ML13255A073: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | Safety System / JPM Title Type Code* | ||
Function | Function | ||
Line 38: | Line 36: | ||
(R)CA >1 / >1 / >1 (S)imulator | (R)CA >1 / >1 / >1 (S)imulator | ||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | Safety System / JPM Title Type Code* | ||
Function | Function | ||
Line 58: | Line 54: | ||
(R)CA >1 / >1 / >1 (S)imulator | (R)CA >1 / >1 / >1 (S)imulator | ||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 | ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | ||
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) | |||
Safety System / JPM Title Type Code* | Safety System / JPM Title Type Code* | ||
Function | Function |
Latest revision as of 02:47, 6 February 2020
ML13255A073 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 06/21/2013 |
From: | NRC/RGN-III |
To: | Jennings T Exelon Generation Co |
Dave Reeser | |
Shared Package | |
ML11354A436 | List: |
References | |
50-461/13-301 | |
Download: ML13255A073 (3) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. RCIC / Task 331001.04 / Manually Startup RCIC System / JPM204 A, D, P, EN, 2 217000 A4.04 3.6/3.6 L, S
- b. Reactor/Turbine Pressure Regulating System / Task 381201.01 A, M, S 3 Turbine On Line Tests (AP) / JPM517 / 241000 A4.19 3.5/3.4
- c. Main and Reheat Steam System / Task 441109.01 / Equalize Around D, L, S 4 and Open MSIVs per CPS 4411.09 / JPM 436 / 239001 A4.01 4.2/4.0
- d. Plant Ventilation Systems / Task 340801.36 / Startup CCP in Filtered N, S 9 Mode / JPM518 / 288000 A4.01 3.1/2.9
- e. Auxiliary Power / Task 350101.23 / Transfer 6900V Bus 1A and 1B From A, D, S 6 Main To Reserve Source (Alternate Path) / JPM 521 / 262001 A4.01 3.4/3.7
- f. RPS / Task 903116.01 / Perform a Manual Scram Functional/SDV Hi N, S 7 Level Bypass Test / JPM519 / 212000 A4.02 3.6/3.7
- g. Instrument Air System / Task 310101.08 / Restore ADS Air Supply To A, D, S 8 Normal Source / JPM 427 / 300000 A4.01 2.6/2.7
- h. PCIS/NSSS / Task 400102.99 / Verify Group 15 Automatic Isolation / A, EN, L, N, 5 JPM520 / 223002 A4.06 3.6/3.7 S
- i. SCRAM Condition Present and Reactor Power above Downscale or D, R, E 1 Unknown / Task 441108.01 / Defeat ATWS Interlocks / JPM 283 /
295037 A1.03 4.1/4.1
- j. High Suppression Pool Water Level / Task 441105.01 / High Containment D, R, E 5 Level Protective Actions / JPM 222 / 295029 2.4.35 3.8/4.0
- k. DC Distribution / Task 350301.17 / Cross Connect DC Distribution Panels D, R 6 1E and 1F / JPM 065 / 263000 2.1.30 4.4/4.0
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. RCIC / Task 331001.04 / Manually Startup RCIC System / JPM204 A, D, P, EN, 2 217000 A4.04 3.6/3.6 L, S
- b. Reactor/Turbine Pressure Regulating System / Task 381201.01 A, M, S 3 Turbine On Line Tests (AP) / JPM517 / 241000 A4.19 3.5/3.4
- c. Main and Reheat Steam System / Task 441109.01 / Equalize Around D, L, S 4 and Open MSIVs per CPS 4411.09 / JPM 436 / 239001 A4.01 4.2/4.0
- e. Auxiliary Power / Task 350101.23 / Transfer 6900V Bus 1A and 1B From A, D, S 6 Main To Reserve Source (Alternate Path) / JPM 521 / 262001 A4.01 3.4/3.7
- f. RPS / Task 903116.01 / Perform a Manual Scram Functional/SDV Hi N, S 7 Level Bypass Test / JPM519 / 212000 A4.02 3.6/3.7
- g. Instrument Air System / Task 310101.08 / Restore ADS Air Supply To A, D, S 8 Normal Source / JPM 427 / 300000 A4.01 2.6/2.7
- h. PCIS/NSSS / Task 400102.99 / Verify Group 15 Automatic Isolation / A, EN, L, N, 5 JPM520 / 223002 A4.06 3.6/3.7 S
- i. SCRAM Condition Present and Reactor Power above Downscale or D, R, E 1 Unknown / Task 441108.01 / Defeat ATWS Interlocks / JPM 283 /
295037 A1.03 4.1/4.1
- j. High Suppression Pool Water Level / Task 441105.01 / High Containment D, R, E 5 Level Protective Actions / JPM 222 / 295029 2.4.35 3.8/4.0
- k. DC Distribution / Task 350301.17 / Cross Connect DC Distribution Panels D, R 6 1E and 1F / JPM 065 / 263000 2.1.30 4.4/4.0
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Clinton Date of Examination: 08/19/ 13 Exam Level: RO SRO-I SRO-U Operating Test Number: 2013301 Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title Type Code*
Function
- a. RCIC / Task 331001.04 / Manually Startup RCIC System / JPM204 A, D, P, EN, 2 217000 A4.04 3.6/3.6 L, S
- g. Instrument Air System / Task 310101.08 / Restore ADS Air Supply To A, D, S 8 Normal Source / JPM 427 / 300000 A4.01 2.6/2.7
- h. PCIS/NSSS / Task 400102.99 / Verify Group 15 Automatic Isolation / A, EN, L, N, 5 JPM520 / 223002 A4.06 3.6/3.7 S
- i. SCRAM Condition Present and Reactor Power above Downscale or D, R, E 1 Unknown / Task 441108.01 / Defeat ATWS Interlocks / JPM 283 /
295037 A1.03 4.1/4.1
- k. DC Distribution / Task 350301.17 / Cross Connect DC Distribution Panels D, R 6 1E and 1F / JPM 065 / 263000 2.1.30 4.4/4.0
@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system (L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3/ <3 / < 2 (randomly selected)
(R)CA >1 / >1 / >1 (S)imulator