{{#Wiki_filter:UNITED STATES REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUiTE 400 ARLINGTON, TEXAS 76011-4125 EA-11-142 Donna Jacobs, Vice President, Operations Entergy Operations, Inc. Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 | {{#Wiki_filter:UNITED STATES | ||
~,,:UCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUiTE 400 ARLINGTON, TEXAS 76011-4125 October 19, 2011 EA-11-142 Donna Jacobs, Vice President, Operations Entergy Operations, Inc. | |||
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751 | |||
==Dear Ms. Jacobs:== | ==Dear Ms. Jacobs:== | ||
The conference was held at the request of the licensee. | On October 3, 2011, representatives of Entergy Operations, Inc., VVaterford Steam Electric Station, Unit 3, met with NRC personnel in the Region IV office located in Arlington, Texas, to discuss the preliminary White finding identified in NRC Inspection Report 05000382/2011009. The conference was held at the request of the licensee. | ||
The licensee presented a summary of the causes for the preliminary White finding and their corrective actions. The licensee provided a discussion of the information in Attachment | The licensee presented a summary of the causes for the preliminary White finding and their corrective actions. The licensee provided a discussion of the information in Attachment 2. | ||
The attendance list and the licensee's presentation are attached to this summary. | |||
In accordance with 10 CFR 2390 of the NRC's "Ru!es of Practice," a copy of this letter vvi!! be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the electronic Reading Room page of the NRC's public website at Sincerely, IRAJ Gregory E. Werner, Chief Plant Support Branch 2 Docket: 50-382 License: NPF-38 | |||
==Enclosures:== | ==Enclosures:== | ||
: 1. Attendance List 2. Licensee Presentation Distribution via ListServ | : 1. Attendance List | ||
PREDECISIONAL ENFORCEMENT CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNIT3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. -11 :00 a.m. CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 NRC REPRESENTATIVES NAME (PLEASE PRINT) ORGANIZATION TITLE Dan Bradley USNRC Project Engineer Gwynne Skaggs Ryan USNRC Reactor Inspector Bryan Ford Entergy Senior Manager, Licensing John Mc Cann Entergy Vice President, Nuclear Safety, Emergency Preparedness, and Licensing USNRC Health Physicist Natasha Greene Larry Ricketson USNRC Senior Health Physicist Ray Kellar USNRC Senior Enforcement Specialist Stephen Garry USNRC, Nuclear Senior Health Physicist Reactor Regulation Manual Jimenez USNRC, , Nuclear Health Physicist Reactor Regulation Stephen Vaughn USNRC, , Nuclear Enforcement Coordinator Reactor Regulation Gerald Gulla USNRC, Enforcement Senior Enforcement Specialist | : 2. Licensee Presentation Distribution via ListServ | ||
"" -""-I | |||
egulatorv Conference October 3, 2011 W ATEltFORD STEAM ELEC'TRIC STATION UNIT 3 NRC R1\DIATION SAFETY INSI>ECTION REPORT 0500 | REGULATORY CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNiT 3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. 11 :00 a.m. | ||
CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 LICENSEE REPRESENTATIVES NAME (PLEASE ORGANIZATION TITLE PRINT) | |||
Entergy Vice President Operations Donna Jacobs Bruce Proctor Entergy Vice President Technical Assistance Daryl Marse Entergy Chemistry Specialist Jeffrey W. Brawley Entergy ALARA Supervisor Billy Steelman Entergy Licensing Manager R~rli':l+if"\n PI"'I"'\+o,...+il"\n I\II""r"\'''\I''''tl'''\r John Gumnick Entergy I '\.U\,AH,..... I"IVI I I I VI,,\,,;vlIVI I IVlctl la~C;;1 Casey Alldredge USNRC Health Physicist Jim Drake USNRC Acting Branch Chief, DRP, Branch E Greg Werner USNRC Branch Chief, DRS! PS82 Marlone Davis USNRC Senior. Resident Inspector, Waterford 3 Dean Overland USNRC Resident Inspector, Waterford 3 Elmo Collins USNRC Regional Administrator Anton Vegel USNRC Division Director, DRS II Page _1_ of -L Enclosure 1 | |||
