ML22039A032: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UCU! * ..LO t L.UL.L.
{{#Wiki_filter:UCU! *..LO t L.UL.L.
Page        2        of    2
*ID: TEXT 3.3.7 REMOVE :    REV: 3 ADD:    REV: 4 CATEGORY: DOCUMENTS  TYPE: TRMl ID: TEXT B3.3.7 ADD:    REV: 4 REMOVE:    REV:3 ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .


1 t;,                                                                                 SSES MANUAL Manual Name:     TRMl
Page 2 of 2 ID: TEXT 3.3.7 REMOVE : REV: 3
  .
 
* Manual
ADD: REV: 4
 
CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT B3.3.7 ADD: REV: 4
 
REMOVE: REV:3
 
ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
 
1
 
t;, SSES MANUAL
 
Manual Name: TRMl
 
.* Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT l Table Of Contents Issue Date:             01/17/2022 Procedure Name                                           Rev                 Issue Date                             Change ID       Change Number TEXT LOES                                                 96                   01/03/2019
TECHNICAL REQUIREMENTS MANUAL UNIT l
 
Table Of Contents Issue Date: 01/17/2022 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 96 01/03/2019


==Title:==
==Title:==
LIST OF EFFECTIVE SECTIONS TEXT TOC                                                   27                   03/05/2019
LIST OF EFFECTIVE SECTIONS
 
TEXT TOC 27 03/05/2019


==Title:==
==Title:==
TABLE OF CONTENTS TEXT 1.1                                                 1                     01/31/2014
TABLE OF CONTENTS
 
TEXT 1.1 1 01/31/2014


==Title:==
==Title:==
USE AND APPLICATION DEFINITIONS TEXT 2.1                                                 2                     04/28/2015           /-,
USE AND APPLICATION DEFINITIONS
 
TEXT 2.1 2 04/28/2015 /-, ',,


==Title:==
==Title:==
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMp"-,                                                               />
PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMp"-, />
                                                                                                    ,./""-:- ....... -..., , * .,/'
,./""-:-....... -...,, *.,/'
                                                                                                    /(  "" "/        '
TEXT 2.2 10 01~3_:(2,~1t ___ / ( "" ' "/ ))
TEXT 2.2                                                 10                     01~3_:(2,~1t___) )


==Title:==
==Title:==
PLANT PROGRAMS AND SETPOINTS ~,N/~TfUJvIENJ_!R:IP SETPOINT TABLE I ,          )  '
PLANT PROGRAMS AND SETPOINTS ~,N/~TfUJvIENJ_!R:IP SETPOINT TABLE
                                                                          *'"**'**, '*,,l / ' '*.     -?
*'"**'**, I, ) ' '*,,l /' '*. -?
                                                                            /o}i,,_is-1_~021 TEXT 3.0
* TEXT 3.0 7 /.. /o}i,,_is-1_~021


==Title:==
==Title:==
TECHNICAL REQUIREMENT F0R''0PERATIO:r:f 7 / ..
TECHNICAL REQUIREMENT F0R''0PERATIO:r:f (TRO) APPLICABILITY & SURVEILLANCE (TRS) *' ' " '
                                                            ,~;*~...:
APPLICABILITY,~;*~... :,........, ',,,.,
(TRO) APPLICABILITY                & SURVEILLANCE (TRS)
-.,, ' ~, *>
APPLICABILITY                              -., '                 ~, *>
TEXT 3.1.1 (~ *,,. l-~~09/2007
TEXT 3 .1.1                                     ( ~ *,,. l-~~09/2007
                                                        ', ~--./


==Title:==
==Title:==
REACTIVITY CONJ;R0L,,,Y-?'Ri?MS ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD I - .,,.,_   , \,     *~"l.
REACTIVITY CONJ;R0L,,,Y-?'Ri?MS ', ~--./ ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD
INJECTION (ATfS':..AR:.r) \INSQ'RUMENTATION
 
                                          \  \        \ \
I -.,,.,_, \\, *~"l.
TEXT 3.1.2             /--......... \   '-, __ ) ) 0                           11/18/2002
INJECTION (ATfS':..AR:.r) \\INSQ'RUMENTATION TEXT 3.1.2 /--......... \\ \\ \\ \\ \\ '-, __ )) 0 11/18/2002
                            /      '    / '*            /


==Title:==
==Title:==
REACTIVITftbN'FROI:i""SYSTEMS CONTROL ROD DRIVE . (CRD) HOUSING SUPPORT
REACTIVITftbN'FROI:i""SYSTEMS CONTROL ROD DRIVE. (CRD) HOUSING SUPPORT / ' / '* /
                            \-~\ *, __)\ /')
\\ -~ *, \\ \\ ') _ _) /
TEXT 3 .1.3             "~-.----                       6                      12/18/2017
TEXT 3.1.3 6 12/18/2017 "~-.----


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION TEXT 3 .1.4                                             l                     10/12/2020
REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION
 
TEXT 3.1.4 l 10/12/2020


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION                                                               &
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &
CHECK VALVE TEXT 3.2.l                                               20                     04/07/2020
CHECK VALVE TEXT 3.2.l 20 04/07/2020


==Title:==
==Title:==
CORE OPERATING LIMIST REPORT (COLR)
CORE OPERATING LIMIST REPORT (COLR)
* Pagel       of 16                                                                                                                     Report Date: 01/17/22
* Pagel of 16 Report Date: 01/17/22 c
SSES MANUAL "
 
Manual Name: TRMl


c SSES MANUAL Manual Name:    TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.3.1                         0   11/18/2002
TECHNICAL REQUIREMENTS MANUAL UNIT 1
* TEXT 3.3.1 0 11/18/2002


==Title:==
==Title:==
I.NSTRUMENTATION RADIATION MONITORING INSTRUMENTATION TEXT 3.3.2                         3   03/31/2011
I.NSTRUMENTATION RADIATION MONITORING INSTRUMENTATION
 
TEXT 3.3.2 3 03/31/2011


==Title:==
==Title:==
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION TEXT 3.3.3                         2   11/09/2007
INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION
 
TEXT 3.3.3 2 11/09/2007


==Title:==
==Title:==
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION TEXT 3.3.4                         11   06/29/2017
INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION
 
TEXT 3.3.4 11 06/29/2017


==Title:==
==Title:==
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION TEXT 3.3.5                         0   11/18/2002
INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION
 
TEXT 3.3.5 0 11/18/2002


==Title:==
==Title:==
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK TEXT 3.3.6                         5   03/05/2019
INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK
 
TEXT 3.3.6 5 03/05/2019


==Title:==
==Title:==
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION TEXT 3.3.7                         4   01/17/2022
INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION
* TEXT 3.3.7 4 01/17/2022


==Title:==
==Title:==
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT 3.3.8                         1   10/22/2003.
INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM
 
TEXT 3.3.8 1 10/22/2003.


==Title:==
==Title:==
INSTRUMENTATION INTENTIONALLY LEFT BLANK TEXT 3.3.9                         3   04/17/2008
INSTRUMENTATION INTENTIONALLY LEFT BLANK
 
TEXT 3.3.9 3 04/17/2008


==Title:==
==Title:==
OPRM INSTRUMENTATION CONFIGURATION TEXT 3.3.10                       1   12/14/2004
OPRM INSTRUMENTATION CONFIGURATION
 
TEXT 3.3.10 1 12/14/2004


==Title:==
==Title:==
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS TEXT 3.3.11                       1   10/22/2003
INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS
 
TEXT 3.3.11 1 10/22/2003


==Title:==
==Title:==
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION TEXT 3.3.12                       2   04/02/2019
INSTRUMENTATION MVP ISOLATION INSTRUMENTATION
 
TEXT 3.3.12 2 04/02/2019


==Title:==
==Title:==
WATER MONITORING INSTRUMENTATION Page 2     of 16                                                       Report Date: 01/17/22
WATER MONITORING INSTRUMENTATION
* Page 2 of 16 Report Date: 01/17/22
. SSES MANUAL
 
Manual Name: TRMl


                                          . SSES MANUAL Manual Name:    TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.4.1                       1     04/26/2006
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT 3.4.1 1 04/26/2006


==Title:==
==Title:==
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY TEXT 3.4.2                       1       04/16/2009
REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY
 
TEXT 3.4.2 1 04/16/2009


==Title:==
==Title:==
REACTOR COOLANT SYSTEM       INTENTIONALLY LEFT BLANK TEXT 3.4.3                       1       11/09/2007
REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK
 
TEXT 3.4.3 1 11/09/2007


==Title:==
==Title:==
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS TEXT 3.4.4                       2       04/17/2008
REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS
 
TEXT 3.4.4 2 04/17/2008


==Title:==
==Title:==
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT 3.4.5                       1       04/26/2006
REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT
 
TEXT 3.4.5 1 04/26/2006


==Title:==
==Title:==
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS TEXT 3.4.6                       2       04/25/2013
REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS
 
TEXT 3.4.6 2 04/25/2013


==Title:==
==Title:==
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT 3.5.1                       2       03/05/2019
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
 
TEXT 3.5.1 2 03/05/2019


==Title:==
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT 3.5.2                       2       03/05/2019
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT
 
TEXT 3.5.2 2 03/05/2019


==Title:==
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT 3.5.3                       1       03/05/2019
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION
 
TEXT 3.5.3 1 03/05/2019


==Title:==
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1                       0     11/18/2002
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002


==Title:==
==Title:==
CONTAINMENT VENTING OR PURGING TEXT 3.6.2                       3       01/03/2019
CONTAINMENT VENTING OR PURGING
 
TEXT 3.6.2 3 01/03/2019


==Title:==
==Title:==
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION TEXT 3.6.3                       0     11/18/2002
SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION
 
TEXT 3.6.3 0 11/18/2002


==Title:==
==Title:==
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION Page 3     of 16                                                       Report Date: 01/17/22
CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION
* Page 3 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL Manual Name:      TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.6.4                       0     11/18/2002
TECHNICAL REQUIREMENTS MANUAL UNIT 1
* TEXT 3.6.4 0 11/18/2002


==Title:==
==Title:==
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT 3.7.1                       0     11/18/2002
CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
 
TEXT 3.7.1 0 11/18/2002


==Title:==
==Title:==
PLANT SYSTEMS EMERGENCY SERVICE WATER S.YSTEM (ESW) SHUTDOWN TEXT 3.7.2                       0     11/18/2002
PLANT SYSTEMS EMERGENCY SERVICE WATER S.YSTEM (ESW) SHUTDOWN
 
TEXT 3.7.2 0 11/18/2002


==Title:==
==Title:==
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL TEXT 3.7.3.1                     5     02/13/2020
PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL
 
TEXT 3.7.3.1 5 02/13/2020


==Title:==
==Title:==
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT 3.7.3-.2                     3     04/16/2009
PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM
 
TEXT 3.7.3-.2 3 04/16/2009


==Title:==
==Title:==
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS TEXT 3.7.3.3                     4
PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS
 
TEXT 3.7.3.3 4 05/16/2016 *


==Title:==
==Title:==
PLANT SYSTEMS CO2 SYSTEMS TEXT 3.7.3.4                     2
PLANT SYSTEMS CO2 SYSTEMS
 
TEXT 3.7.3.4 2 04/16/2009


==Title:==
==Title:==
PLANT SYSTEMS HALON SYSTEMS 05/16/2016 04/16/2009 TEXT 3.7.3.5                     2     04/16/2009*
PLANT SYSTEMS HALON SYSTEMS
 
TEXT 3.7.3.5 2 04/16/2009*


==Title:==
==Title:==
PLANT SYSTEMS FIRE HOSE STATIONS TEXT 3.7.3.6                     2     04/16/2009
PLANT SYSTEMS FIRE HOSE STATIONS
 
TEXT 3.7.3.6 2 04/16/2009


==Title:==
==Title:==
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT 3.7.3.7                     1     04/26/2006
PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
 
TEXT 3.7.3.7 1 04/26/2006


==Title:==
==Title:==
PLANT SYSTEMS FIRE RATED ASSEMBLIES TEXT 3.7.3.8                     13   12/18/2017
PLANT SYSTEMS FIRE RATED ASSEMBLIES
 
