| {{#Wiki_filter:KP-NRC-2403-003 | | {{#Wiki_filter:KP-NRC-2403-003 |
|
| |
|
| March 4, 2024 Docket No. 50- 611 Docket No. 50-612 | | March 4, 2024 Docket No. 50- 611 Docket No. 50-612 |
|
| |
|
| US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | | US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report | | Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report |
|
| |
|
| ==References:== | | ==References:== |
| : 1. Letter, Kairos Power LLC to Document Control Desk Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122) | | : 1. Letter, Kairos Power LLC to Document Control Desk Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122) |
| : 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 Environmental Report Audit Plan, January 5, 2024 (ML23353A069) | | : 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 Environmental Report Audit Plan, January 5, 2024 (ML23353A069) |
| : 3. Email, Peyton Doub (Nuclear Regulatory Commission) to Martin Bryan (Kairos Power), RCI Confirmation Message, February 26, 2024 | | : 3. Email, Peyton Doub (Nuclear Regulatory Commission) to Martin Bryan (Kairos Power), RCI Confirmation Message, February 26, 2024 |
|
| |
|
| In Ju ly 2 023, Kairos Powe r LLC s ubmitted it s E nvironmental Report ( ER) (Reference 1) in s upport o f t he construction p ermit ap plication (CPA) for th e Hermes 2 n on-power reactor. In January 2 024, the Nuclear Regulatory C ommission p rovided th e Hermes 2 Environment al Audit P lan (Reference 2). As a result o f that a udit, the N uclear R egulatory C ommission ( NRC) provided eight requests f or c onfirmatory information ( RCIs) t hat t he s taff w ill use to evaluat e the environmental i mpacts f rom th e proposed action (Reference 3 ). The enclosur e to th is l etter p rovides Kairos P owers confirmation of each R CI. | | In Ju ly 2 023, Kairos Powe r LLC s ubmitted it s E nvironmental Report ( ER) (Reference 1) in s upport o f t he construction p ermit ap plication (CPA) for th e Hermes 2 n on-power reactor. In January 2 024, the Nuclear Regulatory C ommission p rovided th e Hermes 2 Environment al Audit P lan (Reference 2). As a result o f that a udit, the N uclear R egulatory C ommission ( NRC) provided eight requests f or c onfirmatory information ( RCIs) t hat t he s taff w ill use to evaluat e the environmental i mpacts f rom th e proposed action (Reference 3 ). The enclosur e to th is l etter p rovides Kairos P owers confirmation of each R CI. |
| Kairos P ower requests N RC re view o f this in formation in s upport of c ontinued r eview of th e Hermes 2 CPA. | | Kairos P ower requests N RC re view o f this in formation in s upport of c ontinued r eview of th e Hermes 2 CPA. |
|
| |
|
| If you have any questions or need any additional information, please contact M arty Bryan at bryan@kairospower.com or at (865) 399-1 136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1 226. | | If you have any questions or need any additional information, please contact M arty Bryan at bryan@kairospower.com or at (865) 399-1 136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1 226. |
|
| |
|
| I d eclare u nder p enalty o f perjury t hat t he foregoing i s t rue an d correct . | | I d eclare u nder p enalty o f perjury t hat t he foregoing i s t rue an d correct. |
| Executed o n March 4, 2 024 | | Executed o n March 4, 2 024 |
|
| |
|
| Peter Hastings, PE Vice President, Regulatory Affairs and Quality | | Peter Hastings, PE Vice President, Regulatory Affairs and Quality |
|
| |
|
| Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2403- 003 Page 2 | | Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2403- 003 Page 2 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1) Kairos Power Response to NRC Requests for Confirmat ory Information for the Review of the Hermes 2 Environmental Report | | : 1) Kairos Power Response to NRC Requests for Confirmat ory Information for the Review of the Hermes 2 Environmental Report |
|
| |
|
| xc (w/enclosure): | | xc (w/enclosure): |
Line 50: |
Line 50: |