PREDECISIONAL ENFORCEMENT CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNIT3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. - 11 :00 a.m. | |||
CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 NRC REPRESENTATIVES NAME (PLEASE PRINT) ORGANIZATION TITLE Dan Bradley USNRC Project Engineer Gwynne Skaggs Ryan USNRC Reactor Inspector Bryan Ford Entergy Senior Manager, Licensing John Mc Cann Entergy Vice President, Nuclear Safety, Emergency Preparedness, and Licensing USNRC Health Physicist Natasha Greene Larry Ricketson USNRC Senior Health Physicist Ray Kellar USNRC Senior Enforcement Specialist Stephen Garry USNRC, Nuclear Senior Health Physicist Reactor Regulation Manual Jimenez USNRC, , Nuclear Health Physicist Reactor Regulation Stephen Vaughn USNRC, , Nuclear Enforcement Coordinator Reactor Regulation Gerald Gulla USNRC, Enforcement Senior Enforcement Specialist | |||
""" | |||
"" | |||
-""- I Page-L of -L Enclosure 1 | |||
egulatorv Conference October 3, 2011 W ATEltFORD STEAM ELEC'TRIC STATION UNIT 3 NRC R1\DIATION SAFETY INSI>ECTION REPORT 0500 0382/2011009; 1 | |||
PRE-LIMINAR-Y WHITE FINDING Enclosure 2 | |||
Opening RemarKS Waterford 3 Perspective Reactor coolant p'Ull1p vapor seal de staging Waterfor<i 3 has ta.ken ll1itigating actions Waterfor<i 3 has nlade signiiicant ill1prOVenlents in (;urrent pla,nt perforll1ance | Opening RemarKS Waterford 3 Perspective Reactor coolant p'Ull1p vapor seal de staging Waterfor<i 3 has ta.ken ll1itigating actions Waterfor<i 3 has nlade signiiicant ill1prOVenlents in (;urrent pla,nt perforll1ance | ||
:2 Enclosure 2 | :2 Enclosure 2 | ||
Engineering Reactor Coolant Pump Vapor Seal Summary September 2005 -Reactor coolant pump vapor seal de staging March 2006 -Operating procedure changes anuary 2007 -Vendor evaluation started September 2008 -Vendor evaluation and testing complete [] October 2009 -Reactor coolant pum]? seal installed at ANO November 2009 -Refuel 16 installed trough modification April 2011 -. Refuel 17 two reactor coolant pump seal packages replaced 7 Enclosure 2 | Opening Remarks Donna Jacobs - VVaterford ~~ Vice Pres* | ||
* | Collective Radiation Exposure (CRE) 300 250 200 e-O) | ||
* nglneerln 4 | ~ 150 w | ||
a: | |||
u 100 50 o -1LZli",~,~'~4_,'~~~ | |||
Refuel Outage 3 | |||
Enclosure 2 | |||
Opening Remarks l?resentation Olltline | |||
[] Engineering - Bnlce Proctor Refuel Cc)nditions - Daryl Marse Radiation Protection - Jeff Brawley | |||
[] Regulatory Perspt~ctive... Billy Steellllan Closing R"elllarks - Donna Jacobs 4 | |||
Enclosure 2 | |||
.. | |||
vVatertord 3 eSlgn COlllbustion Engilleering 2 I-,oop Design | |||
[] F"our Rea(~tor Coolant PUlllPS Reactor C~oolant F~UlllP Vapc)r Seal Design c* | |||
,) | |||
Enclosure 2 | |||
Engineering Reactor Coolant Pump Vapor Seal Summary September 2005 - Reactor coolant pump vapor seal de staging March 2006 - Operating procedure changes anuary 2007 - Vendor evaluation started September 2008 - Vendor evaluation and testing complete | |||
[] October 2009 - Reactor coolant pum]? seal installed at ANO November 2009 - Refuel 16 installed trough modification April 2011 -. Refuel 17 two reactor coolant pump seal packages replaced 7 | |||
Enclosure 2 | |||
* | |||
* nglneerln g 4 R~efuel 16 Modification Trough lTLodification perfonned in Refuel 16 PennanerLtly instaJled engil1eered control Trough lTLodification established at accolTLlTLo,date unE~xpected s()urce terlTLS 8 | |||
Enclosure 2 | |||
W,lterford 3 Refulel 16 I>lann d Activities | W,lterford 3 Refulel 16 I>lann d Activities | ||
[] Pre-outag'e power reductioIl and clean up DIan Reactor c,oolant systetn dose equivalent iodine and react()r coolaIlt systetn degassing I>lan o Shutdown Cooling PurificatioJQ Cobalt ptans 9 Enclosure 2 | [] Pre-outag'e power reductioIl and clean up DIan Reactor c,oolant systetn dose equivalent iodine and react()r coolaIlt systetn degassing I>lan o Shutdown Cooling PurificatioJQ Cobalt clt~anup ptans | ||