TEXT 3.7.3.8 13 12/18/2017


==Title:==
==Title:==
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION
PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION
  'rEXT *3. 7 .4                   1     04/26/2006
 
'rEXT *3. 7.4 1 04/26/2006


==Title:==
==Title:==
PLANT SYSTEMS SOLID RADWASTE SYSTEM Page 4       of 16                                                       Report Date: 01/17/22
PLANT SYSTEMS SOLID RADWASTE SYSTEM
* Page 4 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name:.TRMl


SSES MANUAL
Manual
* Manual Name:  .TRMl Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.7.5.1                     1     03jo5/2015
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT 3.7.5.1 1 03jo5/2015


==Title:==
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT 3.7.5.2                     0     11/18/2002
PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR
 
TEXT 3.7.5.2 0 11/18/2002


==Title:==
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT 3.7.5.3                     1     04/26/2006
PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
 
TEXT 3.7.5.3 1 04/26/2006


==Title:==
==Title:==
PLANT SYSTEMS LIQUID HOLDUP TANKS TEXT 3.7.6                       3     06/04/2012
PLANT SYSTEMS LIQUID HOLDUP TANKS
 
TEXT 3.7.6 3 06/04/2012


==Title:==
==Title:==
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION TEXT 3.7.7                       2     09/05/2008
PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION
 
TEXT 3.7.7 2 09/05/2008


==Title:==
==Title:==
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT.LOGARITHMIC RADIATION MONITORING TEXT 3.7.8                       5     03/05/2015
PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT.LOGARITHMIC RADIATION MONITORING
 
TEXT 3.7.8 5 03/05/2015


==Title:==
==Title:==
PLANT SYSTEMS SNUBBERS TEXT 3.7.9                       3     03/05/2019
PLANT SYSTEMS SNUBBERS
 
TEXT 3.7.9 3 03/05/2019


==Title:==
==Title:==
PLANT SYSTEMS CONTROL STRUCTURE HVAC TEXT 3.7.10                       1     12/14/2004
PLANT SYSTEMS CONTROL STRUCTURE HVAC
 
TEXT 3.7.10 1 12/14/2004


==Title:==
==Title:==
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)
TEXT 3.7.11                       1     11/01/2018
 
TEXT 3.7.11 1 11/01/2018


==Title:==
==Title:==
STRUCTURAL INTEGRITY TEXT 3.8.1                       3     04/22/2020
STRUCTURAL INTEGRITY
 
TEXT 3.8.1 3 04/22/2020


==Title:==
==Title:==
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES TEXT 3.8.2.1                     2     11/09/2007
ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES
 
TEXT 3.8.2.1 2 11/09/2007


==Title:==
==Title:==
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT 3.8.2.2                     3     06/23/2021
CONTINUOUS
 
TEXT 3.8.2.2 3 06/23/2021


==Title:==
==Title:==
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC Page 5     of 16                                                       Report Date: 01/17/22
AUTOMATIC
* Page 5 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL Manual Name:    TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.8.3                       4     01/28/2020
TECHNICAL REQUIREMENTS MANUAL UNIT 1
* TEXT 3.8.3 4 01/28/2020


==Title:==
==Title:==
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT 3.8.4                       0     11/18/2002
ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
 
TEXT 3.8.4 0 11/18/2002


==Title:==
==Title:==
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT 3.8.5                       1     11/14/2013
ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM
 
TEXT 3.8.5 1 11/14/2013


==Title:==
==Title:==
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION TEXT 3.8.6                       2     03/05/2019
ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION
 
TEXT 3.8.6 2 03/05/2019


==Title:==
==Title:==
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING TEXT 3.8.7                       2     02/25/2021
ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING
 
TEXT 3.8.7 2 02/25/2021


==Title:==
==Title:==
BATTERY MAINTENANCE AND MONITORING PROGRAM TEXT 3.9.1                       0     11/18/2002
BATTERY MAINTENANCE AND MONITORING PROGRAM
 
TEXT 3.9.1 0 11/18/2002


==Title:==
==Title:==
REFUELING OPERATIONS DECAY TIME TEXT 3.9.2                       0     11/18/2002
REFUELING OPERATIONS DECAY TIME
* TEXT 3.9.2 0 11/18/2002


==Title:==
==Title:==
REFUELING OPERATIONS COMMUNICATIONS TEXT 3.9.3                       .1     03/12/2019
REFUELING OPERATIONS COMMUNICATIONS
 
TEXT 3.9.3.1 03/12/2019


==Title:==
==Title:==
REFUELING OPERATIONS REFUELING PLATFORM TEXT 3.10.l                       1     04/26/2006
REFUELING OPERATIONS REFUELING PLATFORM
 
TEXT 3.10.l 1 04/26/2006


==Title:==
==Title:==
MISCELLANEOUS SEAL SOURCE CONTAMINATION TEXT 3.10.2                       3     06/19/2019
MISCELLANEOUS SEAL SOURCE CONTAMINATION
 
TEXT 3.10.2 3 06/19/2019


==Title:==
==Title:==
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT 3.10.3                       3     10/17/2019
MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
 
TEXT 3.10.3 3 10/17/2019


==Title:==
==Title:==
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT 3.10.4                       2     04/17/2008
 
TEXT 3.10.4 2 04/17/2008


==Title:==
==Title:==
INTENTIONALLY LEFT BLANK Page 6     of 16                                                       Report Date: 01/17/22
INTENTIONALLY LEFT BLANK
* Page 6 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL
Manual
* Manual Name:        TRMl Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3 . 11. 1. 1               1     04/26/2006
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT 3. 11. 1. 1 1 04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION TEXT 3 . 11. 1. 2               1     04/26/2006
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION
 
TEXT 3. 11. 1. 2 1 04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE TEXT 3 . 11 . 1. 3               1   -04/26/2006
RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE
 
TEXT 3. 11. 1. 3 1 -04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM TEXT 3.11.1.4                   2     10/09/2012
RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM
 
TEXT 3.11.1.4 2 10/09/2012


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENr MONITORING INSTRUMENTATION TEXT 3.11.1.5                   3     03/05/2015
RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENr MONITORING INSTRUMENTATION
 
TEXT 3.11.1.5 3 03/05/2015


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
* TEXT 3.11.2.1                     4     03/12/2019
* TEXT 3.11.2.1 4 03/12/2019


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS DOSE RATE TEXT 3.11.2.2                     1     04/26/2006
RADIOACTIVE EFFLUENTS DOSE RATE
 
TEXT 3.11.2.2 1 04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES TEXT 3 *. 11 . 2 . 3             1     04/26/2006
RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES
 
TEXT 3 *. 11. 2. 3 1 04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM TEXT 3 . 11. 2 . 4               0     11/18/2002
RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM
 
TEXT 3. 11. 2. 4 0 11/18/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM TEXT 3 .11. 2 . 5               4     07/03/2013
RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM
 
TEXT 3.11. 2. 5 4 07/03/2013


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM.
RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM.
TEXT 3 . 11. 2 . 6               8     06/29/2017
 
TEXT 3. 11. 2. 6 8 06/29/2017


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT 3 .11. 3                   1     04/26/2006
RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
 
TEXT 3.11. 3 1 04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7       of   16                                                     Report Date: 01/17/22
RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 16 Report Date: 01/17/22 SSES MANUAL


SSES MANUAL Manual Name:   TRMl Manual
Manual Name: TRMl
 
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 3.11.4.1                     6     01/03/2022
TECHNICAL REQUIREMENTS MANUAL UNIT 1
* TEXT 3.11.4.1 6 01/03/2022


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS MONITORING PROGRAM TEXT 3.11.4.2                     2     04/26/2006
RADIOACTIVE EFFLUENTS MONITORING PROGRAM
 
TEXT 3.11.4.2 2 04/26/2006


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS LAND USE CENSUS TEXT 3.11.4.3                           04/26/2006
RADIOACTIVE EFFLUENTS LAND USE CENSUS
 
TEXT 3.11.4.3 04/26/2006


==Title:==
==Title:==
.RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM TEXT 3.12.1                       0     11/19/2002
.RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM
 
TEXT 3.12.1 0 11/19/2002


==Title:==
==Title:==
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL TEXT 3.12.2                       4     04/17/2008
LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL
 
TEXT 3.12.2 4 04/17/2008


==Title:==
==Title:==
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS TEXT 3.12.3                       0     11/19/2002
LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS
 
TEXT 3.12.3 0 11/19/2002


==Title:==
==Title:==
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT TEXT 4.1                           0     08/31/1998
LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT
* TEXT 4.1 0 08/31/1998


==Title:==
==Title:==
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 4.2                           1     01/03/2019
ADMINISTRATIVE CONTROLS ORGANIZATION
 
TEXT 4.2 1 01/03/2019


==Title:==
==Title:==
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION TEXT 4.3                           1     01/03/2019
ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION
 
TEXT 4.3 1 01/03/2019


==Title:==
==Title:==
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION TEXT 4.4                           1     12/18/2008
ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION
 
TEXT 4.4 1 12/18/2008


==Title:==
==Title:==
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.5                           1     07/01/2021
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS
 
TEXT 4.5 1 07/01/2021


==Title:==
==Title:==
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS TEXT 4.6                           0     08/31/1998
ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS
 
TEXT 4.6 0 08/31/1998


==Title:==
==Title:==
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM Page 8     of 16                                                       Report Date: 01/17/22
ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM
* Page 8 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL
Manual
* Manual Name:    TRMl Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT 4.7                           0     08/31/1998
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT 4.7 0 08/31/1998


==Title:==
==Title:==
ADMINI.STRATIVE CONTROLS TRAINING TEXT B3.0                         6     03/18/2021
ADMINI.STRATIVE CONTROLS TRAINING
 
TEXT B3.0 6 03/18/2021


==Title:==
==Title:==
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY TEXT B3.l.l                       2       04/29/2014
APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY
 
TEXT B3.l.l 2 04/29/2014


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD* INJECTION (ATWS-ARI) INSTRUMENTATION TEXT B3.l.2                       0       11/19/2002
REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD* INJECTION (ATWS-ARI) INSTRUMENTATION
 
TEXT B3.l.2 0 11/19/2002


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT TEXT B3.l.3                       4       12/18/2017
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT
 
TEXT B3.l.3 4 12/18/2017


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS BASES CONTRO.L _ROD BLOCK INSTRUMENTATION
REACTIVITY CONTROL SYSTEMS BASES CONTRO.L _ROD BLOCK INSTRUMENTATION
* TEXT B3 .1.4                     1       10/12/2020
 
TEXT B3.1.4 1 10/12/2020


==Title:==
==Title:==
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION TEXT B3.2.l AND CHECK VALVE 0     . 11/19/2002
REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE
 
TEXT B3.2.l 0. 11/19/2002


==Title:==
==Title:==
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR).
CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR).
TEXT B3.3.l                       1       01/31/2014
 
TEXT B3.3.l 1 01/31/2014


==Title:==
==Title:==
INSTRUMENTATION BASES RADIATION MONITORING "INSTRUMENTATION TEXT B3.3.2                       2       03/31/2011
INSTRUMENTATION BASES RADIATION MONITORING "INSTRUMENTATION
 
TEXT B3.3.2 2 03/31/2011


==Title:==
==Title:==
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION TEXT B3.3.3                       3       12/18/2008
INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION
 
TEXT B3.3.3 3 12/18/2008


==Title:==
==Title:==
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION TEXT B3.3.4                       7       06/29/2017
INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION
 
TEXT B3.3.4 7 06/29/2017


==Title:==
==Title:==
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT B3.3.5                       2       11/09/2007
INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION
*Page 9
 
TEXT B3.3.5 2 11/09/2007


==Title:==
==Title:==
INTENTIONALLY LEFT BLANK of   16                                                         Report Date: 01/17/22
INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL Manual Name:      TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.3.6                         6     03/05/2019
TECHNICAL REQUIREMENTS MANUAL UNIT 1
* TEXT B3.3.6 6 03/05/2019


==Title:==
==Title:==
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION TEXT B3.3.7                         4     01/17/2022
INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION
 
