|
---|
Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A1022024-04-0101 April 2024 Alternative Request IR-4-13, Proposed Alternative Request to Support Steam Genera Tor Channel Head Drain Modification 2024-09-04
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARML23226A0052023-09-26026 September 2023 Issuance of Amendment No. 287 Supplement to Spent Fuel Pool Criticality Safety Analysis ML23123A2792023-05-0202 May 2023 License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits and Exemption Request for Use of M5 Cladding ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22362A1022022-12-28028 December 2022 Proposed License Amendment Request to Supplement Spent Fuel Pool Criticality Safety Analysis ML22146A0272022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant. ML22096A2212022-04-0606 April 2022 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21053A3422021-02-22022 February 2021 Proposed License Amendment Request to Clarify Shutdown Bank Technical Specification Requirements and Add Alternative Control Rod Position Monitoring Requirements ML20343A2432020-12-0808 December 2020 Proposed License Amendment Request Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1 ML20343A2592020-12-0808 December 2020 Supplement to Proposed License Amendment Request to Revise the Millstone Unit 2 Technical Specifications for Steam Generator Frequency ML20324A7032020-11-19019 November 2020 Proposed License Amendment Request Measurement Uncertainty Recapture Power Uprate ML20310A3242020-11-0505 November 2020 Proposed License Amendment Request, Addition of Analytical Methodology to the Core Operating Limits Report for a Large Break Loss of Coolant Accident (LBLOCA) ML20282A5942020-10-0808 October 2020 Proposed License Amendment Request to Revise the Millstone Unit 2 Technical Specifications for Steam Generator Inspection Frequency ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20121A2172020-04-30030 April 2020 Proposed Technical Specifications Change Battery Surveillance Requirements ML20105A0782020-04-14014 April 2020 Supplement to License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Components ML20065K9762020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML19353A0222019-12-17017 December 2019 License Amendment Request to Revise TS 6.25, Pre-Stressed Concrete Containment Tendon Surveillance Program ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML19217A2082019-07-30030 July 2019 Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals ML19109A1002019-04-11011 April 2019 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. ML19023A4272019-01-17017 January 2019 Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML18128A0492018-05-0303 May 2018 License Amendment Request Regarding Proposed Technical Specifications Changes for Spent Fuel Storage and New Fuel Storage ML18100A0552018-04-0404 April 2018 License Amendment Request to Revise Technical Specification Action Statement for Loss of Control Building Inlet Ventilation Radiation Monitor Instrumentation Channels ML17284A1792017-10-0404 October 2017 Proposed License Amendment Request to Revise Integrated Leak Rate Test (Type a) and Type C Test Intervals ML17171A2322017-06-15015 June 2017 License Amendment Request to Revise the Company Name ML17018A0002017-02-0707 February 2017 Issuance of Amendment Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 ML16354A4242016-12-14014 December 2016 License Amendment Request to Revise Technical Specification Surveillance Requirement 4.1.3.1.2 for Control Element Assembly 39 for the Remainder of Cycle 24 ML16159A2592016-09-0606 September 2016 Enclosure 1 Millstone Power Station, Unit No. 1 Issuance of Amendment Administrative Changes and Corrections to the Technical Specifications ML16153A0262016-05-25025 May 2016 Proposed License Amendment Request Realistic Large Break Loss of Coolant Accident Analysis ML16153A0272016-05-25025 May 2016 ANP-3316(NP), Revision 0, Millstone, Unit 2, M5 Upgrade, Realistic Large Break Loca Analysis Licensing Report. ML16153A2342016-05-23023 May 2016 Supplement to License Amendment Request for Administrative Changes to the Permanently Defueled Technical Specifications ML16034A3582016-01-26026 January 2016 License Amendment Request, Spent Fuel Pool Heat Load Analysis