ML110900537: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 1 10/29/2007 07-0436B ML073100354NoneNone An updated description of the station blackout
{{#Wiki_filter:Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                                   Page 1 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                              H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal     3 - NRC TAC No.         4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                               Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility                                                        No ML#,
10/29/2007                                                                                                                                                                                                                     USAR Quality Assurance Program complete                                      LC000111 since no 07-0436B                                                                                                                                                                                                                       8.2.4.3, 1                                        None                None                      Description, will be          4/18/2008;                                ,        separate                                LI*                                                          none                                  Yes                                NA                              NA ML073100354                                                                                                                                                                                                                    8.2.4.12, 8.2 incorporated into the KPS    NC                                        LA000697 response to Reference Updated Safety Analysis                                                          the NRC Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).


alternate alternating current
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                        Page 2 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be                                                        LC000142 developed for installation of                                              ,
nonwelded valves with end                                                  LA000741 connections other than                                                    ("LA flanges that address                                                      type"soluti operating experience of                                                    on was 11/9/07                                          NRC Information Notices 92-                                                incorrect.                                                                    Maintenance Letter of 2/25/08                                                                                        no response 07-0416A                                          15, 84-55 and 84-55,          complete                                    Data entry                                                                    Procedure 2                                        MD6144 granting relief,                                                                                        to the NRC LI*                                                                None                                              Yes                                NA                              NA ML073106750                                      Supplement 1. The specific 1/2/2008; NC                                    was                                                                            MA-KW-GMP-ML080240029                                                                                              required provisions include: a) not                                                performed                                                                      103 mixing the parts from one                                                  by manufacturer to another, b)                                                inexperien following manufacturer's                                                  ced recommended instructions                                                  person -
for installing compression                                                self fittings, and c) the training                                              corrected) or familiarity with the procedure(s) for personnel doing this work.


source, including the quality
3                          1 - Audit Sample No.
11/9/07 07-0352                          2 - DEK Submittal ML073170705 Amend. No.                      3 - NRC TAC No.
MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB)                5 - Summary of Commitment crane to make it single-failure proof are complete A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
LC000141 Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data complete B - KPS Tracking #
                  ,        Note 03-C            LC#,, CAP#
6/12/08; NC C - If closed, then KPS LA000133                  closeout information LI*                    D - Governed by KPS process document # (See Note LI*)
CA069210 says to                                    E - Affected implementing update                                            document procedure    None GNP-08.12.02 plus tags.
F - Affected change document Yes- it was timely                              G - Closed RgCm implemented since it accomplis NA                            in timely manner (Yes / No / NA) hed a design change.                                  H - Open RgCm is adequately Maintained (Yes / No / NA)
NA I - Changed RgCm is adequately managed (Yes / No / NA)
Page 3


assurance program
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                          Page 4 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:
* Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in Attachment 5 to this license                      Addressed in                                                                                                                                                              Yes.
amendment request (LAR).                          TRM [a                                                                                                                                                                    Completio 11/9/07                        Amend. No.                                                              LC000141 licensee                                                                                            TRM 3.8.1,                                                          n took Complete 4                07-0352                  MD7300 200, 11/20/08,
* Lifting devices not                    ,        controlled  LI*                                                                                    Rev 0,                        none                                  place    NA                                                        NA 1/16/09; NC ML073170705                    ML082971079                    specially designed will meet            LA000135 document                                                                                            1/15/09.                                                            within 60 the guidance in NUREG-                            kdf] See                                                                                                                                                                  days, as 0612, Section 5.1.6(1)(b)                        Note 04-C                                                                                                                                                                planned.
and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.
* The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR
                                                                                      .
* Interfacing lift points will meet the guidance in NUREG-0612, Section


requirements for the TSC
5                                1 - Audit Sample No.
11/9/07 07-0352                                2 - DEK Submittal ML073170705 Amend. No.                              3 - NRC TAC No.
MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Crane operator training will 5 - Summary of Commitment complete meet the guidance in ASME 12/15/08 A - Action Completed (date)
B30.2-2005.                                Action in Prgress (no date)
Not Changed / Changed to what?
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data LC000141                                      B - KPS Tracking #
None to                                  LC#,, CAP#
      ,
NRC LA000736                                    C - If closed, then KPS closeout information LI*                          D - Governed by KPS process document # (See Note LI*)
Lesson Plan M-MD-LP 2.2.1                                          E - Affected implementing "Cranes"; M-                                            document None PM2-LP 1.9.1 "Crane Maintenance
/ Inspection" F - Affected change document Yes.
Lesson Plans had                                    G - Closed RgCm implemented guidance incorporat NA                                in timely manner (Yes / No / NA) ed in reference to this Amd's approval.                                      H - Open RgCm is adequately Maintained (Yes / No / NA)
NA I - Changed RgCm is adequately managed (Yes / No / NA)
Page 5


DG as defined in the
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                   Page 6 A - Action Completed (date)
 
G - Closed RgCm implemented                                       I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                   E - Affected implementing 1 - Audit Sample No.
Dominion Nuclear Facility
B - KPS Tracking #
 
2 - DEK Submittal     3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
Quality Assurance Program
LC#,, CAP#
 
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
Description, will be
Not Changed / Changed to what?
 
Yes.
incorporated into the KPS
During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s
 
TRM Bases concernin (TRM 3.8.1 11/9/07                                                        Crane maintenance and                                                                                                                                                                                                g B30.2 Amend. No.                                                                         LC000141                                                                                          pg 381-2) 07-0352                                                         inspections will meet the              complete            TRM Bases,                                                                                                                                              guidance.
Updated Safety Analysis
6                                        MD7300 200, 11/20/08,                                                                     ,                   LI*                                                                           USAR Rev22 None                                                         NA                                                       NA ML073170705                                                     guidance in ASME B30.2-                 1/16/09, NC         USAR                                                                                                                                                    REF CR ML082971079                                                                        LA000740                                                                                           Sec. 9, pp 1976.                                                                                                                                                                                                                337889.
 
9.5-9, -10 Revised (6/30 MA-KW-MPM-CRN-007 Rev.
Report (USAR) and
 
provided to the Nuclear
 
Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e)
.complete 4/18/2008;
 
NC LC000111 ,
LA000697 No ML#, since no separate response to
 
the NRC LI*USAR 8.2.4.3, 8.2.4.12, 8.2
 
ReferencenoneYesNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 21 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 2 11/9/07 07-0416A ML073106750 MD6144 Letter of 2/25/08 granting relief, ML080240029 Prior to use of nonwelded valves with end connections
 
other than flanges at KPS, procedures will be
 
developed for installation of
 
nonwelded valves with end
 
connections other than
 
flanges that address
 
operating experience of
 
NRC Information Notices 92
-15, 84-55 and 84-55, Supplement 1. The specific
 
provisions include: a) not
 
mixing the parts from one
 
manufacturer to another, b)
 
following manufacturer's
 
recommended instructions
 
for installing compression
 
fittings, and c) the training
 
or familiarity with the
 
procedure(s) for personnel
 
doing this work.
complete 1/2/2008; NC LC000142 ,
LA000741
("LA type"soluti
 
on was incorrect. 
 
Data entry
 
was performed
 
by inexperien
 
ced person -
self corrected) no response to the NRC
 
required LI*Maintenance Procedure
 
MA-KW-GMP-103NoneYesNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 31 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 3 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Notify the NRC when the modifications to the
 
Auxiliary Building (AB)
 
crane to make it single-
 
failure proof are complete complete 6/12/08; NC LC000141 ,
LA000133Note 03-CLI*
CA069210 says to update procedure
 
GNP-08.12.02 plus
 
tags.None Yes- it was timely
 
since it accomplis hed a design change.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 41 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 4 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 All heavy load lifts in or around the spent fuel pool
 
made using the upgraded
 
AB crane lifting system will
 
meet the guidance in
 
NUREG-0612, Section
 
5.1.6, as follows:
* Special lifting devices, as defined in American
 
National Standards
 
Institutes (ANSI) N14.6 will
 
meet the guidance in
 
NUREG-0612, Section
 
5.1.6(1 )(a) and ANSI N14.6
-1993, as clarified in to this license
 
amendment request (LAR).
* Lifting devices not specially designed will meet
 
the guidance in NUREG-
 
0612, Section 5.1.6(1)(b)
 
and American Society of
 
Mechanical Engineers (ASME) B30.9-2003, as
 
clarified in Attachment 5 to
 
this LAR.* The AB crane will meet the guidance in NUREG-
 
0612, Section 5.1.6(2) and
 
NUREG-0554 as clarified in
 
Attachments 5 and 6 to this
 
LAR
.
* Interfacing lift points will
 
meet the guidance in
 
NUREG-0612
, Section Complete 1/16/09; NC LC000141 ,
LA000135 Addressed in TRM [a licensee controlled
 
document kdf] See Note 04-C LI*TRM 3.8.1, Rev 0, 1/15/09.none Yes. Completio n took place within 60
 
days, as planned.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 51 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 5 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Crane operator training will meet the guidance in ASME
 
B30.2-2005.
complete 12/15/08 LC000141 ,
LA000736 None to NRC LI*Lesson Plan M-MD-LP 2.2.1 "Cranes"; M-
 
PM2-LP 1.9.1 "Crane Maintenance
 
/ Inspection" None Yes. Lesson Plans had
 
guidance incorporat
 
ed in reference
 
to this Amd's approval.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 61 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 6 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Crane maintenance and inspections will meet the
 
guidance in ASME B30.2-
 
1976.complete 1/16/09, NC LC000141 ,
LA000740 TRM Bases, USAR LI*TRM Bases (TRM 3.8.1
 
pg 381-2)
USAR Rev22
 
Sec. 9, pp  
 
9.5-9, -10  
 
(6/30 None Yes. During NRC ISFSI Inspection
 
(6/09) issues were identified
 
with crane
 
inspection
 
procedure s
concernin g B30.2 guidance.
 
