| title = Fourth 10-Year Interval, First Period Owner'S Activity Report Number 1R23
| title = Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23
| author name = Gil K
| author name = Gil K
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:10 CFR 50.55a Palo Verde Nuclear Generating Station P.O. Box 52034 102-08465-KJG/MSC                                                         Phoenix, AZ 85072 July 8, 2022                                                               Mail Station 7636 Tel: (623) 393-2488 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
{{#Wiki_filter:10 CFR 50.55a
 
Palo Verde Nuclear Generating Station P.O. Box 52034 102-08465-KJG/MSC Phoenix, AZ 85072 July 8, 2022 Mail Station 7636 Tel: (623) 393-2488 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001


==Subject:==
==Subject:==
Palo Verde Nuclear Generating Station Unit 1 Renewed Operating License No. NPF-41 Docket No. STN 50-528 Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23 Enclosed please find the Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Owners Activity Report for the fourth 10-year interval refueling outage 23 (1R23).
Palo Verde Nuclear Generating Station Unit 1 Renewed Operating License No. NPF-41 Docket No. STN 50-528 Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23
 
Enclosed please find the Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Owners Activity Report for the fourth 10-year interval refueling outage 23 (1R23).
 
Arizona Public Service Company (APS) is submitting this report pursuant to the title 10 of the Code of Federal Regulations (10 CFR) 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1. APS is required to prepare and submit the Form OAR-1 to the Nuclear Regulatory Commission (NRC) within 90 days of the completion of each refueling outage. The 1R23 outage ended on May 13, 2022.
Arizona Public Service Company (APS) is submitting this report pursuant to the title 10 of the Code of Federal Regulations (10 CFR) 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000, Section XI, Division 1. APS is required to prepare and submit the Form OAR-1 to the Nuclear Regulatory Commission (NRC) within 90 days of the completion of each refueling outage. The 1R23 outage ended on May 13, 2022.
No commitments are being made to the NRC by this letter. Should you have any questions concerning the content of this letter, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.
No commitments are being made to the NRC by this letter. Should you have any questions concerning the content of this letter, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.
Sincerely, Digitally signed by Gil, Katherine J(Z05492)
Sincerely, Digitally signed by Gil, Katherine J(Z05492)
Date: 2022.07.08 09:25:56 -07'00' Katherine J. Gil Nuclear Regulatory Affairs Director KJG/MSC/mg
Date: 2022.07.08 09:25:56 -07'00' Katherine J. Gil Nuclear Regulatory Affairs Director
 
KJG/MSC/mg


==Enclosure:==
==Enclosure:==
Unit 1 Twenty-Third Refueling Outage Owners Activity Report, Report 1R23 cc:    S. A. Morris          NRC Region IV Regional Administrator S. P. Lingam          NRC NRR Project Manager for PVNGS L. N. Merker          NRC Senior Resident Inspector for PVNGS A member of the STARS Alliance LLC Callaway
Unit 1 Twenty-Third Refueling Outage Owners Activity Report, Report 1R23
* Diablo Canyon
* Palo Verde
* Wolf Creek


ENCLOSURE Unit 1 Twenty-Third Refueling Outage Owners Activity Report Report 1R23
cc: S. A. Morris NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS
 
A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek ENCLOSURE
 
Unit 1
 
Twenty-Third Refueling Outage Owners Activity Report
 
Report 1R23
 
FORM OAR-1 OWNERS ACTIVITY REPORT
 
Report Number: ________________________________________________________________________________________________1R23
 
Plant: ___________________________________________________________________________________________________________Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529
 
Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________1 Jan 28, 1986 23 (if applicable)
Current inspection interval ______________________________________________________________________________________IWB,IWC,IWD,IWF=4th / IWE =3rd/ IWL=2nd (8/1/11-5/31/21),3rd (6/1/21-5/31/31) / SPT =4th (1st, 2nd, 3rd, 4th, other)
Current inspection period _______________________________________________________________________________________IWB,IWC,IWD,IWF =1st / IWE =2nd / IWL=2nd (8/1/16-5/31/21),1st (6/1/21-5/31/26) / SPT =1st (1st, 2nd, 3rd)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________2013 Ed. (IWE,IWL [2nd Int] = 2007 Ed.,'08 Ad.)
 
