{{#Wiki_filter:November 8, 2007Administrative JudgeAdministrative JudgeRichard F. ColePaul B. Abramson
{{#Wiki_filter:November 8, 2007 Administrative Judge                                Administrative Judge Richard F. Cole                                      Paul B. Abramson Atomic Safety and Licensing Board Panel             Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                                    Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission                  U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                            Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
 
(Pilgrim Nuclear Power Station)
Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board PanelMail Stop: T-3F23Mail Stop: T-3F23 U.S. Nuclear Regulatory CommissionU.S. Nuclear Regulatory Commission Washington, DC 20555-0001Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR


==Dear Administrative Judges:==
==Dear Administrative Judges:==


The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order
The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff has no updates to its privilege log required by 10 C.F.R. § 2.336(b)(5) at this time; however, the Staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached
 
Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index


containing the ADAMS accession number, date, and title or description of each item in the
R. Cole P. Abramson A. Young are the Affidavit of Perry Buckberg, as required by 10 C.F.R. § 2.336(c), and the three documents contained in the hearing file, due to technical issues associated with ability of the public to access ADAMS.
 
Sincerely,
hearing file is appended hereto as Attachment 1.
                                                      /RA/
The Staff has no updates to its privilege log required by 10 C.F.R. § 2.336(b)(5) at this time; however, the Staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached R. Cole P. Abramson
Kimberly A. Sexton Counsel for the NRC Staff
 
A. Young are the Affidavit of Perry Buckberg, as required by 10 C.F.R. § 2.336(c), and the three documents contained in the hearing file, due to technical issues associated with ability of thepublic to access ADAMS.
Sincerely,/RA/Kimberly A. Sexton Counsel for the NRC Staff


==Enclosures:==
==Enclosures:==
Hearing File Index Affidavit of Perry Buckberg
Hearing File Index Affidavit of Perry Buckberg 2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs cc:            Attached Service List


2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17
ATTACHMENT 1:    PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 15- November 8, 2007 Accession Number    Document Date                          Title/Description:
15-01  ML073100225        10/16/2007        2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 15-02  ML073100229        10/17/2007        2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 15-03  ML073100226        10/17/2007        2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs


2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specscc:Attached Service List ATTACHMENT 1: PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 15- November 8, 2007Accession NumberDocument DateTitle/Description:15-01ML07310022510/16/20072007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 15-02ML07310022910/17/20072007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 15-03ML07310022610/17/20072007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs November 8, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
November 8, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                   )
)ENTERGY NUCLEAR GENERATION )Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR)
                                                  )
OPERATIONS, INC.)ASLBP No. 06-848-02-LR
ENTERGY NUCLEAR GENERATION                         )           Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR                       )
)(Pilgrim Nuclear Power Station))
OPERATIONS, INC.                                   )           ASLBP No. 06-848-02-LR
                                                  )
(Pilgrim Nuclear Power Station)                   )
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, Perry Buckberg, do hereby state as follows:1.I am employed as a Project Manager in the Division of License Renewal in theNuclear Regulatory Commission's ("NRC") Office of Nuclear Reactor Regulation. I serve as a
I, Perry Buckberg, do hereby state as follows:
 
: 1.     I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
project manager for the Pilgrim Nuclear Power Station's license renewal application ("LRA"). 2.I hereby certify that all relevant materials required to be disclosed pursuant to10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the
: 2.     I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
 
: 3.     I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
disclosures are accurate and complete as of the date of this certification.3.I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief./Original Signed By/
                                                                /Original Signed By/
______________________
______________________
Perry Buckberg Executed in Rockville, MD this 8 th day of November, 2007 From:  "Sanchez, Edward" <esanch1@entergy.com>
Perry Buckberg Executed in Rockville, MD this 8th day of November, 2007
To:  "Perry Buckberg" <PHB1@nrc.gov> Date:  10/16/2007 10:01:26 AM 
 
