ML20205B913: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:-            __    _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                    _  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _
O
        'Af Telephone (412) 393-6000 E"o*'7,', 4
                      '*                                                                                                                                                      July 29, 1986 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555
        - Mail Stop 340 -
 
==Reference:==
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements Gentlemen:
Attached are marked-up pages from your letter dated April 30, 1986 requesting information regarding the implementation dates of the listed generic            issues.                                            Many            of these issues did not have an actual implementation date since there were no hardware or licensing document changes.          For these issues the completion date was assumed as the date the NRC closed out the licensing issue as indicated in the column "Lic Act Complete".                                                                                                                                                                                            :
All items have been addressed and this letter supercedes our previous submittal of June 2,1986 which provided a partially completed list which was provided as a status report.
If you have any questions regarding this information, please contact members of our Licensing staff.
Very truly yours, Qd. D. ieber Senior Manager Beaver Valley No. I l
          %[k P
00
 
Beaver Valley Power Station, Unit No. 1 i      Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 i            One James River Plaza Richmond, VA 23261 I
i a
                  .-  ,-  ,    ----.m.  -- -- --    ,    .-, - - ------- , y
 
R-1208751-001                            REGULAT0RY          INF0RMATION                  TRACKING                    S Y S 1 t: M                            PAGE NO.*    20 FACILITY          IMPLEMENTATION                                                                              03/31/86 FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, OH                  LICENSED P0HER: 2652 MHT-DOCKET NUMBER: 050-00334                                                                                          PROJECT MANAGER: P. TAM DESIGN POWER:    0335 MHE                            BRANCH CHIEF:                  L. RUBENSTEIN ARCH / ENGINEER: S&H                                        NSSS VENDORt    HEST IE INSPECTOR:            H. TROSKOSKI LIC. ASSISTANT *                  . VACANT k'
TAC NO.
LIC ACT                                            LICENSEE MPA 8                TITLE                                  COMPLETE                                    STATUS              R&l5 M07121              A-01  10 CFR 50.55 ACG) - ISI                                12/04/79C --            tie mposT(c - - - -                    /f 77 M08132              A-02  APPENDIX I - ALARA                                    03/h/83C                  d o m#L Ls r a ,3          - - -
eM M06987              A-03  SECURITY REVIENS-MODIFIED AMENDMENT PLANS              02/k/79C -- C # '"# ''' 7 # D                        ~~~          #
M11153              A-09  PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE                .
                                                                                                        --      0 # '"#              ~ ' ~ ## 7 7 M10474              A-10  CONTINGENCY PLANNING                                  09/12/80C -- < #-*#' d' 7#                    * - ~~~#' '#
M10476              A-11  GUARD TRAINING PLANS                                  02/11/81C              -    C * *'' # ''" '#    - ' ~              ####
M10475              A-12  VITAL AREA ANALYSIS                                                                                      - - - - #
03/27/81C          --        6 0 *"#"' '#"
M06363              A-14  10CFR 50.55 A(G) - INSERVICE TESTING                  06/29/82C            _ .. 6.c m #'* M #          '~~            # T '#
M46811              A-16  QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING    08/12/82C          ___        C c mP'uT#D              - - - #9##
M51071              A-17  INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN    12/30/86 . . -                /#4 s 76 c 746 - - - /9 #9 M55010              A-18  TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43)      11/27/84C          - - -      dcmpcc-7Ed              --
If IV M59070              A-20  to CFR 50.62 OPERATING REACTOR REVIENS 1
12/31/86[ .. .                ge o .,,te.rs o          _ _ _        , , ff M59941              A-21  10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE          06/30/86                  - reo .> < c,-rs o            __        - so / jg, N06405              B-02  FIRE PROTECTION                                        -'IL.Ld75 t              C LC efterj--0cmF'eT#O -- - - # 7 'T 'l M08372              B-03  PHR MODERATOR DILUTION                                02/21/79C        _ _ _ _      e o ,,, v<,.e Ts,a        _    _ i01f M06714              B-04  REACTOR VESSEL OVERPRESSURE PROTECTION                          /83C    _ _ _        c_ o m pc<,, y,rg ,_ _                g/pg
  'M07313              B-07  STEAM GENERATOR FEEDHATER FLOW INSTABILITY            02/12/79C - - - do,nacu7so __ _                                        ,9.f 9 M10837              B-15  FUEL ROD B0H                                          11/03/79C          _ __
g, o ,,tpcu M o - - - f 97 7
,  M08670              B-14  CEA GUIDE TUBE HEAR                                    07/22/80C          ___        g o ,,,p t_ce ve 3 _ _ _ j g pa M12162              B-16  EMERGENCY PLANNING AND REVISIONS                                                                                    -
T4 M 1s 3)
W hndes        skq}e  k hlkl leffer , M $e n~ Sisist O O ce dobe , $ daf e, is 110 b Silajn{                                    s            , "c *,
4                        M neans u t . o ,i .' s .s h y m a e,. vgc_ mies,
 