ML16029A1682016-01-25025 January 2016 License Amendment Request to Revise ECCS TS 3/4.5.2 and FSAR Chapter 14 to Remove Charging ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML15246A1182015-08-31031 August 2015 License Amendment Request to Revise Technical Specification 5.6.3, Fuel Storage Capacity ML15246A1242015-08-27027 August 2015 Connecticut, Inc. Millstone Power Station Unit 2 Supplement to License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML15183A0222015-06-30030 June 2015 License Amendment Request for Removal of Severe Line Outage Detection from the Offsite Power System ML15134A2442015-05-0808 May 2015 License Amendment Request to Adopt Dominion Core Design and Safety Analysis Methods and to Address the Issues Identified in Westinghouse Documents NSAL-09-5, Rev. 1, NSAL-15-1, and 06-IC-03 ML15065A3342015-02-26026 February 2015 Changes to Technical Specification Bases ML15021A1282015-01-15015 January 2015 Proposed License Amendment Requests to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML14310A1872014-10-31031 October 2014 License Amendment Request to Revise the Final Safety Analysis Report - Examination Requirements for ANSI B31.1.0 Piping Welds ML14301A1122014-10-22022 October 2014 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3 ML14188B1892014-06-30030 June 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. ML14133A0092014-05-0808 May 2014 License Amendment Request, Implementation and Engineered WCAP-15376, Reactor Trip System Instrumentation Test Times and Engineered Safety Feature Actuation System Instrumentation Test and Completion Times ML14093A0282014-03-28028 March 2014 License Amendment Request for Administrative Changes to the Permanently Defueled Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14070A3462014-03-0606 March 2014 Changes to Technical Specification Bases 2023-09-26
[Table view] Category:Technical Specification
MONTHYEARML24086A4762024-03-22022 March 2024 Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML24030A7522024-01-30030 January 2024 Technical Specification Bases Pages ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22096A2212022-04-0606 April 2022 Application for Technical Specification Change Regarding Mode Change Limitations Using the Consolidated Line Item Improvement Process ML22032A2702022-01-28028 January 2022 Technical Specification Bases Pages ML22032A2692022-01-28028 January 2022 Technical Specification Bases Pages ML22027A7362022-01-27027 January 2022 Request for Enforcement Discretion from Technical Specification 3.5.2 ECCS Subsystems and Technical Specification 3.7.3 Reactor Plant Component Cooling Water System ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML21047A4332021-02-15015 February 2021 Attachment 2: MPS3 Technical Specification Bases Pages ML21047A4322021-02-15015 February 2021 Attachment 1: MPS2 Technical Specification Bases Pages ML20252A1912020-09-0404 September 2020 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20065K9762020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML20063L2872020-02-26026 February 2020 Technical Specification Bases Pages ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML19109A1002019-04-11011 April 2019 Application to Revise Technical Specifications to Adopt TSTF-522, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month. ML19052A1612019-02-14014 February 2019 Changes to Technical Specification Bases ML16257A5632016-09-19019 September 2016 Correction Letter to Amendment No. 327 - Technical Specification Changes for Spent Fuel Storage ML16258A1442016-09-0101 September 2016 Administrative Correction to License Amendment 327, Technical Specification Changes to Spent Fuel Pool Storage ML16061A0732016-02-23023 February 2016 Changes to Technical Specification Bases ML16034A3582016-01-26026 January 2016 License Amendment Request, Spent Fuel Pool Heat Load Analysis ML15342A0282015-12-0101 December 2015 Supplement to License Amendment Request to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML15065A3342015-02-26026 February 2015 Changes to Technical Specification Bases ML14188B1892014-06-30030 June 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-426, Revise or Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6B & 6C. ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14070A3462014-03-0606 March 2014 Changes to Technical Specification Bases ML13281A8092013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink ML13281A8042013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink ML13198A2712013-06-27027 June 2013 Supplement to License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink. ML13120A1582013-04-25025 April 2013 License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure ML13079A2262013-03-0606 March 2013 Submittal of Changes to Technical Specification Bases ML12362A0122012-12-17017 December 2012 License Amendment Request to Revise Surveillance Requirement 4.4.3.2 Reactor Coolant System Relief Valves ML12081A1292012-03-0909 March 2012 Changes to Technical Specification Bases ML12032A2242012-01-25025 January 2012 License Amendment Request to Relocate TS Surveillance Frequencies to License Controlled Program in Accordance with TSTF-425, Revision 3 ML11193A2242011-07-0505 July 2011 License Amendment Request to Relocate TS Surveillance Frequencies to Licensee Controlled Program in Accordance with TSTF-425, Revision 3, Attachment 3 Through Attachment 6, Marked-up TS Pages and TS Bases Pages ML1023904032010-08-19019 August 2010 Changes to Technical Specification Bases ML0925806592009-09-0909 September 2009 Changes to Technical Specification Bases ML0826104492008-09-0808 September 2008 Transmittal of Changes to Technical Specification Bases ML0723303092007-08-15015 August 2007 Reactor Coolant System Leakage Detection Systems (Lbdcrs 07-MP2-012 and 07-MP3-032) ML0720003962007-07-13013 July 2007 Attachment 4, Millstone Power Station Unit 3, License Amendment Request, Stretch Power Uprate, Mark-Up of Associated Technical Specifications Bases Pages ML0715605312007-05-31031 May 2007 Tech Spec Pages for Amendment 299 Steam Generator Tube Integrity ML0711002192007-04-12012 April 2007 Changes to Technical Specifications Bases ML0708807052007-03-28028 March 2007 License Amendment Request (LBDCR 07-MP2-007) Re Containment Spray Nozzle Surveillance ML0703101462007-01-30030 January 2007 Technical Specification, Pressurizer Water Level Limits ML0700300722007-01-0202 January 2007 Supplement to Proposed Technical Specification Change (LBDCR 04-MP3-011) Auxiliary Feedwater System Allowed Outage Time 2024-03-22
[Table view] Category:Amendment
MONTHYEARML24086A4762024-03-22022 March 2024 Application for Technical Specification Change to Extend the Inspection Interval for Reactor Coolant Pump Flywheels Using the Consolidated Line-Item Improvement Process ML23153A1732023-06-16016 June 2023 Correction to Amendment Nos. 346 & 286 Millstone, 294 & 277 North Anna, 311 & 311 Surry, and 225 Summer to Revise Technical Specifications to Adopt TSTF-554,Rev Reactor Coolant Leakage Requirement ML23013A2242023-01-13013 January 2023 Proposed License Amendment Request to Revise the Applicability Term for Reactor Coolant System Heatup and Cooldown Pressure Temperature Limitation Figures ML22095A1072022-07-11011 July 2022 Issuance of Amendment Nos. 120, 344, & 284, 293 & 276, & 307 & 307 to Relocate Requirements to the QAPD ML22027A7362022-01-27027 January 2022 Request for Enforcement Discretion from Technical Specification 3.5.2 ECCS Subsystems and Technical Specification 3.7.3 Reactor Plant Component Cooling Water System ML21294A3382021-10-21021 October 2021 Proposed Amendment to Relocate Unit Staff Qualification Requirements from Technical Specifications to Nuclear Facility Quality . ML20252A1912020-09-0404 September 2020 Response to Request for Additional Information Regarding License Amendment Request for a One-Time Deferral of the Millstone Unit 3 Steam Generator Inspections ML20224A4572020-08-11011 August 2020 Connecticut. Inc. Millstone Power Station Unit 3, Proposed License Amendment Request for a One-Time Extension of the Millstone Unit 3 Steam Generator Inspections ML20063L8232020-03-0303 March 2020 License Amendment Request to Revise Technical Specification Table 3.3-11, Accident Monitoring Instrumentation ML19304A2942019-10-22022 October 2019 Supplement to Proposed License Amendment Request to Revise TS 3.8.1.1, A.C. Sources - Operating, to Support Maintenance and Replacement of the Millstone Unit 3 'A' Reserve Station Service Transformer and 345 Kv South Bus