==Subject:==
Replacement page 3/4.2-17 Perry, Pilgrim inadvertently issued an in correct page 3/4.2-17 into our controlled Tech Specs when they we re updated for License Amendment 200. I entered the condition into Pilgri m's corrective action program and have already had Document Control co rrect the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's


version was correct - it was the ve rsion on the CD I sent you that was incorrect.
From:        "Sanchez, Edward" <esanch1@entergy.com>
: Thanks, Ed Sanchez Pilgrim Licensing Hearing Identifier: PilgrimRenewalNonPublic Email Number: 81  Mail Envelope Properties  (47304396.HQGWDO01.TWGWPO03.200.2000003.1.12FEF1.1) 
To:          "Perry Buckberg" <PHB1@nrc.gov>
Date:         10/16/2007 10:01:26 AM


==Subject:==
==Subject:==
Replacement page 3/4.2-17 Creation Date:   10/16/2007 10:01:26 AM From:    "Sanchez, Edward" <esanch1@entergy.com>
Replacement page 3/4.2-17
Created By:  esanch1@entergy.com
: Perry, Pilgrim inadvertently issued an incorrect page 3/4.2-17 into our controlled Tech Specs when they were updated for License Amendment 200.
 
I entered the condition into Pilgrim's corrective action program and have already had Document Control correct the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's version was correct - it was the version on the CD I sent you that was incorrect.
Recipients    "Perry Buckberg" <PHB1@nrc.gov>
: Thanks, Ed Sanchez Pilgrim Licensing
 
Post Office        Route  TWGWPO03.HQGWDO01      nrc.gov 
 
Files    Size      Date & Time MESSAGE    563      10/16/2007 10:01:26 AM Scan001.PDF    25948      11/6/2007 10:36:06 AM  Mime.822    38472      11/6/2007 10:36:06 AM 


Options  Priority:     Standard   Reply Requested:   No  Return Notification:    None      None 
Hearing IdentifierPilgrimRenewalNonPublic Email Number:         81 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000003.1.12FEF1.1)
 
Concealed


==Subject:==
==Subject:==
No  Security:     Standard 
Replacement page 3/4.2-17 Creation Date:        10/16/2007 10:01:26 AM From:                 "Sanchez, Edward" <esanch1@entergy.com>
 
Created By:          esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>
From: Perry Buckberg To:  "Steve Bethay" <sbethay@entergy.com> Date:   10/17/2007 8:07:51 AM
Post Office                                      Route TWGWPO03.HQGWDO01                                nrc.gov Files                        Size                Date & Time MESSAGE                      563                10/16/2007 10:01:26 AM Scan001.PDF                  25948              11/6/2007 10:36:06 AM Mime.822                      38472              11/6/2007 10:36:06 AM Options Priority:                    Standard Reply Requested:              No Return Notification:          None None Concealed


==Subject:==
==Subject:==
Pilgrim License Conditions cc:   "Edward Sanchez" <esanch1@entergy.com>,"James Kim" <JSK@nrc.gov>,"Louise Lund" <LXL@nrc.gov>,"Susan Uttal" <SLU@nrc.gov>
No Security:                     Standard
Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.


Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax:      (301)415-3031 phb1@nrc.gov
From:                Perry Buckberg To:                   "Steve Bethay" <sbethay@entergy.com>
 
Date:                10/17/2007 8:07:51 AM
G.        The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section. H.        The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. I.          All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.          J.        On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the inner surface of the RV, will not reach the limiting value of              3.37 x 1018 n/cm2 (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).
Hearing Identifier: PilgrimRenewalNonPublic Email Number: 85  Mail Envelope Properties  (47304396.HQGWDO01.TWGWPO03.200.2000009.1.143A99.1) 


==Subject:==
==Subject:==
Pilgrim License Conditions Creation Date:   10/17/2007 8:07:51 AM From:    Perry Buckberg Created By:  PHB1@nrc.gov
Pilgrim License Conditions cc:                   "Edward Sanchez" <esanch1@entergy.com>,"James Kim"
 