REF CR 337889. 
 
Revised MA-KW-MPM-CRN-007 Rev.
2 and TEC-MA-KW-MPM-CRN-002 Rev
2 and TEC-MA-KW-MPM-CRN-002 Rev
: 3. ASME B30.2 is referenced  
: 3. ASME B30.2 is referenced in procedure s.
 
in procedure s.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 71 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 7 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 Revise USAR Section 9.5.2 to remove the dropped cask
 
analysis from the USAR.
complete 1/15/09: NC LC000141 ,
LA000737USARLI*USAR 14.2.1, 9.5 none Yes, implement ed in a timely manner.
Amd was issued 11/08 and
 
implement ed 1/09. 
 
Much work
 
took place
- USAR revision submitted
 
9/09 with
 
the next scheduled
 
update of
 
USAR being 3/31/10.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 81 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 8 11/9/07 07-0352 ML073170705 MD7300 Amend. No.
200, 11/20/08, ML082971079 After LAR approval and relocation of TS 3.8.a.7 to
 
the technical requirements
 
manual (TRM) is
 
authorized, add to the TRM
 
required actions to take if
 
the AB crane lifting system
 
is found not to meet the


TRM requirements during a  
7                                        1 - Audit Sample No.
11/9/07 07-0352                                            2 - DEK Submittal ML073170705 Amend. No.                                            3 - NRC TAC No.
MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Revise USAR Section 9.5.2              LC000141          5 - Summary of Commitment complete A - Action Completed (date)
Action in Prgress (no date)
Not Changed / Changed to what?
to remove the dropped cask            ,        USAR Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data 1/15/09: NC                      B - KPS Tracking #
LC#,, CAP#
C - If closed, then KPS analysis from the USAR.                LA000737 closeout information LI*                                  D - Governed by KPS process document # (See Note LI*)
E - Affected implementing USAR 14.2.1, document none 9.5 F - Affected change document
: Yes, implement ed in a timely manner.
Amd was issued 11/08 and                                                  G - Closed RgCm implemented implement ed 1/09.
Much work took place NA                                              in timely manner (Yes / No / NA)
- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10.                                                    H - Open RgCm is adequately Maintained (Yes / No / NA)
NA I - Changed RgCm is adequately managed (Yes / No / NA)
Page 7


heavy load lift.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                                    Page 8 A - Action Completed (date)
complete 1/16/09; NC LC000141 ,
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                              H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
LA000735 TRM LI*TRM, licensee controllednoneYesNANA 9 11/9/07 07-0465 ML073180499 MD7301 Letter of 5/9/08 (ML081150741),
B - KPS Tracking #
notice of
2 - DEK Submittal    3 - NRC TAC No.         4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                                Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
After LAR approval and relocation of TS 3.8.a.7 to the technical requirements 11/9/07                                                              manual (TRM) is Amend. No.                                                                    LC000141                                                                                                          TRM, 07-0352                                                              authorized, add to the TRM complete 8                                        MD7300 200, 11/20/08,                                                                ,        TRM                                                                        LI*                          licensee                        none                                  Yes                                  NA                              NA ML073170705                                                          required actions to take if 1/16/09; NC ML082971079                                                                  LA000735                                                                                                         controlled the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.
None to NC, design NRC; Design change change recorded as DEK will complete required                        DCR3629                                                                                                                                                                                          Yes.
Letter of 5/9/08                              completed modifications to the AB                            was                                                                                                                                                                                              Bolting 11/9/07                         (ML081150741),                                on 5/5/08                                                                                                                                        DCR3629 is crane bridge girder to end-              LC000141 completed                                                                                                                                                                                        material is 07-0465                         notice of                                    according to                                                                                                                                      the 9                                        MD7301                  tie connections and confirm              ,        on 4/22/09; LI*                                                                                                                          none                                                    confirmed, NA                                                        NA ML073180499                     withdrawal of                                tTrack LAR                                                                                                                                        implementing bolting material as                      LA000732 ready to                                                                                                                                                                                          per application for                              ML07318049                                                                                                                                        document described in Section 4.2.2.9                      install                                                                                                                                                                                          ECN3629-amendment                                    9 withdrawn of this LAR.                                      9/10/07,                                                                                                                                                                                          06.
by letter which is dated RgCm 4/11/08 closure.
Yes -
USAR                                                                                          tTrack The KPS USAR will be 2/8/2008                                                                                                                                                                                                                                          USAR 6.2.9.3 Change                                                                                        shows modified upon final                                                        LC000181 08-0017                                                        Review is                                                        In progress;                                None to                                                              are planned Request                                                                                        completi 10                                            MC4691                                      resolution of GSI-191 and                                                  ,                                                LI*                                                                                                NA                                            NA ML080650314                                                    ongoing                                                          NC                                          NRC                                                                  to be        (UCR) R21-                                                                                    on date response to Generic Letter                                                LA000907 changed. 108 dated                                                                                    changed 2004-02.
9/19/08.                                                                                      to 6/1/11.


withdrawal of  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                        Page 9 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
: 1. DEK will place a restriction in the Kewaunee procedure governing the                                                                                                                                                                                                  Yes.
use of the AB crane                                                                                                                                                                                                      Verified 6/2/08                                                                                                                                                                                                                                  Changed Amend. No.                      prohibiting the use of                  LC000141                                                                                                                                                                        Step 4.15 08-0113                                                                                                        complete            None to                                                                                            procedure 11a                                            MD7300 200, 11/20/08,                  synthetic slings for heavy              ,                                                                            LI*                                                          none                                  of GNP-  NA                                                        NA ML081550342                                                                                                    1/16/09, NC          NRC                                                                                                GNP-ML082971079                    load lifts with the AB crane            LA000997                                                                                                                                                                        08.12.02 08.12.02 when this crane is in the                                                                                                                                                                                                Rev 26, "Cask Handling" or                                                                                                                                                                                                        7/18/2010 "Override" modes of operation.
: 2. For the AB crane bridge                                                                                                                          Preventive Yes.
welds whose failure could                                                                                                                            Maintenance None to                                                                                                                                                                Preventive result in a drop of the critical                                                                                                                    (PM) Task -
NRC;                                                                                                                                                                  Maintenan 6/2/08                                                          load, DEK will perform                                                                                                                              PM 53065.
Amend. No.                                                                LC000141 entered                                                                                                                                                                ce 08-0113                                                        nondestructive                  complete                                                                                                            Examinations 11b                                            MD7300 200, 11/20/08,                                                            ,        Preventive  LI*                                                                                                none                                                    Program NA                                                          NA ML081550342                                                    examinations at least once 1/16/09, NC                                                                                                              IAW AWS-ML082971079                                                              LA000998 Maintenance                                                                                                                                                            RE89105, every four years following                                                                                                                          01.1-1994.
Program,                                                                                                                                                              which completion of initial cold                                                                                                                          PM Card has RE89105                                                                                                                                                                notes it is proof load testing of the AB                                                                                                                        TS Amend.
a RgCm.
crane.                                                                                                                                              Referenced.


application for  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                          Page 10 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
: 3. DEK will not perform a heavy lift greater than 50 None to tons using the AB crane.
NRC; This commitment will be changed superseded when a seismic procedure                                                                                                                                                              Yes. GNP-6/2/08                                                                        analysis, using NRC-                                                                                                                                Chnged Amend. No.                                                              LC000141 GNP-                                                                                                                                                                    08.12.02 08-0113                                                                      approved methods,            complete                                                                                                                procedure 11c                                        MD7300 200, 11/20/08,                                                          ,        08.12.02,                                                            LI*                                                          none                                  change    NA                                                        NA ML081550342                                                                  demonstrates acceptable      1/27/09, NC                                                                                                            GNP-ML082971079                                                              LA000999 "Control for                                                                                                                                                           done results are achieved for the                                                                                                                        08.12.02 use of                                                                                                                                                                  7/8/10 AB crane and establishes a cranes in new limit based on lifting protected heavy loads greater than 50 area" tons.


