| {{#Wiki_filter:REACTOR COOLANT SYSTEM PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.4 The pressurizer shall be OPERABLE with: a. Pressurizer water level < 70%, and b. At least two groups of pressurizer heaters each having a capacity of at least 130 kW.APPLICABILITY: | | {{#Wiki_filter:REACTOR COOLANT SYSTEM PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.4 The pressurizer shall be OPERABLE with: |
| MODES 1, 2 and 3.ACTION: a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 12 hours.b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the reactor trip breakers open within 6 hours and in HOT SHUTDOWN within the following 6 hours.SURVEILLANCE REQUIREMENTS 4.4.4.1 The pressurizer water level shall be determined to be within its limits at least once per 12 hours.4.4.4.2 Verify at least two groups of pressurizer heaters each have a capacity of at least 130 kW at least once per 92 days: MILLSTONE | | : a. Pressurizer water level < 70%, and |
| -UNIT 2 3/4 4-4 Amendment No. 66, 74, W., 4-30, 24--, 2-64-, 296}} | | : b. At least two groups of pressurizer heaters each having a capacity of at least 130 kW. |
| | APPLICABILITY: MODES 1, 2 and 3. |
| | ACTION: |
| | : a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in HOT SHUTDOWN within the following 12 hours. |
| | : b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the reactor trip breakers open within 6 hours and in HOT SHUTDOWN within the following 6 hours. |
| | SURVEILLANCE REQUIREMENTS 4.4.4.1 The pressurizer water level shall be determined to be within its limits at least once per 12 hours. |
| | 4.4.4.2 Verify at least two groups of pressurizer heaters each have a capacity of at least 130 kW at least once per 92 days: |
| | MILLSTONE - UNIT 2 3/4 4-4 Amendment No. 66, 74, W.,4-30, 24--, |
| | 2-64-, |
| | 296}} |
Latest revision as of 11:01, 23 November 2019
|
---|
Category:Technical Specification
MONTHYEARML24086A4762024-03-22022 March 2024 Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22096A2212022-04-0606 April 2022 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML22032A2702022-01-28028 January 2022 Technical Specification Bases Pages ML22032A2692022-01-28028 January 2022 Technical Specification Bases Pages ML22027A7362022-01-27027 January 2022 Request for Enforcement Discretion from Technical Specification 3.5.2 ECCS Subsystems and Technical Specification 3.7.3 Reactor Plant Component Cooling Water System ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21047A4332021-02-15015 February 2021 Attachment 2: MPS3 Technical Specification Bases Pages ML21047A4322021-02-15015 February 2021 Attachment 1: MPS2 Technical Specification Bases Pages ML20252A1912020-09-0404 September 2020 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20065K9762020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20063L2872020-02-26026 February 2020 Technical Specification Bases Pages ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML19109A1002019-04-11011 April 2019 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. ML19052A1612019-02-14014 February 2019 Changes to Technical Specification Bases ML16257A5632016-09-19019 September 2016 Correction Letter to Amendment No. 327 - Technical Specification Changes for Spent Fuel Storage ML16258A1442016-09-0101 September 2016 Administrative Correction to License Amendment 327, Technical Specification Changes to Spent Fuel Pool Storage ML16061A0732016-02-23023 February 2016 Changes to Technical Specification Bases ML16034A3582016-01-26026 January 2016 License Amendment Request, Spent Fuel Pool Heat Load Analysis ML15342A0282015-12-0101 December 2015 Supplement to License Amendment Request to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML15065A3342015-02-26026 February 2015 Changes to Technical Specification Bases ML14188B1892014-06-30030 June 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14070A3462014-03-0606 March 2014 Changes to Technical Specification Bases ML13281A8092013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink ML13281A8042013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink ML13198A2712013-06-27027 June 2013 Supplement to License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. ML13120A1582013-04-25025 April 2013 License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure ML13079A2262013-03-0606 March 2013 Submittal of Changes to Technical Specification Bases ML12362A0122012-12-17017 December 2012 License Amendment Request to Revise Surveillance Requirement 4.4.3.2 Reactor Coolant System Relief Valves ML12081A1292012-03-0909 March 2012 Changes to Technical Specification Bases ML12032A2242012-01-25025 January 2012 License Amendment Request to Relocate TS Surveillance Frequencies to License Controlled Program in Accordance with TSTF-425, Revision 3 ML11193A2242011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 3 Through Attachment 6, Marked-up TS Pages and TS Bases Pages ML1023904032010-08-19019 August 2010 Changes to Technical Specification Bases ML0925806592009-09-0909 