<JSK@nrc.gov>,"Louise Lund" <LXL@nrc.gov>,"Susan Uttal" <SLU@nrc.gov>
Recipients    "Edward Sanchez" <esanch1@entergy.com> "James Kim" <JSK@nrc.gov> "Louise Lund" <LXL@nrc.gov>
: Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.
"Susan Uttal" <SLU@nrc.gov> "Steve Bethay" <sbethay@entergy.com>
: Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax:    (301)415-3031 phb1@nrc.gov G.     The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section. H.          The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. I.      All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.                J. On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the inner surface of the RV, will not reach the limiting value of            3.37 x 1018 n/cm2 (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).
Post Office        Route  TWGWPO03.HQGWDO01      nrc.gov Files    Size      Date & Time MESSAGE    2345     10/17/2007 8:07:51 AM  TEXT.htm    5087      11/6/2007 10:36:06 AM 
 
Options  Priority:    Standard  Reply Requested:    No  Return Notification:    None      None 


Concealed
Hearing Identifier:    PilgrimRenewalNonPublic Email Number:          85 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000009.1.143A99.1)


==Subject:==
==Subject:==
No  Security:    Standard Steve,  Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.
Pilgrim License Conditions Creation Date:        10/17/2007 8:07:51 AM From:                 Perry Buckberg Created By:            PHB1@nrc.gov Recipients "Edward Sanchez" <esanch1@entergy.com>
Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax:     (301)415-3031 phb1@nrc.gov G.        The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included i n the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prio r Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
"James Kim" <JSK@nrc.gov>
H.        The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
"Louise Lund" <LXL@nrc.gov>
I.          All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
"Susan Uttal" <SLU@nrc.gov>
J.         On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that            will confirm that the neutron fluence for the lower intermediate shell axial welds, a t the inner surface of the RV, will not reach the limiting value of              3.37 x 10 18 n/cm 2 (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).
"Steve Bethay" <sbethay@entergy.com>
Pa ge 1of 1 11/6/2007file://c:\EMailCa pture\Pil g rimRenewalNonPub lic\85\attch1.htm From: "Sanchez, Edward" <esanch1@entergy.com>
Post Office                                      Route TWGWPO03.HQGWDO01                                nrc.gov Files                          Size              Date & Time MESSAGE                        2345              10/17/2007 8:07:51 AM TEXT.htm                      5087              11/6/2007 10:36:06 AM Options Priority:                      Standard Reply Requested:              No Return Notification:          None None Concealed
To:  "Perry Buckberg" <PHB1@nrc.gov>,"James Kim" <JSK@nrc.gov> Date10/17/2007 10:52:59 AM


==Subject:==
==Subject:==
Resolution of discrepancy between NRC and Entergy controlled  versions of Pilgrim Tech Specs 
No Security:                      Standard


Perry and Jim, Pilgrim TS Section 3/4.4 Standby Liquid Control System was amended by License Amendment 169, which over hauled and consolidated the section resulting in pages 3/4.4-3, 3/4.4-4, and 3/4.4-5 bei ng removed. That is why there are only TS pages 3/4.4-1 and 3/4.4-2 for that section. Also note that License Amendment 170 later made a change to a portion of TS page 3/4.4-1. Therefore last amendment affecti ng page 3/4.4-1 is LA 170 and last amendment affecti ng page 3/4.4-2 is LA 169.
Page 1 of 1 Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.
Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax:    (301)415-3031 phb1@nrc.gov G.      The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.
H.      The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.
I.       All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.
J.      On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that         will confirm that the neutron fluence for the lower intermediate shell axial welds, at the 18    2 inner surface of the RV, will not reach the limiting value of           3.37 x 10    n/cm (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).
file://c:\EMailCapture\PilgrimRenewalNonPublic\85\attch1.htm                                                                11/6/2007


Pilgrim TS Section 3/4.8 and TS Section 7/8 were amended by License Amendmat 177. LA 177 relocated TS pages 3/4.8-3 through 20 and Section 7/8 pages 1-17 to the Pilgrim O ffsite Dose Calculation Manual.
From:          "Sanchez, Edward" <esanch1@entergy.com>
To:            "Perry Buckberg" <PHB1@nrc.gov>,"James Kim" <JSK@nrc.gov>
Date:          10/17/2007 10:52:59 AM