amendment DEK will complete required modifications to the AB
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                                  Page 11 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal  3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
: 1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
: 2. DEK will perform a "push" test to provide empirical data documenting 7/7/08 the force required to induce 08-0211 crane trolley and bridge ML081930317                                                                                                                                                                    SN 08-211 drive wheel rolling with the          LC000228 is a resubmittal                                                                                                                                                                sent to NRC brakes applied. The results            (No LAs of an                                                                                                                                                                          on 7/7/08 of the test will be provided          are amendment                                                                                                                                                                       (DEK to the NRC.                            needed request from                                                                                                complete                                                          accomplishe                                                Push Test since the 11/9/07.                Amend. No,                                                                          7/15/10; NC                                                        d all RgCm                                                details
: 3. DEK will have an                    actions 12 (i.e.,Audit      MD9221 205, 4/30/09,                                                                        [All 3                                                            in the      LI*                                          provided in                    none                                  Yes                                NA                              NA independent peer review                can be Sample #12 is          ML090570710                                                                          managed as                                                        sample.                                                    9/19/08 performed of the nonlinear            managed a pickup from                                                                                                one - kdf]                                                        Submitted to                                              Supplement structural model and                  as a group
    #9 with                                                                                                                                                                        the NRC outputs of the nonlinear              within the supplements                                                                                                                                                                    within the analysis to confirm the                LC dated 9/19/08                                                                                                                                                                  9/19/08 methodology is appropriate            number.)
and 3/17/09)                                                                                                                                                                    sample) for the application and provide a summary of the Note 12-2 review to the NRC.
[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]


crane bridge girder to end-
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                      Page 12 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                              H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                                Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such Letter approving that a minimum usable                                                                                                                                        USAR Rev LC000315 1/27/09                                      notice of        amount of 32,858 gallons                                                                                                                                    22 update (No LA                                                                                                                                              Yes.
09-061                                        enforcement      (including the day tanks) is complete                                                  None to                                                              6/30/10 13                                        ME0435                                                                                                number -                                        LI*                                                          none                                  Control is NA                                                        NA ML090510149                                  discretion,      available to supply each    6/10/09; NC                                              NRC                                                                  pg 8.2-18, one item                                                                                                                                            USAR edit 1/29/09,        emergency diesel generator                                                                                                                                  Section only)
ML090291061 (EDG) (without reliance on                                                                                                                                        8.2.3.1 a portable transfer pump),
for the duration of the enforcement discretion.
The installation of EDG 6/1/09                                                      exhaust duct insulation LC000345 09-291                                                      (SAMA 160) will be further                  In progress;                                None to                                                                                               Not yet 14                                        MD9408 Review ongoing                                                                                ,                                                LI*                          Note 14-E                                                            No                                  Yes                            NA ML091600037                                                  evaluated as part of DEK's                  NC                                          NRC                                                                                                  determined LA001560 ongoing performance improvement programs.
Sample deleted at request of                                                                      sample                            sample      sample                                                            sample                          sample                                sample      sample sample 15 Sample deleted MD9408 Project Manager See Note 15-5                                                      results not                        results not results not                          LI*                          results not                    results not                          results not results  results making the                                                                          used.                              used        used                                                              used                            used                                  used        not used not used selection..


tie connections and confirm
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                            Page 13 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal      3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
: 1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.
These USAR Supplement                                                                                                                                        USAR (pages 8/17/09                                                                                                                                              Reportable changes will be consistent                                                    LC000343                                                                      to be defined; 09-469                                        License renewal                                In progress;                                            through 16a                                        MD9408                with the responses to                                                        ,                                                LI*                          expected to none                                              NA                                  Yes                            NA ML092320093                                  review ongoing                                NC                                                      USAR Requests for Additional                                                      LA001541                                                                      be complete change Information (RAIs) B2.1.13-                                                                                                                                  4/4/11) 5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.


bolting material as  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                              Page 14 A - Action Completed (date)
G - Closed RgCm implemented                                          I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                            H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                              Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
LC000343
                                                                                                              ,
: 2. The response to RAI                      LA001542                                                                                                                                                  No change to                                                                                              Yes.
B3.2-2 will be provided                    [original                                                                                                                                                  RgCm.                                                                                                    RgCm Complete                                                                                                                                  Letter SN 10-8/17/09                                                      following reevaluation of the              tracking]                                                                                                                                                  Change was                                                                                                itself not and                                                                                                                                      033 dated 09-469                                        License renewal environmental effects of                    transferre Transferred                                                                                                                                    to tTrack to                                                                                              changed 16b                                        MD9408                                              transferred                          LI*                                                                                                  dated 2/2/10                                Yes                                                        NA ML092320093                                  review ongoing fatigue for the NUREG/CR-                    d to      to LA001848                                                                                                                                    record                                                                                                    (transfer for action by                                                                                                                            (responded to 6260-required evaluations                  LC000392                                                                                                                                                  transfer from                                                                                            was LA001848                                                                                                                                  RAI B3.2-2) that used stress-based                      ,                                                                                                                                                          LA001542 to                                                                                              successfu fatigue monitoring.                        LA001848                                                                                                                                                  LA001848                                                                                                  l)
[Observati on 16b-B]
(The following commitments are selected from Attachment 5) [Three of nine commitments were selected for audit - kdf]
9/24/09 Conversion to                                                                                            LC000407                                                                      Tech Spec 09-491                                                                                                    In progress;                                        None to 17a                                        ME2139 Improved TS                    2. DEK will establish the                                                ,                                                LI*                          Bases LCO                      none                                  NA                                  Yes                            NA ML092440398                                                                                                NC                                                  NRC review ongoing                  Technical Specification                                                  LA001897                                                                      3.0.8 Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.


described in Section 4.2.2.9  
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                    Page 15 A - Action Completed (date)
G - Closed RgCm implemented                                        I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                      H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                    E - Affected implementing 1 - Audit Sample No.
B - KPS Tracking #
2 - DEK Submittal    3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
LC#,, CAP#
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                        Maintained (Yes / No / NA) managed (Yes / No / NA)
Not Changed / Changed to what?
: 7. DEK will have written procedures available describing compensatory measures to be taken in the Procedure event of an intentional or 9/24/09                                                                                                                                                                                                                            OP-KW-AOP-Conversion to                  unintentional entry                      LC000407 09-491                                                                                                    Complete                                                                                                                GEN-005 17b                                        ME2139 Improved TS                    into LCO 3.7.12, Auxiliary              ,        Procedure                                                            LI*                                      none                                              Yes                                  NA                              NA ML092440398                                                                                                12/6/10; NC                                                                                                            "Unplanned review ongoing                  Building Special Ventilation            LA001902 Barrier (ASV) System, Condition B, Control Two ASV trains inoperable due to inoperable ASV boundary.
: 8. DEK will add procedural direction to perform an Letter SN10-extent of condition 457 to NRC evaluation and perform withdrew 9/24/09                                                                      additional testing for Conversion to                                                                  Withdrew via                                                                                          commitment 09-491                                                                        plausible common failure    Withdrew  LC000407 17c                                        ME2139 Improved TS                                                                    8/18/2010    LI*                                                                                      (Letter is  none                                            Withdrew                            NA                              NA ML092440398                                                                  modes associated with the 12/6/10; NC , LA1903 review ongoing                                                                Supple                                                                                                8/18/10 reactor protection system supplement and the engineered safety on TAC features actuation system ME2139) instrument analog channels.
                                                                                  .


of this LAR.
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data                                                                                                                                                                                                                                                                                                             Page 16 A - Action Completed (date)
NC, design change recorded as
G - Closed RgCm implemented                                         I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process                                                                                                           H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS                                   E - Affected implementing 1 - Audit Sample No.
 
B - KPS Tracking #
completed
2 - DEK Submittal     3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)
 
LC#,, CAP#
on 5/5/08
in timely manner (Yes / No / NA) closeout information document document # (See Note LI*)                                                                                                             Maintained (Yes / No / NA) managed (Yes / No / NA)
 
Not Changed / Changed to what?
according to
The revised Work Control                                                                                                                                                Revised work 9/25/09 Process program will be                                                                   LC000394                                                                      control 09-597                                        License renewal                          In progress; 18                                        MD9408                developed and implemented                                                                ,       Not closed                             LI*                           program      none                                                  NA                                 Yes                             NA ML092710045                                   review ongoing                           NC prior to the period of                                                                   LA001858                                                                      document extended operation.                                                                                                                                                     (TBD)
 
The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.
tTrack LAR
[This RgCm was managed as two separate items - kdf]
 
Complete 10/15/09                                                                                                             Leter SN 09-                                                                                                                                    Change to (This RgCm LC000239 09-645                                       Letter of 4/1/10, 1. DEK will revise current fill                      645 dated                                                                                                                                      date only 19a                                        MD7838                                                  was changed ,                      LI*                                                                                                 Note 19-E                                                         Yes                                NA                              Yes ML092890560                                  ML100880212 and vent procedures to                                      9/15/09 to                                                                                                                                     (10/1/09 to from 10/1/09 LA001178 provide a means and                                  NRC                                                                                                                                             10/15/09) to 10/15/09) acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.
ML07318049
 