TEXT B3.3.7 4 01/17/2022


==Title:==
==Title:==
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM TEXT B3'. 3. 8                       1     10/22/2003
INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM
 
TEXT B3'. 3. 8 1 10/22/2003


==Title:==
==Title:==
INTENTIONALLY LEFT BLANK TEXT B3.3.9                         4     01/03/2019
INTENTIONALLY LEFT BLANK
 
TEXT B3.3.9 4 01/03/2019


==Title:==
==Title:==
OPRM INSTRUMENTATION TEXT B3.3.10                         3     08/09/2010
OPRM INSTRUMENTATION
 
TEXT B3.3.10 3 08/09/2010


==Title:==
==Title:==
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS TEXT B3.3.11                         1     10/22/2003
INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS
 
TEXT B3.3.11 1 10/22/2003


==Title:==
==Title:==
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION TEXT B3.3.12                         1     04/02/2019
INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION
* TEXT B3.3.12 1 04/02/2019


==Title:==
==Title:==
WATER MONITORING INSTRUMENTATION TEXT B3.4.1                         0     11/19/2002
WATER MONITORING INSTRUMENTATION
 
TEXT B3.4.1 0 11/19/2002


==Title:==
==Title:==
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY TEXT B3.4.2                         1     04/16/2009
REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY
 
TEXT B3.4.2 1 04/16/2009


==Title:==
==Title:==
INTENTIONALLY LEFT BLANK TEXT B3.4.3                         1     11/09/2007
INTENTIONALLY LEFT BLANK
 
TEXT B3.4.3 1 11/09/2007


==Title:==
==Title:==
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR
REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR
  '.):'EXT B3.4.4                     0     11/19/2002
 
'.):'EXT B3.4.4 0 11/19/2002


==Title:==
==Title:==
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT TEXT B3.4.5                         0     11/19/2002
REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT
 
TEXT B3.4.5 0 11/19/2002


==Title:==
==Title:==
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS Page 10       of 16                                                       Report Date: 01/17/22
REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS
* Page 10 of 16 Report Date: 01/17/22 SSES MANUAL


SSES MANUAL
Manual Name: TRMl
* Manual Name:     TRMl Manual
 
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.4.6                       3     01/03/2019
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT B3.4.6 3 01/03/2019


==Title:==
==Title:==
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION TEXT B3.5.1                       2     03/17/2020
REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION
 
TEXT B3.5.1 2 03/17/2020


==Title:==
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT TEXT B3 ..5. 2                   2     03/05/2019
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT
 
TEXT B3.. 5. 2 2 03/05/2019


==Title:==
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION TEXT B3.5.3                       2     03/05/2019
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION
 
TEXT B3.5.3 2 03/05/2019


==Title:==
==Title:==
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l                       0     11/19/2002
ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002


==Title:==
==Title:==
CONTAINMENT BASES VENTING OR PURGING
CONTAINMENT BASES VENTING OR PURGING
* TEXT B3.6.2                       0     11/19/2002
* TEXT B3.6.2 0 11/19/2002


==Title:==
==Title:==
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION TEXT B3.6.3                       2     04/17/2008
CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION
 
TEXT B3.6.3 2 04/17/2008


==Title:==
==Title:==
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION TEXT B3.6.4                       1     12/14/2004
CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION
 
TEXT B3.6.4 1 12/14/2004


==Title:==
==Title:==
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES TEXT B3.7.l                       0     11/19/2002
CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES
 
TEXT B3.7.l 0 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES EMERGENCY SERVICE. WATER SYSTEM (SHUTDOWN)
PLANT SYSTEMS BASES EMERGENCY SERVICE. WATER SYSTEM (SHUTDOWN)
TEXT B3.7.2                       0     11/19/2002
 
TEXT B3.7.2 0 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL TEXT B3.7.3.l                     4     02/16/2017
PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL
 
TEXT B3.7.3.l 4 02/16/2017


==Title:==
==Title:==
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM TEXT B3.7.3.2                     2     04/26/2006
PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM
 
TEXT B3.7.3.2 2 04/26/2006


==Title:==
==Title:==
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11     of   16                                                     Report Date: 01/17/22
PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL Manual Name:    TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.3.3                     1     01/03/2019
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT B3.7.3.3 1 01/03/2019


==Title:==
==Title:==
PLANT SYSTEMS BASES CO2 SYSTEMS TEXT B3.7.3.4                     4     06/19/2019
PLANT SYSTEMS BASES CO2 SYSTEMS
 
TEXT B3.7.3.4 4 06/19/2019


==Title:==
==Title:==
PLANT SYSTEMS BASES HALON SYSTEMS TEXT B~.7.3.5                     1     04/26/2006
PLANT SYSTEMS BASES HALON SYSTEMS
 
TEXT B~.7.3.5 1 04/26/2006


==Title:==
==Title:==
. PLANT SYSTEMS BASES FIRE HOSE STATIONS TEXT B3.7.3.6                     1     04/26/2006
. PLANT SYSTEMS BASES FIRE HOSE STATIONS
 
TEXT B3.7.3.6 1 04/26/2006


==Title:==
==Title:==
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES TEXT B3.7.3.7                     0     11/19/2002
PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES
 
TEXT B3.7.3.7 0 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES TEXT B3.7.3.8                     3     09/27/2012
PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES
 
TEXT B3.7.3.8 3 09/27/2012


==Title:==
==Title:==
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION TEXT B3.7.4                       *o     11/19/2002
PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION
 
TEXT B3.7.4 *o 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM TEXT B3.7.5.1                     0     11/19/2002
PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM
 
TEXT B3.7.5.1 0 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR TEXT B3.7.5.2                     0     11/19/2002
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR
 
TEXT B3.7.5.2 0 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE TEXT B3.7.5.3                     0     11/19/2002
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE
 
TEXT B3.7.5.3 0 11/19/2002


==Title:==
==Title:==
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS TEXT B3.7.6                       4     06/04/2013
PLANT SYSTEMS BASES LIQUID HOLDUP TANKS
 
TEXT B3.7.6 4 06/04/2013


==Title:==
==Title:==
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION TEXT B3.7.7.                       2     01/31/2008
PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION
 
TEXT B3.7.7. 2 01/31/2008


==Title:==
==Title:==
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION Page 12     of   16                                                     Report Date: 01/17/22
PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION
 
Page 12 of 16 Report Date: 01/17/22
* SSES MANUAL


SSES MANUAL
Manual Name: TRMl
* Manual Name:     TRMl Manual
 
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.7.8                       4     01/31/2014 Title.: PLANT SYSTEMS BASES SNUBBERS TEXT B3.7.9                       3     03/05/2019
TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT B3.7.8 4 01/31/2014 Title.: PLANT SYSTEMS BASES SNUBBERS
 
TEXT B3.7.9 3 03/05/2019


==Title:==
==Title:==
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC TEXT B3.7.10                     1     12/14/2004 Ti~le: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS TEXT B3.7.ll                     2     11/01/2018
PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC
 
TEXT B3.7.10 1 12/14/2004 Ti~le: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS
 
TEXT B3.7.ll 2 11/01/2018


==Title:==
==Title:==
STRUCTURAL INTEGRITY TEXT B3.8.1                       2     03/10/2010
STRUCTURAL INTEGRITY
 
TEXT B3.8.1 2 03/10/2010


==Title:==
==Title:==
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES
ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES
* TEXT B3.8.2.l                     0     11/19/2002
* TEXT B3.8.2.l 0 11/19/2002


==Title:==
==Title:==
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
CONTINUOUS TEXT B3.8.2.2                     2     06/23/2021
CONTINUOUS
 
TEXT B3.8.2.2 2 06/23/2021


==Title:==
==Title:==
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -
AUTOMATIC TEXT B3.8.3                       0     11/19/2002
AUTOMATIC
 
TEXT B3.8.3 0 11/19/2002


==Title:==
==Title:==
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES TEXT B3.8.4                       0     11/19/2002
ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES
 
TEXT B3.8.4 0 11/19/2002


==Title:==
==Title:==
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM TEXT B3.8.5                       1     11/14/2013
ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM
 
TEXT B3.8.5 1 11/14/2013


==Title:==
==Title:==
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION TEXT B3.8.6                       3     03/05/2019
ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION
 
TEXT B3.8.6 3 03/05/2019


==Title:==
==Title:==
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING TEXT B3.8.7                       3     02/25/2021 ,
ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING
* Page 13
 
TEXT B3.8.7 3 02/25/2021,


==Title:==
==Title:==
BATTERY MAINTENANCE AND MONITORING PROGRAM of 16                                                     Report Date: 01/17/22
BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL Manual Name:      TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT i TEXT B3.9.1                     0     11/19/2002
TECHNICAL REQUIREMENTS MANUAL UNIT i
 
TEXT B3.9.1 0 11/19/2002


==Title:==
==Title:==
REFUELING OPERATIONS BASES DECAY TIME
REFUELING OPERATIONS BASES DECAY TIME
* TEXT B3 . 9 . 2                 0     11/19/2002 .
* TEXT B3. 9. 2 0 11/19/2002.


==Title:==
==Title:==
REFUELING OPERATIONS BASES COMMUNICATIONS TEXT B3.9.3                     1     03/12/2019
REFUELING OPERATIONS BASES COMMUNICATIONS
 
TEXT B3.9.3 1 03/12/2019


==Title:==
==Title:==
REFUELING OPERATIONS BASES REFUELING PLATFORM TEXT B3.10.l                     0     11/19/2002
REFUELING OPERATIONS BASES REFUELING PLATFORM
 
TEXT B3.10.l 0 11/19/2002


==Title:==
==Title:==
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION TEXT B3.10.2                     1     03/31/2006
MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION
 
TEXT B3.10.2 1 03/31/2006


==Title:==
==Title:==
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION TEXT B3.10.3                     2     10/17/2019
MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION
 
TEXT B3.10.3 2 10/17/2019


==Title:==
==Title:==
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)
TEXT B3.10.4                     1
 
TEXT B3.10.4 1 04/17/2008


==Title:==
==Title:==
INTENTIONALLY LEFT BLANK 04/17/2008 TEXT B3.ll.l.1                   0     11/19/2002
INTENTIONALLY LEFT BLANK
 
TEXT B3.ll.l.1 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION TEXT B3 . 11. 1. 2               0     11/19/2002
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION
 
TEXT B3. 11. 1. 2 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS*DOSE TEXT B3 .11.1. 3                 0     11/19/2002
RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS*DOSE
 
TEXT B3.11.1. 3 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM TEXT B3.ll.1.4                   0   . 11/19/2002
RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM
 
TEXT B3.ll.1.4 0. 11/19/2002


==Title:==
==Title:==
RADIOACTIVE-EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION TEXT B3 .11.1. 5                 0     11/19/2002
RADIOACTIVE-EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION
 
TEXT B3.11.1. 5 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION Page 14     of     16                                                   Report Date: 01/17/22
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION
 
Page 14 of 16 Report Date: 01/17/22 *
.. SSES MANUAL
 
Manual Name: TRMl


.                                            SSES MANUAL
Manual
* Manual Name:      TRMl Manual


==Title:==
==Title:==
. TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3 .11.2 .1                 1     12/14/2004
. TECHNICAL REQUIREMENTS MANUAL UNIT 1
 
TEXT B3.11.2.1 1 12/14/2004


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE RATE TEXT B3.ll.2.2                   0     11/19/2002
RADIOACTIVE EFFLUENTS BASES DOSE RATE
 
TEXT B3.ll.2.2 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES TEXT B3 .11. 2. 3               0     11/19/2002
RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES
 
TEXT B3.11. 2. 3 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3 .11. 2. 4               0     11/19/2002
RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11. 2. 4 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM TEXT B3. il.2. 5                 5     07/03/2013
RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM
 
TEXT B3. il.2. 5 5 07/03/2013


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM
RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM
* TEXT B3.ll.2.6                   2     09/08/2016
 
TEXT B3.ll.2.6 2 09/08/2016


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION TEXT B3.ll.3                     0     11/19/2002
RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION
 
TEXT B3.ll.3 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE TEXT B3.ll.4.1                   6     01/03/2022
RADIOACTIVE EFFLUENTS BASES TOTAL DOSE
 
TEXT B3.ll.4.1 6 01/03/2022


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM TEXT B3.ll.4.2                   0     11/19/2002
RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM
 
TEXT B3.ll.4.2 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS TEXT B3. 11. 4. 3                 0     11/19/2002
RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS
 
TEXT B3. 11. 4. 3 0 11/19/2002


==Title:==
==Title:==
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PIWGRAM TEXT B3.12.1                     1     10/04/2007
RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PIWGRAM
 
TEXT B3.12.1 1 10/04/2007


==Title:==
==Title:==
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL TEXT B3.12.2                     1     12/03/2010
LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL
 
TEXT B3.12.2 1 12/03/2010


==Title:==
==Title:==
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15     of   16                                                     Report Date: 01/17/22
LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 01/17/22 SSES MANUAL
 
Manual Name: TRMl


SSES MANUAL Manual Name:  TRMl Manual
Manual


==Title:==
==Title:==
TECHNICAL REQUIREMENTS MANUAL UNIT 1 TEXT B3.12.3                     0     11/19/2002
TECHNICAL REQUIREMENTS MANUAL UNIT 1
* TEXT B3.12.3 0 11/19/2002


==Title:==
==Title:==
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS Page 16   of 16                                                 Report Date: 01/17/22
LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS
 
Page 16 of 16 Report Date: 01/17/22
* Main Turbine Overspeed Protection System Rev. 4 3.3.7
** 3.3 Instrumentation
 
3.3.7 Main Turbine Overspeed Protection System
 
TRO 3.3.7 The Main Turbine Overspeed Protection System shall be OPERABLE.