Switchyard Componen ML16257A5632016-09-19019 September 2016 Correction Letter to Amendment No. 327 - Technical Specification Changes for Spent Fuel Storage ML15246A1172015-08-31031 August 2015 Supplement to License Amendment Request to Revise TS 6.19, Containment Leakage Testing Program ML14093A0272014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML14093A0262014-03-28028 March 2014 License Amendment Request for Administrative Changes and Corrections to the Technical Specifications ML13281A8092013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.11, Ultimate Heat Sink ML13281A8042013-10-0202 October 2013 Response to Request for Additional Information Regarding License Amendment Request for Changes to Technical Specification 3/4.7.5, Ultimate Heat Sink ML13120A1582013-04-25025 April 2013 License Amendment Request to Revise Technical Specification 6.8.4.F for Peak Calculated Containment Internal Pressure ML12362A0122012-12-17017 December 2012 License Amendment Request to Revise Surveillance Requirement 4.4.3.2 Reactor Coolant System Relief Valves ML0715605312007-05-31031 May 2007 Tech Spec Pages for Amendment 299 Steam Generator Tube Integrity ML0703101462007-01-30030 January 2007 Technical Specification, Pressurizer Water Level Limits ML0518101502005-06-28028 June 2005 Technical Specification Bases Pages ML0506706622005-02-25025 February 2005 Administrative Changes in Technical Specifications ML0326913862003-09-17017 September 2003 Amended TS Pages Reactivity Control Systems, Power Distribution Limits, and Special Test Exceptions ML0302805422003-01-16016 January 2003 Response to a Request for Additional Information, License Basis Document Change Request 2-1-02 Limiting Safety System Settings & Instrumentation ML0221201682002-07-19019 July 2002 Application for Amendment to NPF-49 to Modify Technical Specification Requirements for Missed Surveillances in Specification 4.0.3 & Modify Associated Technical Specification Bases ML0212901372002-05-0808 May 2002 Technical Specifications for Amendments Relocating Various Reactor Coolant System Technical Specifications to the Respective Unit'S Technical Requirements Manual ML0209200232002-03-29029 March 2002 Corrected TS Pages 3/4 3-39 & 3/4 3-41 ML0203701252002-02-0101 February 2002 Technical Specifications Pages Amendment 264 Revising the TSs and Bases Related to Reactor Coolant Pump Flywheel Inspection Requirements and Reactor Coolant System Structural Integrity ML0201103752002-01-11011 January 2002 Technical Specifications Pages for Amendment 263 Changes to TS Definitions for Core Alteration & Refueling Operations ML0201004062002-01-0808 January 2002 TS Pages for Amendment 262 Elimination of Requirements for Post-Accident Sampling ML0135202902002-01-0808 January 2002 Issuance of Amendment Elimination of Requirements for Post-Accident Sampling ML0135202162002-01-0808 January 2002 Issuance of Amendment Elimination of Requirements for Post-Accident Sampling ML0200702602002-01-0404 January 2002 Amendment 261 to TS Pages Emergency Diesel Generator Allowed Outage Time ML18088A9471976-04-19019 April 1976 Proposed Revisions to Environmental Technical Specifications ML17037B7791974-02-0707 February 1974 Letter Regarding Petition for Derating of Certain Boiling Water Reactors and Enclosed Before the Atomic Safety and Licensing Appeal Board in the Matter of Vermont Yankee Nuclear Power Corporation - Vermont Yankee Nuclear ... 2024-03-22
[Table view] |
Text
'I ,
IC I'/.7III r oilM ltJG U.O. IIVCLI.'AilIICOULATORV C htllsslot4 DDCKCT t4VM(ILfl 50-245/~
FILe NUMocn NfCC DISTBIBUTION Fofl PART GO DO .!<ET M/IiTEBIAL F I ION: NNECO OATC OF OOCVthCt4T Mr, G, Lear Hartford, 'Conn. 06101 4-19-76 D,CD Switzer oATs flccstveo 0-28-76
,. K LSTTSR W NOTofl IZ C 0 I ROP INPUT FORM NUMocfl oF cof'Ics flccelvso QORIOINAI 23 UN C Lnssl F I s 0 I Qcoi v 3 signed 37 CC
- osscRIPTIoN Ltr notarized 4>>19-76 requests for cNctosvRc Proposed & revised kz changes
- to ETS
, . changes to Enviro Tech Specs for Millsto e ~
for Mills tone. ~ ~ ~
Units 1 & 2'Plants & trans. the following (40 cys <<encl rect@
~ 4 ~
I t
I
,! PLANT NAME: Millstone Units 1 & 2 SAI! ETY FOR ACTION/INFO'<1ATION EiNVXRO DHL 4-30 "76 ASSXGNED AD; ASSIGNED AD :
)3RANCH CHXEF: 13R/INCH CHXEF ~
PRO JECT iiL'iNAGER; PROJECT MANAGER ..