9 withdrawn
 
by letter
 
dated 4/11/08 LC000141 ,
LA000732 None to NRC; Design
 
change DCR3629 was completed
 
on 4/22/09;
 
ready to install 9/10/07, which is RgCm closure.LI*DCR3629 is the implementing
 
document none Yes. Bolting material is
 
confirmed, per ECN3629-06.NANA 10 2/8/2008 08-0017 ML080650314 MC4691 Review is ongoing The KPS USAR will be modified upon final
 
resolution of GSI-191 and
 
response to Generic Letter
 
2004-02.In progress; NC LC000181 ,
LA000907 None to NRC LI*USAR 6.2.9.3 are planned
 
to be changed.USAR Change Request (UCR) R21-
 
108 dated
 
9/19/08.NA Yes - tTrack shows completi on date changed to 6/1/11.NA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 91 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 11a 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
: 1. DEK will place a restriction in the Kewaunee
 
procedure governing the
 
use of the AB crane
 
prohibiting the use of
 
synthetic slings for heavy
 
load lifts with the AB crane
 
when this crane is in the "Cask Handling" or "Override" modes of
 
operation.
complete 1/16/09, NC LC000141 ,
LA000997 None to NRC LI*Changed procedure
 
GNP-08.12.02 none Yes. Verified Step 4.15
 
of GNP-08.12.02 Rev 26, 7/18/2010NANA 11b 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
: 2. For the AB crane bridge welds whose failure could
 
result in a drop of the critical
 
load, DEK will perform
 
nondestructive
 
examinations at least once
 
every four years following
 
completion of initial cold
 
proof load testing of the AB
 
crane.complete 1/16/09, NC LC000141 ,
LA000998 None to NRC; entered Preventive
 
Maintenance
: Program, RE89105 LI*Preventive Maintenance (PM) Task - 
 
PM 53065. 
 
Examinations
 
IAW AWS-01.1-1994. 
 
PM Card has
 
TS Amend.
 
Referenced.
none Yes. Preventive
 
Maintenan ce Program
: RE89105, which notes it is
 
a RgCm.NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 101 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 11c 6/2/08 08-0113 ML081550342 MD7300 Amend. No.
200, 11/20/08, ML082971079
: 3. DEK will not perform a heavy lift greater than 50
 
tons using the AB crane.
 
This commitment will be
 
superseded when a seismic
 
analysis, using NRC-
 
approved methods, demonstrates acceptable
 
results are achieved for the
 
AB crane and establishes a
 
new limit based on lifting
 
heavy loads greater than 50
 
tons.complete 1/27/09, NC LC000141 ,
LA000999 None to NRC; changed procedure
 
GNP-08.12.02, "Control for
 
use of cranes in
 
protected
 
area" LI*Chnged procedure
 
GNP-08.12.02 none Yes. GNP-08.12.02 change done 7/8/10NANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 111 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 12 7/7/08 08-0211 ML081930317
 
is a resubmittal
 
of an amendment
 
request from
 
11/9/07.
(i.e.,Audit  
 
Sample #12 is
 
a pickup from
 
#9 with supplements
 
dated 9/19/08
 
and 3/17/09)
Note 12-2 MD9221 Amend. No, 205, 4/30/09, ML090570710
: 1. DEK will submit the results of the analyses
 
performed using the
 
nonlinear seismic analysis
 
methodology described in
 
this LAR.2. DEK will perform a "push" test to provide
 
empirical data documenting
 
the force required to induce
 
crane trolley and bridge
 
drive wheel rolling with the
 
brakes applied. The results
 
of the test will be provided
 
to the NRC.
: 3. DEK will have an independent peer review
 
performed of the nonlinear
 
structural model and
 
outputs of the nonlinear
 
analysis to confirm the
 
methodology is appropriate
 
for the application and
 
provide a summary of the
 
review to the NRC.
[The three items are managed as one. The 4th (RgCm) Regulatory
 
Requirement in the 9/19/09
 
supplement was not
 
selected for the audit
 
sample - kdf]
complete 7/15/10; NC
 
[All 3 managed as
 
one - kdf]
LC000228 (No LAs are needed since the
 
actions can be managed as a group
 
within the
 
LC number.)SN 08-211 sent to NRC
 
on 7/7/08 (DEK accomplishe
 
d all RgCm
 
in the sample.
Submitted to
 
the NRC within the
 
9/19/08 sample)LI*Push Test details provided in
 
9/19/08 SupplementnoneYesNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 121 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 13 1/27/09 09-061 ML090510149 ME0435 Letter approving notice of
 
enforcement
 
discretion, 1/29/09, ML090291061 DEK commits to administratively control the
 
amount of fuel oil in each
 
fuel oil storage tank such
 
that a minimum usable
 
amount of 32,858 gallons (including the day tanks) is
 
available to supply each
 
emergency diesel generator (EDG) (without reliance on
 
a portable transfer pump),
for the duration of the
 
enforcement discretion.
complete 6/10/09; NC LC000315 (No LA number -
one item only)None to NRC LI*USAR Rev 22 update
 
6/30/10 pg 8.2-18, Section 8.2.3.1 none Yes. Control is 
 
USAR editNANA 14 6/1/09 09-291 ML091600037MD9408Review ongoing The installation of EDG exhaust duct insulation (SAMA 160) will be further
 
evaluated as part of DEK's
 
ongoing performance
 
improvement programs.
In progress; NC LC000345 ,
LA001560 None to NRCLI*Note 14-E Not yet determinedNoYesNA15Sample deletedMD9408 Sample deleted at request of
 
Project Manager
 
making the
 
selection..
See Note 15-5 sample results not
 
used.sample results not
 
used sample results not
 
used LI*sample results not
 
used sample results not
 
used sample results not
 
used sample results not used sample results not used Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 131 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 16a 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
: 1. Additional information will be included in the USAR
 
Supplement (License
 
Renewal Application, Appendix A), including
 
license renewal
 
commitments identified in
 
Table A6.0-1, as applicable.
 
These USAR Supplement
 
changes will be consistent
 
with the responses to
 
Requests for Additional
 
Information (RAIs) B2.1.13-
 
5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are
 
proposed to support
 
approval of the renewed
 
operating license, and may
 
change during the NRC
 
review period.
In progress; NC LC000343 ,
LA001541 Reportable through USAR change LI*USAR (pages to be defined;
 
expected to
 
be complete
 
4/4/11)noneNAYesNA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 141 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 16b 8/17/09 09-469 ML092320093 MD9408 License renewal review ongoing
: 2. The response to RAI B3.2-2 will be provided
 
following reevaluation of the
 
environmental effects of
 
fatigue for the NUREG/CR-
 
6260-required evaluations
 
that used stress-based
 
fatigue monitoring.
Complete and transferred
 
for action by
 
LA001848 LC000343 ,
LA001542
[original
 
tracking]
 
transferre
 
d to LC000392
,
LA001848
[Observati
 
on 16b-B]Transferred to LA001848 LI*Letter SN 10-033 dated
 
dated 2/2/10 (responded to
 
RAI B3.2-2)
No change to RgCm.
Change was
 
to tTrack to
 
record transfer from
 
LA001542 to
 
LA001848YesNA Yes. RgCm itself not
 
changed (transfer
 
was successfu l)17a 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS
 
review ongoing (The following commitments are selected from
) [Three of
 
nine commitments were
 
selected for audit - kdf]
: 2. DEK will establish the Technical Specification
 
Bases for Limiting Condition
 
for Operation (LCO) 3.0.8, as adopted, with the
 
applicable license
 
amendment.
In progress; NC LC000407 ,
LA001897 None to NRC LI*Tech Spec Bases LCO
 
3.0.8noneNAYesNA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 151 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 17b 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS
 
review ongoing
: 7. DEK will have written procedures available
 
describing compensatory
 
measures to be taken in the
 
event of an intentional or
 
unintentional entry
 
into LCO 3.7.12, Auxiliary
 
Building Special Ventilation (ASV) System, Condition B, "Two ASV trains inoperable
 
due to inoperable ASV
 
boundary."
Complete 12/6/10; NC LC000407 ,
LA001902ProcedureLI*
Procedure OP-KW-AOP-
 
GEN-005 "Unplanned
 
Barrier ControlnoneYesNANA 17c 9/24/09 09-491 ML092440398 ME2139 Conversion to Improved TS
 
review ongoing
: 8. DEK will add procedural direction to perform an
 
extent of condition
 
evaluation and perform
 
additional testing for
 
plausible common failure
 
modes associated with the
 
reactor protection system
 
and the engineered safety
 
features actuation system
 
instrument analog channels.
 
.Withdrew 12/6/10; NC LC000407 , LA1903 Withdrew via 8/18/2010
 
Supple LI*Letter SN10-457 to NRC
 
withdrew commitment (Letter is
 
8/18/10 supplement
 
on TAC ME2139)noneWithdrewNANA Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 161 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 18 9/25/09 09-597 ML092710045 MD9408 License renewal review ongoing The revised Work Control Process program will be
 
developed and implemented
 
prior to the period of  
 
extended operation.
In progress; NC LC000394 ,
LA001858Not closedLI*
Revised work control program document (TBD)noneNAYesNA 19a 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212 The completion dates for the following two  
 
commitments have been  
 
revised from October 1, 2009, to October 15, 2009.  
 