Main Turbine Overspeed Protection System
** Rev. 4 3.3 3.3.7 Instrumentation Main Turbine Overspeed Protection System 3.3.7 TRO 3.3.7      The Main Turbine Overspeed Protection System shall be OPERABLE.
Applicability: MODES 1 and 2.
Applicability: MODES 1 and 2.
The power/load unbalance circuitry is not required to be OPERABLE with turbine load <40% of full turbine load.
The power/load unbalance circuitry is not required to be OPERABLE with turbine load <40% of full turbine load.
ACTIONS CONDITION                       REQUIRED ACTION                 COMPLETION TIME A. Two of eight stop valves   A.1.1     Close one of the inoperable - 72 hours and control valves                   valves.
 
ACTIONS
 
CONDITION REQUIRED ACTION COMPLETION TIME
 
A. Two of eight stop valves A.1.1 Close one of the inoperable - 72 hours and control valves valves.
inoperable.
inoperable.
AND A.1.2     Limit THERMAL POWER           12 hours following
AND
:5 75% RTP.                   clo_sure of the inoperable valve AND A.1.3     Apply the following limits for 12 hours following a closed Turbine Stop Valve   closure of the or Turbine Control Valve as   inoperable valve specified in the COLR:
 
A.1.2 Limit THERMAL POWER 12 hours following
* :5 75% RTP. clo_sure of the inoperable valve AND
 
A.1.3 Apply the following limits for 12 hours following a closed Turbine Stop Valve closure of the or Turbine Control Valve as inoperable valve specified in the COLR:
: a. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR),"
: a. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR),"
: b. LCO 3.2.3, "LINEAR HEAT GENERATION RATE (LHGR)."
: b. LCO 3.2.3, "LINEAR HEAT GENERATION RATE (LHGR)."
OR A.2        Isolate main turbine from the  72 hours steam supply.
** SUSQUEHANNA - UNIT 1                        TRM / 3.3-17


Main Turbine Overspeed Protection System Rev.4                                                                                 3.3.7 ACTIONS (continued)
OR
CONDITION                 REQUIRED ACTION                 COMPLETION TIME B. Two of twelve intercept   B.1 Close either the intercept   72 hours valves and intermediate         valve or the intermediate stop valves inoperable.         stop valve within one of the affected combined intermediate valves.
 
OR B.2 Isolate main turbine from the 72 hours steam supply.
A.2 Isolate main turbine from the 72 hours steam supply.
C. One main turbine           C. 1 Restore the main turbine     Prior to startup from overspeed protection           overspeed protection device   the next planned device inoperable.             to an OPERABLE status.       refuel outage D. Turbine Overspeed         D.1 Engineering perform           6 days Protection System               evaluation to determine inoperable for reasons         required action in           OR other than Condition A, B,     accordance with FSAR ore.                           Table 3.5-10.                 In accordance with FSAR Table 3.5-1 O AND D.2  Perform action specified in  As specified in FSAR Table 3.5-10.            FSAR Table 3.5-10 SUSQUEHANNA - UNIT 1                TRM / 3.3-17a
** SUSQUEHANNA - UNIT 1 TRM / 3.3-17 Main Turbine Overspeed Protection System Rev.4 3.3.7
 
ACTIONS (continued)
* CONDITION REQUIRED ACTION COMPLETION TIME
 
B. Two of twelve intercept B.1 Close either the intercept 72 hours valves and intermediate valve or the intermediate stop valves inoperable. stop valve within one of the affected combined intermediate valves.
 
OR
 
B.2 Isolate main turbine from the 72 hours steam supply.
 
C. One main turbine C. 1 Restore the main turbine Prior to startup from overspeed protection overspeed protection device the next planned device inoperable. to an OPERABLE status. refuel outage
 
D. Turbine Overspeed D.1 Engineering perform 6 days Protection System evaluation to determine inoperable for reasons required action in OR other than Condition A, B, accordance with FSAR ore. Table 3.5-10. In accordance with FSAR Table 3.5-1 O


Main Turbine Overspeed Protection System
AND
** Rev.4 TECHNICAL REQUIREMENT SURVEILLANCE
  ---------*-----------NOTE------*-----------
When a channel is placed in an inoperable status solely for performance of required 3.3.7 Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours provided the redundant overspeed trip device is OPERABLE.
SURVEILLANCE                                    FREQUENCY TRS 3.3.7.1                            -NOTE-------
The provisions of TRS 3.0.4 are not applicable Cycle each high pressure turbine control valve from the    122 days running position and observe valve closure.
TRS 3.3.7.2                              NOTE The provisions of TRS 3.0.4 are n_ot applicable
:e                Cycle each low pressure turbine combined intermediate valve from the running position and observe valve closure.
122 days TRS 3.3.7.3                              NOTE The provisions of TRS 3.0.4 are not applicable Cycle each high pressure turbine stop valves from the      122 days running position and observe valve closure.
TRS 3.3.7.4    Perform a CHANNEL CALIBRATION of main turbine              24 months overspeed protection instrumentation.
TRS 3.3.7.5    Disassemble one of each type valve identified in          40 months on a TRS 3.3. 7.1, TRS 3.3. 7.2, and TRS 3.3. 7.3, perform a    STAGGERED visual and surface inspection of valve seats, disks and    TEST BASIS stems and verify no unacceptable flaws or corrosion.
SUSQUEHANNA - UNIT 1                      TRM / 3.3-18


Main Turbine Overspeed Protection System Rev. 4                                                                                 3.3.7
D.2 Perform action specified in As specified in FSAR Table 3.5-10. FSAR Table 3.5-10
  . TECHNICAL REQUIREMENT SURVEILLANCE continued SURVEILLANCE                                     FREQUENCY TRS 3.3.7.6 ---------------------NOTE----------
 
SUSQUEHANNA - UNIT 1 TRM / 3.3-17a Main Turbine Overspeed Protection System Rev.4 3.3.7
** TECHNICAL REQUIREMENT SURVEILLANCE
 
---------*-----------NOTE------*-----------
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours provided the redundant overspeed trip device is OPERABLE.
 
SURVEILLANCE FREQUENCY
 
TRS 3.3.7.1 -NOTE-------
The provisions of TRS 3.0.4 are not applicable
 
Cycle each high pressure turbine control valve from the 122 days running position and observe valve closure.
 
TRS 3.3.7.2 NOTE The provisions of TRS 3.0.4 are n_ot applicable
:e Cycle each low pressure turbine combined intermediate 122 days valve from the running position and observe valve closure.
 
TRS 3.3.7.3 NOTE The provisions of TRS 3.0.4 are not applicable
 
Cycle each high pressure turbine stop valves from the 122 days running position and observe valve closure.
 
TRS 3.3.7.4 Perform a CHANNEL CALIBRATION of main turbine 24 months overspeed protection instrumentation.
 
TRS 3.3.7.5 Disassemble one of each type valve identified in 40 months on a TRS 3.3. 7.1, TRS 3.3. 7.2, and TRS 3.3. 7.3, perform a STAGGERED visual and surface inspection of valve seats, disks and TEST BASIS stems and verify no unacceptable flaws or corrosion.
 
SUSQUEHANNA - UNIT 1 TRM / 3.3-18 Main Turbine Overspeed Protection System Rev. 4 3.3.7
 
. TECHNICAL REQUIREMENT SURVEILLANCE continued
* SURVEILLANCE FREQUENCY
 
TRS 3.3.7.6 ---------------------NOTE----------
Not required to be _met during startup until 24 hours after turbine conditions are adequate to perform the test.
Not required to be _met during startup until 24 hours after turbine conditions are adequate to perform the test.
Perform CHANNEL FUNCTIONAL TEST of main turbine            31 days overspeed protection devices.
SUSQUEHANNA - UNIT 1                  TRM / 3.3-1 Sa


Main Turbine Overspeed Protection System Rev. 4                                                             .                         B 3.3.7 B 3.3   Instrumentation B 3.3.7 Main Turbine Overspeed Protection System BASES TRO             The Main Turbine Overspeed Protection System (MTOPS) is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1). It is comprised of overspeed protection devices and the valves which control steam flow to the turbine.
Perform CHANNEL FUNCTIONAL TEST of main turbine 31 days overspeed protection devices.
The mechanical overspeed trip device is an unbalanced ring mounted on the turbine shaft and held concentric with it by a spring. When the turbine speed reaches the trip speed (i.e., 10% above rated speed) the centrifugal force acting on the ring overcomes the tension of the spring and the ring snaps to an eccentric position ..In doing this it strikes the trip finger which operates the mechanical trip valve, which blocks hydraulic fluid-supply which in turn causes the main stop valves, control valves, and combined intercept valves to close .
 
* The electrical overspeed trip receives its signal from a 112% speed trip relay (i.e., 12% above rated speed) that is operated by a speed signal sensed by a magn*etic pickup from a toothed wheel on the turbine shaft and fed to a power amplifier and megacycles circuit whose output is a de voltage proportional to speed. The signal from the speed trip relay energizes the master trip relay, which then energizes the mechanical trip solenoid and deenergizes the master trip solenoid valves .
SUSQUEHANNA - UNIT 1 TRM / 3.3-1 Sa Main Turbine Overspeed Protection System Rev. 4. B 3.3.7
                  . Either one of these actions will trip the turbine.
 
B 3.3 Instrumentation
 
B 3.3.7 Main Turbine Overspeed Protection System
 
BASES
 
TRO The Main Turbine Overspeed Protection System (MTOPS) is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1). It is comprised of overspeed protection devices and the valves which control steam flow to the turbine.
 
The mechanical overspeed trip device is an unbalanced ring mounted on the turbine shaft and held concentric with it by a spring. When the turbine speed reaches the trip speed (i.e., 10% above rated speed) the centrifugal force acting on the ring overcomes the tension of the spring and the ring snaps to an eccentric position.. In doing this it strikes the trip finger which operates the mechanical trip valve, which blocks hydraulic fluid-supply which in turn causes the main stop valves, control valves, and combined intercept valves to close.
 
The electrical overspeed trip receives its signal from a 112% speed trip relay (i.e., 12% above rated speed) that is operated by a speed signal sensed by a
* magn*etic pickup from a toothed wheel on the turbine shaft and fed to a power amplifier and megacycles circuit whose output is a de voltage proportional to speed. The signal from the speed trip relay energizes the master trip relay, which then energizes the mechanical trip solenoid and deenergizes the master trip solenoid valves.
 
. Either one of these actions will trip the turbine.
 