4 R-1208731-001                  REGULAT0RY            INF0RHATION                TRACKING                        SYSTEM                            PAGE NO.      21 FACILITY          IMPLEMENTATION                                                                            03/31/86 BEAVER VALLEY l            (CONTINUATION)
                                                                                                        )it TAC NO.
LIC ACT                                              LICENSEE MPA 8              TITLE                                  COMPLETE                                      STATUS            DATE M10477        B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS        03/30/82C - - - c c m p<_ u vsc,                          - - < f j g M10260        B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION      - Zg -                                    pypz e74 g _                j9E2.
M10323        B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA
                                                                                                  ^ -
                                                                                    .T4 Z t'is o, ; b.4.s.1c.( j M10478          B-22 C H SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL    03/30/82C -                    - _ C o mpc ere                . - /9/ L M10007          B-23 DEGRADED GRID VOLTAGE                                03/03/81C                - --        C o m #c ("# 6 - - /97/
M42553          B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL POW  ; / ,e s i c l              -- - C O
* Av 7'# o - ~ / 9/ 2.
M10473          B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H  titr21MHG                                  O#NW4 - - --- /9pA M12991          B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H    _ _-.. .                              ccmgurrea _ _                f pg M10222          B-26 INADVERTANT SAFETY INJECTION DURING C00LD0HN        12/28/79C                      -
                                                                                                                        - t o mpw. rso _ __j97y M07240          B-31 LONG SHAFT LHSI & OUTSIDE RECIRC. PUMP DEGRADATION g; } --                                      ,        p            _ , , 9.g M49417          B-32 BLOCKED SI SIGNAL DURING C00LD0HN gg?g'g                      _ _                    g 7g , ,,,,                            ,
M08653          B-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS          "=
Z                            '"'""                '
M11111          B-41 Wii=TMe { }
FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S  03/14/83C _ _                      _
e c inpce r#c          - - /9'7 7 M11685          B-42 TMI FOLLOH UP - ALL PLANTS gjjg                                        gg,rs o                - / M A M11901          B-42 TMI FOLLOH UP - ALL PLANTS ( 5 { u f u f; n )      07/17/79C              --
                                                                                                                        - Q_ o m pc e 7#b - -- e9 79 M11766          B-43 PHR FEEDHATER LINE CRACKS                          02/25/80C - -- t o m # Car r,r4                                - - e97f M43129          B-43 PHR FEEDHATER LINE CRACKS                          -trase9r006is-(s'f or./jk .DL C le.tter) , _ g m p c e 7 f ,) , __ ,pfd M30750          B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C _- tomeceT4o                                    , -
rffo M30751          B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C                                  f                              l
    'M30752              B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C M30753          B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C M30754          B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C                                f                            Y
                                                                                                                                              ~ ~
M30755          B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C                  -      00##
 
R-1208751-001                                REGULAT0RY            INF0RMATION          TRACKING                    SYSTEM                        PAGE NO.s    25 FACILITY        IMPLEMENTATION                                                                03/31/82 BEAVER VALLEY 1                          (CONTINUATION)
LIC ACT                                    LICENSEE TAC H0.                MPA 9                TITLE                                COMPLETE                              STATUS            Ralf, M30756                    B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C - - - Co a3 9 W T' O --                          /9/v M30757                    B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C                              '
M30758                    B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C M30759                    B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C M30760                    B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C M30761                    3-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C                                                    y M30762                    B-44 LESSONS LEARNED IMPLEMENTATION                      04/18/80C        - - - Con?#CETE6                    - / f/C M12395                    B-44 LESSONS LEARNED IMPLEMENTATION                      02/11/81C      --            C o d' 9L L" 74 0 - - - ' M')
M12922                    B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR  04/20/81C    -            -    CC "'# ''' 7" O -            '99#
.                          M12598                    B-46 ANALYSIS OF TURBINE DISC CRACKS                      08/19/81C  -              -  0 0 "'                  -
                                                                                                                                                                          ' #NI M12673                    B-47 ECCS; CLAD SHELLING AND RUPTURE                      09/12/80C -          -        tesu N W 6 - - e fh                          ,
M13110                    B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE    06/21/82C - --              d. c m pcteva 6    - - af/.A M11865                    B-52 REVIEN OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI  02/05/81C - - - 0 0 *' # ' '' '# 0 --- ' f f' M42092                    B-57 DHR CAPABILITY                                      05/15/81C - --                t c m et e reb - - - /ff/
M42858                    B-59 MASONRY 84ALL DESIGN                                07/12/82C    -          . tcmFC67#6          --          /f/A M42459                    B-60 ENVIRONMENTAL QUALIFICATION                          03/ 07/85C - - - e i n.p ce Tag                    - -      f fpr M42652                    B-61 LOSS OF NON CLASS IE ISC PONER (IES 79-27)                r-^^                    d c meurwa - - e f FI
                                                                                                              +--53f)TC et (
M42722                    B-62 ESF RESET CONTROL DESIGN DEFICIENCY                g ;;                                _ g o, p C 6 7(6 - - ' 9 PJ M43911                    B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT          09/01/81C - __ c. o m pu va                    --
t9PA M47146                    B-66 NATURAL CIRCULATION C00LD0HN                        08/02/83C -              -  /go /(C Tr.-4        - - /9p? [6EE F-uS)
M46826                    B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDH  08/04/82C  -        __ _ d o ntece7%                ^ '9Q M46598                    B-70 FATIGUE TRANSIENT LIMIT TS                                                                %              -
                                                                                                                              )
M49724                      B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16)        10/21/83C _ _ __                (o mpce ya - - / 5 / g j
 
R-1208751-001                                                      REGULAT0RY            INF0RMATION              TRACKING                    SYSTEM                            PAGE NO.      2B FACILITY        IMPLEMENTATION                                                                    03/31/86 BEAVER VALLEY 1                                                (CONTINUATION)
LIC ACT                                      LICENSEE TAC NO.                                        MPA 9                TITLE                                COMPLETE                                STATUS            DATE M52737                                          B-76 3
ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION &  4s/20/85C -- -                  60"#W-T'du--'/f4/
M52818                                          B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER  10/31/86    -          --
d c W #'F WB - - e 9 /3 M52899                                          B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU  11/21/85C              -
O_ o m F < *" T h -- 'F/Py.
M52980                                          B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO  10/31/85C      --
eemPCe746            - - ' 98 5; M53061                                          B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO  11/21/85C -- a d '*1 P ' c 7 # o                - -- # 9#3 M53114                                          B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R  10/h85C --- ( m p w rca                          __
s/jy MS3166                                          B-82 ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC
                                                                                                              ^
PRodd'cTKb              -
f/g M54516                                          B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83-  04/30/86 - - -                  /R o J te -r E3    _ _ _ , ,/ pg M53569                                          B-85 SALEM ATHS 1.2 DATA CAPABILITY                      04/30/86 - --                ac m PL r7C6        - - /9p3 M53652                                          B-86 SALEM ATHS 2.2 S-R COMPONENTS                        09/30/86 - --                  a c mpce 7c6 -                3/ B5 M53735                                          B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS              11/21/85C -~                  d o ntpct"rvA , _
5/j,                .
M53818                                          B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS                10/31/85C - -- g e oi pcg7s o
___          , 9 p3 M53901                                          B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS            12/31/86                  _ p40J M #b -                    - g/g M55348                                          B-90 SALEM ATHS 4.3 H AND B&H T.S.                        06/30/86
                                                                                                                                  -- /403I6Tro                - - - 9g M54045                                          B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FFATURES              11/21/85C - -- c o n,pce 7q                          -
fpjg M53962                                          B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES          01/31/87      _      __      p fe,jge 7 f,3    , , _      ,2 7'y 7 M12188                                          C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME  01      80C    - - - d ont pce r,r3            ,_ ,_
                                                                                                                                                                            ,pfg M08596                                          C-03 QUALIFICATIONS OF RADIATION PROTECTION MANAGER      03/27/79C WW - - d e m pce rsg                        _ _,,p77 N08594                                          C-06 PUMP SUPPORT-LAMELLAR TEARING                      R.  .I.d.lb MC  C - -- den 1PceTr3                        .    .fpjo M08593                                        C-07  FUEL HANDLING ACCIDENT INSIDE CONTAINMENT            12/12/79C - --                  d o ns pceno            _ ,fv79 M07972                                        C-10  CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE  12/20/84C        -- -
(cim pcv7a g _ . , ,g'f g M43646                                        C-14  AUXILIARY FEEDilATER SEISMIC QUALIFICATION          01/11/82C - -                    ccmpcevcc              , , f pg MS2208                                        C-15  CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA  06/28/,85C        . - - dompC<'rsc                      _,,4[,g u Ah WRC f)les . Ak l clu.r wiuf +hls clafe re{ers fo,
 
