ML19064B144

From kanterella
Jump to navigation Jump to search
Notice of Significant Public Meeting to Discuss Nrc'S End-of-Cycle Assessment of the Clinton Power Station Performance for the 2018 Calendar Year
ML19064B144
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/05/2019
From: Kenneth Riemer
NRC/RGN-III/DRP/B1
To:
References
Download: ML19064B144 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 March 5, 2019 NOTICE OF SIGNIFICANT LICENSEE MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee: Exelon Generation Company, LLC Name of Facility: Clinton Power Station Docket No: 50-461 Date and Time of Meeting: Wednesday, March 27, 2019 4:00 p.m. to 7:00 p.m. (CDT)

Location of Meeting: Clinton High School 1200 Highway 54 West Clinton, IL 61727 Purpose of Meeting: To provide opportunities to discuss NRC activities, and Clinton Power Station performance for the 2018 calendar year with the public. The NRCs Policy Statement, Enhancing Public Participation in NRC Meetings, effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, www.nrc.gov, and contains information regarding visitors and security.

Category: This is a Category 3 Meeting. The meeting is considered an outreach/open house and the public is invited to participate by observing displays, providing comments, and asking questions throughout the open house.

NRC Attendees: K. Riemer, Chief, Branch 1, Division of Reactor Projects E. Sanchez-Santiago, Senior Resident Inspector D. Sargis, Resident Inspector

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Kenneth Riemer at 630-829-9628 by Thursday, March 21, 2019.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRCs meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

Because meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, such as severe weather, confirm the meeting schedule with the meeting contact.

Approved By: /RA/

Kenneth Riemer, Chief Branch 1 Division of Reactor Projects Meeting

Contact:

Kenneth Riemer, Chief Branch 1 630-829-9628 Kenneth.Riemer@nrc.gov

Notice of Significant Licensee Meeting DISTRIBUTION:

Michael McCoppin, Region III Coordinator, OEDO Michael King, Deputy Director, Division of Inspection and Regional Support, NRR RidsNrrDorlLpl3 RidsNrrPMClinton Resource Julio Lara, Director, Division of Reactor Projects, RIII Robert Orlikowski, Acting Deputy Director, Division of Reactor Projects, RIII Kenneth OBrien, Director, Division of Reactor Safety, RIII Nathan Sanfilippo, Acting Deputy Director, Division of Reactor Safety, RIII Kenneth Riemer, DRP, Branch Chief Elba Sanchez-Santiago, SRI, Clinton Power Station DRS Branch Chiefs:

Robert Daley Steven Orth David Hills Allan Barker, Regional State Liaison Officer, RIII Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs ADAMS Accession Number: ML19064B144 OFFICE RIII NAME KRiemer:lg DATE 3/5/2019 OFFICIAL RECORD COPY