Therefore, with respect to theses sections I am confident that the CD I sent you containing the Pilgrim controlled copy of Tech Specs is  
==Subject:==
 
Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Perry and Jim, Pilgrim TS Section 3/4.4 Standby Liquid Control System was amended by License Amendment 169, which overhauled and consolidated the section resulting in pages 3/4.4-3, 3/4.4-4, and 3/4.4-5 being removed. That is why there are only TS pages 3/4.4-1 and 3/4.4-2 for that section. Also note that License Amendment 170 later made a change to a portion of TS page 3/4.4-1. Therefore last amendment affecting page 3/4.4-1 is LA 170 and last amendment affecting page 3/4.4-2 is LA 169.
correct.  
Pilgrim TS Section 3/4.8 and TS Section 7/8 were amended by License Amendmat 177. LA 177 relocated TS pages 3/4.8-3 through 20 and Section 7/8 pages 1-17 to the Pilgrim Offsite Dose Calculation Manual.
 
Therefore, with respect to theses sections I am confident that the CD I sent you containing the Pilgrim controlled copy of Tech Specs is correct.
Please let me know if you need additional information.  
Please let me know if you need additional information.
 
Ed Sanchez Pilgrim Licensing
Ed Sanchez Pilgrim Licensing  
-----Original Message-----
 
From: Sanchez, Edward Sent: Tuesday, October 16, 2007 10:01 AM To: 'Perry Buckberg'
-----Original Message-----  
 
From: Sanchez, Edward
 
Sent: Tuesday, October 16, 2007 10:01 AM  
 
To: 'Perry Buckberg'  


==Subject:==
==Subject:==
Replacement page 3/4.2-17
Replacement page 3/4.2-17
: Perry,  
: Perry, Pilgrim inadvertently issued an incorrect page 3/4.2-17 into our controlled Tech Specs when they were updated for License Amendment 200.
I entered the condition into Pilgrim's corrective action program and have already had Document Control correct the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's
 
version was correct - it was the version on the CD I sent you that was incorrect.
: Thanks, Ed Sanchez Pilgrim Licensing


Pilgrim inadvertently issued an in correct page 3/4.2-17 into our controlled Tech Specs when they we re updated for License Amendment 200. I entered the condition into Pilgri m's corrective action program and have already had Document Control co rrect the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's version was correct - it was the ve rsion on the CD I sent you that was incorrect.
Hearing Identifier:     PilgrimRenewalNonPublic Email Number:           82 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000002.1.F2037.1)
: Thanks, Ed Sanchez Pilgrim Licensing Hearing Identifier: PilgrimRenewalNonPublic Email Number: 82   Mail Envelope Properties   (47304396.HQGWDO01.TWGWPO03.200.2000002.1.F2037.1)


==Subject:==
==Subject:==
Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Creation Date:   10/17/2007 10:52:59 AM From:   "Sanchez, Edward" <esanch1@entergy.com>  
Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Creation Date:         10/17/2007 10:52:59 AM From:                   "Sanchez, Edward" <esanch1@entergy.com>
 
Created By:             esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>
Created By:   esanch1@entergy.com Recipients     "Perry Buckberg" <PHB1@nrc.gov> "James Kim" <JSK@nrc.gov>  
"James Kim" <JSK@nrc.gov>
 
Post Office                                             Route TWGWPO03.HQGWDO01                                       nrc.gov Files                           Size                   Date & Time MESSAGE                         1679                   10/17/2007 10:52:59 AM Mime.822                       3962                   11/6/2007 10:36:06 AM Options Priority:                       Standard Reply Requested:               No Return Notification:           None None Concealed  
Post Office       Route TWGWPO03.HQGWDO01       nrc.gov
 
Files     Size     Date & Time MESSAGE   1679     10/17/2007 10:52:59 AM Mime.822   3962     11/6/2007 10:36:06 AM Options Priority:     Standard   Reply Requested:   No   Return Notification:   None     None Concealed  


==Subject:==
==Subject:==
No Security:     Standard UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARDIn the Matter of)
No Security:                       Standard
)ENTERGY NUCLEAR OPERATIONS, INC.    )Docket No. 50-293-LR
          )
(Pilgrim Nuclear Power Station) )ASLBP No. 06-848-02-LR
)    CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that
 
the hearing file and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S.
 