R-1208751-001                                                          REGULAT0RY      INF0RMATION          TRACKING                          SYSTEM                                PAGE NO.      2C FACILITY      IMPLEMENTATION                                                                              03/31/82 BEAVER VALLEY 1                            (CONTINUATION)
TAC NO.                                                                                                LIC ACT                                          LICENSEE MPA W                                                          TITLE                        COMPLETE                                      STATUS          DATE
(,Ict[fr M58045    C-16          UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN                            :( _. ., #c DLC le tieg. ~ 'OM74M7'b                            - /9JY stum genentou M07861    D-02          ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR-                          01/09/80C - - - e o m pcc-rso                                -/9/o M07830    D-03          PRESSURIZER HEATUP RATE ERROR                                                G3/27/79C - - - E c " #c e 7#r)                          --t17?
M08597    D-10          ASYMMETRIC LOCA LOADS                                                        03/31/86 -                -- /1 4 c- M c T c.3                          /
                                                                                                                                                                              ._<f        /g 2.S' M08974    D-11          FISSION GAS RELEASE                                                          02/3r/80C        - -- - d c m P< ev,o                      _ -,ygo M12263    D-15          HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL                            d_!            *
                                                                                                                                                          ~~
                                                                                                                                                                                    ~ ~ ' 9'T T M12769    D-16          REVIEN OF CORPORATE MANAGEMENT CAPABILITY                                            /81C -                -
                                                                                                                                                      - c.o mpc crs h      - - - f f gf M43002    D-17          DEFINITION OF OPERABLE                                                                  S ~ ~ -~ ~~ i c o:Pc6TEC                            -
                                                                                                                                                                                          -f9po M55838    D-19          DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15)                                                                    ~ ~ 0" ##M - - / FN M10386    E-05          H N-1 LOOP OPERATION                                                          07/2 /84C -              -- -
PacJcc rsb - -- / 4 37 M44002    F-01          I.A.1.1                  SHIFT TECHNICAL ADVISOR                            01/49/82C        - - -
c ompcevr o        -        ..fppf                .
M44070    F-02          I.A.1.3                  SHIFT MANNING                                                    '                -'-        d  "#'#7#0        - -            ,ff3 M44141    F-03          I.A.2.1                  UPGRADING OF RO AND SRO TRAINING                    11/15/82C          -        - _
d e m ece 7Cd        ---
                                                                                                                                                                                              # 9p a.
M44212    F-04          I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC                            Og .        -
                                                                                                                                                      , _ g pcg7,o                  _
M44282    F-05          I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG                            10/01/86 - -
M47195    F-06
__ c , m#ce 74rb      - --
6/pg I.C.5                    FEEDBACK OF OPERATING EXPERIENCE                    11/18/81C - - - - co m /cu Tr o                          . _ _ _
f9g F-07                                                                                        'dJ M47267                  I.C.6                    CORRECT PERFORMANCE OF OPERATING ACTIVITI            L _LlLLC - - - - dom #ce746 _ __ fpp4 M51141    F-08          I . D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA                                  84C -              ~ -
dem/ceT#o - --                    < , [pg M51221    F-09          I.D.2                    SAFETY PARAMETER DISPLAY SYSTEM                      10/30/86
                                                                                                                                  - - __ pg,,jge,rsb                        ---              , o/ ff,
          'M44353    F-10          II.B.1                  RCS HIGH POINT VENTS                                09/08/83C -                - -- d enspce rc6 M47919    F-11          II.B.2                  PLANT SHIELDING                                      11/08/82C g/N d em/ce rro . . _ fpgg M44421    F-12          II.B.3                  POST ACCIDENT SAMPLING                                09/07/84C            _ __            ,      g (,q      _,,            ,
M44491    F-13          II.B.4                  TRAINING FOR MITIGATING CORE DAMAGE                  11/15j82C        - -- - d o mpuen                      -,,m
 
