{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257
{{#Wiki_filter:UNITED STATES
  September 26, 2012  
                              NUCLEAR REGULATORY COMMISSION
 
                                              REGION II
Mr. Mano Nazar  
                            245 PEACHTREE CENTER AVENUE NE, SUITE 1200
Executive Vice President  
                                    ATLANTA, GEORGIA 30303-1257
                                        September 26, 2012
Mr. Mano Nazar
Executive Vice President
  and Chief Nuclear Officer
Florida Power and Light Company
P.O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT:        TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED
                OPERATOR INITIAL EXAMINATION 05000250/2013301 AND
                05000251/2013301
Dear Mr. Nazar:
In a telephone conversation on September 19, 2012, between Mr. Tim James, Exam Project
Manager, and Mr. Gerard Laska, Senior Operations Examiner, arrangements were made for the
administration of licensing examinations at the Turkey Point Nuclear Plant. The operating test is
scheduled to be administered during the weeks of March 4, 2013, and March 11, 2013. The
written examination is scheduled to be administered the week of March 11, 2013. The on-site
preparatory week is scheduled for the week of February 11, 2013.
As agreed during the telephone conversation, your staff will prepare both the operating test and
written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory
Commission (NRC) regional office will discuss with your staff any changes that might be
necessary before the examinations are administered. Your staff has also agreed to make
copies of all examination materials that are necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the operating test
outline by December 21, 2012. Mr. Gerry Laska provided a written examination outline to your
staff on July 16, 2012. The written examination, operating test and the supporting reference
materials identified in Attachment 3, to ES-201, will be due by January 18, 2013. Pursuant to
Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an
authorized representative of the facility licensee shall approve the outline, examination, and test
before they are submitted to the NRC for review and approval. All materials shall be complete
and ready-to-use.
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked. Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.


  and Chief Nuclear Officer  
M. Nazar                                      2
Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above. In accordance with ES-302,
your staff should retain the original simulator performance data (e.g., system pressures,
temperatures, and levels) generated during the dynamic operating tests until the examination
results are final.
Appendix E of NUREG-1021, contains a number of NRC policies and guidelines that will be in
effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date. If the applications are not
received at least 30 days before the examination date, a postponement may be necessary.
Signed applications certifying that all training has been completed should be submitted at least
14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of
Management and Budget (OMB) under approval number 3150-0018, which expires on
February 28, 2013. The public reporting burden for this collection of information is estimated to
average 500 hours per response, including the time for reviewing instructions, gathering and
maintaining the data needed, writing the examinations, and completing and reviewing the
collection of information. Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management
Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by
Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of
Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRCs document
system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter. Mr. James has been advised of the policies and
guidelines referenced in this letter. If you have any questions regarding the NRC's examination


M. Nazar                                  3
SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED 
procedures and guidelines, please contact Mr. Gerry Laska at (404) 997- 4626, (Internet E-mail:
OPERATOR INITIAL EXAMINATION 05000250/2013301 AND
gerard.laska@nrc.gov), or me at (404) 997- 4550, (Internet E-mail:malcolm.widmann@nrc.gov).
05000251/2013301
                                          Sincerely,
Dear Mr. Nazar:  
                                          /RA/
                                          Malcolm T. Widmann, Chief
                                          Operations Branch 1
                                          Division of Reactor Safety
Docket Nos. 50-250, 50-251
License Nos. DRP-31, DPR-41
cc: (See page 4)


In a telephone conversation on September 19, 2012, between Mr. Tim James, Exam Project Manager, and Mr. Gerard Laska, Senior Operations Examiner, arrangements were made for the administration of licensing examinations at the Turkey Point Nuclear Plant.  The operating test is scheduled to be administered during the weeks of March 4, 2013, and March 11, 2013.  The
written examination is scheduled to be administered the week of March 11, 2013.  The on-site
preparatory week is scheduled for the week of February 11, 2013.