Nuclear Regulatory Commission's internal mail system as indicated by a single asterisk(*), or by
 
deposit in the U.S. mail system, as indicated by a double asterisk (**) this 8 th day of November, 2007.Administrative Judge*
Richard F. Cole
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: rfc1@nrc.gov Administrative Judge*
Ann Marshall Young, Chair
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: amy@nrc.gov Sheila Slocum Hollis**
Duane Morris LLP
 
1667 K Street, NW, Suite 700
 
Washington, DC 20006
 
E-mail: sshollis@duanemorris.com Administrative Judge*
Paul B. Abramson
 
Atomic Safety and Licensing Board Panel
 
Mail Stop: T-3F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: pba@nrc.gov Office of Commission Appellate
* Adjudication
 
Mail Stop: O-16C1
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: OCAAMail@nrc.gov Office of the Secretary*
Attn: Rulemaking and Adjudications Staff
 
Mail Stop: O-16C1
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001
 
E-mail: hearingdocket@nrc.gov Atomic Safety and Licensing Board*
Mail Stop: T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 Mary Lampert**
Pilgrim Watch
 
148 Washington Street
 
Duxbury, MA 02332
 
E-mail: mary.lampert@comcast.net Chief Kevin M. Nord**
Fire Chief & Director Duxbury Emergency   
 
Management Agency
 
668 Tremont Street
 
Duxbury, MA 02332
 
E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.**
Entergy Nuclear
 
1340 Echelon Parkway
 
Mail Stop: M-ECH-62
 
Jackson, MS 39213 David R. Lewis, Esq.**
Paul A. Gaukler, Esq.
 
Pillsbury, Winthrop, Shaw, Pittman, LLP
 
2300 N Street, NW
 
Washington, DC 20037-1137
 
E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager**
Town of Plymouth
 
11 Lincoln St.


Plymouth, MA 02360
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of                                    )
                                                    )
ENTERGY NUCLEAR OPERATIONS, INC.                    )            Docket No. 50-293-LR
                                                    )
(Pilgrim Nuclear Power Station)                    )            ASLBP No. 06-848-02-LR
                                                    )
CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S.
Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 8th day of November, 2007.
Administrative Judge*                                  Administrative Judge*
Richard F. Cole                                        Paul B. Abramson Atomic Safety and Licensing Board Panel                Atomic Safety and Licensing Board Panel Mail Stop: T-3F23                                      Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission                      U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                              Washington, DC 20555-0001 E-mail: rfc1@nrc.gov                                    E-mail: pba@nrc.gov Administrative Judge*                                  Office of Commission Appellate
* Ann Marshall Young, Chair                              Adjudication Atomic Safety and Licensing Board Panel                Mail Stop: O-16C1 Mail Stop: T-3F23                                      U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission                      Washington, DC 20555-0001 Washington, DC 20555-0001                              E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*
Sheila Slocum Hollis**                                  Attn: Rulemaking and Adjudications Staff Duane Morris LLP                                        Mail Stop: O-16C1 1667 K Street, NW, Suite 700                            U.S. Nuclear Regulatory Commission Washington, DC 20006                                    Washington, DC 20555-0001 E-mail: sshollis@duanemorris.com                        E-mail: hearingdocket@nrc.gov