| William Jessup, Chief, NRR Advanced Reactor Licensing Branch Peyton Doub, Environmental Project Manager, NMSS, Environmental Review Branch Mary Richmond, Environmental Project Manager, NMSS, Environmental Review Branch | | William Jessup, Chief, NRR Advanced Reactor Licensing Branch Peyton Doub, Environmental Project Manager, NMSS, Environmental Review Branch Mary Richmond, Environmental Project Manager, NMSS, Environmental Review Branch |
|
| |
|
| KP-NRC-2403- 003 | | KP-NRC-2403- 003 |
|
| |
|
| Enclosure 1 | | Enclosure 1 |
|
| |
|
| Kairos Power Response to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report | | Kairos Power Response to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report |
|
| |
|
| (Non-Proprietary)}} | | (Non-Proprietary)}} |
|
---|
Category:Letter
MONTHYEARML24261C0092024-09-16016 September 2024 Kairos Power LLC - Charlotte Office Address ML24158A2322024-08-30030 August 2024 Letter to Kairos, Inc., Exemption and Final EA ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation ML24155A0612024-06-0303 June 2024 Kairos Power LLC, Presentation Materials for the Kairos Power Meeting with the Nuclear Regulatory Commission on the Hermes Foundation Design ML24150A2442024-05-29029 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report, Chapters 2, 3, 5, 9, and 13 ML24150A2172024-05-28028 May 2024 Kairos Power, LLC - Request for Documents Related to Non-Power Security ML24144A0912024-05-23023 May 2024 Kairos Power, LLC - Submittal of the Hermes 2 Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor, Revision 1, and the Postulated Event Analysis Methodology Technical Report, Revi ML24138A2122024-05-16016 May 2024 Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapters 3, 5, and 13 ML24136A2542024-05-15015 May 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 9 ML24135A3832024-05-14014 May 2024 Kairos Power, LLC - Transmittal of Response to NRC Request for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24131A1262024-05-10010 May 2024 Kairos Power, LLC - Presentation Materials for Kairos Power Briefing to the Advisory Committee on Reactor Safeguards, Kairos Power Subcommittee on Hermes 2 Preliminary Safety Analysis Report Chapters 1, 4, 6-8, 10-12, 14, and 16-18 ML24101A0772024-04-23023 April 2024 Hermes 2 NPS Dea ML24101A0782024-04-23023 April 2024 Hermes 2 SHPO Dea ML24101A0722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, J ML24113A1732024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hill, D ML24113A1702024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bunch, J ML24113A1692024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Bryan, a ML24113A1682024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Barnes, B ML24113A1712024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Cernek, J ML24113A1722024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hicks, M ML24113A1742024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Hoskin, Jr., C ML24113A1752024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Johnson, L J ML24113A1762024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Morrow, R K ML24113A1782024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Rogers, L ML24113A1772024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Osceola, Jr. M W ML24113A1792024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Sylestine, R ML24113A1822024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yargee, W ML24113A1802024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Wallace, G J ML24113A1812024-04-22022 April 2024 Tribal Letters for Dea Hermes 2-Yahola, ML24101A2172024-04-19019 April 2024 Letter to Kairos Power, LLC-Notice of Availability of the Draft Environmental Assessment for the Construction Permit for Hermes 2 Test Reactors ML24109A2952024-04-16016 April 2024 Kairos Power, LLC - Slides to Support April 22, 2024, Public Meeting About Hermes Physical Security ML24103A2422024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 ML24103A2452024-04-12012 April 2024 Kairos Power, LLC, Transmittal of Changes to Construction