ML063410112: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML063410112 | | number = ML063410112 | ||
| issue date = 12/07/2006 | | issue date = 12/07/2006 | ||
| title = | | title = Notice of Meeting with Amergen Energy Co. to Discuss an Apparent Violation Involving Potential Vortexing and Subsequent Operation of the High Pressure Core Spray Pump | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR | | author affiliation = NRC/NRR | ||
Line 27: | Line 27: | ||
Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Ann Marie Stone at (630) 829-9729 by December 15, 2006. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. | Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Ann Marie Stone at (630) 829-9729 by December 15, 2006. The NRC provides reasonable accommodation to individuals with disabilities where appropriate. | ||
If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. | If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. | ||
Meeting Contact: | Meeting | ||
==Contact:== | |||
Ann Marie Stone, Chief, Engineering Branch 2 Division of Reactor Safety 630-829-9729 E-mail: AMS1@nrc.gov Approved by: _________/RA/____________ | |||
Ann Marie Stone Chief, Engineering Branch 2 Division of Reactor Safety Distribution: | Ann Marie Stone Chief, Engineering Branch 2 Division of Reactor Safety Distribution: | ||
J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII M. Ring, DRP Branch Chief B. Dickson, SRI, Clinton DRS Branch Chiefs (JFL, DEH, AMS1, SKO, HXP1, KXR) | J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII M. Ring, DRP Branch Chief B. Dickson, SRI, Clinton DRS Branch Chiefs (JFL, DEH, AMS1, SKO, HXP1, KXR) | ||
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM) | R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM) | ||
T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA}} | T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA}} |
Latest revision as of 15:19, 7 December 2019
ML063410112 | |
Person / Time | |
---|---|
Site: | Clinton |
Issue date: | 12/07/2006 |
From: | Office of Nuclear Reactor Regulation |
To: | |
References | |
EA-06-291 | |
Download: ML063410112 (2) | |
Text
December 7, 2006 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: AmerGen Energy Company, LLC Name of Facility: Clinton Power Station Docket No: 50-461 Date and Time of Meeting: Tuesday, December 19, 2006 at 1:30 p.m. (CST)
Location of Meeting: U.S. Nuclear Regulatory Commission - Region III 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532 Purpose of Meeting: A public Regulatory Conference will be held to discuss an apparent violation involving potential vortexing and subsequent operation of the high pressure core spray pump. This issue is potentially greater than very low safety significant as documented in Inspection Report 05000461/2006011.
Category: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
NRC Attendees:
James Caldwell, Regional Administrator Geoffrey Grant, Deputy Regional Administrator Cynthia Pederson, Director, Division of Reactor Safety Mark Satorius, Director, Division of Reactor Projects Anne Boland, Deputy Director, Division of Reactor Safety Ann Marie Stone, Chief, Engineering Branch 2, Division of Reactor Safety Mark Ring, Chief, Projects Branch 1, Division of Reactor Projects Laura Kozak, Senior Reactor Analyst Others as Designated Licensee Attendees:
Michael Pascilio, Senior Vice President of Midwest Operations Craig Lambert, Vice President, Corporate Engineering Michael McDowell, Plant Manager Others as designated
Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Ann Marie Stone at (630) 829-9729 by December 15, 2006. The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
Meeting
Contact:
Ann Marie Stone, Chief, Engineering Branch 2 Division of Reactor Safety 630-829-9729 E-mail: AMS1@nrc.gov Approved by: _________/RA/____________
Ann Marie Stone Chief, Engineering Branch 2 Division of Reactor Safety Distribution:
J. Dixon-Herrity (JLD), Region III Coordinator, OEDO C. Holden (CFH), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR E. Hackett (EMH1), Deputy Director, Division of Operating Reactor Licensing (DORL), NRR D. Collins, DORL, NRR M. Satorius (MAS), Director, Division of Reactor Projects, RIII S. West (KSW), Deputy Director, Division of Reactor Projects, RIII C. Pederson (CDP1), Director, Division of Reactor Safety, RIII A. Boland (ATB), Deputy Director, Division of Reactor Safety, RIII M. Ring, DRP Branch Chief B. Dickson, SRI, Clinton DRS Branch Chiefs (JFL, DEH, AMS1, SKO, HXP1, KXR)
R. M. Lickus (RML2), Regional State Liaison Officer, RIII PMNS RIII Public Affairs (RJS2, VTM)
T. Tomczak (TXN), ORA P. Buckley (PLB1), ORA