Date and revision of inspection plans ___________________________________________________________________________ISI=4/09/22 R1, SPT=6/21/18 R0, IWE=10/3/18 R0, IWL=8/8/18 R4,6/14/22 R0
 
Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________2013 Edition


FORM OAR-1 OWNERS ACTIVITY REPORT 1R23 Report Number: ________________________________________________________________________________________________
Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529 Plant: ___________________________________________________________________________________________________________
1 Unit No.: ___________                                                                Jan 28, 1986 Commercial service date: ___________________                                                              23 Refueling Outage No.: ___________________
(if applicable)
IWB,IWC,IWD,IWF=4th / IWE =3rd/ IWL=2nd (8/1/11-5/31/21),3rd (6/1/21-5/31/31) / SPT =4th Current inspection interval ______________________________________________________________________________________
(1st, 2nd, 3rd, 4th, other)
IWB,IWC,IWD,IWF =1st / IWE =2nd / IWL=2nd (8/1/16-5/31/21),1st (6/1/21-5/31/26) / SPT =1st Current inspection period _______________________________________________________________________________________
(1st, 2nd, 3rd) 2013 Ed. (IWE,IWL [2nd Int] = 2007 Ed.,'08 Ad.)
Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________
ISI=4/09/22 R1, SPT=6/21/18 R0, IWE=10/3/18 R0, IWL=8/8/18 R4,6/14/22 R0 Date and revision of inspection plans ___________________________________________________________________________
Edition and Addenda of Section XI applicable to repair/replacement activities, 2013 Edition if different than the inspection plans ____________________________________________________________________________
Code Cases used for inspection and evaluation:
Code Cases used for inspection and evaluation:
N-532-5, N-716-1, N-722-1, N-729-6, N-770-5 (if applicable)
_____________________________________________________________________________________________N-532-5, N-716-1, N-722-1, N-729-6, N-770-5 (if applicable)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of U1R23
 
_______________               conform to the requirements of Section XI.
CERTIFICATE OF CONFORMANCE
(refueling outage number)
 
Folley, Roy                                 Digitally signed by Folley, Roy C(Z07131)
I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code, Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of
C(Z07131)                                   Date: 2022.06.28 10:17:33
_______________ conform to the requirements of Section XI. U1R23 (refueling outage number)
                                                          -07'00' Signed _________________________________________________________                                                                        Jun 28, 2022 Date: _____________________________________
Folley, Roy Digitally signed by Folley, Roy C(Z07131)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________
C(Z07131) Date: 2022.06.28 10:17:33 Signed _________________________________________________________ Date: _____________________________________ -07'00' Jun 28, 2022
* Hartford, Connecticut of _______________________________                         have inspected the items described in this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
 
CERTIFICATE OF INSERVICE INSPECTION
 
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in
* Hartford, Connecticut this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
                                                *The Hartford Steam Boiler Inspection and Insurance Company Digitally signed by Hogstrom, Hogstrom,                           Robert (YH2450)
Digitally signed by Hogstrom, *The Hartford Steam Boiler Inspection and Insurance Company Hogstrom, Robert (YH2450)
Robert (YH2450)                     Date: 2022.06.28 10:55:38
Robert (YH2450) Date: 2022.06.28 10:55:38
                                      -07'00'                                                             N.B. 9685 "A, N, I, C"
__________________________________________ Commissions ____________________________________________________-07'00' N.B. 9685 "A, N, I, C"
__________________________________________                                Commissions ____________________________________________________
 
(Inspectors Signature)                                                                       National Board, State, Province, and Endorsements Jun 28, 2022 Date: _____________________________________
(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________Jun 28, 2022
PV-E0796 Ver. 2
 
PV-E0796 Ver. 2 1R23 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service
 
Examination Category and Item Item Description Evaluation Description Number None None None
 