R-1208731-001                  REGULAT0RY            INF0RMATION            TRACKINO                        SYSTEM                                PkGENO.      22 FACILITY        IHPLEMENTATION                                                                            03/31/80 BEAVER VALLEY 1            (CONTINUATION)
TAC NO.                                                                  LIC ACT                                        LICENSEE MPA 9                  TITLE                                  COMPLETE                                  STATUS              DATE M44562    F-14  II.D.1      RV AND SV TRAINING                          03/31/86      -
                                                                                                            - fe e J uc Tec ro f/pg M44632    F-15 II .E.1.1 AFH SYSTEM EVALUATION                          02/02/82C          -
                                                                                                            - (c M PCar Tr b            -
efjA M44674    F-16 II.E.1.2.1 AFM SYSTEM INITIATION                        07/Sk82C -                  - G o n1 #c e re s        --
                                                                                                                                              <9p3 M44711    F-17 II.E.1.2.2 AFH SYSTEM FLOW INDICATION                    07/S$/82C -                .
gompCW7#b          - --        ifp3 M44759    F-18 II.E.4.1      DEDICATED HYDROGEN PENETRATION          - - -    ~ ^ ^ '
M44830    F-19 Gild hii.ag , but ela se,q} - e cmpc.a r.:<3 - - ? 9)o II.E.4.2      CONTAINMENT ISOLATION DEPENDABILITY      07/19/82C -            __
c c ,vt Fce rrb . -,pyg M44901    F-20 II.F.1.1      NOBLE GAS MONITOR                        11/b81C , DLC lef f e,-                - dom pcerse . - f fyg M44972    F-21 II.F.1.2      IODINE / PARTICULATE SAMPLING            11/09/81C , M C I e He,- - ~ d o m P( r7E 6 - / 9 M M45043    F-22 II.F.1.3      CONTAINMENT HIGH RANGE MONITOR            12/24/81C            - - - - ocmpce7eo - . .. f 9 g M47580    F-23 II.F.1.4      CONTAINMENT PRESSURE INSTRUMENT          05/17/83C -                      - - c o m #ce7so -                    .f9p3 M47651    F-24 II.F.1.5      CONTAINMENT HATER LEVEL INSTRUMENT        05/17/83C        -          -
                                                                                                                - 0.c m pcarr.rb - - - / 913                          .
l M47722    F-25 II . F.1. 6    CONTAINMENT HYDROGEN MONITOR            05/17/83C - - - - d Cm ett'T# o                              -- - f9/3 M45114    F-26 II.F.2        INSTRUgENg,F0,R ETECTION ON INADEQUATE  07/31/86 -                - - ~ ggcj ec_ys,)              ,    ,_ fppp M46878    F-30 II.K.2.13      THERMAL-MECHANICAL REPORT                06/15/S4C - - - - d * *'#cc 7J~d                        - -          6 /yy M47792    F-33 II.K.2.17      POTENTIAL FOR VOIDING IN RCS            12/19/83C - -                -
d om9certh        - -              , pf 3 M45229    F-36 II.K.3.1      AUTO PORV ISOLATION                      09/14/83C - --                      0 MSf#cerco              -
fg M45275    F-37 II.K.3.2      REPORT ON PORV FAILURES                  09/14/83C - -- - d c .vs pcerst                                    .
                                                                                                                                                    ,9f3 M45323    F-38 II.K.3.3      REPORTING SV AND RV FAILURES AND CHALLE  03/04/82C -                -- dom pte r.r.6                --
ef/3 M45392    F-39 II.K.3.5      AUTO TRIP OF RCPS
  'M45441      F-40                PID CONTROLLER
                                                                                  }/-                                                            ,,j II.K.3.9                                                11/18/81C - _ _ _                  g          g  , , _
M45471    F-41 II.K.3.10    ANTICIPATORY TRIP MODIFICATIONS          01/26/83C            --            e o ,v,pce -rso -            -
f pn M45501    F-42 II.K.3.12    ANTICIPATORY TRIP DN TURBINE TRIP        04/06/83C          -        -
dcwpcevXo - - - t'f/3 M45609    F-47 II.K.3.17      ECCS OUTA0ES                            08/04/,83C                          eo,
_ _,                    g 7% _            _, fpp3
 
D        ."
9 R-1208731-001                  REGULAT0RY            INF0RHATION          TRACKINO                SYSTEM                            PAGE NO.        26 FACILITY          IMPLEMENTATION                                                            03/31/86 BEAVER VALLEY 1          (CONTINUATION)
TAC NO.
LIC ACT                              LICENSEE MPA 8                  TITLE                                COMPLETE                        STATUS            DATE M48414    F-53  II.K.3.25    POWER ON PUMP SEALS                    06/24/82C - -- danSWE Teh - - / ?#J M45805    F-57  II.K.3.30    SB LOCA METHODS                        05/28/85C - -- E'##"                      -' @Y M48146    F-58  II.K.3.31    COMPLIANCE NITH 10 CFR 50.46            01/31/87 - - - Fro 3 ec v eo            - ~ ~~ ' ' M M45925    F-63  III.A.1.2    TECHNICAL SUPPORT CENTER                12/30/86  - - - - dcw' M 7#b - --/ W M45996    F-64  III.A.1.2    OPERATIONAL SUPPORT CENTER              12/30/86 - -        ~
ocwfM 7#0        - -
                                                                                                                              '[%'
M46068    F-65  III.A.I.2    EMERGENCY OPERATIONS FACILITY          12/30/86 - - - - dem A c''TE.b            --- ,[pf M46140    F-66  III.A.1.2    NUCLEAR DATA LINK                      "?    :^^      j                                    --
M46213    F-67  III.A.2.1    EMERGENCY PLAN UPGRADE TO MEET RULE    05/11/83C    -
                                                                                          - - ocw2Pcc7sb - -                  / j'p3 M46284    F-68 M46355    F-69 III.A.2.2 III.D.3.3 METEOROLOGICAL DATA UPGRADE IMPLANT RADIATION MONITORING 12/30/86 - - -
02/19/82C - __
c_ , m ec c.-Tss
                                                                                                                        - - - rh c Ompce7E6        - --rp@
M46426    F-70  III.D.3.4    CONTROL ROOM HABITABILITY                02/09/82C - -              den,9< na 6
                                                                                                                          - -- / 9 / A              .
M56102    F-71  I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO    03/31/86  __ _ _
_ gg,jgc TE 6 - - - /PPP M49695    G-01  REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5)          03/31/86    _ _ __      _                              ,
e e}}

Revision as of 05:40, 30 December 2020

Forwards Implementation Dates for Generic Requirements Per NRC 860430 Request
ML20205B913
Person / Time
Site: Beaver Valley
Issue date: 07/29/1986
From: Sieber J
DUQUESNE LIGHT CO.
To: Tam P
Office of Nuclear Reactor Regulation
References
TASK-***, TASK-TM NUDOCS 8608120206
Download: ML20205B913 (9)


Text

- __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

O

'Af Telephone (412) 393-6000 E"o*'7,', 4

'* July 29, 1986 Shippingport, PA 15077-0004 Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Attn: Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555

- Mail Stop 340 -

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements Gentlemen:

Attached are marked-up pages from your letter dated April 30, 1986 requesting information regarding the implementation dates of the listed generic issues. Many of these issues did not have an actual implementation date since there were no hardware or licensing document changes. For these issues the completion date was assumed as the date the NRC closed out the licensing issue as indicated in the column "Lic Act Complete".  :

All items have been addressed and this letter supercedes our previous submittal of June 2,1986 which provided a partially completed list which was provided as a status report.

