ELEC MECH STR NUCLEAR PLANT UNITS NO. 1 & 2 250 V Distribution "IN" N Battery MICHIGAN 17 INDIANA MICHIGAN POWER COMPANY REVISED PER UCR 620 250 V DC BATTERY "I N" BATTERY CHARGER TRAIN A BATTERY CHARGER TRAIN B AMSAC INVERTER 250 V DC DISTRIBUTION CAB.

"DCN" FRV - 256 POSITION INDICATION CTL BUS FAILURE 600 V AUX BUS BUS "IID" FED FROM 600 V AUX BUS FED FROM BUS "IIB" TURBINE DRIVEN AUX FEED WATER CONTROL BUS VCC "AB-N" FMO-211 FMO-221 FMO-231 FMO-241 QT-506 UFSAR Revision 32.0

NOTE:

VALVE POSITIONS ARE NOT GOVERNED BY THE UFSAR FIGURES BUT RATHER BY STATION PROCEDURES (EXCEPT VALVES WITH LOCKED OR SEALED, AND FAILURE POSITIONS AS INDICATED).

FSAR FIG. 8.4 - 1 EMERGENCY DIESEL GENERATOR FUEL OIL SUPPLY UNITS NO. 1 & 2 Revised Per UCR 98-UFSAR-0458 16.6 DIESEL FUEL OIL DAY TANKS (WHEN FULL, EACH DAY TANK CONTAINS FUEL FOR APPROXIMATELY 87 MINUTES OF DIESEL GENERATOR OPERATION AT FULL LOAD) 16.6 DIESEL FUEL OIL DAY TANKS (WHEN FULL, EACH DAY TANK CONTAINS FUEL FOR APPROXIMATELY 87 MINUTES OF DIESEL GENERATOR OPERATION AT FULL LOAD) 16.6 UFSAR Revision 32.0