JRadiation Pre-Outage ALARA Planning Reactor coolant pUlTIP Radi,ltion W | ()perating~ Experit~nce 9 | ||
PeflTIit planning Radiatiol1 W orl( | Enclosure 2 | ||
expected conditions Reactor coolant pUlTIP vapor destaging planned c:ontingel1cies 10 Enclosure 2 | |||
JRadiation Prott~ction Pre-Outage ALARA Planning Reactor coolant pUlTIP Radi,ltion W or~: PeflTIit planning Radiatiol1 W orl( F~erlllit expected conditions Reactor coolant pUlTIP vapor destaging pre-planned c:ontingel1cies 10 Enclosure 2 | |||
W4aterford 3 Refuel 16 Unplanned Conditions Reactor trip (moisture separator reheater) | W4aterford 3 Refuel 16 Unplanned Conditions Reactor trip (moisture separator reheater) | ||
Fuel pin (iefects Addition,ll cleanu.p Reactor coolant system acid reducing duration 11 Enclosure 2 | Fuel pin (iefects Addition,ll cleanu.p Reactor coolant system acid reducing duration 11 Enclosure 2 | ||
]~adiation Prote~ction Unexpected Conditions Response Initiated 1~adiatiol1 Work Permit revisions Analyzed impact lof emergel1t conditions Documented and *briefed Radiation W()rk Permit re visions 1 | |||
Executed ALARA contingel1cy actions 12 Enclosure 2 | |||
Wclterford 3 ALARA Improvements Installed trough ITlodificatio:n Replaced two rea(~tor coolarlt pUITlP seal packages Purchase(i additional tungst(~n shieldin.g including tungste11 vests Increased. the aITlc)unt of shielding Added ne:w shieldling applic,ations 13 Enclosure 2 | |||
Radiation ProtE~ctl0n ALARA Improvement Statistic RF16 RFI I | |||
()utage Dose ~250 Rem ~98 Rem F~ersonnel COfltaminatic)n 128 21 I~vents 14 Enclosure 2 | |||
Regulatory Perspective IMC 030:8 Reactc~r Oversigllt Process (ROP) | |||
IMC 060~9 Appendix C Occupational Radiatiol1 Safety :Significan~:;e Detenninati Process 15 Enclosure 2 | |||
Closing Remarks Reactor c,oolant pump vapor seal leakage Waterforci 3 took reasonablt~ actions Waterforci 3 has i:mplementt~d ALARA itnprOvenlents 16 Enclosure 2}} | |||
Closing Remarks Reactor c,oolant pump vapor seal leakage Waterforci 3 took actions Waterforci 3 has ALARA itnprOvenlents 16 Enclosure 2}} | |||
Revision as of 13:15, 12 November 2019
| ML112920520 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/19/2011 |
| From: | Greg Werner NRC/RGN-IV/DRS/PSB-2 |
| To: | Jacobs D Entergy Operations |
| References | |
| EA-11-142, IR-11-009 | |
| Download: ML112920520 (19) | |
Text
UNITED STATES
~,,:UCLEAR REGULATORY COMMISSION REGION IV 612 EAST LAMAR BLVD, SUiTE 400 ARLINGTON, TEXAS 76011-4125 October 19, 2011 EA-11-142 Donna Jacobs, Vice President, Operations Entergy Operations, Inc.
Waterford Steam Electric Station, Unit 3 17265 River Road Killona, LA 70057-0751
Dear Ms. Jacobs:
On October 3, 2011, representatives of Entergy Operations, Inc., VVaterford Steam Electric Station, Unit 3, met with NRC personnel in the Region IV office located in Arlington, Texas, to discuss the preliminary White finding identified in NRC Inspection Report 05000382/2011009. The conference was held at the request of the licensee.
The licensee presented a summary of the causes for the preliminary White finding and their corrective actions. The licensee provided a discussion of the information in Attachment 2.
The attendance list and the licensee's presentation are attached to this summary.
In accordance with 10 CFR 2390 of the NRC's "Ru!es of Practice," a copy of this letter vvi!! be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the electronic Reading Room page of the NRC's public website at Sincerely, IRAJ Gregory E. Werner, Chief Plant Support Branch 2 Docket: 50-382 License: NPF-38
Enclosures:
- 1. Attendance List
- 2. Licensee Presentation Distribution via ListServ
REGULATORY CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNiT 3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. 11 :00 a.m.
CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 LICENSEE REPRESENTATIVES NAME (PLEASE ORGANIZATION TITLE PRINT)
Entergy Vice President Operations Donna Jacobs Bruce Proctor Entergy Vice President Technical Assistance Daryl Marse Entergy Chemistry Specialist Jeffrey W. Brawley Entergy ALARA Supervisor Billy Steelman Entergy Licensing Manager R~rli':l+if"\n PI"'I"'\+o,...+il"\n I\II""r"\\I'tl\r John Gumnick Entergy I '\.U\,AH,..... I"IVI I I I VI,,\,,;vlIVI I IVlctl la~C;;1 Casey Alldredge USNRC Health Physicist Jim Drake USNRC Acting Branch Chief, DRP, Branch E Greg Werner USNRC Branch Chief, DRS! PS82 Marlone Davis USNRC Senior. Resident Inspector, Waterford 3 Dean Overland USNRC Resident Inspector, Waterford 3 Elmo Collins USNRC Regional Administrator Anton Vegel USNRC Division Director, DRS II Page _1_ of -L Enclosure 1
PREDECISIONAL ENFORCEMENT CONFERENCE ATTENDANCE LICENSEE/FACILITY ENTERGYIWATERFORD STEAM ELECTRIC STATION, UNIT3 DATE/TIME OCTOBER 3, 2011/9:00 a.m. - 11 :00 a.m.
CONFERENCE NRC REGION IV LOCATION EA NUMBER 11-142 NRC REPRESENTATIVES NAME (PLEASE PRINT) ORGANIZATION TITLE Dan Bradley USNRC Project Engineer Gwynne Skaggs Ryan USNRC Reactor Inspector Bryan Ford Entergy Senior Manager, Licensing John Mc Cann Entergy Vice President, Nuclear Safety, Emergency Preparedness, and Licensing USNRC Health Physicist Natasha Greene Larry Ricketson USNRC Senior Health Physicist Ray Kellar USNRC Senior Enforcement Specialist Stephen Garry USNRC, Nuclear Senior Health Physicist Reactor Regulation Manual Jimenez USNRC, , Nuclear Health Physicist Reactor Regulation Stephen Vaughn USNRC, , Nuclear Enforcement Coordinator Reactor Regulation Gerald Gulla USNRC, Enforcement Senior Enforcement Specialist
"""
""
-""- I Page-L of -L Enclosure 1
egulatorv Conference October 3, 2011 W ATEltFORD STEAM ELEC'TRIC STATION UNIT 3 NRC R1\DIATION SAFETY INSI>ECTION REPORT 0500 0382/2011009; 1
PRE-LIMINAR-Y WHITE FINDING Enclosure 2
Opening RemarKS Waterford 3 Perspective Reactor coolant p'Ull1p vapor seal de staging Waterfor<i 3 has ta.ken ll1itigating actions Waterforlann d Activities
[] Pre-outag'e power reductioIl and clean up DIan Reactor c,oolant systetn dose equivalent iodine and react()r coolaIlt systetn degassing I>lan o Shutdown Cooling PurificatioJQ Cobalt clt~anup ptans
()perating~ Experit~nce 9
Enclosure 2
JRadiation Prott~ction Pre-Outage ALARA Planning Reactor coolant pUlTIP Radi,ltion W or~: PeflTIit planning Radiatiol1 W orl( F~erlllit expected conditions Reactor coolant pUlTIP vapor destaging pre-planned c:ontingel1cies 10 Enclosure 2
W4aterford 3 Refuel 16 Unplanned Conditions Reactor trip (moisture separator reheater)
Fuel pin (iefects Addition,ll cleanu.p Reactor coolant system acid reducing duration 11 Enclosure 2
]~adiation Prote~ction Unexpected Conditions Response Initiated 1~adiatiol1 Work Permit revisions Analyzed impact lof emergel1t conditions Documented and *briefed Radiation W()rk Permit re visions 1
Executed ALARA contingel1cy actions 12 Enclosure 2
Wclterford 3 ALARA Improvements Installed trough ITlodificatio:n Replaced two rea(~tor coolarlt pUITlP seal packages Purchase(i additional tungst(~n shieldin.g including tungste11 vests Increased. the aITlc)unt of shielding Added ne:w shieldling applic,ations 13 Enclosure 2
Radiation ProtE~ctl0n ALARA Improvement Statistic RF16 RFI I
()utage Dose ~250 Rem ~98 Rem F~ersonnel COfltaminatic)n 128 21 I~vents 14 Enclosure 2
Regulatory Perspective IMC 030:8 Reactc~r Oversigllt Process (ROP)
IMC 060~9 Appendix C Occupational Radiatiol1 Safety :Significan~:;e Detenninati Process 15 Enclosure 2
Closing Remarks Reactor c,oolant pump vapor seal leakage Waterforci 3 took reasonablt~ actions Waterforci 3 has i:mplementt~d ALARA itnprOvenlents 16 Enclosure 2