If you have any questions regarding this information, please contact members of our Licensing staff.

Very truly yours, Qd. D. ieber Senior Manager Beaver Valley No. I l

%[k P

00

Beaver Valley Power Station, Unit No. 1 i Docket No. 50-334, License No. DPR-66 Implementation Dates of Generic Requirements cc: Mr. W. M. Troskoski, Resident Inspector U. S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 U. S. Nuclear Regulatory Commission c/o Document Branch Washington, DC 20555 Director, Safety Evaluation & Control Virginia Electric & Power Company P. O. Box 26666 i One James River Plaza Richmond, VA 23261 I

i a

.- ,- , ----.m. -- -- -- , .-, - - ------- , y

R-1208751-001 REGULAT0RY INF0RMATION TRACKING S Y S 1 t: M PAGE NO.* 20 FACILITY IMPLEMENTATION 03/31/86 FACILITY: BEAVER VALLEY 1 PLANT LOCATION: 5 MI E OF E. LIVERPOOL, OH LICENSED P0HER: 2652 MHT-DOCKET NUMBER: 050-00334 PROJECT MANAGER: P. TAM DESIGN POWER: 0335 MHE BRANCH CHIEF: L. RUBENSTEIN ARCH / ENGINEER: S&H NSSS VENDORt HEST IE INSPECTOR: H. TROSKOSKI LIC. ASSISTANT * . VACANT k'

TAC NO.

LIC ACT LICENSEE MPA 8 TITLE COMPLETE STATUS R&l5 M07121 A-01 10 CFR 50.55 ACG) - ISI 12/04/79C -- tie mposT(c - - - - /f 77 M08132 A-02 APPENDIX I - ALARA 03/h/83C d o m#L Ls r a ,3 - - -

eM M06987 A-03 SECURITY REVIENS-MODIFIED AMENDMENT PLANS 02/k/79C -- C # '"# 7 # D ~~~ #

M11153 A-09 PRESSURE VESSEL BELTLINE MATERIAL SURVEILLANCE .

-- 0 # '"# ~ ' ~ ## 7 7 M10474 A-10 CONTINGENCY PLANNING 09/12/80C -- < #-*#' d' 7# * - ~~~#' '#

M10476 A-11 GUARD TRAINING PLANS 02/11/81C - C * * # " '# - ' ~ ####

M10475 A-12 VITAL AREA ANALYSIS - - - - #

03/27/81C -- 6 0 *"#"' '#"

M06363 A-14 10CFR 50.55 A(G) - INSERVICE TESTING 06/29/82C _ .. 6.c m #'* M # '~~ # T '#

M46811 A-16 QUALIFICATIONS OF EXAMINATION, INSPECTION, TESTING 08/12/82C ___ C c mP'uT#D - - - #9##

M51071 A-17 INSTRUMENTATION TO FOLLON THE COURSE OF AN ACCIDEN 12/30/86 . . - /#4 s 76 c 746 - - - /9 #9 M55010 A-18 TECH SPECS AFFECTED BY 50.72 AND 50.73 (GL 83-43) 11/27/84C - - - dcmpcc-7Ed --

If IV M59070 A-20 to CFR 50.62 OPERATING REACTOR REVIENS 1

12/31/86[ .. . ge o .,,te.rs o _ _ _ , , ff M59941 A-21 10 CFR 50.61, PRESSURIZED THERMAL SHOCK RULE 06/30/86 - reo .> < c,-rs o __ - so / jg, N06405 B-02 FIRE PROTECTION -'IL.Ld75 t C LC efterj--0cmF'eT#O -- - - # 7 'T 'l M08372 B-03 PHR MODERATOR DILUTION 02/21/79C _ _ _ _ e o ,,, v<,.e Ts,a _ _ i01f M06714 B-04 REACTOR VESSEL OVERPRESSURE PROTECTION /83C _ _ _ c_ o m pc<,, y,rg ,_ _ g/pg

'M07313 B-07 STEAM GENERATOR FEEDHATER FLOW INSTABILITY 02/12/79C - - - do,nacu7so __ _ ,9.f 9 M10837 B-15 FUEL ROD B0H 11/03/79C _ __

g, o ,,tpcu M o - - - f 97 7

, M08670 B-14 CEA GUIDE TUBE HEAR 07/22/80C ___ g o ,,,p t_ce ve 3 _ _ _ j g pa M12162 B-16 EMERGENCY PLANNING AND REVISIONS -

T4 M 1s 3)

W hndes skq}e k hlkl leffer , M $e n~ Sisist O O ce dobe , $ daf e, is 110 b Silajn{ s , "c *,

4 M neans u t . o ,i .' s .s h y m a e,. vgc_ mies,

4 R-1208731-001 REGULAT0RY INF0RHATION TRACKING SYSTEM PAGE NO. 21 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY l (CONTINUATION)

)it TAC NO.

LIC ACT LICENSEE MPA 8 TITLE COMPLETE STATUS DATE M10477 B-17 TECH SPEC SURVEILLANCE FOR HYDRAULIC SNUBBERS 03/30/82C - - - c c m p<_ u vsc, - - < f j g M10260 B-20 CONTAINMENT LEAKAGE DUE TO SEAL DETERIORATION - Zg - pypz e74 g _ j9E2.

M10323 B-21 LOSS OF 125-V DC BUS VOLTAGE HITH LOSS OF ANNUNCIA

^ -

.T4 Z t'is o, ; b.4.s.1c.( j M10478 B-22 C H SPEC SURVEILLANCE REQUIREMENTS FOR MECHANICAL 03/30/82C - - _ C o mpc ere . - /9/ L M10007 B-23 DEGRADED GRID VOLTAGE 03/03/81C - -- C o m #c ("# 6 - - /97/

M42553 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL POW  ; / ,e s i c l -- - C O

  • Av 7'# o - ~ / 9/ 2.

