{{#Wiki_filter:FENOC""%% 76 South Main Street | {{#Wiki_filter:FENOC ""%% 76 South Main Street FirstEnergyNuclear OperatingCompany Akron, Ohio 44308 Danny L. Pace 330-384-3733 Senior Vice President,Engineering Fax: 330-384-3799 Docket Number 50-346 License Number NPF-3 Serial Number 3331 March 20, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001 | ||
==Subject:== | ==Subject:== | ||
Submittal of Exponent Failure Analysis Associates Report Ladies and Gentlemen: | Submittal of Exponent Failure Analysis Associates Report Ladies and Gentlemen: | ||
As discussed by a telephone call on March 19, 2007, with members of the Nuclear Regulatory Commission staff, enclosed are one hardcopy and one electronic copy of the Exponent Failure Analysis Associates report, "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," dated December 15, 2006, for your information. | As discussed by a telephone call on March 19, 2007, with members of the Nuclear Regulatory Commission staff, enclosed are one hardcopy and one electronic copy of the Exponent Failure Analysis Associates report, "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," dated December 15, 2006, for your information. | ||
If you have any questions or require further information, please contact Mr. James J. Powers, Director, Fleet Engineering, at (330) 384-4930.Very truly yours, Danny L. Pace Senior Vice Presdent, Fleet Engineering GMW/s Attachment Enclosures cc: Regional Administrator, NRC Region III Branch Chief, NRC Region EIl Reactor Projects Branch 6 DB-1 NRC/NRR Project Manager (3 copies)DB-1 Senior NRC Resident Inspector Utility Radiological Safety Board (w/o Enclosure) | If you have any questions or require further information, please contact Mr. James J. Powers, Director, Fleet Engineering, at (330) 384-4930. | ||
Docket Number 50-346 License Number NPF-3 Serial Number 3331 | Very truly yours, Danny L. Pace Senior Vice Presdent, Fleet Engineering GMW/s Attachment Enclosures cc: Regional Administrator, NRC Region III Branch Chief, NRC Region EIl Reactor Projects Branch 6 DB-1 NRC/NRR Project Manager (3 copies) | ||
Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. | DB-1 Senior NRC Resident Inspector Utility Radiological Safety Board (w/o Enclosure) | ||
They are described only as information and are not regulatory commitments. | |||
Please notify the Manager, Regulatory Compliance (Acting), at (419) 321-7120 at Davis-Besse of any questions regarding this document or associated regulatory commitments. | Docket Number 50-346 License Number NPF-3 Serial Number 3331 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager, Regulatory Compliance (Acting), at (419) 321-7120 at Davis-Besse of any questions regarding this document or associated regulatory commitments. | ||
COMMITMENTS DUE DATE None N/A Docket Number 50-346 License Number NPF-3 Serial Number 3331 Enclosure I Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event Prepared by: Exponent Failure Analysis Associates (661 pages follow)}} | COMMITMENTS DUE DATE None N/A | ||
Docket Number 50-346 License Number NPF-3 Serial Number 3331 Enclosure I Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event Prepared by: Exponent Failure Analysis Associates (661 pages follow)}} | |||
Revision as of 08:01, 23 November 2019
| ML070860216 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/20/2007 |
| From: | Pace D FirstEnergy Nuclear Operating Co |
| To: | Document Control Desk, NRC/NRR/ADRO |
| Shared Package | |
| ML070860211 | List: |
| References | |
| 33315, FOIA/PA-2007-0299 | |
| Download: ML070860216 (3) | |
Text
FENOC ""%% 76 South Main Street FirstEnergyNuclear OperatingCompany Akron, Ohio 44308 Danny L. Pace 330-384-3733 Senior Vice President,Engineering Fax: 330-384-3799 Docket Number 50-346 License Number NPF-3 Serial Number 3331 March 20, 2007 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555-0001
Subject:
Submittal of Exponent Failure Analysis Associates Report Ladies and Gentlemen:
As discussed by a telephone call on March 19, 2007, with members of the Nuclear Regulatory Commission staff, enclosed are one hardcopy and one electronic copy of the Exponent Failure Analysis Associates report, "Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event," dated December 15, 2006, for your information.
If you have any questions or require further information, please contact Mr. James J. Powers, Director, Fleet Engineering, at (330) 384-4930.
Very truly yours, Danny L. Pace Senior Vice Presdent, Fleet Engineering GMW/s Attachment Enclosures cc: Regional Administrator, NRC Region III Branch Chief, NRC Region EIl Reactor Projects Branch 6 DB-1 NRC/NRR Project Manager (3 copies)
DB-1 Senior NRC Resident Inspector Utility Radiological Safety Board (w/o Enclosure)
Docket Number 50-346 License Number NPF-3 Serial Number 3331 Page 1 of 1 COMMITMENT LIST The following list identifies those actions committed to by the Davis-Besse Nuclear Power Station in this document. Any other actions discussed in the submittal represent intended or planned actions by Davis-Besse. They are described only as information and are not regulatory commitments. Please notify the Manager, Regulatory Compliance (Acting), at (419) 321-7120 at Davis-Besse of any questions regarding this document or associated regulatory commitments.
COMMITMENTS DUE DATE None N/A
Docket Number 50-346 License Number NPF-3 Serial Number 3331 Enclosure I Review and Analysis of the Davis-Besse March 2002 Reactor Pressure Vessel Head Wastage Event Prepared by: Exponent Failure Analysis Associates (661 pages follow)