E-mail: msylvia@townhall.plymouth.ma.us
Atomic Safety and Licensing Board*      Terence A. Burke, Esq.**
/RA/
Mail Stop: T-3 F23                      Entergy Nuclear U.S. Nuclear Regulatory Commission      1340 Echelon Parkway Washington, DC 20555-0001              Mail Stop: M-ECH-62 Jackson, MS 39213 Mary Lampert**
Pilgrim Watch                          David R. Lewis, Esq.**
148 Washington Street                  Paul A. Gaukler, Esq.
Duxbury, MA 02332                      Pillsbury, Winthrop, Shaw, Pittman, LLP E-mail: mary.lampert@comcast.net        2300 N Street, NW Washington, DC 20037-1137 Chief Kevin M. Nord**                  E-mail: david.lewis@pillsburylaw.com Fire Chief & Director Duxbury Emergency        paul.gaukler@pillsburylaw.com Management Agency 668 Tremont Street                      Town Manager**
Duxbury, MA 02332                      Town of Plymouth E-mail: nord@town.duxbury.ma.us        11 Lincoln St.
Fax: 781-934-6530                      Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us
                                        /RA/
Kimberly A. Sexton Counsel for the NRC Staff}}
Kimberly A. Sexton Counsel for the NRC Staff}}

Revision as of 01:49, 23 November 2019

2007/11/08 - Pilgrim - Hearing File Update Supplement 15
ML073130042
Person / Time
Site: Pilgrim
Issue date: 11/08/2007
From: Sexton K
NRC/OGC
To: Abramson P, Cole R, Austin Young
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-293-LR, ASLBP 06-848-02-LR, RAS 14638
Download: ML073130042 (15)


Text

November 8, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.

(Pilgrim Nuclear Power Station)

Docket No. 50-293-LR; ASLBP No. 06-848-02-LR

Dear Administrative Judges:

The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff has no updates to its privilege log required by 10 C.F.R. § 2.336(b)(5) at this time; however, the Staff is continuing to preserve and maintain all privileged documents during the pendency of this proceeding. Also attached

R. Cole P. Abramson A. Young are the Affidavit of Perry Buckberg, as required by 10 C.F.R. § 2.336(c), and the three documents contained in the hearing file, due to technical issues associated with ability of the public to access ADAMS.

Sincerely,

/RA/

Kimberly A. Sexton Counsel for the NRC Staff

Enclosures:

Hearing File Index Affidavit of Perry Buckberg 2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs cc: Attached Service List

ATTACHMENT 1: PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 15- November 8, 2007 Accession Number Document Date Title/Description:

15-01 ML073100225 10/16/2007 2007/10/16 Pilgrim Renewal Hearing - Replacement page 3/4.2-17 15-02 ML073100229 10/17/2007 2007/10/17 Pilgrim Renewal Hearing - Pilgrim License Conditions 15-03 ML073100226 10/17/2007 2007/10/17 Pilgrim Renewal Hearing - Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs

November 8, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR GENERATION ) Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR )

OPERATIONS, INC. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

AFFIDAVIT OF PERRY BUCKBERG CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)

I, Perry Buckberg, do hereby state as follows:

1. I am employed as a Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I serve as a project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2. I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3. I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.

/Original Signed By/

______________________

Perry Buckberg Executed in Rockville, MD this 8th day of November, 2007

From: "Sanchez, Edward" <esanch1@entergy.com>

To: "Perry Buckberg" <PHB1@nrc.gov>

Date: 10/16/2007 10:01:26 AM

Subject:

Replacement page 3/4.2-17

Perry, Pilgrim inadvertently issued an incorrect page 3/4.2-17 into our controlled Tech Specs when they were updated for License Amendment 200.

I entered the condition into Pilgrim's corrective action program and have already had Document Control correct the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's version was correct - it was the version on the CD I sent you that was incorrect.