An additional feature of the protective system which will minimize the likelihood of an overspeed condition is the power/load unbalance circuitry.
An additional feature of the protective system which will minimize the likelihood of an overspeed condition is the power/load unbalance circuitry.
Generator load is sensed by means of three current transformers and is compared with the turbine power input which is sensed by the turbine intermediate pressure sensor. If the difference between the steam power input and the generator output rises to at least 40% in 35 msec, auxiliary relays will be actuated which will energize the control valves fast closing solenoids, remove the load reference at the load control unit and automatically drive the load reference motor to zero setpoint. By design, the power/load unbalance circuitry is not required to be OPERABLE until turbine power/load exceeds 40% of rated oufput. Therefore, the Applicability of the TRO indicates the circuitry is not required to be OPERABLE until 40% turbine load/power is reached .
Generator load is sensed by means of three current transformers and is compared with the turbine power input which is sensed by the turbine intermediate pressure sensor. If the difference between the steam power input and the generator output rises to at least 40% in 35 msec, auxiliary relays will be actuated which will energize the control valves fast closing solenoids, remove the load reference at the load control unit and automatically drive the load reference motor to zero setpoint. By design, the power/load unbalance circuitry is not required to be OPERABLE until turbine power/load exceeds 40% of rated oufput. Therefore, the Applicability of the TRO indicates the circuitry is not required to be OPERABLE until 40% turbine load/power is reached.
** SUSQUEHANNA - UNIT 1                     TRM / B 3.3-14
SUSQUEHANNA - UNIT 1 TRM / B 3.3-14 Main Turbine Overspeed Protection System Rev.4 B 3.3.7
 
BASES
 
TRO In this TRM section, the mechanical overspeed trip device, the backup (continued) electrical overspeed trip device, the power/load unbalance circuitry, and the master trip solenoid valves are collectively referred to as overspeed protection devices. The operability of the overspeed protection devices is assumed in the turbine missile probability analysis documented in Refs. 4 and 5. The turbine missile probability analysis can accommodate the inoperability of any one of the overspeed protection devices. However, appropriate corrective actions must be taken as specified in the FSAR.


Main Turbine Overspeed Protection System Rev.4                                                                                    B 3.3.7 BASES TRO          In this TRM section, the mechanical overspeed trip device, the backup (continued)  electrical overspeed trip device, the power/load unbalance circuitry, and the master trip solenoid valves are collectively referred to as overspeed protection devices. The operability of the overspeed protection devices is assumed in the turbine missile probability analysis documented in Refs. 4 and 5. The turbine missile probability analysis can accommodate the inoperability of any one of the overspeed protection devices. However, appropriate corrective actions must be taken as specified in the FSAR.
MTOPS OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2).
MTOPS OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2).
Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in ReC2.
Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in ReC2.
However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.
However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.
Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.
Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.
ACTIONS      The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
A.1.1, A.1.2, A.1.3 and A.2 If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours.
This action ensures steam isolation.to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of th*e inoperable valves is closed, then limit thermal power to less than or equal to 75% of SUSQUEHANNA - UNIT 1                TRM / B 3.3-14a


Main Turbine Overspeed Protection System
ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.
  ** Rev.4 BASES ACTIONS       A.1.1, A.1.2, A.1.3 and A.2 (continued)
 
B 3.3.7 (continued) rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR)'limits as specified in the COLR within 12 hours. Restricting thermal power to less than or equal to 75% of rated
A.1.1, A.1.2, A.1.3 and A.2
                . power eliminates possible shock loa<;ls to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable .requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.
 
If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours.
This action ensures steam isolation.to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of th*e inoperable valves is closed, then limit thermal power to less than or equal to 75% of
 
SUSQUEHANNA - UNIT 1 TRM / B 3.3-14a Main Turbine Overspeed Protection System Rev.4 B 3.3.7
  ** BASES
 
ACTIONS A.1.1, A.1.2, A.1.3 and A.2 (continued)
(continued) rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR)'limits as specified in the COLR within 12 hours. Restricting thermal power to less than or equal to 75% of rated
. power eliminates possible shock loa<;ls to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable.requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.
This time* is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.
This time* is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.
B.1 and B.2 If two of twelve intercept valves and intermediate stop _valves are inoperable, a"ction must be taken to restore at least one of these valves to OPERABLE status in 72 hours. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems.
The required action if the problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam supply.
C.1 Operability of the main turbine overspeed protection devices is assumed in the turbine missile probability analysis (Refs. 4 and 5). If one of the main turbine overspeed protection devices is inoperable, _analysis has shown that the increase in turbine missile probability is such that continued operation to the next regularly scheduled refuel outage is allowed. The inoperable main turbine overspeed protection device shall be restored to OPERABLE status prior to startup from the next regularly scheduled refuel outage to restore the probabilities to the baseline values assumed in the turbine missile probability analysis.
D.1 and D.2 If the MTOPS is inoperable for reasons other than Conditions A, 8, or C, the impacts on the turbine missile probability analysis (Refs. 4 and 5) are not immediately known. Engineering shall determine the impacts of the combination of inoperable equipment on the turbine missile *probability analysis. The results of the evaluation will determine which action from FSAR Table 3.5-10 shall be taken. The action specified by FSAR Table 3.5-10 shall be taken within the time specified in FSAR Table 3.5-10, as measured from the time Condition D i's entered.
SUSQUEHANNA - UNIT 1                  TRM / B 3.3-14b


Main Turbine Overspeed Protection System Rev.4                                                                                   B 3.3.7 BASES TRS           The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.
B.1 and B.2
 
If two of twelve intercept valves and intermediate stop _valves are inoperable, a"ction must be taken to restore at least one of these valves to OPERABLE status in 72 hours. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems.
The required action if the problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam
* supply.
 
C.1
 
Operability of the main turbine overspeed protection devices is assumed in the turbine missile probability analysis (Refs. 4 and 5). If one of the main turbine overspeed protection devices is inoperable, _analysis has shown that the increase in turbine missile probability is such that continued operation to the next regularly scheduled refuel outage is allowed. The inoperable main turbine overspeed protection device shall be restored to OPERABLE status prior to startup from the next regularly scheduled refuel outage to restore the probabilities to the baseline values assumed in the turbine missile probability analysis.
 
D.1 and D.2
 
If the MTOPS is inoperable for reasons other than Conditions A, 8, or C, the impacts on the turbine missile probability analysis (Refs. 4 and 5) are not immediately known. Engineering shall determine the impacts of the combination of inoperable equipment on the turbine missile *probability analysis. The results of the evaluation will determine which action from FSAR Table 3.5-10 shall be taken. The action specified by FSAR Table 3.5-10 shall be taken within the time specified in FSAR Table 3.5-10, as measured from the time Condition D i's entered.
** SUSQUEHANNA - UNIT 1 TRM / B 3.3-14b Main Turbine Overspeed Protection System Rev.4 B 3.3.7
 
BASES TRS The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.
 
The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required *surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.
The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required *surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.
TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3 Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The Frequency ensures the assumptions of the turbine missile probability analysis remain valid (Ref. 4).
 
TRS 3.3.7.4 This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sens_ing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.
TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3
TRS 3.3.7.5 The disassembly and inspection of the valves referenced ensures that*
 
Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The Frequency ensures the assumptions of the turbine missile probability analysis remain valid (Ref. 4).
 
TRS 3.3.7.4
 
This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sens_ing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.
 
TRS 3.3.7.5
 
The disassembly and inspection of the valves referenced ensures that*
abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).
abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).
Valve bushings are inspected and cle_aned, and bore diameters are checked for proper clearance .
Valve bushings are inspected and cle_aned, and bore diameters are checked for proper clearance.
* SUSQUE_HANNA - UNIT 1                 TRM / B 3.3-14c
* SUSQUE_HANNA - UNIT 1 TRM / B 3.3-14c Main Turbine Overspeed Protection System Rev.4 B 3.3.7


Main Turbine Overspeed Protection System Rev.4                                                                                B 3.3.7 BASES TRS         TRS 3.3.7.6 (continued)
BASES
 
TRS TRS 3.3.7.6 (continued)
A CHANNEL FUNCTIONAL TEST of Overspeed Trip Device, Master Trip Solenoid Valves, Backup Overspeed Trip Circuits, and the Power-Load Unbalance Circuits is performed to ensure that the entire channel will perform the intended function. Performance of this TRS at a monthly frequency ensures the assumptions of the turbine missile probability analysis documented in Refs. 4 and 5 remain valid.
A CHANNEL FUNCTIONAL TEST of Overspeed Trip Device, Master Trip Solenoid Valves, Backup Overspeed Trip Circuits, and the Power-Load Unbalance Circuits is performed to ensure that the entire channel will perform the intended function. Performance of this TRS at a monthly frequency ensures the assumptions of the turbine missile probability analysis documented in Refs. 4 and 5 remain valid.
This TRS is modified by a note that states the TRS is not required to be met until 24 hours after the turbine steam flow, pressure, and load are adequate to perform the test. Reactor and turbine startup are allowed prior to meeting the TRS because the steam flow through the turbine is insufficient to generate an overspeed condition at low reactor power. The turbine is allowed to come up to speed since it is assumed that any prior performances of the TRS were successful and there is presumption of MT_OPS OPERABILITY.
This TRS is modified by a note that states the TRS is not required to be met until 24 hours after the turbine steam flow, pressure, and load are adequate to perform the test. Reactor and turbine startup are allowed prior to meeting the TRS because the steam flow through the turbine is insufficient to generate an overspeed condition at low reactor power. The turbine is allowed to come up to speed since it is assumed that any prior performances of the TRS were successful and there is presumption of MT_OPS OPERABILITY.
REFERENCES   1. FSAR Section 7.7.1.5 2 . FSAR Section 10.2.2.6.
 
* 3. FSAR Section 10.2.3.6.
REFERENCES 1. FSAR Section 7.7.1.5
: 4. FSAR Section 3.5.1.3.
 
2. FSAR Section 10.2.2.6.
: 3. FSAR Section 10.2.3.6.
* 4. FSAR Section 3.5.1.3.
: 5. EC-093-1023, "Turbine Missile Probability Analysis for Susquehanna Units 1 & 2."
: 5. EC-093-1023, "Turbine Missile Probability Analysis for Susquehanna Units 1 & 2."
* SUSQUEHANNA - UNIT 1               TRM / B 3.3-14d}}
* SUSQUEHANNA - UNIT 1 TRM / B 3.3-14d}}

Revision as of 18:23, 18 November 2024

Technical Requirements Manual, Rev. 4
ML22039A032
Person / Time
Site: Susquehanna 
Issue date: 01/17/2022
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML22039A032 (26)


Text

UCU! *..LO t L.UL.L.

Page 2 of 2 ID: TEXT 3.3.7 REMOVE : REV: 3

ADD: REV: 4

CATEGORY: DOCUMENTS TYPE: TRMl ID: TEXT B3.3.7 ADD: REV: 4

REMOVE: REV:3

ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3171 OR X3194 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.

1

t;, SSES MANUAL

Manual Name: TRMl

.* Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT l

Table Of Contents Issue Date: 01/17/2022 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 96 01/03/2019

Title:

LIST OF EFFECTIVE SECTIONS

TEXT TOC 27 03/05/2019

Title:

TABLE OF CONTENTS

TEXT 1.1 1 01/31/2014

Title:

USE AND APPLICATION DEFINITIONS

TEXT 2.1 2 04/28/2015 /-, ',,

Title:

PLANT PROGRAMS AND SETPOINTS PLANT PROGRAMp"-, />

,./""-:-....... -...,, *.,/'

TEXT 2.2 10 01~3_:(2,~1t ___ / ( "" ' "/ ))

Title:

PLANT PROGRAMS AND SETPOINTS ~,N/~TfUJvIENJ_!R:IP SETPOINT TABLE

  • '"**'**, I, ) ' '*,,l /' '*. -?
  • TEXT 3.0 7 /.. /o}i,,_is-1_~021

Title:

TECHNICAL REQUIREMENT F0R0PERATIO:r:f (TRO) APPLICABILITY & SURVEILLANCE (TRS) *' ' " '

APPLICABILITY,~;*~... :,........, ',,,.,

-.,, ' ~, *>

TEXT 3.1.1 (~ *,,. l-~~09/2007

Title:

REACTIVITY CONJ;R0L,,,Y-?'Ri?MS ', ~--./ ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD

I -.,,.,_, \\, *~"l.