  As agreed during the telephone conversation, your staff will prepare both the operating test and written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,
_________________________            x SUNSI REVIEW COMPLETE x FORM 665 ATTACHED
"Operator Licensing Examination Standards for Power Reactors."  The U.S. Nuclear Regulatory  
OFFICE            RII: DRS      RII: DRS
Commission (NRC) regional office will discuss
SIGNATURE        RA/GL          RA/MW
with your staff any changes that might be necessary before the examinations are administered. Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.  
NAME              G. Laska      M. WIDMANN
DATE                09/26/2012    09/26/2012
To meet the above schedule, it will be necessary for your staff to furnish the operating test
  E-MAIL COPY?        YES    NO    YES      NO  YES    NO    YES  NO      YES    NO    YES    NO    YES    NO
       
M. Nazar                          4
cc:                                  Mitch S. Ross
Alison Brown                        Vice President and General Counsel
Nuclear Licensing                    Nuclear
Florida Power & Light Company        Florida Power & Light Company
Electronic Mail Distribution        Electronic Mail Distribution
Larry Nicholson                      Cynthia Becker
Director                            (Acting) Chief
Licensing                            Florida Bureau of Radiation Control
Florida Power & Light Company        Department of Health
Electronic Mail Distribution        Electronic Mail Distribution
Michael Kiley                        Senior Resident Inspector
Site Vice President                  Turkey Point Nuclear Generating Station
Turkey Point Nuclear Plant          U.S. Nuclear Regulatory Commission
Florida Power and Light Company      9762 SW 344th St.
Electronic Mail Distribution        Florida City, FL 33035
Niel Batista                        Attorney General
Emergency Management Coordinator    Department of Legal Affairs
Department of Emergency Management  The Capitol PL-01
and Homeland Security                Tallahassee, FL 32399-1050
Electronic Mail Distribution
                                    County Manager of Miami-Dade County
Paul Freeman                        111 NW 1st Street, 29th Floor
Vice President                      Miami, FL 33128
Organizational Effectiveness
Florida Power & Light Company        George Gretsas
Electronic Mail Distribution        City Manager
                                    City of Homestead
Peter Wells                          Electronic Mail Distribution
Vice President
Outage Support CFAM                  Florida Power and Light Company
Florida Power & Light Company        ATTN: Mr. Brian Stamp
Electronic Mail Distribution                Training Manager
                                    Turkey Point Nuclear Plant
Robert J. Tomonto                    9760 SW 344th Street
Licensing Manager                    Homestead, FL 33035
Turkey Point Nuclear Plant
Florida Power & Light Company
Electronic Mail Distribution
Eric McCartney
Plant General Manager
Turkey Point Nuclear Plant
Florida Power and Light Company
Electronic Mail Distribution


outline by December 21, 2012.  Mr. Gerry Laska
Letter to Mano Nazar from Malcolm T. Widmann dated
provided a written examination outline to your staff on July 16, 2012.  The written examination, operating test and the supporting reference
SUBJECT:     TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED
materials identified in Attachment 3, to ES-201, will be due by January 18, 2013. Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline, examination, and test
              OPERATOR INITIAL EXAMINATION 05000250/2013301 AND
before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use. 
              05000251/2013301
 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled. 
M. Nazar 2
In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator
performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
 
Appendix E of NUREG-1021, contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications, medical certifications, and waiver
requests (if any) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office of Management and Budget (OMB) under approval number 3150-0018, which expires on  February 28, 2013.  The public reporting burden for this collection of information is estimated to
average 500 hours per response, including the time for reviewing instructions, gathering and
maintaining the data needed, writing the examinations, and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information,
including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and
Budget, Washington, DC 20503.
 
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its
enclosures will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Records (PARS) component of the NRC's document
system (ADAMS).  ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-
rm/adams.html (the Public Electronic Reading Room).
Thank you for your cooperation in this matter.  Mr. James  has been advised of the policies and
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination
M. Nazar 3
procedures and guidelines, please contact Mr. Gerry La
ska at (404) 997- 4626, (Internet E-mail: gerard.laska@nrc.gov), or me at (404) 997- 4550, (Internet E-mail:malcolm.widmann@nrc.gov).
Sincerely,        /RA/ 
      Malcolm T. Widmann, Chief      Operations Branch 1      Division of Reactor Safety
 
Docket Nos.  50-250, 50-251
License Nos.  DRP-31, DPR-41
cc:  (See page 4)
 
_________________________  x SUNSI REVIEW COMPLETE x  FORM 665 ATTACHED OFFICE RII:  DRS RII: DRS      SIGNATURE RA/GL RA/MW      NAME G. Laska M. WIDMANN      DATE 09/26/2012 09/26/2012      E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO     
M. Nazar 4
cc: Alison Brown
Nuclear Licensing
Florida Power & Light Company Electronic Mail Distribution
 