LXC ~ ASST, LXC ~
ASST'v INTERNAL 0 1ST R I I3iJ T I Oiil ri
~
S'QL",lR SQI'F~ I'XVZRQTZ
~~
T~'RC PDR Qc
~
Qv~~f
~DES I PiIST X&K erg,o ZD MAX'~
C.'ENAROYq BAI L/BAIRD SPANGLER GOSSXCK & STAFF ENG+iMit R N XPPOLXTO u.Fc ~I' Geiger<
SXTE TECH C..
,ASE 1(N GriT OPERATXIIG REACTORS S XII.<i Xi. sTEI.LQ STI'.PP hRLESS PAIII.XCKX I!ULIIAN OPI!~ATXiIG TECII PROJI CT 'IIAHAGI'.~iIIENT REACTOR SAI'I'TY I'.XSI'.ViIIUT <</ +u SXTE ANALYSXS 130YD voi.uzi< r P~~
-F 1! .
IIOUSTON COLI.XNS PI"TI'.llSON ROSS NOVAI~
ROSZTOCZY SIIAO BAI'R SCli.'I:.NCI;I<
13UNCII CIII CV. rl;Xi!Its KRI'.GI'.Ii MI I,TZ I I I'. I,TI.'111 S AT& l SITI'. SAI I."I'Y & I'.K~Vlw(
S I(()V I IOI.T SALT ".AN h NAI.YS X!I I'U'I'll: I)I/II'I'ON 6 tlllr I CON'I'Il()I. Nl)h,) IIE II l,l'l)II;g
"'TXC J~ cP
"('.A VII.I;xI'. ()N ((>><Nr.)
Ni'Ir.
I'II;()OI;IIAVI:.,I LAI>
t 4225 I'I) I 1 A llI.IL (:()t1! i llf.'I'AN'I'!i
/~oilà /5 ~~/.'i:i. I
~
~ D""it-.A'~
lw gggU]6tory Docket S
/VIVACD ,(5(%>
. BOX 270 TFORO, CONNECTICUT 06101 NORTHEAST NUCLEAR ENERGY COMPANY 66-6911 A NORTHEAST UTILITIES COMPANY gP Q,2~
8 rod Q April,19, 19 u.> go~~io>>
'4 y Oly Director of Nuclear Reactor Regulation Docket'No. 5 .2 0 Attn: Mr. G. Lear, Chief Operating Reactors 'Branch II3 Qo~
U. S. Nuclear Regulatory Commission Washington, D. C. 20555 II AQUAjP6.@@
Dear Sir:
'4 a,", Pg, Millstone Nuclear Power Station, Units No. 1 and 2 Pro osed Revisions to Environmental Technical S ecificatio Pursuant to Section 5.6.3 of the Millstone Unit No. 1 (License No. DPR-21) and Unit No., 2 (License No. DPR-65) Environmental Technical Specifications (ETS),
Northeast Nuclear Energy Company hereby proposes to incorporate the following proposed changes to the ETS.
Specifically, NNECo proposes to delete sections 4.3, Lobster Habitat Sampling; and 4.5, Intake Velocity Profile Me'asurements, as these programs have been completed and their respective reports have been submitted.
In addition, NNECo proposes to modify sections 3.1.2.1.5, Benthic Survey; and 3.1.2.1.7, Trawling; as indicated on the attached sheets. These proposals concern improvements in sampling frequencies and locations based upon analyses of existing data.
Finally, NNECo proposes to delete section 3.1.2.1.8, Ichthyoplankton and Zooplankton Survey; as this program was to terminate after December, 1975.
The Millstone Environmental Review Board has reviewed and approved these proposed revisions.
Your favorable action on thi's request will be appreciated.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY pc R9~
President Attachments
I 4 V
lp I '
STATE OF CONNECTICUT )
) ss. Berlin April 19, 1976 COUNTY OF HARTFORD )
Then personally appeared before me D. C. Switzer, who being duly sworn, did state that he is President of Northeast Nuclear Energy Company, a licensee herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the licensees herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.
Notary Public My cammission Expires Qjg...;,j' l~j/a.
a(
PROPOSED CHANGES 3.1.2.1.5 Benthic Sur've Pa e 3.1-9 Benthic survey intertidal sand sample replicates to be decreased from ten (10) to five (5).