INJECTION (ATfS':..AR:.r) \\INSQ'RUMENTATION TEXT 3.1.2 /--......... \\ \\ \\ \\ \\ '-, __ )) 0 11/18/2002

Title:

REACTIVITftbN'FROI:i""SYSTEMS CONTROL ROD DRIVE. (CRD) HOUSING SUPPORT / ' / '* /

\\ -~ *, \\ \\ ') _ _) /

TEXT 3.1.3 6 12/18/2017 "~-.----

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD BLOCK INSTRUMENTATION

TEXT 3.1.4 l 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION &

CHECK VALVE TEXT 3.2.l 20 04/07/2020

Title:

CORE OPERATING LIMIST REPORT (COLR)

  • Pagel of 16 Report Date: 01/17/22 c

SSES MANUAL "

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT 3.3.1 0 11/18/2002

Title:

I.NSTRUMENTATION RADIATION MONITORING INSTRUMENTATION

TEXT 3.3.2 3 03/31/2011

Title:

INSTRUMENTATION SEISMIC MONITORING INSTRUMENTATION

TEXT 3.3.3 2 11/09/2007

Title:

INSTRUMENTATION METEOROLOGICAL MONITORING INSTRUMENTATION

TEXT 3.3.4 11 06/29/2017

Title:

INSTRUMENTATION TRM POST-ACCIDENT MONITORING INSTRUMENTATION

TEXT 3.3.5 0 11/18/2002

Title:

INSTRUMENTATION THIS PAGE INTENTIONALLY LEFT BLANK

TEXT 3.3.6 5 03/05/2019

Title:

INSTRUMENTATION TRM ISOLATION ACTUATION INSTRUMENTATION

  • TEXT 3.3.7 4 01/17/2022

Title:

INSTRUMENTATION MAIN TURBINE OVERSPEED PROTECTION SYSTEM

TEXT 3.3.8 1 10/22/2003.

Title:

INSTRUMENTATION INTENTIONALLY LEFT BLANK

TEXT 3.3.9 3 04/17/2008

Title:

OPRM INSTRUMENTATION CONFIGURATION

TEXT 3.3.10 1 12/14/2004

Title:

INSTRUMENTATION REACTOR RECIRCULATION PUMP MG SET STOPS

TEXT 3.3.11 1 10/22/2003

Title:

INSTRUMENTATION MVP ISOLATION INSTRUMENTATION

TEXT 3.3.12 2 04/02/2019

Title:

WATER MONITORING INSTRUMENTATION

  • Page 2 of 16 Report Date: 01/17/22

. SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT 3.4.1 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR COOLANT SYSTEM CHEMISTRY

TEXT 3.4.2 1 04/16/2009

Title:

REACTOR COOLANT SYSTEM INTENTIONALLY LEFT BLANK

TEXT 3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITORS

TEXT 3.4.4 2 04/17/2008

Title:

REACTOR COOLANT SYSTEM REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT

TEXT 3.4.5 1 04/26/2006

Title:

REACTOR COOLANT SYSTEM REACTOR VESSEL MATERIALS

TEXT 3.4.6 2 04/25/2013

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION

TEXT 3.5.1 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT

TEXT 3.5.2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION

TEXT 3.5.3 1 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT 3.6.1 0 11/18/2002

Title:

CONTAINMENT VENTING OR PURGING

TEXT 3.6.2 3 01/03/2019

Title:

SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKER POSITION INDICATION

TEXT 3.6.3 0 11/18/2002

Title:

CONTAINMENT SUPPRESSION POOL ALARM INSTRUMENTATION

  • Page 3 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT 3.6.4 0 11/18/2002

Title:

CONTAINMENT PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES

TEXT 3.7.1 0 11/18/2002

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER S.YSTEM (ESW) SHUTDOWN

TEXT 3.7.2 0 11/18/2002

Title:

PLANT SYSTEMS ULTIMATE HEAT SINK (UHS) AND GROUND WATER LEVEL

TEXT 3.7.3.1 5 02/13/2020

Title:

PLANT SYSTEMS FIRE SUPPRESSION WATER SUPPLY SYSTEM

TEXT 3.7.3-.2 3 04/16/2009

Title:

PLANT SYSTEMS SPRAY AND SPRINKLER SYSTEMS

TEXT 3.7.3.3 4 05/16/2016 *

Title:

PLANT SYSTEMS CO2 SYSTEMS

TEXT 3.7.3.4 2 04/16/2009

Title:

PLANT SYSTEMS HALON SYSTEMS

TEXT 3.7.3.5 2 04/16/2009*

Title:

PLANT SYSTEMS FIRE HOSE STATIONS

TEXT 3.7.3.6 2 04/16/2009

Title:

PLANT SYSTEMS YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES

TEXT 3.7.3.7 1 04/26/2006

Title:

PLANT SYSTEMS FIRE RATED ASSEMBLIES

TEXT 3.7.3.8 13 12/18/2017

Title:

PLANT SYSTEMS FIRE DETECTION INSTRUMENTATION

'rEXT *3. 7.4 1 04/26/2006

Title:

PLANT SYSTEMS SOLID RADWASTE SYSTEM

  • Page 4 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name:.TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT 3.7.5.1 1 03jo5/2015

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS HYDROGEN MONITOR

TEXT 3.7.5.2 0 11/18/2002

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE

TEXT 3.7.5.3 1 04/26/2006

Title:

PLANT SYSTEMS LIQUID HOLDUP TANKS

TEXT 3.7.6 3 06/04/2012

Title:

PLANT SYSTEMS ESSW PUMPHOUSE VENTILATION

TEXT 3.7.7 2 09/05/2008

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS PRETREATMENT.LOGARITHMIC RADIATION MONITORING

TEXT 3.7.8 5 03/05/2015

Title:

PLANT SYSTEMS SNUBBERS

TEXT 3.7.9 3 03/05/2019

Title:

PLANT SYSTEMS CONTROL STRUCTURE HVAC

TEXT 3.7.10 1 12/14/2004

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOLS (SFSPS)

TEXT 3.7.11 1 11/01/2018

Title:

STRUCTURAL INTEGRITY

TEXT 3.8.1 3 04/22/2020

Title:

ELECTRICAL POWER PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES

TEXT 3.8.2.1 2 11/09/2007

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS

TEXT 3.8.2.2 3 06/23/2021

Title:

ELECTRICAL POWER MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC

  • Page 5 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT 3.8.3 4 01/28/2020

Title:

ELECTRICAL POWER DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES

TEXT 3.8.4 0 11/18/2002

Title:

ELECTRICAL POWER 24 VDC ELECTRICAL POWER SUBSYSTEM

TEXT 3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER DEGRADED VOLTAGE PROTECTION

TEXT 3.8.6 2 03/05/2019

Title:

ELECTRICAL POWER EMERGENCY SWITCHGEAR ROOM COOLING

TEXT 3.8.7 2 02/25/2021

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM

TEXT 3.9.1 0 11/18/2002

Title:

REFUELING OPERATIONS DECAY TIME

  • TEXT 3.9.2 0 11/18/2002

Title:

REFUELING OPERATIONS COMMUNICATIONS

TEXT 3.9.3.1 03/12/2019

Title:

REFUELING OPERATIONS REFUELING PLATFORM

TEXT 3.10.l 1 04/26/2006

Title:

MISCELLANEOUS SEAL SOURCE CONTAMINATION

TEXT 3.10.2 3 06/19/2019

Title:

MISCELLANEOUS SHUTDOWN MARGIN TEST RPS INSTRUMENTATION

TEXT 3.10.3 3 10/17/2019

Title:

MISCELLANEOUS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT 3.10.4 2 04/17/2008

Title:

INTENTIONALLY LEFT BLANK

  • Page 6 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT 3. 11. 1. 1 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS CONCENTRATION

TEXT 3. 11. 1. 2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID EFFLUENTS DOSE

TEXT 3. 11. 1. 3 1 -04/26/2006

Title:

RADIOACTIVE EFFLUENTS LIQUID WASTE TREATMENT SYSTEM

TEXT 3.11.1.4 2 10/09/2012

Title:

RADIOACTIVE EFFLUENTS LIQUID RADWASTE EFFLUENr MONITORING INSTRUMENTATION

TEXT 3.11.1.5 3 03/05/2015

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION

  • TEXT 3.11.2.1 4 03/12/2019

Title:

RADIOACTIVE EFFLUENTS DOSE RATE

TEXT 3.11.2.2 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - NOBLE GASES

TEXT 3 *. 11. 2. 3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATE FORM

TEXT 3. 11. 2. 4 0 11/18/2002

Title:

RADIOACTIVE EFFLUENTS GASEOUS RADWASTE TREATMENT SYSTEM

TEXT 3.11. 2. 5 4 07/03/2013

Title:

RADIOACTIVE EFFLUENTS VENTILATION EXHAUST TREATMENT SYSTEM.

TEXT 3. 11. 2. 6 8 06/29/2017

Title:

RADIOACTIVE EFFLUENTS RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION

TEXT 3.11. 3 1 04/26/2006

Title:

RADIOACTIVE EFFLUENTS TOTAL DOSE Page 7 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT 3.11.4.1 6 01/03/2022

Title:

RADIOACTIVE EFFLUENTS MONITORING PROGRAM

TEXT 3.11.4.2 2 04/26/2006

Title:

RADIOACTIVE EFFLUENTS LAND USE CENSUS

TEXT 3.11.4.3 04/26/2006

Title:

.RADIOACTIVE EFFLUENTS INTERLABORATORY COMPARISON PROGRAM

TEXT 3.12.1 0 11/19/2002

Title:

LOADS CONTROL PROGRAM CRANE TRAVEL-SPENT FUEL POOL STORAGE POOL

TEXT 3.12.2 4 04/17/2008

Title:

LOADS CONTROL PROGRAM HEAVY LOADS REQUIREMENTS

TEXT 3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM LIGHT LOADS REQUIREMENT

  • TEXT 4.1 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION

TEXT 4.2 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS REPORTABLE EVENT ACTION

TEXT 4.3 1 01/03/2019

Title:

ADMINISTRATIVE CONTROLS SAFETY LIMIT VIOLATION

TEXT 4.4 1 12/18/2008

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS

TEXT 4.5 1 07/01/2021

Title:

ADMINISTRATIVE CONTROLS PROCEDURES & PROGRAMS

TEXT 4.6 0 08/31/1998

Title:

ADMINISTRATIVE CONTROLS RADIATION PROTECTION PROGRAM

  • Page 8 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT 4.7 0 08/31/1998

Title:

ADMINI.STRATIVE CONTROLS TRAINING

TEXT B3.0 6 03/18/2021

Title:

APPLICABILITY BASES TECHNICAL REQUIREMENT FOR OPERATION (TRO) APPLICABILITY

TEXT B3.l.l 2 04/29/2014

Title:

REACTIVITY CONTROL SYSTEMS BASES ANTICIPATED TRANSIENT WITHOUT SCRAM ALTERNATE ROD* INJECTION (ATWS-ARI) INSTRUMENTATION

TEXT B3.l.2 0 11/19/2002

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD DRIVE (CRD) HOUSING SUPPORT

TEXT B3.l.3 4 12/18/2017

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTRO.L _ROD BLOCK INSTRUMENTATION

TEXT B3.1.4 1 10/12/2020

Title:

REACTIVITY CONTROL SYSTEMS BASES CONTROL ROD SCRAM ACCUMULATORS INSTRUMENTATION AND CHECK VALVE

TEXT B3.2.l 0. 11/19/2002

Title:

CORE OPERATING LIMITS BASES CORE OPERATING LIMITS REPORT (COLR).