1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service
 
Code Repair/Replacement Class Component ID Description of Work Date Complete Plan number 3 1PSPBL025B Perform base material repairs to Spool-001 of Line SPB-L025B. 4/23/2022 5123121-3 3 1MDGAE01A Weld Repair of Corroded Areas 3/05/2022 5297661-0 3 1MEWBE01 Perform Base Material Repairs to the Heat Exchanger. 4/25/2022 5307476-1 Install Westinghouse Mechanical 1 1MRCEE01A Plugs In Steam Generator 4/29/2022 5392240-0 1MRCEE01A "Cold" Leg.
Install Westinghouse Mechanical 1 1MRCEE01A Plugs In Steam Generator 4/29/2022 5392241-0 1MRCEE01A "Hot" Leg.
Install Westinghouse Mechanical 1 1MRCEE01B Plugs In Steam Generator 4/29/2022 5392242-0 1MRCEE01B "Cold" Leg.
Install Westinghouse Mechanical 1 1MRCEE01B Plugs In Steam Generator 4/29/2022 5392243-0 1MRCEE01B "Hot" Leg.
3 1MDGAE01A/B Weld Repair of Corroded Areas 3/05/2022 5297661-0 3 1MDGAE01B Weld Repair of Corroded Areas 3/05/2022 5297661-0 3 1MEWBE01 Weld replace Nozzle # 7 4/26/2022 5436979-0 3 1MDGAE01A Replace DG Intercooler Cross Connect Spools 6 and 8 3/05/2022 5297615-0 3 1MDGAE01B Replace DG Intercooler Cross Connect Spools 5 and 7 3/05/2022 5297616-0 Perform Base Metal Repair to 2B 3 00142964 00142965 00142966 00142967 DG AREVA Intercooler Cross 10/28/2021 5231422-0 Under Spools 5, 6, 7 and 8 Perform Base Metal Repairs To 3 00150230 2A EDG Intercooler Cross Under 10/02/2021 5191007-0 Spool 6 Perform Base Metal Repairs To 3 00150232 2A EDG Intercooler Cross Under 1/02/2021 5191007-0 Spool 8 Perform Base Metal Repair To 3 00142956 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 5.
Perform Base Metal Repair To 3 00142957 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 6.
Perform Base Metal Repair To 3 00142958 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 7.


1R23 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service Examination Category and Item        Item Description            Evaluation Description Number None                          None                            None
1 1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service


1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Code                                                            Date  Repair/Replacement Component ID              Description of Work Class                                                        Complete    Plan number Perform base material repairs to 3       1PSPBL025B                                        4/23/2022      5123121-3 Spool-001 of Line SPB-L025B.
Perform Base Metal Repair To 3 00142959 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 8.
3      1MDGAE01A        Weld Repair of Corroded Areas    3/05/2022     5297661-0 Perform Base Material Repairs 3      1MEWBE01                                          4/25/2022      5307476-1 to the Heat Exchanger.
1 1PSIBV057 Replaced Valve Due To Seat Leakage 5/11/2022 5280176-0 Replacement Of S/G #1 Line 2 2 1JSGEPSV0578 Main Steam Safety Relief Valve 5/11/2022 5300318-0 With Reconditioned And Tested Spare.
Install Westinghouse Mechanical 1       1MRCEE01A            Plugs In Steam Generator    4/29/2022     5392240-0 1MRCEE01A "Cold" Leg.
2 1JSIBPSV0166 Replaced PSV, per Surveillance Test Results. 5/05/2022 5305487-0 1 1JSIBPSV0169 Replaced PSV, per Surveillance Test Results. 4/24/2022 5308139-0 2 1JSIEPSV0221 Replaced PSV, per Surveillance Test Results. 5/01/2022 5308146-0
Install Westinghouse Mechanical 1      1MRCEE01A            Plugs In Steam Generator    4/29/2022    5392241-0 1MRCEE01A "Hot" Leg.
Install Westinghouse Mechanical 1       1MRCEE01B            Plugs In Steam Generator    4/29/2022     5392242-0 1MRCEE01B "Cold" Leg.
Install Westinghouse Mechanical 1      1MRCEE01B            Plugs In Steam Generator    4/29/2022    5392243-0 1MRCEE01B "Hot" Leg.
3      1MDGAE01A/B        Weld Repair of Corroded Areas    3/05/2022     5297661-0 3      1MDGAE01B        Weld Repair of Corroded Areas    3/05/2022    5297661-0 3      1MEWBE01              Weld replace Nozzle # 7    4/26/2022     5436979-0 Replace DG Intercooler Cross 3      1MDGAE01A                                        3/05/2022      5297615-0 Connect Spools 6 and 8 Replace DG Intercooler Cross 3      1MDGAE01B                                        3/05/2022      5297616-0 Connect Spools 5 and 7 Perform Base Metal Repair to 2B 00142964 00142965 3                            DG AREVA Intercooler Cross  10/28/2021    5231422-0 00142966 00142967 Under Spools 5, 6, 7 and 8 Perform Base Metal Repairs To 3        00150230        2A EDG Intercooler Cross Under  10/02/2021    5191007-0 Spool 6 Perform Base Metal Repairs To 3        00150232        2A EDG Intercooler Cross Under  1/02/2021      5191007-0 Spool 8 Perform Base Metal Repair To 3        00142956        1A DG Intercooler Cross Under  3/05/2022      5231420-0 Spool 5.
Perform Base Metal Repair To 3        00142957        1A DG Intercooler Cross Under  3/05/2022      5231420-0 Spool 6.
Perform Base Metal Repair To 3        00142958        1A DG Intercooler Cross Under  3/05/2022     5231420-0 Spool 7.
1