[This RgCm was managed  
 
as two separate items - kdf]
: 1. DEK will revise current fill and vent procedures to
 
provide a means and
 
acceptance criteria to
 
ensure that piping is
 
sufficiently full after system
 
fill and vent. This may
 
include confirmation by
 
ultrasonic testing or other
 
appropriate means.
Complete (This RgCm
 
was changed
 
from 10/1/09
 
to 10/15/09)
LC000239 ,
LA001178 Leter SN 09-645 dated
 
9/15/09 to
 
NRCLI*Note 19-E Change to date only
 
(10/1/09 to  
 
10/15/09)YesNAYes Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit DataPage 171 - Audit Sample No.2 - DEK Submittal 3 - NRC TAC No.4 - NRC Issuance5 - Summary of CommitmentA - Action Completed (date)Action in Prgress (no date)Not Changed / Changed to what?B - KPS Tracking #LC#,, CAP#C - If closed, then KPS closeout informationD - Governed by KPS process document # (See Note LI*)E - Affected implementing documentF - Affected change documentG - Closed RgCm implemented in timely manner (Yes / No / NA)H - Open RgCm is adequately Maintained (Yes / No / NA)I - Changed RgCm is adequately managed (Yes / No / NA) 19b 10/15/09 09-645 ML092890560 MD7838 Letter of 4/1/10, ML100880212
: 2. DEK will revise current inservice test procedures to
 
provide dynamic sweeping
 
as part of the filling of the
 
systems where needed to  
 
ensure systems are
 
sufficiently full.
Complete (This RgCm
 
was changed
 
from 10/1/09


1 - Audit Sample No.
10/15/09 09-645 2 - DEK Submittal 19b ML092890560
: 2. DEK will revise current            3 - NRC TAC No.
inservice test procedures to 4 - NRC Issuance provide dynamic sweeping Letter of 4/1/10, MD7838                  as part of the filling of the ML100880212 systems where needed to 5 - Summary of Commitment ensure systems are sufficiently full.
Complete                                            A - Action Completed (date)
Action in Prgress (no date)
(This RgCm LC000239 Not Changed / Changed to what?
Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data was changed ,
from 10/1/09 LA001179                                  B - KPS Tracking #
LC#,, CAP#
to 10/15/09)
to 10/15/09)
LC000239 ,
C - If closed, then KPS closeout information LI*                                D - Governed by KPS process document # (See Note LI*)
LA001179LI*Note 19-E Uses LI* -
E - Affected implementing Note 19-E                                   document Uses LI* -
commitment  
commitment change evaluation Change to                                                 F - Affected change document date only (10/1/09 to 10/15/09)
 
Yes G - Closed RgCm implemented in timely manner (Yes / No / NA)
change evaluation
NA H - Open RgCm is adequately Maintained (Yes / No / NA)
 
Yes                               I - Changed RgCm is adequately managed (Yes / No / NA)
Change to  
Page 17
 
date only  
 
(10/1/09 to  
 
10/15/09)YesNAYes Table 3 - Kewaunee Power Station RgCm Data Table - Notes and LegendPage 18 To p ic or Word / S ymbolNote, le g end or discussionADAMSAgencywide Document Access and Management SystemAmd or Amend.amendment Audit observation (general)
The Preventive Maintenance  Program would be improved if the Comment field on the PM (preventive maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.
Audit observation (training)
Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by stakeholders making infrequent use of tTrack.
Audit observation 16b-B The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for the transfer is explained in LA001848:  The NRC wanted more items for another purpose. KPS consolidated
 
LA001542 with LA001848.CFRCode of Federal Regulations
 
Column headings and cell
 
designations Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.
Notes are designated as "Note (row) - (column)" Commitment management staff Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, MaryJo Haese, and Thomas Breene during the course of RgCm data collection.ECNEngineering Change Notice Generic Letter 2004-02"Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Water Reactors," September 13, 2004 GSI-191"Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with Emphasis on the Effects of Calcium Silicate Insulation," May 2005kdfKarl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)
KPSKewaunee Power Station LALicensing Action;one or more LA can be associated with one LC LCLicensing Commitment LI*In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as
 
the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the
 
management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.
ML#"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records within its Agencywide Document Access and Management System (ADAMS) document control system.NCNot Changed (as used in column A)
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and LegendPage 19 To p ic or Word / S ymbolNote, le g end or discussion Note 01-G, -H, -I (i.e., headings in column G, H and I)
A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading. 
 
NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for
 
unchanged RgCm, "changed" does not apply.
 
Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.Note 03-CNRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 Note 04-C The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that the NRC has approved to be transferred from control by the Technical Specifications.(TS)
Note 12-2, Audit Observation and Audit Finding Observation:  Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)
A udit Finding:  DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs the commitment management staff to review all incoming / outgoing correspondence for impact on existing
 
RgCm. Heretofore, commitment management staff has been performing this action without a documented
 
instruction, within LI-AA-110, to do so.
Note 14-E[Suggestion pertaining to on-going RgCm:  Stakeholders should report completion plans to Licensing staff for tTrack entry and for future reference.- kdf]
Note 15-5 The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the
 
findings of the audit. Further, the sample population grew from the original 19 selections to a net population of
 
24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to
 
track the management of separate RgCm parts.
Note 19-E Affected procedures (21 documents, as indicated by separate serial numbers):
OP-KW-NOP-RHR-001, -003
 
SP-34-099A, -099B
 
OP-KW-NOP-SI-002
 
OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B
 
OP-KW-NOP-SI-001 [possible typo in KPS text:  NOP should possibly be MOP - kdf], -002, -004
 
OP-KW-MOP-ICS-001, -002, -003 Note on references to TS In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Improved Technical Specifications (ITS) on February 2, 2011.
Note on sample characteristics for the sample size of 24, categorized
 
from audit results RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)
RgCm items changed and closed = 16b, 19a, 19b (3 items)
 
RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items)
 
RgCm items open and changed = none Table 3 - Kewaunee Power Station RgCm Data Table - Notes and LegendPage 20 To p ic or Word / S ymbolNote, le g end or discussion Note row-column A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.NRC Information Notice 84-55"Seal Table Leaks at PWRs," July 6, 1984


NRC Information Notice 84-55, Supplement 1"Seal Table Leaks at PWRs," May 14, 1985NRC Information Notice 92-15"Failure of Primary System Compression Fitting," February 24, 1992NUREG/CR-6260"Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components,"  1995 NUREG-0554"Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979NUREG-0612"Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 RgCm Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management) and LIC-105 (the NRC document governing RgCm audits)
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend                                                                            Page 18 Topic or Word / Symbol            Note, legend or discussion ADAMS                            Agencywide Document Access and Management System Amd or Amend.                    amendment The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive Audit observation (general) maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.
SAMA 160 SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts."  The context is that insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align
Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by Audit observation (training) stakeholders making infrequent use of tTrack.
The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for Audit observation 16b-B          the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.
CFR                              Code of Federal Regulations Column headings and cell          Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.
designations                      Notes are designated as "Note (row) - (column)"
Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, Commitment management staff MaryJo Haese, and Thomas Breene during the course of RgCm data collection.
ECN                              Engineering Change Notice "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Generic Letter 2004-02 Water Reactors," September 13, 2004 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with GSI-191 Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf                              Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)
KPS                              Kewaunee Power Station LA                                Licensing Action;one or more LA can be associated with one LC LC                                Licensing Commitment In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, LI*                              "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.
                                  "MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records ML#
within its Agencywide Document Access and Management System (ADAMS) document control system.
NC                                Not Changed (as used in column A)


alternate room cooling in the event that room cooling has failed.
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend                                                                                    Page 19 Topic or Word / Symbol              Note, legend or discussion A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.
Suggestion A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is expected.Suggestion (based on Audit Items
Note 01-G, -H, -I (i.e., headings in NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for column G, H and I) unchanged RgCm, "changed" does not apply.
Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.
Note 03-C                            NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that Note 04-C the NRC has approved to be transferred from control by the Technical Specifications.(TS)
Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)
Note 12-2, Audit Observation and Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs Audit Finding the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.
[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for Note 14-E tTrack entry and for future reference.- kdf]
The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the Note 15-5                            findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.
Affected procedures (21 documents, as indicated by separate serial numbers):
OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B Note 19-E                            OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Note on references to TS Improved Technical Specifications (ITS) on February 2, 2011.
RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)
Note on sample characteristics for RgCm items changed and closed = 16b, 19a, 19b (3 items) the sample size of 24, categorized RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items) from audit results RgCm items open and changed = none


