| CCA = H.5 | | CCA = H.5 | ||
| INPO aspect = WP.1 | | INPO aspect = WP.1 | ||
| description = The inspectors identified a Green NCV of Technical Specification (TS) 3'7.8.2'f | | description = The inspectors identified a Green NCV of Technical Specification (TS) 3\'7.8.2\'f | ||
StanOOV Gas Treatment System and Control Room High Efficiency Air Filtration Syste | StanOOV Gas Treatment System and Control Room High Efficiency Air Filtration Syste | ||
(CRHEAFS)," for Entergy's failure to enter and perform the actions prescribed in TS afte | (CRHEAFS),\" for Entergy\'s failure to enter and perform the actions prescribed in TS afte | ||
the Control Room Envelope (CRE) was breached during work on a vital area door into th | the Control Room Envelope (CRE) was breached during work on a vital area door into th | ||
CRE. Entergy has since repaired the vital area door and restored the CRE. This finding was more than minor because it was associated with the Human Performanc | CRE. Entergy has since repaired the vital area door and restored the CRE. This finding was more than minor because it was associated with the Human Performanc | ||
Line 23: | Line 23: | ||
control room) and adversely affected the cornerstone objective to provide reasonabl | control room) and adversely affected the cornerstone objective to provide reasonabl | ||
assurance that physical design barriers protect the public from radionuclide release | assurance that physical design barriers protect the public from radionuclide release | ||
caused by accidents or events. Specifically, the inoperable CRE could affect the operator' | caused by accidents or events. Specifically, the inoperable CRE could affect the operator\' | ||
ability to occupy the control room under adverse radiological, chemical, or smoke condition | ability to occupy the control room under adverse radiological, chemical, or smoke condition | ||
while responding to an event. IMC 0609, "Significance Determination Process," Attachmen | while responding to an event. IMC 0609, \"Significance Determination Process,\" Attachmen | ||
0609.04, "Phase 1- Initial Screening and Characterization of Findings," was used t | 0609.04, \"Phase 1- Initial Screening and Characterization of Findings,\" was used t | ||
evaluate the impact of the finding on loss of operability or functionality of the CRE an | evaluate the impact of the finding on loss of operability or functionality of the CRE an | ||
CHREAFS, and it was determined that further evaluation was required since the finding ha | CHREAFS, and it was determined that further evaluation was required since the finding ha |
Latest revision as of 20:42, 20 February 2018
Site: | Pilgrim |
---|---|
Report | IR 05000293/2011003 Section 1R15 |
Date counted | Sep 30, 2011 (2011Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | T Burns R Rolph B Smith M Schneider K Dunham |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |