August 17, 2007 Administrative Judge Administrative Judge Richard F. Cole Paul B. Abramson Atomic Safety and Licensing Board Panel Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 Administrative Judge Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 In the Matter of Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc.
(Pilgrim Nuclear Power Station)
Docket No. 50-293-LR; ASLBP No. 06-848-02-LR
Dear Administrative Judges:
The NRC Staff hereby provides its notice that it has updated the hearing file for this proceeding pursuant to 10 C.F.R. § 2.336(d) as modified by the Board's Order Regarding Schedule for Proceeding and Related Matters (November 29, 2006). An index containing the ADAMS accession number, date, and title or description of each item in the hearing file is appended hereto as Attachment 1. The Staff is also producing, as Attachment 2, updates to its privilege logs as required by 10 C.F.R. § 2.336(b)(5), and is continuing to preserve and maintain all privileged documents during the pendency of this
R. Cole P. Abramson A. Young proceeding. Also attached are the Affidavit of David Wrona, as required by 10 C.F.R.
§ 2.336(c), and the Declaration of Pao-Tsin Kuo, Director of the Division of License Renewal, formally invoking the deliberative process privilege.
Sincerely,
/RA/
Andrea L. Silvia Counsel for the NRC Staff
Enclosures:
Hearing File Index Privilege Log - Deliberative Process Affidavit of David Wrona Declaration of Pao-Tsin Kuo cc:
Attached Service List
ATTACHMENT 1:
PILGRIM LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES HEARING FILE INDEX Supplement 9 - August 17, 2007 Accession Number Document Date Title/Description:
09-01 ML072060320 Final Supplement 29 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station.
09-02 ML072060399 Notice of Availability of the Final Plant-Specific Supplement 29 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Pilgrim Nuclear Power Station (TAC No. MC9676).
09-03 ML072150602 7/30/2007 E-MAIL: Pilgrim LRA Amendment 19 - 7/30/2007.
09-04 ML072150600 7/30/2007 E-MAIL: Pilgrim LRA Amendment 19.
ATTACHMENT 2: PILGRIM NUCLEAR POWER STATION LICENSE RENEWAL HEARING FILE AND MANDATORY DISCLOSURES PRIVILEGE LOG - DELIBERATIVE PROCESS PRIVILEGE Supplement 9: August 17, 2007 Certain documents otherwise subject to inclusion in the hearing file and mandatory disclosures for this proceeding have been determined by the NRC Staff to contain information subject to withholding from public disclosure as predecisional, deliberative information. Pursuant to 10 C.F.R. § 2.336(b)(5), the Staff is providing this log to identify the following documents, withheld under the deliberative process privilege.
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count 09-01 ML072150605 Medoff J, NRC/NRR/
ADRO/DLR E-MAIL: ACTION:
Generic Fracture Toughness Issues with the Pilgrim, VY, and FitzPatrick LRAs.
5/9/2007 E-Mail Buckberg P H, Howard K, Le N B, Rowley J G, NRC Internal discussion of SER 3
09-02 ML072270371 Williamson A R, NRC/NRO/
DSER E-MAIL: EPA and Bald Eagle Info.
7/2/2007 E-Mail Emch R L, Muir J M, NRC/NRR/ADR O/DLR/REBA Draft input to FSEIS 2
09-03 ML072010142 Palla R L, NRC/NRR/
ADES/DRA E-MAIL: FSEIS Insert Based on Sandia Summary Assessment.
7/3/2007 E-Mail Bixler N, Greene N A, Jones J A, Mitchell J A, Moody R E, Rikhoff J J, NRC, Sandia National Labs (SNL)
Draft input to FSEIS 13
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count 09-04 ML072010140 Greene N A,
NRC/NRR/
ADES/DRA/
ADB E-MAIL: Re:
FSEIS Insert based on Sandia Summary Assessment.
7/3/2007 E-Mail Palla R L, NRC/NRR/ADE S/DRA Draft input to FSEIS 14 09-05 ML072000491 Palla R L, NRC/NRR E-MAIL: Input to FSEIS Re: SAMA.
7/5/2007 E-Mail Greene N A, Mitchell J A, Moody R E, Rikhoff J J, Uttal S L, NRC, Sandia National Labs (SNL)
Draft input to FSEIS 11 09-06 ML072010137 Jones J A, Sandia National Labs (SNL)
E-MAIL: FEIS 7/5/2007 E-Mail Palla R L, NRC/NRR Draft input to FSEIS 13 09-07 ML072010138 Palla R L, NRC/NRR/
ADES/DRA E-MAIL: Fwd: Re:
FSEIS Insert based on Sandia Summary Assessment.
7/5/2007 E-Mail Mitchell J A, NRC/RES/DRA SP/DDNRCA Draft input to FSEIS 14 09-08 ML072150604 Mitchell J A, NRC/RES E-MAIL: Fwd:
Water Zo Value!
7/5/2007 E-Mail Palla R L, NRC/NRR Draft input to FSEIS 4
PDP No.
Accession Number Author Name/
Affiliation:
Title/Description:
Document Date Document Type Addressee /
Addressee Affiliation Comment Page Count 09-09 ML072000492 Bixler N E, Sandia National Labs (SNL)
E-mail: Re: Input to FSEIS Re:
SAMA.
7/6/2007 E-Mail Greene N A, Mitchell J A, Moody R E, Palla R L, Rikhoff J J, Uttal S L, NRC Draft input to FSEIS 11 09-10 ML072150569 Chang K C, NRC/NRR/
ADRO/DLR/
RLRA E-MAIL: Fwd: Past Precedents for License Renewal.
7/12/2007 E-Mail Davis J A, Hsu K R, Kuo P T, Lee S S, Mathew R K, Medoff J, Wen P C, NRC Internal discussion of SERs 4
09-11 ML072270373 Williamson A R, NRC/NRO/
DSER E-MAIL: Pilgrim Final SEIS.
7/23/2007 E-Mail McIntyre D T, NRC/OPA Draft Federal Register notice 4
09-12 ML072270370 Palla R L, NRC/NRR/
ADRA/DRA/
APLA E-MAIL: Fwd:
Pilgrim Final SEIS.
7/30/2007 E-Mail Greene N A, Mitchell J A, Moody R E, Rikhoff J J, NRC/NRR/ADR O/DLR/REBB, NRC/NSIR/DP R/DDEP/RIOB, NRC/RES/DRA SP/NRCA Internal discussion of FSEIS 3
August 16, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
AFFIDAVIT OF DAVID WRONA CONCERNING MANDATORY DISCLOSURE REQUIREMENT OF 10 C.F.R. § 2.336(c)
I, David Wrona, do hereby state as follows:
1.
I am employed as a Senior Project Manager in the Division of License Renewal in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation. I am serving as acting project manager for the Pilgrim Nuclear Power Stations license renewal application (LRA).
2.
I hereby certify that all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336 (b) and (c) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of the date of this certification.
3.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
David Wrona Executed in Rockville, MD this 16th day of August, 2007
August 17, 2007 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR GENERATION
)
Docket No. 50-293-LR COMPANY AND ENTERGY NUCLEAR
)
OPERATIONS, INC.
)
ASLBP No. 06-848-02-LR
)
(Pilgrim Nuclear Power Station)
)
DECLARATION OF PAO-TSIN KUO I, Pao-Tsin Kuo, do hereby state as follows:
- 1.
I am employed as the Director of the Division of Licensing Renewal (DLR) in the Nuclear Regulatory Commissions (NRC) Office of Nuclear Reactor Regulation (NRR). My supervisory responsibilities include oversight of the NRC Staffs review and evaluation of the Pilgrim Nuclear Power Station license renewal application.
- 2.
As part of their responsibilities in preparing the hearing file and mandatory disclosures for these proceedings, NRC staff members under my supervision identified several documents as privileged because they contained information concerning the Staffs deliberative process. Those documents are listed in Attachment 2 to the August 17, 2007, submission of the Staffs Hearing File.
- 3.
I have personally reviewed the documents identified as privileged in Attachment 2, and have determined, in accordance with the guidance set forth in Management Directive 3.4, that they contain predecisional information concerning the Staffs review of the license renewal application. All documents contain either the Staffs analyses, recommendations, opinions, or evaluations, and may not necessarily reflect the final agency position with respect to the matters discussed therein. Each of the documents comprises part of the deliberative process necessary to the Staffs review of the pending license renewal application.
- 4.
Further, I have determined that disclosure of these documents could result in harm to the agency, in that it would (a) prematurely disclose the preliminary views of individual Staff members and/or the Staff prior to reaching a final agency decision, and could thus create confusion as to the actual policy or views of the NRC Staff; (b) hinder the efficiency of the Staff, in that forced disclosure of its internal discussions on an unresolved issue would tend to chill all future deliberations and would interfere with the Staffs ability to engage in a free exchange of opinions and analyses prior to publishing its final review documents; and (c) imply or suggest incorrectly that the opinions of the Staff members involved in these communications are actually the final decisions of the agency, while no such final decision has yet been made.
- 5.
Accordingly, I formally invoke the deliberative process privilege with respect to each of the documents listed in Attachment 2 to the August 17, 2007 submission of the Hearing File Supplement 9.
- 6.
I declare under penalty of perjury that the foregoing is true and correct to the best of my knowledge, information and belief.
/Original Signed By/
Pao-Tsin Kuo Executed in Rockville, MD this 17th day of August, 2007
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of
)
)
ENTERGY NUCLEAR OPERATIONS, INC. )
Docket No. 50-293-LR
)
(Pilgrim Nuclear Power Station)
)
ASLBP No. 06-848-02-LR
)
CERTIFICATE OF SERVICE I hereby certify that copies of the letter notifying the administrative judges and the parties that the hearing file and mandatory disclosures, privilege log, accompanying declaration, and affidavit in the above-captioned proceeding have been served on the following by electronic mail and deposit in the U.S. Mail Service or by deposit in the U.S. Nuclear Regulatory Commissions internal mail system as indicated by a single asterisk(*), or by deposit in the U.S. mail system, as indicated by a double asterisk (**) this 17th day of August 2007.
Administrative Judge*
Richard F. Cole Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: rfc1@nrc.gov Administrative Judge*
Ann Marshall Young, Chair Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: amy@nrc.gov Sheila Slocum Hollis**
Duane Morris LLP 1667 K Street, NW, Suite 700 Washington, DC 20006 E-mail: sshollis@duanemorris.com Administrative Judge*
Paul B. Abramson Atomic Safety and Licensing Board Panel Mail Stop: T-3F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: pba@nrc.gov Office of Commission Appellate
- Adjudication Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: OCAAMail@nrc.gov Office of the Secretary*
Attn: Rulemaking and Adjudications Staff Mail Stop: O-16C1 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 E-mail: hearingdocket@nrc.gov Atomic Safety and Licensing Board*
Mail Stop: T-3 F23 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Mary Lampert**
Pilgrim Watch 148 Washington Street Duxbury, MA 02332 E-mail: mary.lampert@comcast.net Chief Kevin M. Nord**
Fire Chief & Director Duxbury Emergency Management Agency 668 Tremont Street Duxbury, MA 02332 E-mail: nord@town.duxbury.ma.us Fax: 781-934-6530 Terence A. Burke, Esq.**
Entergy Nuclear 1340 Echelon Parkway Mail Stop: M-ECH-62 Jackson, MS 39213 David R. Lewis, Esq.**
Paul A. Gaukler, Esq.
Pillsbury, Winthrop, Shaw, Pittman, LLP 2300 N Street, NW Washington, DC 20037-1137 E-mail: david.lewis@pillsburylaw.com paul.gaukler@pillsburylaw.com Town Manager**
Town of Plymouth 11 Lincoln St.
Plymouth, MA 02360 E-mail: msylvia@townhall.plymouth.ma.us
/RA/