11a, b, c)
Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend                                                                          Page 20 Topic or Word / Symbol            Note, legend or discussion A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space Note row-column limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.
[Commitment management staff should monitor processes that cause users to contact them for RgCm information and arrange to add RgCm information to relevant databases. - kdf]SuppleSupplement Title 10The section of the Code of Federal Regulations pertaining to "Energy" TRM Technical Requirements Manual - a licensee controlled document for managing plant specific technical requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)TSTechnical Specifications, as described in 10 CFR 50.36 tTrackName of database used to track RgCm.
NRC Information Notice 84-55      "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, "Seal Table Leaks at PWRs," May 14, 1985 Supplement 1 NRC Information Notice 92-15      "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260                    "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554                        "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612                        "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management)
UCRUSAR Change Request USARUpdated Safety Analysis Report}}
RgCm and LIC-105 (the NRC document governing RgCm audits)
SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that SAMA 160                          insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.
A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is Suggestion expected.
Suggestion (based on Audit Items  [Commitment management staff should monitor processes that cause users to contact them for RgCm 11a, b, c)                        information and arrange to add RgCm information to relevant databases. - kdf]
Supple                            Supplement Title 10                          The section of the Code of Federal Regulations pertaining to "Energy" Technical Requirements Manual - a licensee controlled document for managing plant specific technical TRM requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)
TS                                Technical Specifications, as described in 10 CFR 50.36 tTrack                            Name of database used to track RgCm.
UCR                              USAR Change Request USAR                              Updated Safety Analysis Report}}

Revision as of 01:25, 13 November 2019

Audit Report Tables 2 and 3
ML110900537
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 04/11/2011
From: Feintuch K
Plant Licensing Branch III
To: Heacock D
Dominion Energy Kewaunee
Feintuch K, NRR/DORL/LPL3-1, 415-3079
Shared Package
ML110900569 List:
References
TAC ME3804
Download: ML110900537 (10)


Text

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 1 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

An updated description of the station blackout alternate alternating current source, including the quality assurance program requirements for the TSC DG as defined in the Dominion Nuclear Facility No ML#,

10/29/2007 USAR Quality Assurance Program complete LC000111 since no 07-0436B 8.2.4.3, 1 None None Description, will be 4/18/2008; , separate LI* none Yes NA NA ML073100354 8.2.4.12, 8.2 incorporated into the KPS NC LA000697 response to Reference Updated Safety Analysis the NRC Report (USAR) and provided to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 50.71 (e).

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 2 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

Prior to use of nonwelded valves with end connections other than flanges at KPS, procedures will be LC000142 developed for installation of ,

nonwelded valves with end LA000741 connections other than ("LA flanges that address type"soluti operating experience of on was 11/9/07 NRC Information Notices 92- incorrect. Maintenance Letter of 2/25/08 no response 07-0416A 15, 84-55 and 84-55, complete Data entry Procedure 2 MD6144 granting relief, to the NRC LI* None Yes NA NA ML073106750 Supplement 1. The specific 1/2/2008; NC was MA-KW-GMP-ML080240029 required provisions include: a) not performed 103 mixing the parts from one by manufacturer to another, b) inexperien following manufacturer's ced recommended instructions person -

for installing compression self fittings, and c) the training corrected) or familiarity with the procedure(s) for personnel doing this work.

3 1 - Audit Sample No.

11/9/07 07-0352 2 - DEK Submittal ML073170705 Amend. No. 3 - NRC TAC No.

MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Notify the NRC when the modifications to the Auxiliary Building (AB) 5 - Summary of Commitment crane to make it single-failure proof are complete A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

LC000141 Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data complete B - KPS Tracking #

, Note 03-C LC#,, CAP#

6/12/08; NC C - If closed, then KPS LA000133 closeout information LI* D - Governed by KPS process document # (See Note LI*)

CA069210 says to E - Affected implementing update document procedure None GNP-08.12.02 plus tags.

F - Affected change document Yes- it was timely G - Closed RgCm implemented since it accomplis NA in timely manner (Yes / No / NA) hed a design change. H - Open RgCm is adequately Maintained (Yes / No / NA)

NA I - Changed RgCm is adequately managed (Yes / No / NA)

Page 3

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 4 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

All heavy load lifts in or around the spent fuel pool made using the upgraded AB crane lifting system will meet the guidance in NUREG-0612, Section 5.1.6, as follows:

  • Special lifting devices, as defined in American National Standards Institutes (ANSI) N14.6 will meet the guidance in NUREG-0612, Section 5.1.6(1 )(a) and ANSI N14.6-1993, as clarified in Attachment 5 to this license Addressed in Yes.

amendment request (LAR). TRM [a Completio 11/9/07 Amend. No. LC000141 licensee TRM 3.8.1, n took Complete 4 07-0352 MD7300 200, 11/20/08,

  • Lifting devices not , controlled LI* Rev 0, none place NA NA 1/16/09; NC ML073170705 ML082971079 specially designed will meet LA000135 document 1/15/09. within 60 the guidance in NUREG- kdf] See days, as 0612, Section 5.1.6(1)(b) Note 04-C planned.

and American Society of Mechanical Engineers (ASME) B30.9-2003, as clarified in Attachment 5 to this LAR.

  • The AB crane will meet the guidance in NUREG-0612, Section 5.1.6(2) and NUREG-0554 as clarified in Attachments 5 and 6 to this LAR

.

  • Interfacing lift points will meet the guidance in NUREG-0612, Section

5 1 - Audit Sample No.

11/9/07 07-0352 2 - DEK Submittal ML073170705 Amend. No. 3 - NRC TAC No.

MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Crane operator training will 5 - Summary of Commitment complete meet the guidance in ASME 12/15/08 A - Action Completed (date)

B30.2-2005. Action in Prgress (no date)

Not Changed / Changed to what?

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data LC000141 B - KPS Tracking #

None to LC#,, CAP#

,

NRC LA000736 C - If closed, then KPS closeout information LI* D - Governed by KPS process document # (See Note LI*)

Lesson Plan M-MD-LP 2.2.1 E - Affected implementing "Cranes"; M- document None PM2-LP 1.9.1 "Crane Maintenance

/ Inspection" F - Affected change document Yes.

Lesson Plans had G - Closed RgCm implemented guidance incorporat NA in timely manner (Yes / No / NA) ed in reference to this Amd's approval. H - Open RgCm is adequately Maintained (Yes / No / NA)

NA I - Changed RgCm is adequately managed (Yes / No / NA)

Page 5

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 6 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

Yes.

During NRC ISFSI Inspection (6/09) issues were identified with crane inspection procedure s

TRM Bases concernin (TRM 3.8.1 11/9/07 Crane maintenance and g B30.2 Amend. No. LC000141 pg 381-2) 07-0352 inspections will meet the complete TRM Bases, guidance.

6 MD7300 200, 11/20/08, , LI* USAR Rev22 None NA NA ML073170705 guidance in ASME B30.2- 1/16/09, NC USAR REF CR ML082971079 LA000740 Sec. 9, pp 1976. 337889.

9.5-9, -10 Revised (6/30 MA-KW-MPM-CRN-007 Rev.

2 and TEC-MA-KW-MPM-CRN-002 Rev

3. ASME B30.2 is referenced in procedure s.

7 1 - Audit Sample No.

11/9/07 07-0352 2 - DEK Submittal ML073170705 Amend. No. 3 - NRC TAC No.

MD7300 200, 11/20/08, 4 - NRC Issuance ML082971079 Revise USAR Section 9.5.2 LC000141 5 - Summary of Commitment complete A - Action Completed (date)

Action in Prgress (no date)

Not Changed / Changed to what?

to remove the dropped cask , USAR Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data 1/15/09: NC B - KPS Tracking #

LC#,, CAP#

C - If closed, then KPS analysis from the USAR. LA000737 closeout information LI* D - Governed by KPS process document # (See Note LI*)

E - Affected implementing USAR 14.2.1, document none 9.5 F - Affected change document

Yes, implement ed in a timely manner.

Amd was issued 11/08 and G - Closed RgCm implemented implement ed 1/09.

Much work took place NA in timely manner (Yes / No / NA)

- USAR revision submitted 9/09 with the next scheduled update of USAR being 3/31/10. H - Open RgCm is adequately Maintained (Yes / No / NA)

NA I - Changed RgCm is adequately managed (Yes / No / NA)

Page 7

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 8 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

After LAR approval and relocation of TS 3.8.a.7 to the technical requirements 11/9/07 manual (TRM) is Amend. No. LC000141 TRM, 07-0352 authorized, add to the TRM complete 8 MD7300 200, 11/20/08, , TRM LI* licensee none Yes NA NA ML073170705 required actions to take if 1/16/09; NC ML082971079 LA000735 controlled the AB crane lifting system is found not to meet the TRM requirements during a heavy load lift.

None to NC, design NRC; Design change change recorded as DEK will complete required DCR3629 Yes.

Letter of 5/9/08 completed modifications to the AB was Bolting 11/9/07 (ML081150741), on 5/5/08 DCR3629 is crane bridge girder to end- LC000141 completed material is 07-0465 notice of according to the 9 MD7301 tie connections and confirm , on 4/22/09; LI* none confirmed, NA NA ML073180499 withdrawal of tTrack LAR implementing bolting material as LA000732 ready to per application for ML07318049 document described in Section 4.2.2.9 install ECN3629-amendment 9 withdrawn of this LAR. 9/10/07, 06.

by letter which is dated RgCm 4/11/08 closure.

Yes -

USAR tTrack The KPS USAR will be 2/8/2008 USAR 6.2.9.3 Change shows modified upon final LC000181 08-0017 Review is In progress; None to are planned Request completi 10 MC4691 resolution of GSI-191 and , LI* NA NA ML080650314 ongoing NC NRC to be (UCR) R21- on date response to Generic Letter LA000907 changed. 108 dated changed 2004-02.

9/19/08. to 6/1/11.

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 9 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

1. DEK will place a restriction in the Kewaunee procedure governing the Yes.

use of the AB crane Verified 6/2/08 Changed Amend. No. prohibiting the use of LC000141 Step 4.15 08-0113 complete None to procedure 11a MD7300 200, 11/20/08, synthetic slings for heavy , LI* none of GNP- NA NA ML081550342 1/16/09, NC NRC GNP-ML082971079 load lifts with the AB crane LA000997 08.12.02 08.12.02 when this crane is in the Rev 26, "Cask Handling" or 7/18/2010 "Override" modes of operation.

2. For the AB crane bridge Preventive Yes.

welds whose failure could Maintenance None to Preventive result in a drop of the critical (PM) Task -

NRC; Maintenan 6/2/08 load, DEK will perform PM 53065.

Amend. No. LC000141 entered ce 08-0113 nondestructive complete Examinations 11b MD7300 200, 11/20/08, , Preventive LI* none Program NA NA ML081550342 examinations at least once 1/16/09, NC IAW AWS-ML082971079 LA000998 Maintenance RE89105, every four years following 01.1-1994.

Program, which completion of initial cold PM Card has RE89105 notes it is proof load testing of the AB TS Amend.

a RgCm.

crane. Referenced.

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 10 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

3. DEK will not perform a heavy lift greater than 50 None to tons using the AB crane.

NRC; This commitment will be changed superseded when a seismic procedure Yes. GNP-6/2/08 analysis, using NRC- Chnged Amend. No. LC000141 GNP- 08.12.02 08-0113 approved methods, complete procedure 11c MD7300 200, 11/20/08, , 08.12.02, LI* none change NA NA ML081550342 demonstrates acceptable 1/27/09, NC GNP-ML082971079 LA000999 "Control for done results are achieved for the 08.12.02 use of 7/8/10 AB crane and establishes a cranes in new limit based on lifting protected heavy loads greater than 50 area" tons.

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 11 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

1. DEK will submit the results of the analyses performed using the nonlinear seismic analysis methodology described in this LAR.
2. DEK will perform a "push" test to provide empirical data documenting 7/7/08 the force required to induce 08-0211 crane trolley and bridge ML081930317 SN 08-211 drive wheel rolling with the LC000228 is a resubmittal sent to NRC brakes applied. The results (No LAs of an on 7/7/08 of the test will be provided are amendment (DEK to the NRC. needed request from complete accomplishe Push Test since the 11/9/07. Amend. No, 7/15/10; NC d all RgCm details
3. DEK will have an actions 12 (i.e.,Audit MD9221 205, 4/30/09, [All 3 in the LI* provided in none Yes NA NA independent peer review can be Sample #12 is ML090570710 managed as sample. 9/19/08 performed of the nonlinear managed a pickup from one - kdf] Submitted to Supplement structural model and as a group
  1. 9 with the NRC outputs of the nonlinear within the supplements within the analysis to confirm the LC dated 9/19/08 9/19/08 methodology is appropriate number.)

and 3/17/09) sample) for the application and provide a summary of the Note 12-2 review to the NRC.

[The three items are managed as one. The 4th (RgCm) Regulatory Requirement in the 9/19/09 supplement was not selected for the audit sample - kdf]

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 12 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

DEK commits to administratively control the amount of fuel oil in each fuel oil storage tank such Letter approving that a minimum usable USAR Rev LC000315 1/27/09 notice of amount of 32,858 gallons 22 update (No LA Yes.09-061 enforcement (including the day tanks) is complete None to 6/30/10 13 ME0435 number - LI* none Control is NA NA ML090510149 discretion, available to supply each 6/10/09; NC NRC pg 8.2-18, one item USAR edit 1/29/09, emergency diesel generator Section only)

ML090291061 (EDG) (without reliance on 8.2.3.1 a portable transfer pump),

for the duration of the enforcement discretion.

The installation of EDG 6/1/09 exhaust duct insulation LC000345 09-291 (SAMA 160) will be further In progress; None to Not yet 14 MD9408 Review ongoing , LI* Note 14-E No Yes NA ML091600037 evaluated as part of DEK's NC NRC determined LA001560 ongoing performance improvement programs.

Sample deleted at request of sample sample sample sample sample sample sample sample 15 Sample deleted MD9408 Project Manager See Note 15-5 results not results not results not LI* results not results not results not results results making the used. used used used used used not used not used selection..

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 13 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

1. Additional information will be included in the USAR Supplement (License Renewal Application, Appendix A), including license renewal commitments identified in Table A6.0-1, as applicable.

These USAR Supplement USAR (pages 8/17/09 Reportable changes will be consistent LC000343 to be defined;09-469 License renewal In progress; through 16a MD9408 with the responses to , LI* expected to none NA Yes NA ML092320093 review ongoing NC USAR Requests for Additional LA001541 be complete change Information (RAIs) B2.1.13- 4/4/11) 5, B2.1.14-3, B2.1.15-1, B2.1.18-1, B2.1.21-1, B.2.1.31-1, and B3.1-1, are proposed to support approval of the renewed operating license, and may change during the NRC review period.

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 14 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

LC000343

,

2. The response to RAI LA001542 No change to Yes.

B3.2-2 will be provided [original RgCm. RgCm Complete Letter SN 10-8/17/09 following reevaluation of the tracking] Change was itself not and 033 dated 09-469 License renewal environmental effects of transferre Transferred to tTrack to changed 16b MD9408 transferred LI* dated 2/2/10 Yes NA ML092320093 review ongoing fatigue for the NUREG/CR- d to to LA001848 record (transfer for action by (responded to 6260-required evaluations LC000392 transfer from was LA001848 RAI B3.2-2) that used stress-based , LA001542 to successfu fatigue monitoring. LA001848 LA001848 l)

[Observati on 16b-B]

(The following commitments are selected from Attachment 5) [Three of nine commitments were selected for audit - kdf]

9/24/09 Conversion to LC000407 Tech Spec 09-491 In progress; None to 17a ME2139 Improved TS 2. DEK will establish the , LI* Bases LCO none NA Yes NA ML092440398 NC NRC review ongoing Technical Specification LA001897 3.0.8 Bases for Limiting Condition for Operation (LCO) 3.0.8, as adopted, with the applicable license amendment.

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 15 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

7. DEK will have written procedures available describing compensatory measures to be taken in the Procedure event of an intentional or 9/24/09 OP-KW-AOP-Conversion to unintentional entry LC000407 09-491 Complete GEN-005 17b ME2139 Improved TS into LCO 3.7.12, Auxiliary , Procedure LI* none Yes NA NA ML092440398 12/6/10; NC "Unplanned review ongoing Building Special Ventilation LA001902 Barrier (ASV) System, Condition B, Control Two ASV trains inoperable due to inoperable ASV boundary.
8. DEK will add procedural direction to perform an Letter SN10-extent of condition 457 to NRC evaluation and perform withdrew 9/24/09 additional testing for Conversion to Withdrew via commitment 09-491 plausible common failure Withdrew LC000407 17c ME2139 Improved TS 8/18/2010 LI* (Letter is none Withdrew NA NA ML092440398 modes associated with the 12/6/10; NC , LA1903 review ongoing Supple 8/18/10 reactor protection system supplement and the engineered safety on TAC features actuation system ME2139) instrument analog channels.

.

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data Page 16 A - Action Completed (date)

G - Closed RgCm implemented I - Changed RgCm is adequately F - Affected change document D - Governed by KPS process H - Open RgCm is adequately 5 - Summary of Commitment C - If closed, then KPS E - Affected implementing 1 - Audit Sample No.

B - KPS Tracking #

2 - DEK Submittal 3 - NRC TAC No. 4 - NRC Issuance Action in Prgress (no date)

LC#,, CAP#

in timely manner (Yes / No / NA) closeout information document document # (See Note LI*) Maintained (Yes / No / NA) managed (Yes / No / NA)

Not Changed / Changed to what?

The revised Work Control Revised work 9/25/09 Process program will be LC000394 control 09-597 License renewal In progress; 18 MD9408 developed and implemented , Not closed LI* program none NA Yes NA ML092710045 review ongoing NC prior to the period of LA001858 document extended operation. (TBD)

The completion dates for the following two commitments have been revised from October 1, 2009, to October 15, 2009.

