ML19254F000

From kanterella
Jump to navigation Jump to search
Forwards Proposed Change to Tech Specs Re Seismic Monitoring Instrumentation Surveillance.Class III Fee Encl
ML19254F000
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 10/23/1979
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: Reid R
Office of Nuclear Reactor Regulation
Shared Package
ML19254F001 List:
References
2-109-14, NUDOCS 7911050322
Download: ML19254F000 (3)


Text

i i

ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 UTTLE ROCK. ARKANSAS 72203 (501) 371-4422 October 23, 1979 WILLIAM CAVANAUGH 111 Vice President Generation & Construction 2-109-14 Director of Nuclear Reactor Regulation ATTN: Mr. R. W. Reid, Chief Operating Reactors Branch #4 U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Subject:

Arkansas Nuclear One-Unit 2 Docket No. 50-36 License No. NPF Technical Specification Change Request (File: 2-1511.1)

Gentlemen:

Attached for your review is a proposed change to the Arkansas Nuclear One-Unit 2 (ANO-2) Technical Specifications concerning seismic monitoring inctrumentation surveillance.

ANO-2 Technical Specification 4.3.3.3.1 and corresponding Table 4.3-4 require a CHANNEL FUNCTIONAL TEST of the Triaxial Response-Spectrum

, Recorder 2XR-8350 on a semi-annual (SA) basis. This recorder has no capability for testing without recalibrating the instrument. Present standards (ANSI /ANS-2.2-1978) require calibration of mechanical instru-ments only at 18 months or a refueling interval. Our vendor for this instrument has strongly recommended that we change our calibration in-tervals to agree .ith this standard as it is possible to degrade rather than improve per. otrance by overtesting and calibra*ing mechanical in-struments. We tnsrefore request to change the CHANNEL FUNCTIONAL TEST interval to at least once every 18 months (R).

Also, the Triaxial Time-History Accelerographs .'.CS-8001 and ACS-8002 have no capability for CHANNEL CHECK as is now required on a monthly basis. Complete calibration is our only means of meeting this speci-fication. Again, present standards require calibration only on a re-fueling interval in order to reduce the~ chance for damage. We there-fore request to remove the monthly CHANNEL CHECK requirement for these instruments.

1269 321 7 911050h MEMBEA MtDOLE SOUTH UTILITIES SYSTEM

Mr. R. W. Reid October 23, 1979 Pursuant to the requirements of 10 CFR 170.22, we have determined this request to require a Class III fee of $4,000, and a check for that amount is enclosed.

Very truly yours

,g

- W William Ca 7 gh, II /

WC:nak y Enclosure 1269 326

STATE OF ARKANSAS )

) SS COUNTY OF PULASK1 )

William Cavanaugh III, being duly sworn, states that he is Vice President, Generation & Construction, for Arkansas Power & Light Company; that he is authorized on the part of said Ccmpany to sign and file with the Nuclear Regulatory Commission this Supplementary Infonnation; that he has reviewed or caused to have reviewed all of the statements contained in such infonnation, and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, informa-tion and belief.

/ .-

/

f b iLL&

' William Cavbnaugh III ,

,/

]

SUBSCRIBED AND SWORN T0 before me, a Notary Public in and for the Count and State above named, this dday of ///][Md)1979.

g /M H m /P Notary Putilic' /

_u & /

My Coranission Expires:

f4 commis::en o;,c, of g, 1269 W

\%sse