M10473 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H titr21MHG O#NW4 - - --- /9pA M12991 B-24 VENTING AND PURGING CONTAINMENTS HHILE AT FULL P0H _ _-.. . ccmgurrea _ _ f pg M10222 B-26 INADVERTANT SAFETY INJECTION DURING C00LD0HN 12/28/79C -

- t o mpw. rso _ __j97y M07240 B-31 LONG SHAFT LHSI & OUTSIDE RECIRC. PUMP DEGRADATION g; } -- , p _ , , 9.g M49417 B-32 BLOCKED SI SIGNAL DURING C00LD0HN gg?g'g _ _ g 7g , ,,,, ,

M08653 B-39 PHR PRESSURE - TEMPERATURE LIMIT TECH SPECS "=

Z '"'"" '

M11111 B-41 Wii=TMe { }

FIRE PROTECTION - FINAL TECH SPECS (INCLUDES SER S 03/14/83C _ _ _

e c inpce r#c - - /9'7 7 M11685 B-42 TMI FOLLOH UP - ALL PLANTS gjjg gg,rs o - / M A M11901 B-42 TMI FOLLOH UP - ALL PLANTS ( 5 { u f u f; n ) 07/17/79C --

- Q_ o m pc e 7#b - -- e9 79 M11766 B-43 PHR FEEDHATER LINE CRACKS 02/25/80C - -- t o m # Car r,r4 - - e97f M43129 B-43 PHR FEEDHATER LINE CRACKS -trase9r006is-(s'f or./jk .DL C le.tter) , _ g m p c e 7 f ,) , __ ,pfd M30750 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C _- tomeceT4o , -

rffo M30751 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C f l

'M30752 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30753 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30754 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C f Y

~ ~

M30755 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C - 00##

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO.s 25 FACILITY IMPLEMENTATION 03/31/82 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC H0. MPA 9 TITLE COMPLETE STATUS Ralf, M30756 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C - - - Co a3 9 W T' O -- /9/v M30757 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C '

M30758 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30759 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30760 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C M30761 3-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C y M30762 B-44 LESSONS LEARNED IMPLEMENTATION 04/18/80C - - - Con?#CETE6 - / f/C M12395 B-44 LESSONS LEARNED IMPLEMENTATION 02/11/81C -- C o d' 9L L" 74 0 - - - ' M')

M12922 B-45 HASH 1400 EVENT V, " PRIMARY COOLANT SYSTEM PRESSUR 04/20/81C - - CC "'# 7" O - '99#

. M12598 B-46 ANALYSIS OF TURBINE DISC CRACKS 08/19/81C - - 0 0 "' -

' #NI M12673 B-47 ECCS; CLAD SHELLING AND RUPTURE 09/12/80C - - tesu N W 6 - - e fh ,

M13110 B-48 ADEQUACY OF STATION ELECTRIC DISTRIBUTION VOLTAGE 06/21/82C - -- d. c m pcteva 6 - - af/.A M11865 B-52 REVIEN OF SAFETY ASPECT OF INADVERTENT SAFETY ACTI 02/05/81C - - - 0 0 *' # ' '# 0 --- ' f f' M42092 B-57 DHR CAPABILITY 05/15/81C - -- t c m et e reb - - - /ff/

M42858 B-59 MASONRY 84ALL DESIGN 07/12/82C - . tcmFC67#6 -- /f/A M42459 B-60 ENVIRONMENTAL QUALIFICATION 03/ 07/85C - - - e i n.p ce Tag - - f fpr M42652 B-61 LOSS OF NON CLASS IE ISC PONER (IES 79-27) r-^^ d c meurwa - - e f FI

+--53f)TC et (

M42722 B-62 ESF RESET CONTROL DESIGN DEFICIENCY g ;; _ g o, p C 6 7(6 - - ' 9 PJ M43911 B-63 INTERIM PROCEDURES FOR SHORT TERM BLACKOUT 09/01/81C - __ c. o m pu va --

t9PA M47146 B-66 NATURAL CIRCULATION C00LD0HN 08/02/83C - - /go /(C Tr.-4 - - /9p? [6EE F-uS)

M46826 B-69 IEB 80-4 MAINSTEAM LINE BREAK HITH CONTINUED FEEDH 08/04/82C - __ _ d o ntece7% ^ '9Q M46598 B-70 FATIGUE TRANSIENT LIMIT TS  % -

)

M49724 B-72 NUREG 0737 TECH SPECS (GENERIC LETTER 82-16) 10/21/83C _ _ __ (o mpce ya - - / 5 / g j

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 2B FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)

LIC ACT LICENSEE TAC NO. MPA 9 TITLE COMPLETE STATUS DATE M52737 B-76 3

ITEM 1.1 - POST TRIP REVIENs PROGRAM DESCRIPTION & 4s/20/85C -- - 60"#W-T'du--'/f4/

M52818 B-77 ITEM 2.1 - EQUIPMENT CLASSIFICATION & VENDOR INTER 10/31/86 - --

d c W #'F WB - - e 9 /3 M52899 B-78 ITEMS 3.1.1 & 3.1.2 -POST MAINTENANCE TEST PROCEDU 11/21/85C -

O_ o m F < *" T h -- 'F/Py.

M52980 B-79 ITEM 3.1.3 - POST MAINTENANCE TESTING - CHANGES TO 10/31/85C --

eemPCe746 - - ' 98 5; M53061 B-80 ITEM 4.1 - REACTOR TRIP SYSTEM RELIABILITY - VENDO 11/21/85C -- a d '*1 P ' c 7 # o - -- # 9#3 M53114 B-81 ITEMS 4.2.1 & 4.2.2 -PREVENTATIVE MAINT PROG FOR R 10/h85C --- ( m p w rca __

s/jy MS3166 B-82 ITEM 4.5 - AUTOMATIC ACTUATION OF SHUNT TRIP ATTAC

^

PRodd'cTKb -

f/g M54516 B-83 TECH SPECIFICATIONS COVERED BY GENERIC LETTERS 83- 04/30/86 - - - /R o J te -r E3 _ _ _ , ,/ pg M53569 B-85 SALEM ATHS 1.2 DATA CAPABILITY 04/30/86 - -- ac m PL r7C6 - - /9p3 M53652 B-86 SALEM ATHS 2.2 S-R COMPONENTS 09/30/86 - -- a c mpce 7c6 - 3/ B5 M53735 B-87 SALEM ATHS 3.2.1 & 3.2.2 S-R COMPONENTS 11/21/85C -~ d o ntpct"rvA , _

5/j, .