[This RgCm was managed as two separate items - kdf]

Complete 10/15/09 Leter SN 09- Change to (This RgCm LC000239 09-645 Letter of 4/1/10, 1. DEK will revise current fill 645 dated date only 19a MD7838 was changed , LI* Note 19-E Yes NA Yes ML092890560 ML100880212 and vent procedures to 9/15/09 to (10/1/09 to from 10/1/09 LA001178 provide a means and NRC 10/15/09) to 10/15/09) acceptance criteria to ensure that piping is sufficiently full after system fill and vent. This may include confirmation by ultrasonic testing or other appropriate means.

1 - Audit Sample No.

10/15/09 09-645 2 - DEK Submittal 19b ML092890560

2. DEK will revise current 3 - NRC TAC No.

inservice test procedures to 4 - NRC Issuance provide dynamic sweeping Letter of 4/1/10, MD7838 as part of the filling of the ML100880212 systems where needed to 5 - Summary of Commitment ensure systems are sufficiently full.

Complete A - Action Completed (date)

Action in Prgress (no date)

(This RgCm LC000239 Not Changed / Changed to what?

Table 2 - Kewaunee Power Station RgCm Data Table - Detailed Audit Data was changed ,

from 10/1/09 LA001179 B - KPS Tracking #

LC#,, CAP#

to 10/15/09)

C - If closed, then KPS closeout information LI* D - Governed by KPS process document # (See Note LI*)

E - Affected implementing Note 19-E document Uses LI* -

commitment change evaluation Change to F - Affected change document date only (10/1/09 to 10/15/09)

Yes G - Closed RgCm implemented in timely manner (Yes / No / NA)

NA H - Open RgCm is adequately Maintained (Yes / No / NA)

Yes I - Changed RgCm is adequately managed (Yes / No / NA)

Page 17

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 18 Topic or Word / Symbol Note, legend or discussion ADAMS Agencywide Document Access and Management System Amd or Amend. amendment The Preventive Maintenance Program would be improved if the Comment field on the PM (preventive Audit observation (general) maintenance) Data Sheet informed the user that the sheet had a RgCm associated with it.

Commitment management staff should consider preparing a Guideline to ensure consistent input to tTrack by Audit observation (training) stakeholders making infrequent use of tTrack.

The ability to transfer tracking from one LC/LA set to another is demonstrated in Sample 16b. The rationale for Audit observation 16b-B the transfer is explained in LA001848: The NRC wanted more items for another purpose. KPS consolidated LA001542 with LA001848.

CFR Code of Federal Regulations Column headings and cell Columns are labeled numbers 1 through 5 and letters A through I. Sample numbers are listed in column 1.

designations Notes are designated as "Note (row) - (column)"

Persons identified as making routine, standardized data entry into tTrack, identified as Noreen Wenborne, Commitment management staff MaryJo Haese, and Thomas Breene during the course of RgCm data collection.

ECN Engineering Change Notice "Potential Impact of Debris Blockage on Emergency Recirculation during Design Bais Accidents at Pressurized-Generic Letter 2004-02 Water Reactors," September 13, 2004 "Experimental Studies of Loss-of-Coolant Accident-Generated Debris Accumulation and Head Loss with GSI-191 Emphasis on the Effects of Calcium Silicate Insulation," May 2005 kdf Karl D. Feintuch (Mainly used in combination with brackets to indicate an auditor comment.)

KPS Kewaunee Power Station LA Licensing Action;one or more LA can be associated with one LC LC Licensing Commitment In this report LI* represents LI-AA-110, Rev. 0, "Commitment Management," which governs the management of RgCm. In addition, GNP-03.01.01, Rev. 41 during RgCm Audit and Rev 42 when the Report was issued, LI* "Directive, Implementing Document, and Procedure Administrative Controls" (commonly referred to at KPS as the "Procedure on procedures") governs tracing the effect of RgCm on procedures. Therefore, the management of RgCm, when it affects procedures is controlled by a combination of these 2 procedures.

"MLnnnnnnnnn" (i.e. ML followed by 9 digits) is the identifier used by the NRC to access documents and records ML#

within its Agencywide Document Access and Management System (ADAMS) document control system.

NC Not Changed (as used in column A)

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 19 Topic or Word / Symbol Note, legend or discussion A "Yes" in Column G, H, or I indicates that the RgCm was successfully managed according to the description in the heading.

Note 01-G, -H, -I (i.e., headings in NA applies if the particilar column does not apply. As examples, for a closed RgCm, "open" is NA; for column G, H and I) unchanged RgCm, "changed" does not apply.

Thus "No" would only appear in Columns G, H or I if the RgCm was not adequately managed.

Note 03-C NRC notified via suubmitted document SN 08-0113 dated 6/2/08, ML081550342 The Technical Requirements Manual (TRM) is a licensee controlled document for managing requirements that Note 04-C the NRC has approved to be transferred from control by the Technical Specifications.(TS)

Observation: Regarding the July 7, 2008 application, the licensing group should define a closeout event at which to terminate its ownership of a RgCm intended for its doownstream stakeholders (i.e., Design, Operations, Training, as examples)

Note 12-2, Audit Observation and Audit Finding: DEK lacks a documented instruction in LI-AA-110, "Commitment Management," that the instructs Audit Finding the commitment management staff to review all incoming / outgoing correspondence for impact on existing RgCm. Heretofore, commitment management staff has been performing this action without a documented instruction, within LI-AA-110, to do so.

[Suggestion pertaining to on-going RgCm: Stakeholders should report completion plans to Licensing staff for Note 14-E tTrack entry and for future reference.- kdf]

The sample contained proprietary information, an attribute not needed to assemble a valid audit sample. The audit results for the sample were consistent with results from other samples, and its removal did not change the Note 15-5 findings of the audit. Further, the sample population grew from the original 19 selections to a net population of 24 (1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11a, 11b, 11c, 12, 13, 14, 15 omitted, 16a, 16b, 17a, 17b, 17c, 18, 19a, 19b) to track the management of separate RgCm parts.

Affected procedures (21 documents, as indicated by separate serial numbers):

OP-KW-NOP-RHR-001, -003 SP-34-099A, -099B Note 19-E OP-KW-NOP-SI-002 OP-KW-MOP-RHR-001A, -001B, -002A, -002B, -003A, -005A, -005B, -006, -006A, -006B OP-KW-NOP-SI-001 [possible typo in KPS text: NOP should possibly be MOP - kdf], -002, -004 OP-KW-MOP-ICS-001, -002, -003 In this audit TS references are to the Custom Technical Specifications (CTS), which preceded the conversion to Note on references to TS Improved Technical Specifications (ITS) on February 2, 2011.

RgCm items closed and remaining the same = 1, 2, 3, 4, 5, 6, 7, 8, 9, 11a, 11b, 11c, 12, 13, 17b, 17c (16 items)

Note on sample characteristics for RgCm items changed and closed = 16b, 19a, 19b (3 items) the sample size of 24, categorized RgCm items open and remaining the same = 10, 14, 16a, 17a, 18 (5 items) from audit results RgCm items open and changed = none

Table 3 - Kewaunee Power Station RgCm Data Table - Notes and Legend Page 20 Topic or Word / Symbol Note, legend or discussion A discussion pertaining to Table 2, row number and column number, which is inserted in Table 3 due to space Note row-column limitation. (Example: Note 01-G, pertains to row 01, column G on Table 2.

NRC Information Notice 84-55 "Seal Table Leaks at PWRs," July 6, 1984 NRC Information Notice 84-55, "Seal Table Leaks at PWRs," May 14, 1985 Supplement 1 NRC Information Notice 92-15 "Failure of Primary System Compression Fitting," February 24, 1992 NUREG/CR-6260 "Application of NUREG/CR-59999 Interim Fatigue Curves to Selected Nuclear Power Plant Components," 1995 NUREG-0554 "Single-Failure-Proof Cranes for Nuclear Power Plants," May 1979 NUREG-0612 "Control of Heavy Loads at Nuclear Power Plants: Resolution of Generic Technical Activity A-36," July 1980 Regulatory Commitment, as interpreted by NEI 99-04 (the industry document governing RgCm management)

RgCm and LIC-105 (the NRC document governing RgCm audits)

SAMA 160 is described in the license renewal submittal as "Insulate EDG Exhaust Ducts." The context is that SAMA 160 insulating the EDG exhaust ducts would reduce the heat load in thhe room and provide additional time to align alternate room cooling in the event that room cooling has failed.

A comment by auditor kdf, not specific to a RgCm, but offered as a suggestion. No action or response is Suggestion expected.

Suggestion (based on Audit Items [Commitment management staff should monitor processes that cause users to contact them for RgCm 11a, b, c) information and arrange to add RgCm information to relevant databases. - kdf]

Supple Supplement Title 10 The section of the Code of Federal Regulations pertaining to "Energy" Technical Requirements Manual - a licensee controlled document for managing plant specific technical TRM requirements. The TRM is incorporated by reference into the Updated Safety Analysis Report (USAR)

TS Technical Specifications, as described in 10 CFR 50.36 tTrack Name of database used to track RgCm.

UCR USAR Change Request USAR Updated Safety Analysis Report