{{#Wiki_filter:April 22, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board PanelIn the Matter of                     )  
{{#Wiki_filter:April 22, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board Panel In the Matter of                                     )
)Entergy Nuclear Generation Company and   )       Docket No. 50-293-LR Entergy Nuclear Operations, Inc.         )       ASLBP No. 06-848-02-LR  
                                                    )
)(Pilgrim Nuclear Power Station)         )
Entergy Nuclear Generation Company and )                       Docket No. 50-293-LR Entergy Nuclear Operations, Inc.                     )         ASLBP No. 06-848-02-LR
ENTERGY'S OBJECTION TO PILGRIM WATCH'SPOST-HEARING MEMORANDA AND OTHER UNAUTHORIZED FILINGSEntergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (collectively "Entergy") hereby object to Pilgrim Watch's successive, improper filings. Since the oral argument in Plymouth on March 9, 2011, Pilgrim Watch has filed four post-hearing memoranda.
                                                    )
1 These submissions are improper attempts to have the Board consider new information or assertions without any attempt to meet the standards for motions in 10 C.F.R. § 2.323, including the consultation requirements. Pilgrim Watch has also filed an impermissible reply to the answers to one of these requests, without any request for leave required by 10 C.F.R.  
(Pilgrim Nuclear Power Station)                     )
§ 2.323(c).
ENTERGYS OBJECTION TO PILGRIM WATCHS POST-HEARING MEMORANDA AND OTHER UNAUTHORIZED FILINGS Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (collectively Entergy) hereby object to Pilgrim Watchs successive, improper filings. Since the oral argument in Plymouth on March 9, 2011, Pilgrim Watch has filed four post-hearing memoranda. 1 These submissions are improper attempts to have the Board consider new information or assertions without any attempt to meet the standards for motions in 10 C.F.R. § 2.323, including the consultation requirements. Pilgrim Watch has also filed an impermissible reply to the answers to one of these requests, without any request for leave required by 10 C.F.R.
2 Entergy objects to Pilgrim Watch's continual unauthorized filings and disregard for the rules of practice. See Detroit Edison Co. (Enrico Fermi Atomic Plant, Unit 2), ALAB-469, 7 N.R.C. 470, 471 (1978) (unauthorized filing may be disregarded); Tennessee Valley Authority (Browns Ferry Nuclear Plant, Units 1 and 2), LBP-76-10, 3 N.R.C. 209, 211 (1976) ("The Board dislikes the gratuitous filing of unauthorized pleadings extra the Rules of Practice").
§ 2.323(c). 2 Entergy objects to Pilgrim Watchs continual unauthorized filings and disregard for the rules of practice. See Detroit Edison Co. (Enrico Fermi Atomic Plant, Unit 2), ALAB-469, 7 N.R.C. 470, 471 (1978) (unauthorized filing may be disregarded); Tennessee Valley Authority (Browns Ferry Nuclear Plant, Units 1 and 2), LBP-76-10, 3 N.R.C. 209, 211 (1976) (The Board dislikes the gratuitous filing of unauthorized pleadings extra the Rules of Practice).
1 Pilgrim Watch Memorandum Regarding Fukushima (March 12, 2011); Pilgrim Watch's Post Hearing Memorandum (March 28, 2011); Pilgrim Watch Memorandum - Entergy's Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation (April 11, 2011); Pilgrim Watch Memorandum - Entergy's Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation - Video Supplement (April 12, 2011).
1 Pilgrim Watch Memorandum Regarding Fukushima (March 12, 2011); Pilgrim Watchs Post Hearing Memorandum (March 28, 2011); Pilgrim Watch Memorandum - Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation (April 11, 2011); Pilgrim Watch Memorandum -
2 Pilgrim Watch Answer to Entergy's and NRC Staff's Reply to Pilgrim Watch Post-Hearing Memorandum Filed April 7, 2011 (A pril 11, 2011). 402865464v1 Entergy also objects to the inaccurate allegations in these submissions. For example, in its April 11, 2011 Memorandum, Pilgrim Watch states, "the Joint Committees asked Entergy's panel if there were proven tests to assess submerged electric cable degradation at Pilgrim Station."  This question was not asked. In the same memorandum, Pilgrim Watch states:  Mr. S.J. Bethay, Director Nuclear Safety Assurance Pilgrim Station, responded for Entergy's panel. He testified that there were no proven commercially available tests to detect cable insulation degradation; but when they became available, Pilgrim would use them. (Emphasis added) Emphasis in original. Mr. Bethay did not make this statement.
Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation
3In Pilgrim Watch's April 12, 2011 Memorandum, Pilgrim Watch refers the Board to an archived video recording of the presentations before these Massachusetts Joint Committees, which it now claims only "supports that there are no proven commercially available tests for cable insulation degradation currently available."  Even this attempt by Pilgrim Watch to recast its previous misstatements is inaccurate. Mr. Bethay, who was discussing one type of test called a megger test, stated that it "tests insulation capability" and "tells you what's its condition right now."  Thus, his presentation in fact supports the existence of a test capable of detecting cable insulation degradation. Mr. Bethay did observe that this test is "not necessarily a good predictor" [of future degradation] and that "there are new types of tests being developed to be more predictive and identify what's the long term effects of this."  That "better" tests are being developed does not imply that there are no proven commercially available tests for cable
  - Video Supplement (April 12, 2011).
2 Pilgrim Watch Answer to Entergys and NRC Staffs Reply to Pilgrim Watch Post-Hearing Memorandum Filed April 7, 2011 (April 11, 2011).
402865464v1