TEXT B3.3.l 1 01/31/2014

Title:

INSTRUMENTATION BASES RADIATION MONITORING "INSTRUMENTATION

TEXT B3.3.2 2 03/31/2011

Title:

INSTRUMENTATION BASES SEISMIC MONITORING INSTRUMENTATION

TEXT B3.3.3 3 12/18/2008

Title:

INSTRUMENTATION BASES METEOROLOGICAL MONITORING INSTRUMENTATION

TEXT B3.3.4 7 06/29/2017

Title:

INSTRUMENTATION BASES TRM POST ACCIDENT MONITORING (PAM) INSTRUMENTATION

TEXT B3.3.5 2 11/09/2007

Title:

INTENTIONALLY LEFT BLANK Page 9 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT B3.3.6 6 03/05/2019

Title:

INSTRUMENTATION BASES TRM ISOLATION ACTUATION INSTRUMENTATION

TEXT B3.3.7 4 01/17/2022

Title:

INSTRUMENTATION BASES MAIN TURBINE OVERSPEED PROTECTION SYSTEM

TEXT B3'. 3. 8 1 10/22/2003

Title:

INTENTIONALLY LEFT BLANK

TEXT B3.3.9 4 01/03/2019

Title:

OPRM INSTRUMENTATION

TEXT B3.3.10 3 08/09/2010

Title:

INSTRUMENTATION BASES REACTOR RECIRCULATION PUMP MG SET STOPS

TEXT B3.3.11 1 10/22/2003

Title:

INSTRUMENTATION BASES MVP ISOLATION INSTRUMENTATION

  • TEXT B3.3.12 1 04/02/2019

Title:

WATER MONITORING INSTRUMENTATION

TEXT B3.4.1 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR COOLANT SYSTEM CHEMISTRY

TEXT B3.4.2 1 04/16/2009

Title:

INTENTIONALLY LEFT BLANK

TEXT B3.4.3 1 11/09/2007

Title:

REACTOR COOLANT SYSTEM BASES HIGH/LOW PRESSURE INTERFACE LEAKAGE MONITOR

'.):'EXT B3.4.4 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR RECIRCULATION FLOW AND ROD LINE LIMIT

TEXT B3.4.5 0 11/19/2002

Title:

REACTOR COOLANT SYSTEM BASES REACTOR VESSEL MATERIALS

  • Page 10 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT B3.4.6 3 01/03/2019

Title:

REACTOR RECIRCULATION SINGLE LOOP OPERATION SLO FLOW RATE RESTRICTION

TEXT B3.5.1 2 03/17/2020

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ADS MANUAL INHIBIT

TEXT B3.. 5. 2 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM ECCS RPV WATER INVENTORY CONTROL AND RCIC MONITORING INSTRUMENTATION

TEXT B3.5.3 2 03/05/2019

Title:

ECCS RPV WATER INVENTORY CONTROL AND RCIC SYSTEM LONG TERM NITROGEN SUPPLY TO ADS TEXT B3.6.l 0 11/19/2002

Title:

CONTAINMENT BASES VENTING OR PURGING

  • TEXT B3.6.2 0 11/19/2002

Title:

CONTAINMENT BASES SUPPRESSION CHAMBER-TO-DRYWELL VACUUM BREAKER POSITION INDICATION

TEXT B3.6.3 2 04/17/2008

Title:

CONTAINMENT BASES SUPPRESSION POOL ALARM INSTRUMENTATION

TEXT B3.6.4 1 12/14/2004

Title:

CONTAINMENT BASES PRIMARY CONTAINMENT CLOSED SYSTEM BOUNDARIES

TEXT B3.7.l 0 11/19/2002

Title:

PLANT SYSTEMS BASES EMERGENCY SERVICE. WATER SYSTEM (SHUTDOWN)

TEXT B3.7.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES ULTIMATE HEAT SINK (UHS) GROUND WATER LEVEL

TEXT B3.7.3.l 4 02/16/2017

Title:

PLANT SYSTEMS BASES FIRE SUPPRESSION WATER SUPPLY SYSTEM

TEXT B3.7.3.2 2 04/26/2006

Title:

PLANT SYSTEMS BASES SPRAY AND SPRINKLER SYSTEMS Page 11 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT B3.7.3.3 1 01/03/2019

Title:

PLANT SYSTEMS BASES CO2 SYSTEMS

TEXT B3.7.3.4 4 06/19/2019

Title:

PLANT SYSTEMS BASES HALON SYSTEMS

TEXT B~.7.3.5 1 04/26/2006

Title:

. PLANT SYSTEMS BASES FIRE HOSE STATIONS

TEXT B3.7.3.6 1 04/26/2006

Title:

PLANT SYSTEMS BASES YARD FIRE HYDRANTS AND HYDRANT HOSE HOUSES

TEXT B3.7.3.7 0 11/19/2002

Title:

PLANT SYSTEMS BASES FIRE RATED ASSEMBLIES

TEXT B3.7.3.8 3 09/27/2012

Title:

PLANT SYSTEMS BASES FIRE DETECTION INSTRUMENTATION

TEXT B3.7.4 *o 11/19/2002

Title:

PLANT SYSTEMS BASES SOLID RADWASTE SYSTEM

TEXT B3.7.5.1 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS HYDROGEN MONITOR

TEXT B3.7.5.2 0 11/19/2002

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS EXPLOSIVE GAS MIXTURE

TEXT B3.7.5.3 0 11/19/2002

Title:

PLANT SYSTEMS BASES LIQUID HOLDUP TANKS

TEXT B3.7.6 4 06/04/2013

Title:

PLANT SYSTEMS BASES ESSW PUMPHOUSE VENTILATION

TEXT B3.7.7. 2 01/31/2008

Title:

PLANT SYSTEMS BASES MAIN CONDENSER OFFGAS PRETREATMENT LOGARITHMIC RADIATION MONITORING INSTRUMENTATION

Page 12 of 16 Report Date: 01/17/22

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT B3.7.8 4 01/31/2014 Title.: PLANT SYSTEMS BASES SNUBBERS

TEXT B3.7.9 3 03/05/2019

Title:

PLANT SYSTEMS BASES CONTROL STRUCTURE HVAC

TEXT B3.7.10 1 12/14/2004 Ti~le: PLANT SYSTEMS BASES SPENT FUEL STORAGE POOLS

TEXT B3.7.ll 2 11/01/2018

Title:

STRUCTURAL INTEGRITY

TEXT B3.8.1 2 03/10/2010

Title:

ELECTRICAL POWER BASES PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES

  • TEXT B3.8.2.l 0 11/19/2002

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

CONTINUOUS

TEXT B3.8.2.2 2 06/23/2021

Title:

ELECTRICAL POWER BASES MOTOR OPERATED VALVES (MOV) THERMAL OVERLOAD PROTECTION -

AUTOMATIC

TEXT B3.8.3 0 11/19/2002

Title:

ELECTRICAL POWER BASES DIESEL GENERATOR (DG) MAINTENANCE ACTIVITIES

TEXT B3.8.4 0 11/19/2002

Title:

ELECTRICAL POWER BASES 24 VDC ELECTRICAL POWER SUBSYSTEM

TEXT B3.8.5 1 11/14/2013

Title:

ELECTRICAL POWER BASES DEGRADED VOLTAGE PROTECTION

TEXT B3.8.6 3 03/05/2019

Title:

ELECTRICAL POWER BASES EMERGENCY SWITCHGEAR ROOM COOLING

TEXT B3.8.7 3 02/25/2021,

Title:

BATTERY MAINTENANCE AND MONITORING PROGRAM Page 13 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT i

TEXT B3.9.1 0 11/19/2002

Title:

REFUELING OPERATIONS BASES DECAY TIME

  • TEXT B3. 9. 2 0 11/19/2002.

Title:

REFUELING OPERATIONS BASES COMMUNICATIONS

TEXT B3.9.3 1 03/12/2019

Title:

REFUELING OPERATIONS BASES REFUELING PLATFORM

TEXT B3.10.l 0 11/19/2002

Title:

MISCELLANEOUS BASES SEALED SOURCE CONTAMINATION

TEXT B3.10.2 1 03/31/2006

Title:

MISCELLANEOUS BASES SHUTDOWN MARGIN TEST RPS INSTRUMENTATION

TEXT B3.10.3 2 10/17/2019

Title:

MISCELLANEOUS BASES INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI)

TEXT B3.10.4 1 04/17/2008

Title:

INTENTIONALLY LEFT BLANK

TEXT B3.ll.l.1 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS CONCENTRATION

TEXT B3. 11. 1. 2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID EFFLUENTS*DOSE

TEXT B3.11.1. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LIQUID WASTE TREATMENT SYSTEM

TEXT B3.ll.1.4 0. 11/19/2002

Title:

RADIOACTIVE-EFFLUENTS BASES LIQUID RADWASTE EFFLUENT MONITORING INSTRUMENTATION

TEXT B3.11.1. 5 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE LIQUID PROCESS MONITORING INSTRUMENTATION

Page 14 of 16 Report Date: 01/17/22 *

.. SSES MANUAL

Manual Name: TRMl

Manual

Title:

. TECHNICAL REQUIREMENTS MANUAL UNIT 1

TEXT B3.11.2.1 1 12/14/2004

Title:

RADIOACTIVE EFFLUENTS BASES DOSE RATE

TEXT B3.ll.2.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - NOBLE GASES

TEXT B3.11. 2. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES DOSE - IODINE, TRITIUM, AND RADIONUCLIDES IN PARTICULATES FORM TEXT B3.11. 2. 4 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES GASEOUS RADWASTE TREATMENT SYSTEM

TEXT B3. il.2. 5 5 07/03/2013

Title:

RADIOACTIVE EFFLUENTS BASES VENTILATION EXHAUST TREATMENT SYSTEM

TEXT B3.ll.2.6 2 09/08/2016

Title:

RADIOACTIVE EFFLUENTS BASES RADIOACTIVE GASEOUS EFFLUENT MONITORING INSTRUMENTATION

TEXT B3.ll.3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES TOTAL DOSE

TEXT B3.ll.4.1 6 01/03/2022

Title:

RADIOACTIVE EFFLUENTS BASES MONITORING PROGRAM

TEXT B3.ll.4.2 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES LAND USE CENSUS

TEXT B3. 11. 4. 3 0 11/19/2002

Title:

RADIOACTIVE EFFLUENTS BASES INTERLABORATORY COMPARISON PIWGRAM

TEXT B3.12.1 1 10/04/2007

Title:

LOADS CONTROL PROGRAM BASES CRANE TRAVEL-SPENT FUEL STORAGE POOL

TEXT B3.12.2 1 12/03/2010

Title:

LOADS CONTROL PROGRAM BASES HEAVY LOADS REQUIREMENTS Page 15 of 16 Report Date: 01/17/22 SSES MANUAL

Manual Name: TRMl

Manual

Title:

TECHNICAL REQUIREMENTS MANUAL UNIT 1

  • TEXT B3.12.3 0 11/19/2002

Title:

LOADS CONTROL PROGRAM BASES LIGHT LOADS REQUIREMENTS

Page 16 of 16 Report Date: 01/17/22

    • 3.3 Instrumentation

3.3.7 Main Turbine Overspeed Protection System

TRO 3.3.7 The Main Turbine Overspeed Protection System shall be OPERABLE.

Applicability: MODES 1 and 2.

The power/load unbalance circuitry is not required to be OPERABLE with turbine load <40% of full turbine load.

ACTIONS

CONDITION REQUIRED ACTION COMPLETION TIME

A. Two of eight stop valves A.1.1 Close one of the inoperable - 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> and control valves valves.

inoperable.

AND

A.1.2 Limit THERMAL POWER 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following

A.1.3 Apply the following limits for 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> following a closed Turbine Stop Valve closure of the or Turbine Control Valve as inoperable valve specified in the COLR:

a. LCO 3.2.2, "MINIMUM CRITICAL POWER RATIO (MCPR),"
b. LCO 3.2.3, "LINEAR HEAT GENERATION RATE (LHGR)."

OR

A.2 Isolate main turbine from the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> steam supply.

ACTIONS (continued)

  • CONDITION REQUIRED ACTION COMPLETION TIME

B. Two of twelve intercept B.1 Close either the intercept 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> valves and intermediate valve or the intermediate stop valves inoperable. stop valve within one of the affected combined intermediate valves.

OR

B.2 Isolate main turbine from the 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> steam supply.

