ML19254F001

From kanterella
Jump to navigation Jump to search
Forwards Proposed Change to Tech Specs Re Seismic Monitoring Instrumentation Surveillance.Class III Fee Encl
Date released: 09/25/2019 Download: ML19254F001


Proposed Change to Tech Spec 4.3.3.3.1,Table 4.3-4,re Seismic Monitoring Instrumentation Surveillance,Changing Channel Functional Test Interval to at Least Once Every 18 Months & Removing Monthly Channel Check Requirement
ML19254F002
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/23/1979
From:
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19254F002 (1)
Forwards Proposed Change to Tech Specs Re Seismic Monitoring Instrumentation Surveillance.Class III Fee Encl
ML19254F000
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/23/1979
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: REID R W
Office of Nuclear Reactor Regulation
References
Download: ML19254F000 (3)