Permit Application - Financial Information Enclosure and PSAR Chapter 15 ML24206A0852024-03-20020 March 2024 NPS Section 106 Initiation Response - Hermes 2 ML24073A3182024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 ML24072A2982024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 ML24065A1012024-03-0404 March 2024 Kairos Power LLC, Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report ML24039A1902024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 ML24032A1892024-02-0202 February 2024 Ltr Hon Glenna J Wallace Chief Eastern Shawnee Tribe of Oklahoma Re Hermes 2 ML24032A2002024-02-0202 February 2024 Ltr Libby Rogers, Principal Chief, Jena Band of Choctaw Indians Re Hermes 2 ML24032A1992024-02-0202 February 2024 Ltr Hon Wilson Yargee, Chief Alabama-Quassarte Tribal Town Re Hermes 2 ML24032A1982024-02-0202 February 2024 Ltr Hon Stephanie Yahola, Mekko Kialegee Tribal Town Re Hermes 2 ML24032A1972024-02-0202 February 2024 Ltr Hon Stephanie a Bryan Chairwoman Poarch Band of Creek Indians Re Hermes 2 ML24032A1962024-02-0202 February 2024 Ltr Hon Ryan K Morrow Town King Thlopthlocco Tribal Town Re Hermes 2 ML24032A1952024-02-0202 February 2024 Ltr Hon Rick Sylestine, Chairman, Alabama-Coushatta Tribe of Tx Re Hermes 2 ML24032A1942024-02-0202 February 2024 Ltr Hon Michell Hicks Principal Chief Eastern Band of Cherokee Indians Re Hermes 2 ML24032A1932024-02-0202 February 2024 Ltr Hon Marcellus W Osceola Jr Chairman Seminole Tribe of Fl Re Hermes 2 ML24032A1922024-02-0202 February 2024 Ltr Hon Lewis J Johnson Chief Seminole Nation of Oklahoma Re Hermes 2 ML24032A1912024-02-0202 February 2024 Ltr Hon Jonathan Cernek Chairman Coushatta Tribe of Louisiana Re Hermes 2 ML24032A1902024-02-0202 February 2024 Ltr Hon Joe Bunch Chief United Keetoowah Band of Cherokee Indians Re Hermes 2 2024-09-16
[Table view] |
Text
KP-NRC-2403-003
March 4, 2024 Docket No. 50- 611 Docket No. 50-612
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Reponses to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report
References:
- 1. Letter, Kairos Power LLC to Document Control Desk Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Nuclear Regulatory Commission, Kairos Power, LLC Hermes 2 Environmental Report Audit Plan, January 5, 2024 (ML23353A069)
- 3. Email, Peyton Doub (Nuclear Regulatory Commission) to Martin Bryan (Kairos Power), RCI Confirmation Message, February 26, 2024
In Ju ly 2 023, Kairos Powe r LLC s ubmitted it s E nvironmental Report ( ER) (Reference 1) in s upport o f t he construction p ermit ap plication (CPA) for th e Hermes 2 n on-power reactor. In January 2 024, the Nuclear Regulatory C ommission p rovided th e Hermes 2 Environment al Audit P lan (Reference 2). As a result o f that a udit, the N uclear R egulatory C ommission ( NRC) provided eight requests f or c onfirmatory information ( RCIs) t hat t he s taff w ill use to evaluat e the environmental i mpacts f rom th e proposed action (Reference 3 ). The enclosur e to th is l etter p rovides Kairos P owers confirmation of each R CI.
Kairos P ower requests N RC re view o f this in formation in s upport of c ontinued r eview of th e Hermes 2 CPA.
If you have any questions or need any additional information, please contact M arty Bryan at bryan@kairospower.com or at (865) 399-1 136, or Darrell Gardner at gardner@kairospower.com or (704) 769-1 226.
I d eclare u nder p enalty o f perjury t hat t he foregoing i s t rue an d correct.
Executed o n March 4, 2 024
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2403- 003 Page 2
Enclosures:
- 1) Kairos Power Response to NRC Requests for Confirmat ory Information for the Review of the Hermes 2 Environmental Report
xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Peyton Doub, Environmental Project Manager, NMSS, Environmental Review Branch Mary Richmond, Environmental Project Manager, NMSS, Environmental Review Branch
KP-NRC-2403- 003
Enclosure 1
Kairos Power Response to NRC Requests for Confirmatory Information for the Review of the Hermes 2 Environmental Report
(Non-Proprietary)