1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service Perform Base Metal Repair To 3      00142959        1A DG Intercooler Cross Under  3/05/2022    5231420-0 Spool 8.
Replaced Valve Due To Seat 1      1PSIBV057                                      5/11/2022    5280176-0 Leakage Replacement Of S/G #1 Line 2 Main Steam Safety Relief Valve 2    1JSGEPSV0578                                      5/11/2022    5300318-0 With Reconditioned And Tested Spare.
Replaced PSV, per Surveillance 2    1JSIBPSV0166                                      5/05/2022    5305487-0 Test Results.
Replaced PSV, per Surveillance 1    1JSIBPSV0169                                      4/24/2022    5308139-0 Test Results.
Replaced PSV, per Surveillance 2    1JSIEPSV0221                                      5/01/2022    5308146-0 Test Results.
2}}
2}}

Revision as of 09:25, 16 November 2024

Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23
ML22189A143
Person / Time
Site: Palo Verde 
Issue date: 07/08/2022
From: Gil K
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-08465-KJG/MSC
Download: ML22189A143 (6)


Text

10 CFR 50.55a

Palo Verde Nuclear Generating Station P.O. Box 52034 102-08465-KJG/MSC Phoenix, AZ 85072 July 8, 2022 Mail Station 7636 Tel: (623) 393-2488 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Palo Verde Nuclear Generating Station Unit 1 Renewed Operating License No. NPF-41 Docket No. STN 50-528 Fourth 10-Year Interval, First Period Owners Activity Report Number 1R23

Enclosed please find the Palo Verde Nuclear Generating Station (PVNGS) Unit 1 Owners Activity Report for the fourth 10-year interval refueling outage 23 (1R23).

Arizona Public Service Company (APS) is submitting this report pursuant to the title 10 of the Code of Federal Regulations (10 CFR) 50.55a and in accordance with the American Society of Mechanical Engineers Boiler and Pressure Vessel Code Case N-532-5, Alternative Requirements to Repair and Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000 and IWA-6000,Section XI, Division 1. APS is required to prepare and submit the Form OAR-1 to the Nuclear Regulatory Commission (NRC) within 90 days of the completion of each refueling outage. The 1R23 outage ended on May 13, 2022.

No commitments are being made to the NRC by this letter. Should you have any questions concerning the content of this letter, please contact Matthew S. Cox, Licensing Section Leader, at (623) 393-5753.

Sincerely, Digitally signed by Gil, Katherine J(Z05492)

Date: 2022.07.08 09:25:56 -07'00' Katherine J. Gil Nuclear Regulatory Affairs Director

KJG/MSC/mg

Enclosure:

Unit 1 Twenty-Third Refueling Outage Owners Activity Report, Report 1R23

cc: S. A. Morris NRC Region IV Regional Administrator S. P. Lingam NRC NRR Project Manager for PVNGS L. N. Merker NRC Senior Resident Inspector for PVNGS

A member of the STARS Alliance LLC Callaway Diablo Canyon Palo Verde Wolf Creek ENCLOSURE

Unit 1

Twenty-Third Refueling Outage Owners Activity Report

Report 1R23

FORM OAR-1 OWNERS ACTIVITY REPORT

Report Number: ________________________________________________________________________________________________1R23

Plant: ___________________________________________________________________________________________________________Palo Verde Generating Station, 5801 S. Wintersburg Road, Tonopah, Arizona 85354-7529

Unit No.: ___________ Commercial service date: ___________________ Refueling Outage No.: ___________________1 Jan 28, 1986 23 (if applicable)

Current inspection interval ______________________________________________________________________________________IWB,IWC,IWD,IWF=4th / IWE =3rd/ IWL=2nd (8/1/11-5/31/21),3rd (6/1/21-5/31/31) / SPT =4th (1st, 2nd, 3rd, 4th, other)

Current inspection period _______________________________________________________________________________________IWB,IWC,IWD,IWF =1st / IWE =2nd / IWL=2nd (8/1/16-5/31/21),1st (6/1/21-5/31/26) / SPT =1st (1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the inspection plans ____________________________________________2013 Ed. (IWE,IWL [2nd Int] = 2007 Ed.,'08 Ad.)

