ML24039A190: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML24039A190 | | number = ML24039A190 | ||
| issue date = 02/08/2024 | | issue date = 02/08/2024 | ||
| title = Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application PSAR Chapter 2 | | title = Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 | ||
| author name = Hastings P | | author name = Hastings P | ||
| author affiliation = Kairos Power, LLC | | author affiliation = Kairos Power, LLC | ||
Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:KP-NRC-2402- 001 | ||
February 8, 2024 Docket No. 50-611 Docket No. 50-612 | |||
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 | |||
==Subject:== | |||
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 2 | |||
==References:== | |||
: 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122) | |||
: 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446) | |||
In July 2023 , Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR) | |||
(Reference 1) as part of the Construction Permit Application (CPA) for t he Hermes 2 non-power reactor. | |||
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 2 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in . Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA. | |||
If you have any questions or need any additional information, please contact Austin Clark at clark@kairospower.com or (704) 247- 6310 Ext. 1337, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226. | |||
I declare under penalty of perjury that the foregoing is true and correct. | |||
Executed on February 8, 2024 | |||
Sincerely, | |||
Peter Hastings, PE Vice President, Regulatory Affairs and Quality | |||
==Enclosure:== | |||
Changes to Hermes 2 PSAR Chapter 2 | |||
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2402- 001 Page 2 | |||
xc (w/enclosure): | |||
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Rea ctor Licensing Branch}} |
Revision as of 22:08, 2 September 2024
ML24039A190 | |
Person / Time | |
---|---|
Site: | Hermes File:Kairos Power icon.png |
Issue date: | 02/08/2024 |
From: | Hastings P Kairos Power |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML24039A189 | List: |
References | |
KP-NRC-2402-001 | |
Download: ML24039A190 (1) | |
Text
KP-NRC-2402- 001
February 8, 2024 Docket No. 50-611 Docket No. 50-612
US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 2
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Audit Plan, Nuclear Regulatory Commission, Plan for a General Audit of the Hermes 2 Construction Permit Application, October 3, 2023 (ML23268A446)
In July 2023 , Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR)
(Reference 1) as part of the Construction Permit Application (CPA) for t he Hermes 2 non-power reactor.
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 2 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in . Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA.
If you have any questions or need any additional information, please contact Austin Clark at clark@kairospower.com or (704) 247- 6310 Ext. 1337, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on February 8, 2024
Sincerely,
Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to Hermes 2 PSAR Chapter 2
Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 KP-NRC-2402- 001 Page 2
xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos Jr., Project Manager, NRR Advanced Rea ctor Licensing Branch