ENS 57079: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 15: Line 15:
| NRC officer = Bill Gott
| NRC officer = Bill Gott
| event date = 02/15/2024 00:00 CDT
| event date = 02/15/2024 00:00 CDT
| last update date = 05/02/2024
| last update date = 05/31/2024
| title = Initial Part 21 Report - Potential Defect with Circuit Breaker
| title = Initial Part 21 Report - Potential Defect with Circuit Breaker
| event text = The following information was provided by the licensee via email:
| event text = The following information was provided by the licensee via email:
Line 26: Line 26:
Due to inconclusive results, the completion date of the testing is revised to 05/31/2024.
Due to inconclusive results, the completion date of the testing is revised to 05/31/2024.
Notified R2DO (Miller) and Part 21/50.55 Reactors (email).
Notified R2DO (Miller) and Part 21/50.55 Reactors (email).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240503en.html#en57079
* * * UPDATE ON 5/31/2024 AT 1534 EDT FROM RICHARD KNOTT TO ERNEST WEST * * *
The following is a synopsis of the updated information received:
The only known affected licensee is Oconee. Paragon is evaluating if the issue pertains to other equipment or plants.
Paragon has conducted additional testing with the original equipment manufacturer, Schneider Electric, but will require more time to complete their evaluation. Evaluation is expected to be complete by 6/30/2024.
Other circuit breaker types that may be affected are:
5GSB2-250-1200 (uses KVR type element)
5GSB2-350-1200 (uses KVR type element)
5GSB3-350-1200 (uses KVR type element)
5GSB3-350-2000 (uses KVR type element)
Paragon recommends licensees with the breaker types listed above monitor for failure to close on demand or delayed. If any improper operation is found, report it to Paragon for evaluation.
Contact Information:
Richard Knott
Vice President Quality Assurance
Paragon Energy Solutions
817-284-0077
rknott@paragones.com
Notified R2DO (Franke) and Part 21/50.55 Reactors (email).
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2024/20240603en.html#en57079
}}
}}


{{ENS-Nav}}
{{ENS-Nav}}

Revision as of 05:55, 3 June 2024

ENS 57079 +/-
Where
Paragon Energy Solutions
Fort Worth, Texas (NRC Region 2)
Organization: Paragon Energy Solutions
Reporting
10 CFR 21.21(a)(2), Interim Report for Comply or Defect in Component
Time - Person (Reporting Time:+1483.48 h61.812 days <br />8.83 weeks <br />2.032 months <br />)
Opened: Richard Knott
23:29 Apr 16, 2024
NRC Officer: Bill Gott
Last Updated: May 31, 2024
57079 - NRC Website