insulation degradation.
Entergy also objects to the inaccurate allegations in these submissions. For example, in its April 11, 2011 Memorandum, Pilgrim Watch states, the Joint Committees asked Entergys panel if there were proven tests to assess submerged electric cable degradation at Pilgrim Station. This question was not asked. In the same memorandum, Pilgrim Watch states:
3 Pilgrim Watch also asserts that Entergy's panel included Rick Smith (Entergy's President, Wholesale Commodity Business). That statement too is inaccurate. 402865464v1 Respectfully Submitted, /Signed electronically by:/
Mr. S.J. Bethay, Director Nuclear Safety Assurance Pilgrim Station, responded for Entergys panel. He testified that there were no proven commercially available tests to detect cable insulation degradation; but when they became available, Pilgrim would use them. (Emphasis added)
________________________
Emphasis in original. Mr. Bethay did not make this statement. 3 In Pilgrim Watchs April 12, 2011 Memorandum, Pilgrim Watch refers the Board to an archived video recording of the presentations before these Massachusetts Joint Committees, which it now claims only supports that there are no proven commercially available tests for cable insulation degradation currently available. Even this attempt by Pilgrim Watch to recast its previous misstatements is inaccurate. Mr. Bethay, who was discussing one type of test called a megger test, stated that it tests insulation capability and tells you whats its condition right now. Thus, his presentation in fact supports the existence of a test capable of detecting cable insulation degradation. Mr. Bethay did observe that this test is not necessarily a good predictor [of future degradation] and that there are new types of tests being developed to be more predictive and identify whats the long term effects of this. That better tests are being developed does not imply that there are no proven commercially available tests for cable insulation degradation.
David R. Lewis
3 Pilgrim Watch also asserts that Entergys panel included Rick Smith (Entergys President, Wholesale Commodity Business). That statement too is inaccurate.
402865464v1


Paul A. Gaukler PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW
Respectfully Submitted,
                      /Signed electronically by:/
___ _____________________
David R. Lewis Paul A. Gaukler PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1128 Tel. (202) 663-8000 Counsel for Entergy Dated: April 22, 2011 402865464v1


Washington, DC 20037-1128
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of                                )
                                                )
Entergy Nuclear Generation Company and )                Docket No. 50-293-LR Entergy Nuclear Operations, Inc.                )      ASLBP No. 06-848-02-LR
                                                )
(Pilgrim Nuclear Power Station)                )
CERTIFICATE OF SERVICE I hereby certify that copies of Entergys Objection to Pilgrim Watch Post-Hearing Memoranda and Other Unauthorized Filings, dated April 22, 2011, was provided to the Electronic Information Exchange for service on the individuals below, this 22nd day of April, 2011.
Secretary                                        Office of Commission Appellate Adjudication Attn: Rulemakings and Adjudications Staff      Mail Stop O-16 C1 Mail Stop O-16 C1                                U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission              Washington, DC 20555-0001 Washington, DC 20555-0001                        ocaamail@nrc.gov secy@nrc.gov; hearingdocket@nrc.gov Administrative Judge                            Administrative Judge Ann Marshall Young, Esq., Chair                  Dr. Richard F. Cole Atomic Safety and Licensing Board                Atomic Safety and Licensing Board Mail Stop T-3 F23                                Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission              U.S. Nuclear Regulatory Commission Washington, DC 20555-0001                        Washington, DC 20555-0001 amy@nrc.gov                                      rfc1@nrc.gov Administrative Judge                            Atomic Safety and Licensing Board Paul B. Abramson                                Mail Stop T-3 F23 Atomic Safety and Licensing Board                U.S. Nuclear Regulatory Commission Mail Stop T-3 F23                                Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 pba@nrc.gov 402865464v1


Tel.  (202) 663-8000                              Counsel for Entergy Dated: April 22, 2011 402865464v1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing BoardIn the Matter of                    )                              )
Ms. Mary Lampert                         Susan L. Uttal, Esq.
Entergy Nuclear Generation Company and  )      Docket No. 50-293-LR Entergy Nuclear Operations, Inc.        )      ASLBP No. 06-848-02-LR
148 Washington Street                    Andrea Z. Jones, Esq.
                              )
Duxbury, MA 02332                        Brian Harris, Esq.
(Pilgrim Nuclear Power Station)        )
mary.lampert@comcast.net                  Beth Mizuno, Esq.
CERTIFICATE OF SERVICEI hereby certify that copies of "Entergy's Objection to Pilgrim Watch Post-Hearing Memoranda and Other Unauthorized Filings," dated April 22, 2011, was provided to the Electronic Information Exchange for service on the individuals below, this 22 nd day of April, 2011.SecretaryAtt'n:  Rulemakings and Adjudications Staff
Office of the General Counsel Mail Stop O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Susan.Uttal@nrc.gov; andrea.jones@nrc.gov; brian.harris@nrc.gov; beth.mizuno@nrc.gov Matthew Brock, Assistant Attorney General Sheila Slocum Hollis, Esq.
 
Commonwealth of Massachusetts             Duane Morris LLP Office of the Attorney General           505 9th Street, NW One Ashburton Place                       Suite 1000 Boston, MA 02108                         Washington, DC 20006 Martha.Coakley@state.ma.us               sshollis@duanemorris.com Matthew.Brock@state.ma.us Mr. Mark D. Sylvia                       Chief Kevin M. Nord Town Manager                              Fire Chief and Director, Duxbury Emergency Town of Plymouth                          Management Agency 11 Lincoln St.                            688 Tremont Street Plymouth, MA 02360                        P.O. Box 2824 msylvia@townhall.plymouth.ma.us          Duxbury, MA 02331 nord@town.duxbury.ma.us Richard R. MacDonald                      Katherine Tucker, Esq.
Mail Stop O-16 C1
Town Manager                              Law Clerk, 878 Tremont Street                        Atomic Safety and Licensing Board Panel Duxbury, MA 02332                        Mail Stop T3-E2a macdonald@town.duxbury.ma.us              U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Katie.Tucker@nrc.gov
 
[Signed electronically by:]
U.S. Nuclear Regulatory Commission
_______________________________
 
David R. Lewis 5
Washington, DC 20555-0001
402865464v1}}
 
secy@nrc.gov; hearingdocket@nrc.gov Office of Commission Appellate Adjudication Mail Stop O-16 C1
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 ocaamail@nrc.gov Administrative Judge
 
Ann Marshall Young, Esq., Chair Atomic Safety and Licensing Board
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC  20555-0001 amy@nrc.govAdministrative Judge
 
Dr. Richard F. Cole Atomic Safety and Licensing Board
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC  20555-0001
 
rfc1@nrc.govAdministrative Judge Paul B. Abramson Atomic Safety and Licensing Board
 
Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC  20555-0001
 
pba@nrc.govAtomic Safety and Licensing Board Mail Stop T-3 F23
 
U.S. Nuclear Regulatory Commission
 
Washington, DC 20555-0001 402865464v1 Ms. Mary Lampert 148 Washington Street
 
Duxbury, MA 02332 mary.lampert@comcast.net Susan L. Uttal, Esq.
Andrea Z. Jones, Esq.  
 
Brian Harris, Esq.  
 
Beth Mizuno, Esq.  
 
Office of the General Counsel  
 
Mail Stop O-15 D21  
 
U.S. Nuclear Regulatory Commission  
 
Washington, DC 20555-0001  
 
Susan.Uttal@nrc.gov; andrea.jones@nrc.gov; brian.harris@nrc.gov; beth.mizuno@nrc.gov Matthew Brock, Assistant Attorney General Commonwealth of Massachusetts Office of the Attorney General  
 
One Ashburton Place  
 
Boston, MA 02108 Martha.Coakley@state.ma.us Matthew.Brock@state.ma.us Sheila Slocum Hollis, Esq.
Duane Morris LLP 505 9th Street, NW 
 
Suite 1000
 
Washington, DC  20006 sshollis@duanemorris.com Mr. Mark D. Sylvia Town Manager
 
Town of Plymouth
 
11 Lincoln St.
Plymouth, MA 02360 msylvia@townhall.plymouth.ma.us Chief Kevin M. Nord Fire Chief and Director, Duxbury Emergency Management Agency 688 Tremont Street  
 
P.O. Box 2824  
 
Duxbury, MA 02331 nord@town.duxbury.ma.usRichard R. MacDonald Town Manager 878 Tremont Street
 
Duxbury, MA 02332 macdonald@town.duxbury.ma.us Katherine Tucker, Esq.
Law Clerk, Atomic Safety and Licensing Board Panel  
 
Mail Stop T3-E2a  
 
U.S. Nuclear Regulatory Commission  
 
Washington, DC 20555-0001  
 
Katie.Tucker@nrc.gov                             [Signed electronically by:] _______________________________
David R. Lewis 5402865464v1}}

Revision as of 01:38, 13 November 2019

Entergy'S Objection to Pilgrim Watch'S Post-Hearing Memoranda and Other Unauthorized Filings
ML111120384
Person / Time
Site: Pilgrim
Issue date: 04/22/2011
From: Gaukler P, Doris Lewis
Entergy Nuclear Generation Co, Entergy Nuclear Operations, Pillsbury, Winthrop, Shaw, Pittman, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-293-LR, ASLBP 06-848-02-LR, RAS 20020
Download: ML111120384 (5)


Text

April 22, 2011 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board Panel In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

ENTERGYS OBJECTION TO PILGRIM WATCHS POST-HEARING MEMORANDA AND OTHER UNAUTHORIZED FILINGS Entergy Nuclear Generation Company and Entergy Nuclear Operations, Inc. (collectively Entergy) hereby object to Pilgrim Watchs successive, improper filings. Since the oral argument in Plymouth on March 9, 2011, Pilgrim Watch has filed four post-hearing memoranda. 1 These submissions are improper attempts to have the Board consider new information or assertions without any attempt to meet the standards for motions in 10 C.F.R. § 2.323, including the consultation requirements. Pilgrim Watch has also filed an impermissible reply to the answers to one of these requests, without any request for leave required by 10 C.F.R.

§ 2.323(c). 2 Entergy objects to Pilgrim Watchs continual unauthorized filings and disregard for the rules of practice. See Detroit Edison Co. (Enrico Fermi Atomic Plant, Unit 2), ALAB-469, 7 N.R.C. 470, 471 (1978) (unauthorized filing may be disregarded); Tennessee Valley Authority (Browns Ferry Nuclear Plant, Units 1 and 2), LBP-76-10, 3 N.R.C. 209, 211 (1976) (The Board dislikes the gratuitous filing of unauthorized pleadings extra the Rules of Practice).

1 Pilgrim Watch Memorandum Regarding Fukushima (March 12, 2011); Pilgrim Watchs Post Hearing Memorandum (March 28, 2011); Pilgrim Watch Memorandum - Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation (April 11, 2011); Pilgrim Watch Memorandum -

Entergys Incorrect and Misleading Information Regarding Proven Tests to Detect Cable Insulation Degradation

- Video Supplement (April 12, 2011).

2 Pilgrim Watch Answer to Entergys and NRC Staffs Reply to Pilgrim Watch Post-Hearing Memorandum Filed April 7, 2011 (April 11, 2011).

402865464v1

Entergy also objects to the inaccurate allegations in these submissions. For example, in its April 11, 2011 Memorandum, Pilgrim Watch states, the Joint Committees asked Entergys panel if there were proven tests to assess submerged electric cable degradation at Pilgrim Station. This question was not asked. In the same memorandum, Pilgrim Watch states:

Mr. S.J. Bethay, Director Nuclear Safety Assurance Pilgrim Station, responded for Entergys panel. He testified that there were no proven commercially available tests to detect cable insulation degradation; but when they became available, Pilgrim would use them. (Emphasis added)

Emphasis in original. Mr. Bethay did not make this statement. 3 In Pilgrim Watchs April 12, 2011 Memorandum, Pilgrim Watch refers the Board to an archived video recording of the presentations before these Massachusetts Joint Committees, which it now claims only supports that there are no proven commercially available tests for cable insulation degradation currently available. Even this attempt by Pilgrim Watch to recast its previous misstatements is inaccurate. Mr. Bethay, who was discussing one type of test called a megger test, stated that it tests insulation capability and tells you whats its condition right now. Thus, his presentation in fact supports the existence of a test capable of detecting cable insulation degradation. Mr. Bethay did observe that this test is not necessarily a good predictor [of future degradation] and that there are new types of tests being developed to be more predictive and identify whats the long term effects of this. That better tests are being developed does not imply that there are no proven commercially available tests for cable insulation degradation.

3 Pilgrim Watch also asserts that Entergys panel included Rick Smith (Entergys President, Wholesale Commodity Business). That statement too is inaccurate.

402865464v1

Respectfully Submitted,

/Signed electronically by:/

___ _____________________

David R. Lewis Paul A. Gaukler PILLSBURY WINTHROP SHAW PITTMAN LLP 2300 N Street, NW Washington, DC 20037-1128 Tel. (202) 663-8000 Counsel for Entergy Dated: April 22, 2011 402865464v1

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION Before the Atomic Safety and Licensing Board In the Matter of )

)

Entergy Nuclear Generation Company and ) Docket No. 50-293-LR Entergy Nuclear Operations, Inc. ) ASLBP No. 06-848-02-LR

)

(Pilgrim Nuclear Power Station) )

CERTIFICATE OF SERVICE I hereby certify that copies of Entergys Objection to Pilgrim Watch Post-Hearing Memoranda and Other Unauthorized Filings, dated April 22, 2011, was provided to the Electronic Information Exchange for service on the individuals below, this 22nd day of April, 2011.

Secretary Office of Commission Appellate Adjudication Attn: Rulemakings and Adjudications Staff Mail Stop O-16 C1 Mail Stop O-16 C1 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 ocaamail@nrc.gov secy@nrc.gov; hearingdocket@nrc.gov Administrative Judge Administrative Judge Ann Marshall Young, Esq., Chair Dr. Richard F. Cole Atomic Safety and Licensing Board Atomic Safety and Licensing Board Mail Stop T-3 F23 Mail Stop T-3 F23 U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Washington, DC 20555-0001 amy@nrc.gov rfc1@nrc.gov Administrative Judge Atomic Safety and Licensing Board Paul B. Abramson Mail Stop T-3 F23 Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Mail Stop T-3 F23 Washington, DC 20555-0001 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 pba@nrc.gov 402865464v1

Ms. Mary Lampert Susan L. Uttal, Esq.

148 Washington Street Andrea Z. Jones, Esq.

Duxbury, MA 02332 Brian Harris, Esq.

mary.lampert@comcast.net Beth Mizuno, Esq.

Office of the General Counsel Mail Stop O-15 D21 U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Susan.Uttal@nrc.gov; andrea.jones@nrc.gov; brian.harris@nrc.gov; beth.mizuno@nrc.gov Matthew Brock, Assistant Attorney General Sheila Slocum Hollis, Esq.

Commonwealth of Massachusetts Duane Morris LLP Office of the Attorney General 505 9th Street, NW One Ashburton Place Suite 1000 Boston, MA 02108 Washington, DC 20006 Martha.Coakley@state.ma.us sshollis@duanemorris.com Matthew.Brock@state.ma.us Mr. Mark D. Sylvia Chief Kevin M. Nord Town Manager Fire Chief and Director, Duxbury Emergency Town of Plymouth Management Agency 11 Lincoln St. 688 Tremont Street Plymouth, MA 02360 P.O. Box 2824 msylvia@townhall.plymouth.ma.us Duxbury, MA 02331 nord@town.duxbury.ma.us Richard R. MacDonald Katherine Tucker, Esq.

Town Manager Law Clerk, 878 Tremont Street Atomic Safety and Licensing Board Panel Duxbury, MA 02332 Mail Stop T3-E2a macdonald@town.duxbury.ma.us U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Katie.Tucker@nrc.gov

[Signed electronically by:]

_______________________________

David R. Lewis 5

402865464v1