September 2009 Changes to Technical Specification Bases ML0826104492008-09-0808 September 2008 Transmittal of Changes to Technical Specification Bases ML0723303092007-08-15015 August 2007 Reactor Coolant System Leakage Detection Systems (Lbdcrs 07-MP2-012 and 07-MP3-032) ML0720003962007-07-13013 July 2007 Attachment 4, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Mark-Up of Associated Technical Specifications Bases Pages ML0715605312007-05-31031 May 2007 Tech Spec Pages for Amendment 299 Steam Generator Tube Integrity ML0711002192007-04-12012 April 2007 Changes to Technical Specifications Bases ML0708807052007-03-28028 March 2007 License Amendment Request (LBDCR 07-MP2-007) Re Containment Spray Nozzle Surveillance ML0703101462007-01-30030 January 2007 Technical Specification, Pressurizer Water Level Limits ML0700300722007-01-0202 January 2007 Supplement to Proposed Technical Specification Change (LBDCR 04-MP3-011) Auxiliary Feedwater System Allowed Outage Time 2024-03-22
[Table view] Category:Amendment
MONTHYEARML24086A4762024-03-22022 March 2024 Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22027A7362022-01-27027 January 2022 Request for Enforcement Discretion from Technical Specification 3.5.2 ECCS Subsystems and Technical Specification 3.7.3 Reactor Plant Component Cooling Water System ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML20252A1912020-09-0404 September 2020 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML16257A5632016-09-19019 September 2016 Correction Letter to Amendment No. 327 - Technical Specification Changes for Spent Fuel Storage ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML13281A8092013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink ML13281A8042013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink ML13120A1582013-04-25025 April 2013 License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure ML12362A0122012-12-17017 December 2012 License Amendment Request to Revise Surveillance Requirement 4.4.3.2 Reactor Coolant System Relief Valves ML0715605312007-05-31031 May 2007 Tech Spec Pages for Amendment 299 Steam Generator Tube Integrity ML0703101462007-01-30030 January 2007 Technical Specification, Pressurizer Water Level Limits ML0518101502005-06-28028 June 2005 Technical Specification Bases Pages ML0506706622005-02-25025 February 2005 Administrative Changes in Technical Specifications ML0326913862003-09-17017 September 2003 Amended TS Pages Reactivity Control Systems, Power Distribution Limits, and Special Test Exceptions ML0302805422003-01-16016 January 2003 Response to a Request for Additional Information, License Basis Document Change Request 2-1-02 Limiting Safety System Settings & Instrumentation ML0221201682002-07-19019 July 2002 Application for Amendment to NPF-49 to Modify Technical Specification Requirements for Missed Surveillances in Specification 4.0.3 & Modify Associated Technical Specification Bases ML0212901372002-05-0808 May 2002 Technical Specifications for Amendments Relocating Various Reactor Coolant System Technical Specifications to the Respective Unit'S Technical Requirements Manual ML0209200232002-03-29029 March 2002 Corrected TS Pages 3/4 3-39 & 3/4 3-41 ML0203701252002-02-0101 February 2002 Technical Specifications Pages Amendment 264 Revising the TSs and Bases Related to Reactor Coolant Pump Flywheel Inspection Requirements and Reactor Coolant System Structural Integrity ML0201103752002-01-11011 January 2002 Technical Specifications Pages for Amendment 263 Changes to TS Definitions for Core Alteration & Refueling Operations ML0201004062002-01-0808 January 2002 TS Pages for Amendment 262 Elimination of Requirements for Post-Accident Sampling ML0135202902002-01-0808 January 2002 Issuance of Amendment Elimination of Requirements for Post-Accident Sampling ML0135202162002-01-0808 January 2002 Issuance of Amendment Elimination of Requirements for Post-Accident Sampling ML0200702602002-01-0404 January 2002 Amendment 261 to TS Pages Emergency Diesel Generator Allowed Outage Time ML18088A9471976-04-19019 April 1976 Proposed Revisions to Environmental Technical Specifications ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2024-03-22
[Table view] |
Text
REACTOR COOLANT SYSTEM PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.4 The pressurizer shall be OPERABLE with:
- a. Pressurizer water level < 70%, and
- b. At least two groups of pressurizer heaters each having a capacity of at least 130 kW.
APPLICABILITY: MODES 1, 2 and 3.
ACTION:
- a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
- b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the reactor trip breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.4.4.1 The pressurizer water level shall be determined to be within its limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.
4.4.4.2 Verify at least two groups of pressurizer heaters each have a capacity of at least 130 kW at least once per 92 days:
MILLSTONE - UNIT 2 3/4 4-4 Amendment No. 66, 74, W.,4-30, 24--,
2-64-,