M53818 B-88 SALEM ATHS 3.2.3 T.S. S-R COMPONENTS 10/31/85C - -- g e oi pcg7s o

___ , 9 p3 M53901 B-89 SALEM ATHS 4.2.3 & 4.2.4 LIFE COMPONENTS 12/31/86 _ p40J M #b - - g/g M55348 B-90 SALEM ATHS 4.3 H AND B&H T.S. 06/30/86

-- /403I6Tro - - - 9g M54045 B-92 SALEM ATHS 4.5.1 DIVERSE TRIP FFATURES 11/21/85C - -- c o n,pce 7q -

fpjg M53962 B-95 SALEM ATHS 4.5.2 & 4.5.3 TEST ALTERNATIVES 01/31/87 _ __ p fe,jge 7 f,3 , , _ ,2 7'y 7 M12188 C-01 PHR SECONDARY HATER CHEMISTRY MONITORING REQUIREME 01 80C - - - d ont pce r,r3 ,_ ,_

,pfg M08596 C-03 QUALIFICATIONS OF RADIATION PROTECTION MANAGER 03/27/79C WW - - d e m pce rsg _ _,,p77 N08594 C-06 PUMP SUPPORT-LAMELLAR TEARING R. .I.d.lb MC C - -- den 1PceTr3 . .fpjo M08593 C-07 FUEL HANDLING ACCIDENT INSIDE CONTAINMENT 12/12/79C - -- d o ns pceno _ ,fv79 M07972 C-10 CONTROL OF HEAVY LOADS OVER SPENT FUEL POOL (PHASE 12/20/84C -- -

(cim pcv7a g _ . , ,g'f g M43646 C-14 AUXILIARY FEEDilATER SEISMIC QUALIFICATION 01/11/82C - - ccmpcevcc , , f pg MS2208 C-15 CONTROL OF HEAVY LOADS - PHASE II (FOLLOHUP OF MPA 06/28/,85C . - - dompC<'rsc _,,4[,g u Ah WRC f)les . Ak l clu.r wiuf +hls clafe re{ers fo,

R-1208751-001 REGULAT0RY INF0RMATION TRACKING SYSTEM PAGE NO. 2C FACILITY IMPLEMENTATION 03/31/82 BEAVER VALLEY 1 (CONTINUATION)

TAC NO. LIC ACT LICENSEE MPA W TITLE COMPLETE STATUS DATE

(,Ict[fr M58045 C-16 UTILITY RESPONSES TO STAFF RECOMMENDATIONS CONCERN  :( _. ., #c DLC le tieg. ~ 'OM74M7'b - /9JY stum genentou M07861 D-02 ECCS ZIRC CLAD MODEL ERROR-COMPLIANCE HITH 10 CFR- 01/09/80C - - - e o m pcc-rso -/9/o M07830 D-03 PRESSURIZER HEATUP RATE ERROR G3/27/79C - - - E c " #c e 7#r) --t17?

M08597 D-10 ASYMMETRIC LOCA LOADS 03/31/86 - -- /1 4 c- M c T c.3 /

._<f /g 2.S' M08974 D-11 FISSION GAS RELEASE 02/3r/80C - -- - d c m P< ev,o _ -,ygo M12263 D-15 HIGH ENERGY LINE BREAK & CONSEQUENTIAL SYSTEM FAIL d_! *

~~

~ ~ ' 9'T T M12769 D-16 REVIEN OF CORPORATE MANAGEMENT CAPABILITY /81C - -

- c.o mpc crs h - - - f f gf M43002 D-17 DEFINITION OF OPERABLE S ~ ~ -~ ~~ i c o:Pc6TEC -

-f9po M55838 D-19 DIESEL GENERATOR RELIABILITY TECH SPECS (GL 84-15) ~ ~ 0" ##M - - / FN M10386 E-05 H N-1 LOOP OPERATION 07/2 /84C - -- -

PacJcc rsb - -- / 4 37 M44002 F-01 I.A.1.1 SHIFT TECHNICAL ADVISOR 01/49/82C - - -

c ompcevr o - ..fppf .

M44070 F-02 I.A.1.3 SHIFT MANNING ' -'- d "#'#7#0 - - ,ff3 M44141 F-03 I.A.2.1 UPGRADING OF RO AND SRO TRAINING 11/15/82C - - _

d e m ece 7Cd ---

  1. 9p a.

M44212 F-04 I.C.1.2/3.A EMERGENCY OPERATING PROCEDURES GENERIC Og . -

, _ g pcg7,o _

M44282 F-05 I.C.1.2/3.B PROCEDURES GENERATION PACKAGES (NUREG 10/01/86 - -

M47195 F-06

__ c , m#ce 74rb - --

6/pg I.C.5 FEEDBACK OF OPERATING EXPERIENCE 11/18/81C - - - - co m /cu Tr o . _ _ _

f9g F-07 'dJ M47267 I.C.6 CORRECT PERFORMANCE OF OPERATING ACTIVITI L _LlLLC - - - - dom #ce746 _ __ fpp4 M51141 F-08 I . D.1.1 DETAILED CONTROL ROOM DESIGN REVIEH PROGRA 84C - ~ -

dem/ceT#o - -- < , [pg M51221 F-09 I.D.2 SAFETY PARAMETER DISPLAY SYSTEM 10/30/86

- - __ pg,,jge,rsb --- , o/ ff,

'M44353 F-10 II.B.1 RCS HIGH POINT VENTS 09/08/83C - - -- d enspce rc6 M47919 F-11 II.B.2 PLANT SHIELDING 11/08/82C g/N d em/ce rro . . _ fpgg M44421 F-12 II.B.3 POST ACCIDENT SAMPLING 09/07/84C _ __ , g (,q _,, ,

