ENCLOSURE 1 NOTICE OF VIOLATION Florida Power Corporation Docket No. 50-302 Crystal River 3 License No. DPR-72 y | |||
~ | |||
The following violation was identified during .an inspection conducted 'on March 25-28, 1985. ~ The Severity Level was assigned in accordance with the NRC | |||
. Enforcement Policy (10 CFR Part 2, Appendix-C). | |||
10 CFR 50, Appendix B, Criterion V, and FSAR Section .1.7.1.5 require that | |||
. activities affecting quality shall be prescribed by documented instructions, procedures or drawings...- and shall be accomplished in accordance with these | |||
: p. instructions, procedures or drawings. .The pipe support drawing and modifi-cation drawing provide installation dimensions for piece "H" of pipe support y- =MUH 556. The " Piping Hanger - Final Inspection" requirements provided on | |||
' inspection plan . number. WR-60571 for pipe support . MUH 556 required - QC . . | |||
E verification that "the overall configuration and sizing .of the completed hanger assembly or modification conform. to the applicable approved ' | |||
engineering; drawing." | |||
M Contrary to the above, completed, installed, modified, inspected and QC 3 accepted pipe support MUH 556 piece "H" installation dimensions did not e " conform" with the applicable approved _ engineering drawings. . In addition, O unauthorized. loads (scaffolding) were being partially supported by the pipe 1 support. No procedure or -instructions were available authorizing or f prohibiting installation of scaffolding / staging on permanent -plant | |||
. equipment. . | |||
This is a Severity Level IV violation (Supplement II). | |||
. Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 | |||
' days of the date of this Notice, .a written statement or explanation in reply, 1 | |||
including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results . achieved; (4). corrective steps which will be taken' to avoid | |||
;further violations; and (5) the date when full compliance will be achieved. | |||
, Security or' safeguards information should be submitted as 'an enclosure - to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) | |||
'or 10 CFR 73.21. | |||
p-n Q | |||
Date: APR 181985 | |||
,g a c ; | |||
-9505210152 850418 PDR ADOCK 05000302 | |||
*% G PDR v | |||
4 , | |||
7 | |||
: s. , , . . . _ , - ,;,..- .-,,,.,_._.,.,,,.,-,_,,-+-,,.,_.--n.-_.- . , _ . - . , . , , , - , _ , . , - _ . .}} | |||
Revision as of 16:42, 23 July 2020
| ML20127G811 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 04/18/1985 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20127G809 | List: |
| References | |
| 50-302-85-16, NUDOCS 8505210152 | |
| Download: ML20127G811 (1) | |
Text
._ _ . . ._.
+
- jo 4
ENCLOSURE 1 NOTICE OF VIOLATION Florida Power Corporation Docket No. 50-302 Crystal River 3 License No. DPR-72 y
~
The following violation was identified during .an inspection conducted 'on March 25-28, 1985. ~ The Severity Level was assigned in accordance with the NRC
. Enforcement Policy (10 CFR Part 2, Appendix-C).
10 CFR 50, Appendix B, Criterion V, and FSAR Section .1.7.1.5 require that
. activities affecting quality shall be prescribed by documented instructions, procedures or drawings...- and shall be accomplished in accordance with these
- p. instructions, procedures or drawings. .The pipe support drawing and modifi-cation drawing provide installation dimensions for piece "H" of pipe support y- =MUH 556. The " Piping Hanger - Final Inspection" requirements provided on
' inspection plan . number. WR-60571 for pipe support . MUH 556 required - QC . .
E verification that "the overall configuration and sizing .of the completed hanger assembly or modification conform. to the applicable approved '
engineering; drawing."
M Contrary to the above, completed, installed, modified, inspected and QC 3 accepted pipe support MUH 556 piece "H" installation dimensions did not e " conform" with the applicable approved _ engineering drawings. . In addition, O unauthorized. loads (scaffolding) were being partially supported by the pipe 1 support. No procedure or -instructions were available authorizing or f prohibiting installation of scaffolding / staging on permanent -plant
. equipment. .
This is a Severity Level IV violation (Supplement II).
. Pursuant to 10 CFR 2.201, you are required to submit to this office within 30
' days of the date of this Notice, .a written statement or explanation in reply, 1
including: (1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results . achieved; (4). corrective steps which will be taken' to avoid
- further violations; and (5) the date when full compliance will be achieved.
, Security or' safeguards information should be submitted as 'an enclosure - to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d)
'or 10 CFR 73.21.