Clinch River: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
| Line 12: | Line 12: | ||
|is cancelled=Yes | |is cancelled=Yes | ||
|Reactor type=sodium-cooled fast-neutron | |Reactor type=sodium-cooled fast-neutron | ||
}}{{Site unit | |||
|Unit number=2 | |||
|Docket=05200047 | |||
|is cancelled=No | |||
}} | }} | ||
}} | }} | ||
Latest revision as of 18:58, 2 July 2023
| Plant | |
|---|---|
| Company | |
| Where | Oak Ridge, Tennessee |
| Regulatory | |
| Region | NRC Region 2 |
| ISFSI docket | |
| wikipedia link | |
| Docket | 05000537-Canceled |
|---|---|
| Unit type | sodium-cooled fast-neutron |
| Status | |
| Docket | 05200047 |
|---|---|
| Status | |