Date and revision of inspection plans ___________________________________________________________________________ISI=4/09/22 R1, SPT=6/21/18 R0, IWE=10/3/18 R0, IWL=8/8/18 R4,6/14/22 R0

Edition and Addenda of Section XI applicable to repair/replacement activities, if different than the inspection plans ____________________________________________________________________________2013 Edition

Code Cases used for inspection and evaluation:

_____________________________________________________________________________________________N-532-5, N-716-1, N-722-1, N-729-6, N-770-5 (if applicable)

CERTIFICATE OF CONFORMANCE

I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of

_______________ conform to the requirements of Section XI. U1R23 (refueling outage number)

Folley, Roy Digitally signed by Folley, Roy C(Z07131)

C(Z07131) Date: 2022.06.28 10:17:33 Signed _________________________________________________________ Date: _____________________________________ -07'00' Jun 28, 2022

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by _____________________________ of _______________________________ have inspected the items described in

  • Hartford, Connecticut this Owners Activity Report, and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.

Digitally signed by Hogstrom, *The Hartford Steam Boiler Inspection and Insurance Company Hogstrom, Robert (YH2450)

Robert (YH2450) Date: 2022.06.28 10:55:38

__________________________________________ Commissions ____________________________________________________-07'00' N.B. 9685 "A, N, I, C"

(Inspectors Signature) National Board, State, Province, and Endorsements Date: _____________________________________Jun 28, 2022

PV-E0796 Ver. 2 1R23 Table 1 Items with Flaws or Relevant Conditions That Required Evaluation for Continued Service

Examination Category and Item Item Description Evaluation Description Number None None None

1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service

Code Repair/Replacement Class Component ID Description of Work Date Complete Plan number 3 1PSPBL025B Perform base material repairs to Spool-001 of Line SPB-L025B. 4/23/2022 5123121-3 3 1MDGAE01A Weld Repair of Corroded Areas 3/05/2022 5297661-0 3 1MEWBE01 Perform Base Material Repairs to the Heat Exchanger. 4/25/2022 5307476-1 Install Westinghouse Mechanical 1 1MRCEE01A Plugs In Steam Generator 4/29/2022 5392240-0 1MRCEE01A "Cold" Leg.

Install Westinghouse Mechanical 1 1MRCEE01A Plugs In Steam Generator 4/29/2022 5392241-0 1MRCEE01A "Hot" Leg.

Install Westinghouse Mechanical 1 1MRCEE01B Plugs In Steam Generator 4/29/2022 5392242-0 1MRCEE01B "Cold" Leg.

Install Westinghouse Mechanical 1 1MRCEE01B Plugs In Steam Generator 4/29/2022 5392243-0 1MRCEE01B "Hot" Leg.

3 1MDGAE01A/B Weld Repair of Corroded Areas 3/05/2022 5297661-0 3 1MDGAE01B Weld Repair of Corroded Areas 3/05/2022 5297661-0 3 1MEWBE01 Weld replace Nozzle # 7 4/26/2022 5436979-0 3 1MDGAE01A Replace DG Intercooler Cross Connect Spools 6 and 8 3/05/2022 5297615-0 3 1MDGAE01B Replace DG Intercooler Cross Connect Spools 5 and 7 3/05/2022 5297616-0 Perform Base Metal Repair to 2B 3 00142964 00142965 00142966 00142967 DG AREVA Intercooler Cross 10/28/2021 5231422-0 Under Spools 5, 6, 7 and 8 Perform Base Metal Repairs To 3 00150230 2A EDG Intercooler Cross Under 10/02/2021 5191007-0 Spool 6 Perform Base Metal Repairs To 3 00150232 2A EDG Intercooler Cross Under 1/02/2021 5191007-0 Spool 8 Perform Base Metal Repair To 3 00142956 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 5.

Perform Base Metal Repair To 3 00142957 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 6.

Perform Base Metal Repair To 3 00142958 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 7.

1 1R23 Table 2 Abstract of Repair/Replacement Activities Required for Continued Service

Perform Base Metal Repair To 3 00142959 1A DG Intercooler Cross Under 3/05/2022 5231420-0 Spool 8.

1 1PSIBV057 Replaced Valve Due To Seat Leakage 5/11/2022 5280176-0 Replacement Of S/G #1 Line 2 2 1JSGEPSV0578 Main Steam Safety Relief Valve 5/11/2022 5300318-0 With Reconditioned And Tested Spare.

2 1JSIBPSV0166 Replaced PSV, per Surveillance Test Results. 5/05/2022 5305487-0 1 1JSIBPSV0169 Replaced PSV, per Surveillance Test Results. 4/24/2022 5308139-0 2 1JSIEPSV0221 Replaced PSV, per Surveillance Test Results. 5/01/2022 5308146-0