ML19254F001: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 6: | Line 6: | ||
| number = ML19254F002 | | number = ML19254F002 | ||
| issue date = 10/23/1979 | | issue date = 10/23/1979 | ||
| title = | | title = Proposed Change to Tech Spec 4.3.3.3.1,Table 4.3-4,re Seismic Monitoring Instrumentation Surveillance,Changing Channel Functional Test Interval to at Least Once Every 18 Months & Removing Monthly Channel Check Requirement | ||
| author name = | | author name = | ||
| author affiliation = ARKANSAS POWER & LIGHT CO. | | author affiliation = ARKANSAS POWER & LIGHT CO. | ||
Latest revision as of 17:34, 23 January 2020
| Date released: 09/25/2019 | Download: ML19254F001 |
|---|---|
| ML19254F002 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/23/1979 |
| From: | ARKANSAS POWER & LIGHT CO. |
| To: | |
| References | |
| Download: ML19254F002 (1) | |
| ML19254F000 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/23/1979 |
| From: | Cavanaugh W ARKANSAS POWER & LIGHT CO. |
| To: | REID R W Office of Nuclear Reactor Regulation |
| References | |
| Download: ML19254F000 (3) | |