M44491 F-13 II.B.4 TRAINING FOR MITIGATING CORE DAMAGE 11/15j82C - -- - d o mpuen -,,m

R-1208731-001 REGULAT0RY INF0RMATION TRACKINO SYSTEM PkGENO. 22 FACILITY IHPLEMENTATION 03/31/80 BEAVER VALLEY 1 (CONTINUATION)

TAC NO. LIC ACT LICENSEE MPA 9 TITLE COMPLETE STATUS DATE M44562 F-14 II.D.1 RV AND SV TRAINING 03/31/86 -

- fe e J uc Tec ro f/pg M44632 F-15 II .E.1.1 AFH SYSTEM EVALUATION 02/02/82C -

- (c M PCar Tr b -

efjA M44674 F-16 II.E.1.2.1 AFM SYSTEM INITIATION 07/Sk82C - - G o n1 #c e re s --

<9p3 M44711 F-17 II.E.1.2.2 AFH SYSTEM FLOW INDICATION 07/S$/82C - .

gompCW7#b - -- ifp3 M44759 F-18 II.E.4.1 DEDICATED HYDROGEN PENETRATION - - - ~ ^ ^ '

M44830 F-19 Gild hii.ag , but ela se,q} - e cmpc.a r.:<3 - - ? 9)o II.E.4.2 CONTAINMENT ISOLATION DEPENDABILITY 07/19/82C - __

c c ,vt Fce rrb . -,pyg M44901 F-20 II.F.1.1 NOBLE GAS MONITOR 11/b81C , DLC lef f e,- - dom pcerse . - f fyg M44972 F-21 II.F.1.2 IODINE / PARTICULATE SAMPLING 11/09/81C , M C I e He,- - ~ d o m P( r7E 6 - / 9 M M45043 F-22 II.F.1.3 CONTAINMENT HIGH RANGE MONITOR 12/24/81C - - - - ocmpce7eo - . .. f 9 g M47580 F-23 II.F.1.4 CONTAINMENT PRESSURE INSTRUMENT 05/17/83C - - - c o m #ce7so - .f9p3 M47651 F-24 II.F.1.5 CONTAINMENT HATER LEVEL INSTRUMENT 05/17/83C - -

- 0.c m pcarr.rb - - - / 913 .

l M47722 F-25 II . F.1. 6 CONTAINMENT HYDROGEN MONITOR 05/17/83C - - - - d Cm ett'T# o -- - f9/3 M45114 F-26 II.F.2 INSTRUgENg,F0,R ETECTION ON INADEQUATE 07/31/86 - - - ~ ggcj ec_ys,) , ,_ fppp M46878 F-30 II.K.2.13 THERMAL-MECHANICAL REPORT 06/15/S4C - - - - d * *'#cc 7J~d - - 6 /yy M47792 F-33 II.K.2.17 POTENTIAL FOR VOIDING IN RCS 12/19/83C - - -

d om9certh - - , pf 3 M45229 F-36 II.K.3.1 AUTO PORV ISOLATION 09/14/83C - -- 0 MSf#cerco -

fg M45275 F-37 II.K.3.2 REPORT ON PORV FAILURES 09/14/83C - -- - d c .vs pcerst .

,9f3 M45323 F-38 II.K.3.3 REPORTING SV AND RV FAILURES AND CHALLE 03/04/82C - -- dom pte r.r.6 --

ef/3 M45392 F-39 II.K.3.5 AUTO TRIP OF RCPS

'M45441 F-40 PID CONTROLLER

}/- ,,j II.K.3.9 11/18/81C - _ _ _ g g , , _

M45471 F-41 II.K.3.10 ANTICIPATORY TRIP MODIFICATIONS 01/26/83C -- e o ,v,pce -rso - -

f pn M45501 F-42 II.K.3.12 ANTICIPATORY TRIP DN TURBINE TRIP 04/06/83C - -

dcwpcevXo - - - t'f/3 M45609 F-47 II.K.3.17 ECCS OUTA0ES 08/04/,83C eo,

_ _, g 7% _ _, fpp3

D ."

9 R-1208731-001 REGULAT0RY INF0RHATION TRACKINO SYSTEM PAGE NO. 26 FACILITY IMPLEMENTATION 03/31/86 BEAVER VALLEY 1 (CONTINUATION)

TAC NO.

LIC ACT LICENSEE MPA 8 TITLE COMPLETE STATUS DATE M48414 F-53 II.K.3.25 POWER ON PUMP SEALS 06/24/82C - -- danSWE Teh - - / ?#J M45805 F-57 II.K.3.30 SB LOCA METHODS 05/28/85C - -- E'##" -' @Y M48146 F-58 II.K.3.31 COMPLIANCE NITH 10 CFR 50.46 01/31/87 - - - Fro 3 ec v eo - ~ ~~ ' ' M M45925 F-63 III.A.1.2 TECHNICAL SUPPORT CENTER 12/30/86 - - - - dcw' M 7#b - --/ W M45996 F-64 III.A.1.2 OPERATIONAL SUPPORT CENTER 12/30/86 - - ~

ocwfM 7#0 - -

'[%'

M46068 F-65 III.A.I.2 EMERGENCY OPERATIONS FACILITY 12/30/86 - - - - dem A cTE.b --- ,[pf M46140 F-66 III.A.1.2 NUCLEAR DATA LINK "?  :^^ j --

M46213 F-67 III.A.2.1 EMERGENCY PLAN UPGRADE TO MEET RULE 05/11/83C -

- - ocw2Pcc7sb - - / j'p3 M46284 F-68 M46355 F-69 III.A.2.2 III.D.3.3 METEOROLOGICAL DATA UPGRADE IMPLANT RADIATION MONITORING 12/30/86 - - -

02/19/82C - __

c_ , m ec c.-Tss

- - - rh c Ompce7E6 - --rp@

M46426 F-70 III.D.3.4 CONTROL ROOM HABITABILITY 02/09/82C - - den,9< na 6

- -- / 9 / A .

M56102 F-71 I.D.1.2 DETAILED CONTROL ROOM REVIEW (FDLLONUP TO 03/31/86 __ _ _

_ gg,jgc TE 6 - - - /PPP M49695 G-01 REACTOR COOLANT PUMP TRIP (D660 - II.K.3.5) 03/31/86 _ _ __ _ ,

e e