Thanks, Ed Sanchez Pilgrim Licensing

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 81 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000003.1.12FEF1.1)

Subject:

Replacement page 3/4.2-17 Creation Date: 10/16/2007 10:01:26 AM From: "Sanchez, Edward" <esanch1@entergy.com>

Created By: esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 563 10/16/2007 10:01:26 AM Scan001.PDF 25948 11/6/2007 10:36:06 AM Mime.822 38472 11/6/2007 10:36:06 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

From: Perry Buckberg To: "Steve Bethay" <sbethay@entergy.com>

Date: 10/17/2007 8:07:51 AM

Subject:

Pilgrim License Conditions cc: "Edward Sanchez" <esanch1@entergy.com>,"James Kim"

<JSK@nrc.gov>,"Louise Lund" <LXL@nrc.gov>,"Susan Uttal" <SLU@nrc.gov>

Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.
Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phb1@nrc.gov G. The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section. H. The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection. I. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H. J. On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the inner surface of the RV, will not reach the limiting value of 3.37 x 1018 n/cm2 (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 85 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000009.1.143A99.1)

Subject:

Pilgrim License Conditions Creation Date: 10/17/2007 8:07:51 AM From: Perry Buckberg Created By: PHB1@nrc.gov Recipients "Edward Sanchez" <esanch1@entergy.com>

"James Kim" <JSK@nrc.gov>

"Louise Lund" <LXL@nrc.gov>

"Susan Uttal" <SLU@nrc.gov>

"Steve Bethay" <sbethay@entergy.com>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 2345 10/17/2007 8:07:51 AM TEXT.htm 5087 11/6/2007 10:36:06 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

Page 1 of 1 Steve, Below are the four Pilgrim License Renewal SER (June 28, 2007) license conditions as they will read in renewed Facility Operating License DPR-35. Please contact me if you have any comments on these license conditions.

Thanks, Perry Buckberg Project Manager Nuclear Regulatory Commission Division of License Renewal phone: (301)415-1383 fax: (301)415-3031 phb1@nrc.gov G. The Updated Safety Analysis Report supplement, as revised, submitted pursuant to 10 CFR 54.21(d), shall be included in the next scheduled update to the Updated Safety Analysis Report required by 10 CFR 50.71(e)(4) following the issuance of this renewed operating license. Until that update is complete, ENO may make changes to the programs and activities described in the supplement without prior Commission approval, provided that ENO evaluates such changes pursuant to the criteria set forth in 10 CFR 50.59 and otherwise complies with the requirements in that section.

H. The Updated Final Safety Analysis Report supplement, as revised, describes certain future activities to be completed prior to the period of extended operation. Entergy Nuclear Operations, Inc., shall complete these activities no later than June 8, 2012, and shall notify the NRC in writing when implementation of these activities is complete and can be verified by NRC inspection.

I. All capsules in the reactor vessel that are removed and tested must meet the test procedures and reporting requirements of the most recent NRC-approved version of the Boiling Water Reactor Vessels and Internals Project (BWRVIP) Integrated Surveillance Program (ISP) appropriate for the configuration of the specimens in the capsule. All capsules placed in storage must be maintained for future insertion. Any changes to storage requirements must be approved by the NRC, as required by 10 CFR Part 50, Appendix H.

J. On or before June 8, 2010, the applicant will submit to the NRC correctly benchmarked RV neutron fluence calculations, consistent with RG 1.190, that will confirm that the neutron fluence for the lower intermediate shell axial welds, at the 18 2 inner surface of the RV, will not reach the limiting value of 3.37 x 10 n/cm (E > 1.0 MeV) by the end of the period of extended operation (54 EFPY).

file://c:\EMailCapture\PilgrimRenewalNonPublic\85\attch1.htm 11/6/2007

From: "Sanchez, Edward" <esanch1@entergy.com>

To: "Perry Buckberg" <PHB1@nrc.gov>,"James Kim" <JSK@nrc.gov>

Date: 10/17/2007 10:52:59 AM

Subject:

Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Perry and Jim, Pilgrim TS Section 3/4.4 Standby Liquid Control System was amended by License Amendment 169, which overhauled and consolidated the section resulting in pages 3/4.4-3, 3/4.4-4, and 3/4.4-5 being removed. That is why there are only TS pages 3/4.4-1 and 3/4.4-2 for that section. Also note that License Amendment 170 later made a change to a portion of TS page 3/4.4-1. Therefore last amendment affecting page 3/4.4-1 is LA 170 and last amendment affecting page 3/4.4-2 is LA 169.