C. One main turbine C. 1 Restore the main turbine Prior to startup from overspeed protection overspeed protection device the next planned device inoperable. to an OPERABLE status. refuel outage

D. Turbine Overspeed D.1 Engineering perform 6 days Protection System evaluation to determine inoperable for reasons required action in OR other than Condition A, B, accordance with FSAR ore. Table 3.5-10. In accordance with FSAR Table 3.5-1 O

AND

D.2 Perform action specified in As specified in FSAR Table 3.5-10. FSAR Table 3.5-10

SUSQUEHANNA - UNIT 1 TRM / 3.3-17a Main Turbine Overspeed Protection System Rev.4 3.3.7

    • TECHNICAL REQUIREMENT SURVEILLANCE

*-----------NOTE------*-----------

When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the redundant overspeed trip device is OPERABLE.

SURVEILLANCE FREQUENCY

TRS 3.3.7.1 -NOTE-------

The provisions of TRS 3.0.4 are not applicable

Cycle each high pressure turbine control valve from the 122 days running position and observe valve closure.

TRS 3.3.7.2 NOTE The provisions of TRS 3.0.4 are n_ot applicable

e Cycle each low pressure turbine combined intermediate 122 days valve from the running position and observe valve closure.

TRS 3.3.7.3 NOTE The provisions of TRS 3.0.4 are not applicable

Cycle each high pressure turbine stop valves from the 122 days running position and observe valve closure.

TRS 3.3.7.4 Perform a CHANNEL CALIBRATION of main turbine 24 months overspeed protection instrumentation.

TRS 3.3.7.5 Disassemble one of each type valve identified in 40 months on a TRS 3.3. 7.1, TRS 3.3. 7.2, and TRS 3.3. 7.3, perform a STAGGERED visual and surface inspection of valve seats, disks and TEST BASIS stems and verify no unacceptable flaws or corrosion.

SUSQUEHANNA - UNIT 1 TRM / 3.3-18 Main Turbine Overspeed Protection System Rev. 4 3.3.7

. TECHNICAL REQUIREMENT SURVEILLANCE continued

  • SURVEILLANCE FREQUENCY

TRS 3.3.7.6 ---------------------NOTE----------

Not required to be _met during startup until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after turbine conditions are adequate to perform the test.

Perform CHANNEL FUNCTIONAL TEST of main turbine 31 days overspeed protection devices.

SUSQUEHANNA - UNIT 1 TRM / 3.3-1 Sa Main Turbine Overspeed Protection System Rev. 4. B 3.3.7

B 3.3 Instrumentation

B 3.3.7 Main Turbine Overspeed Protection System

BASES

TRO The Main Turbine Overspeed Protection System (MTOPS) is designed to protect the main turbine from excessive overspeed by initiating a turbine trip by fast closure of the turbine control valves and closure of the intercept valves to essentially secure all steam flow to the turbine (Ref. 1). It is comprised of overspeed protection devices and the valves which control steam flow to the turbine.

The mechanical overspeed trip device is an unbalanced ring mounted on the turbine shaft and held concentric with it by a spring. When the turbine speed reaches the trip speed (i.e., 10% above rated speed) the centrifugal force acting on the ring overcomes the tension of the spring and the ring snaps to an eccentric position.. In doing this it strikes the trip finger which operates the mechanical trip valve, which blocks hydraulic fluid-supply which in turn causes the main stop valves, control valves, and combined intercept valves to close.

The electrical overspeed trip receives its signal from a 112% speed trip relay (i.e., 12% above rated speed) that is operated by a speed signal sensed by a

  • magn*etic pickup from a toothed wheel on the turbine shaft and fed to a power amplifier and megacycles circuit whose output is a de voltage proportional to speed. The signal from the speed trip relay energizes the master trip relay, which then energizes the mechanical trip solenoid and deenergizes the master trip solenoid valves.

. Either one of these actions will trip the turbine.

An additional feature of the protective system which will minimize the likelihood of an overspeed condition is the power/load unbalance circuitry.

Generator load is sensed by means of three current transformers and is compared with the turbine power input which is sensed by the turbine intermediate pressure sensor. If the difference between the steam power input and the generator output rises to at least 40% in 35 msec, auxiliary relays will be actuated which will energize the control valves fast closing solenoids, remove the load reference at the load control unit and automatically drive the load reference motor to zero setpoint. By design, the power/load unbalance circuitry is not required to be OPERABLE until turbine power/load exceeds 40% of rated oufput. Therefore, the Applicability of the TRO indicates the circuitry is not required to be OPERABLE until 40% turbine load/power is reached.

SUSQUEHANNA - UNIT 1 TRM / B 3.3-14 Main Turbine Overspeed Protection System Rev.4 B 3.3.7

BASES

TRO In this TRM section, the mechanical overspeed trip device, the backup (continued) electrical overspeed trip device, the power/load unbalance circuitry, and the master trip solenoid valves are collectively referred to as overspeed protection devices. The operability of the overspeed protection devices is assumed in the turbine missile probability analysis documented in Refs. 4 and 5. The turbine missile probability analysis can accommodate the inoperability of any one of the overspeed protection devices. However, appropriate corrective actions must be taken as specified in the FSAR.

MTOPS OPERABILITY is also based upon the ability of the valves that control steam flow to the turbine to close following the receipt of a closure signal. The 4 stop valves, 4 control valves, 6 intermediate stop valves, and 6 intercept valves make up a system of 20 valves. A single failure to any one of the above system of 20 valves will not prevent a turbine trip (Ref. 2).

Hence, if 19 of the 20 noted valves are OPERABLE, the MTOPS is OPERABLE. Note that for this statement to be true, the intermediate stop valves and intercept valves are considered separate valves. Overspeed protection is only disabled on a CIV failure if both valves within a CIV are inoperable. Failure of only one valve in a CIV does not prevent an overspeed trip, and does not affect operability. Actions to close one inoperable valve if two valves are inoperable maintain the unit within the analysis in ReC2.

However, redundancy is reduced and repairs should be completed in accordance with the corrective action program.

Excessive turbine overspeed could generate potentially damaging missiles that could present a personnel and equipment hazard. MTOPS is not necessary to provide adequate protection of the public health and safety and is not required to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety.

ACTIONS The Actions are defined to ensure proper corrective measures are taken in response to the inoperable components.

A.1.1, A.1.2, A.1.3 and A.2

If two of eight stop valves and control valves are inoperable, action must be taken to restore at least one of the valves to OPERABLE status in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

This action ensures steam isolation.to the turbine in the event of an overspeed condition, and maintains the unit within the bounds of the FSAR analysis. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems. The required action if the problem is not resolved is to close one of the inoperable valves, or to isolate the main turbine from the steam supply. If one of th*e inoperable valves is closed, then limit thermal power to less than or equal to 75% of

SUSQUEHANNA - UNIT 1 TRM / B 3.3-14a Main Turbine Overspeed Protection System Rev.4 B 3.3.7

    • BASES

ACTIONS A.1.1, A.1.2, A.1.3 and A.2 (continued)

(continued) rated power, and apply Minimum Critical Power Ratio (MCPR) and Linear Heat Generation Rate (LHGR)'limits as specified in the COLR within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />. Restricting thermal power to less than or equal to 75% of rated

. power eliminates possible shock loa<;ls to the turbine blades that could occur from a non-uniform circumferential steam flow distribution entering the HP turbine for this configuration. If the MCPR and LHGR limits are not in compliance with the applicable.requirements at the end of this period, the ACTIONS required by the applicable specifications must be implemented.

This time* is provided to stabilize operation with a closed Turbine Stop Valve or Turbine Control Valve.

B.1 and B.2

If two of twelve intercept valves and intermediate stop _valves are inoperable, a"ction must be taken to restore at least one of these valves to OPERABLE status in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. This action ensures steam isolation to the turbine in the event of an overspeed condition. The 72-hour Completion Time provides a reasonable time to troubleshoot the problem, make repairs, and reduce power in an orderly manner if required without challenging plant systems.

The required action if the problem is not resolved is to close either the intercept valve or the intermediate stop valve within one of the affected combined intermediate valves, or to isolate the main turbine from the steam

  • supply.

C.1

Operability of the main turbine overspeed protection devices is assumed in the turbine missile probability analysis (Refs. 4 and 5). If one of the main turbine overspeed protection devices is inoperable, _analysis has shown that the increase in turbine missile probability is such that continued operation to the next regularly scheduled refuel outage is allowed. The inoperable main turbine overspeed protection device shall be restored to OPERABLE status prior to startup from the next regularly scheduled refuel outage to restore the probabilities to the baseline values assumed in the turbine missile probability analysis.

D.1 and D.2

If the MTOPS is inoperable for reasons other than Conditions A, 8, or C, the impacts on the turbine missile probability analysis (Refs. 4 and 5) are not immediately known. Engineering shall determine the impacts of the combination of inoperable equipment on the turbine missile *probability analysis. The results of the evaluation will determine which action from FSAR Table 3.5-10 shall be taken. The action specified by FSAR Table 3.5-10 shall be taken within the time specified in FSAR Table 3.5-10, as measured from the time Condition D i's entered.

BASES TRS The TRSs are performed at the specified Frequency to ensure that the turbine overspeed protection function is maintained OPERABLE.

The TRSs are modified by a Note to indicate that when a channel is placed in an inoperable status solely for performance of required *surveillances, entry into associated Conditions and Required Actions may be delayed for up to 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> provided the redundant overspeed trip device is OPERABLE. Upon completion of the Surveillance, or expiration of the 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowance, the channel must be returned to OPERABLE status or the applicable Condition entered and Required Actions taken. This Note is based on the average time required to perform channel Surveillance. The 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> testing allowance does not significantly reduce the probability that the Main Turbine Overspeed Protection System will function when necessary.

TRS 3.3.7.1, TRS 3.3.7.2, and TRS 3.3.7.3

Verification of the movement of each of the four high pressure turbine control valves, six low pressure turbine combined intermediate valves (composed of 6 intermediate stop valves and 6 intercept valves), and four high pressure turbine stop valves ensures the OPERABILITY of each valve and that it will be able to close in the event of a turbine trip condition. The Frequency ensures the assumptions of the turbine missile probability analysis remain valid (Ref. 4).

TRS 3.3.7.4

This TRS is for the performance of a CHANNEL CALIBRATION of the required main turbine overspeed protection instrumentation. The calibration is a complete check of the instrument channel from the sens_ing device to main turbine trip initiation. The Frequency of 24 months is a typical refueling cycle and considers channel reliability.

TRS 3.3.7.5

The disassembly and inspection of the valves referenced ensures that*

abnormal wear is not occurring which could result in the valves inability to close upon receipt of a close signal. The Frequency is such that only one of each type valve (i.e., high pressure turbine stop; high pressure turbine control; and low pressure turbine combined intermediate), is required to be inspected within a 40 month period. If unacceptable flaws or excessive corrosion are found in a valve, all valves of its type are inspected (Ref. 3).

Valve bushings are inspected and cle_aned, and bore diameters are checked for proper clearance.

BASES

TRS TRS 3.3.7.6 (continued)

A CHANNEL FUNCTIONAL TEST of Overspeed Trip Device, Master Trip Solenoid Valves, Backup Overspeed Trip Circuits, and the Power-Load Unbalance Circuits is performed to ensure that the entire channel will perform the intended function. Performance of this TRS at a monthly frequency ensures the assumptions of the turbine missile probability analysis documented in Refs. 4 and 5 remain valid.

This TRS is modified by a note that states the TRS is not required to be met until 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after the turbine steam flow, pressure, and load are adequate to perform the test. Reactor and turbine startup are allowed prior to meeting the TRS because the steam flow through the turbine is insufficient to generate an overspeed condition at low reactor power. The turbine is allowed to come up to speed since it is assumed that any prior performances of the TRS were successful and there is presumption of MT_OPS OPERABILITY.

REFERENCES 1. FSAR Section 7.7.1.5

2. FSAR Section 10.2.2.6.

3. FSAR Section 10.2.3.6.
  • 4. FSAR Section 3.5.1.3.
5. EC-093-1023, "Turbine Missile Probability Analysis for Susquehanna Units 1 & 2."
  • SUSQUEHANNA - UNIT 1 TRM / B 3.3-14d