Analysis of existing data show that comparable data are obtained with only 5 subsamples in the intertidal zone. Similar numbers of species are obtained with 5 subsamples as are obtained with 10.
3.1.2.1.7 Trawlin a e 3.1-12 Trawl stations 1, 4 and 10 to be relocated to stations 2, 5, and 14 respectively as shown in ETS Figure 3.1-2. Stations 7 and 9 are to be deleted while an additional trawl will be taken at station 11.
Trawls taken over the last year of stations 2, 5, and 14 show that these stations are more easily sampled (because of bottom configurations) and therefore provide more consistent and uniform catches. Stations 7 and 9 have also been difficult to sample due to uneven bottom contours and obstructions, thereby providin'g little comparable data.
3.1.2.1.8 Ichth o lankton Surve a e 3.1-13 Delete this section. As shown on page 3.1-14, the ichthyoplankton program was to terminate after December, 1975.
4j
~Ob ective The obgective is to examine in detail the populations of benthic organisms in order to describe any plant effects.
S ecification During the months of March, June, September and December benthic samples shall be taken at the stations shown in Figure 3.1-1. For the subtidal rocky-substrate samples, divers descend to the station mooring block and record the general appearance of the plot and the number of species of fish. Five sampling, quadrats are then established as follows: a 10-foot line marked at 2-foot intervals is attached to the center of the block; the first sample is taken 2 feet from the block; the line is then swung 72 degrees (1/5 of 360 degrees) clockwise and a second sample is taken 4 feet from the block; the process is repeated so that the five samples taken 2, 4, 6, 8, and 10 feet from the block are 72 degrees apart.
Each of the five quadrats, delineated by a frame with inside measurements of 25 by 25 centimeters, is scraped clean with a knife or diving tool. As the sample is scraped it is sucked through a tube, and delivered to a bag of fine mesh net material at the upper end of the tube. Air is provided by a standard SCUBA tank. When a quadrat has been scraped clean, the bag is removed and corked and a new bag is fitted into place for the next quadrat.
The same methods are used for the intertidal rock substrate samples with the, exception of SCUBA.
Upon return to the laboratory, all samples taken on rocky substrates are frozen until processed. Processing includes sorting, identifying, counting where possible, drying and weighing to the nearest tenth of a gram. Due to the time involved in processing, the invertebrates, once sorted from the algae, are preserved in 70 percent ethanol. The algae are placed in sea-water and refrigerated until identified and readied for drying. Identifications are made to the lowest taxon possible.'n subtidal sand stations ten core samples each 10 cm in diameter and 5 cm deep are taken within a 10-foot diameter quadrat established by the same methods described above for rocky substrates. Five samples are taken on intertidal sand stations.
V All sand samples, upon return to the laboratory, are frozen until ready for processing. Samples are sieved through a 1-millimeter-mesh screen and the organisms retained on the screen are then placed in 70 percent ethanol.
Processing includes identification to the lowest practical taxon, counting, and recording the size range to the nearest millimeter for each species.
Re ortin Re uirement A non-routine report shall be submitted to NRC in accordance with Section 5.6.2.a.(2) when gross changes in population species composition or abundance 3.1-9
~ ~ h
~Ob ective The objectives of this study are to provide information on the occurrence and distribution of the larger ground fish in the area; to give data on food preferences, reproductive activity, and condition factors; and to provide recaptures for the fish tagging study.
S ecification A 30-foot otter trawl with 1/4-inch cod-end liner shall be used to trawl six locations'round Millstone Point every other week. (Stations 2, 5, 6, 8, 11, 14 Fig. 3.1-2). All fish and invertebrates collected shall be identified and measured in the field. Efforts will be made to release uninjured individuals alive.
Re ortin Re uirement Reports shall be issued on a routine basis as described in Section 5.6.1.
Marked or gross changes, beyond seasonal variations, in species abundance, composition or feeding habits, will be cause for the submittal of a non-routine report in accordance with Section 5.6.2.a.(2). Disappearance of a previously common or abundant species (e.g., flounder) shall also be the cause for submitting a non-routine report.
Bases The basis for this program element is that data on changes in overall species compositions and abundances in the area are necessary for continuous mon-itoring of the plant's operation and surveillance of its effects, if any, on the regional biota.
301-12
4
~ ~