Pilgrim TS Section 3/4.8 and TS Section 7/8 were amended by License Amendmat 177. LA 177 relocated TS pages 3/4.8-3 through 20 and Section 7/8 pages 1-17 to the Pilgrim Offsite Dose Calculation Manual.

Therefore, with respect to theses sections I am confident that the CD I sent you containing the Pilgrim controlled copy of Tech Specs is correct.

Please let me know if you need additional information.

Ed Sanchez Pilgrim Licensing


Original Message-----

From: Sanchez, Edward Sent: Tuesday, October 16, 2007 10:01 AM To: 'Perry Buckberg'

Subject:

Replacement page 3/4.2-17

Perry, Pilgrim inadvertently issued an incorrect page 3/4.2-17 into our controlled Tech Specs when they were updated for License Amendment 200.

I entered the condition into Pilgrim's corrective action program and have already had Document Control correct the controlled copy with the correct page which is attached. Please use the attached page for the controlled copy you are working with. I believe you told me the NRC's

version was correct - it was the version on the CD I sent you that was incorrect.

Thanks, Ed Sanchez Pilgrim Licensing

Hearing Identifier: PilgrimRenewalNonPublic Email Number: 82 Mail Envelope Properties (47304396.HQGWDO01.TWGWPO03.200.2000002.1.F2037.1)

Subject:

Resolution of discrepancy between NRC and Entergy controlled versions of Pilgrim Tech Specs Creation Date: 10/17/2007 10:52:59 AM From: "Sanchez, Edward" <esanch1@entergy.com>

Created By: esanch1@entergy.com Recipients "Perry Buckberg" <PHB1@nrc.gov>

"James Kim" <JSK@nrc.gov>

Post Office Route TWGWPO03.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 1679 10/17/2007 10:52:59 AM Mime.822 3962 11/6/2007 10:36:06 AM Options Priority: Standard Reply Requested: No Return Notification: None None Concealed

Subject:

No Security: Standard

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of )

)

ENTERGY NUCLEAR OPERATIONS, INC. ) Docket No. 50-293-LR

)

(Pilgrim Nuclear Power Station) ) ASLBP No. 06-848-02-LR

)

CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S.

Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 8th day of November, 2007.

Administrative Judge* Administrative Judge*

Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: rfc1@nrc.gov E-mail: pba@nrc.gov Administrative Judge* Office of Commission Appellate

  • Ann Marshall Young, Chair Adjudication Atomic Safety and Licensing Board Panel Mail Stop: O-16C1 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov E-mail: amy@nrc.gov Office of the Secretary*

Sheila Slocum Hollis** Attn: Rulemaking and Adjudications Staff Duane Morris LLP Mail Stop: O-16C1 1667 K Street, NW, Suite 700 U.S. Nuclear Regulatory Commission Washington, DC 20006 Washington, DC 20555-0001 E-mail: sshollis@duanemorris.com E-mail: hearingdocket@nrc.gov

Atomic Safety and Licensing Board* Terence A. Burke, Esq.**

Mail Stop: T-3 F23 Entergy Nuclear U.S. Nuclear Regulatory Commission 1340 Echelon Parkway Washington, DC 20555-0001 Mail Stop: M-ECH-62 Jackson, MS 39213 Mary Lampert**

Pilgrim Watch David R. Lewis, Esq.**

148 Washington Street Paul A. Gaukler, Esq.

Duxbury, MA 02332 Pillsbury, Winthrop, Shaw, Pittman, LLP E-mail: mary.lampert@comcast.net 2300 N Street, NW Washington, DC 20037-1137 Chief Kevin M. Nord** E-mail: david.lewis@pillsburylaw.com Fire Chief & Director Duxbury Emergency paul.gaukler@pillsburylaw.com Management Agency 668 Tremont Street Town Manager**

Duxbury, MA 02332 Town of Plymouth E-mail: nord@town.duxbury.ma.us 11 Lincoln St.

Fax: 781-934-6530 Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us

/RA/

Kimberly A. Sexton Counsel for the NRC Staff