Larry Nicholson
 
Director
Licensing
Florida Power & Light Company Electronic Mail Distribution
 
Michael Kiley
Site Vice President
Turkey Point Nuclear Plant Florida Power and Light Company
Electronic Mail Distribution
 
Niel Batista Emergency Management Coordinator Department of Emergency Management
and Homeland Security
Electronic Mail Distribution
 
Paul Freeman Vice President Organizational Effectiveness
 
Florida Power & Light Company
Electronic Mail Distribution
 
Peter Wells Vice President
 
Outage Support CFAM
 
Florida Power & Light Company
Electronic Mail Distribution
 
Robert J. Tomonto Licensing Manager
 
Turkey Point Nuclear Plant
 
Florida Power & Light Company
Electronic Mail Distribution
Eric McCartney
 
Plant General Manager
 
Turkey Point Nuclear Plant
Florida Power and Light Company
Electronic Mail Distribution
 
Mitch S. Ross Vice President and General Counsel
 
Nuclear Florida Power & Light Company Electronic Mail Distribution
 
Cynthia Becker
(Acting) Chief
 
Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
 
Senior Resident Inspector
 
Turkey Point Nuclear Generating Station U.S. Nuclear Regulatory Commission
9762 SW 344th St.
Florida City, FL  33035
 
Attorney General Department of Legal Affairs The Capitol PL-01
Tallahassee, FL  32399-1050
 
County Manager of Miami-Dade County
 
111 NW 1st Street, 29th Floor
Miami, FL  33128
George Gretsas
City Manager
City of Homestead Electronic Mail Distribution
Florida Power and Light Company
ATTN:  Mr. Brian Stamp
Training Manager
 
Turkey Point Nuclear Plant
9760 SW 344
th Street Homestead, FL 33035
 
 
Letter to Mano Nazar from Malcolm T. Widmann dated
SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED
OPERATOR INITIAL EXAMINATION 05000250/2013301 AND  
05000251/2013301  
Distribution:
Distribution:
RIDSNRRDIRS  
RIDSNRRDIRS
PUBLIC RidsNrrPMTurkeyPoint Resource
PUBLIC
RidsNrrPMTurkeyPoint Resource
}}
}}

Revision as of 23:03, 11 November 2019

Notification of Licensed Operator Initial Examination 05000250/2013301 and 05000251/2013301
ML12270A862
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/26/2012
From: Widmann M
Division of Reactor Safety II
To: Nazar M
Florida Power & Light Co
References
50-250/13-301, 50-251/13-301
Download: ML12270A862 (6)


See also: IR 05000250/2013301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

245 PEACHTREE CENTER AVENUE NE, SUITE 1200

ATLANTA, GEORGIA 30303-1257

September 26, 2012

Mr. Mano Nazar

Executive Vice President

and Chief Nuclear Officer

Florida Power and Light Company

P.O. Box 14000

Juno Beach, FL 33408-0420

SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000250/2013301 AND

05000251/2013301

Dear Mr. Nazar:

In a telephone conversation on September 19, 2012, between Mr. Tim James, Exam Project

Manager, and Mr. Gerard Laska, Senior Operations Examiner, arrangements were made for the

administration of licensing examinations at the Turkey Point Nuclear Plant. The operating test is

scheduled to be administered during the weeks of March 4, 2013, and March 11, 2013. The

written examination is scheduled to be administered the week of March 11, 2013. The on-site

preparatory week is scheduled for the week of February 11, 2013.

As agreed during the telephone conversation, your staff will prepare both the operating test and

written examination based on the guidelines in Revision 9, Supplement 1, of NUREG-1021,

"Operator Licensing Examination Standards for Power Reactors." The U.S. Nuclear Regulatory

Commission (NRC) regional office will discuss with your staff any changes that might be

necessary before the examinations are administered. Your staff has also agreed to make

copies of all examination materials that are necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the operating test

outline by December 21, 2012. Mr. Gerry Laska provided a written examination outline to your

staff on July 16, 2012. The written examination, operating test and the supporting reference

materials identified in Attachment 3, to ES-201, will be due by January 18, 2013. Pursuant to

Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an

authorized representative of the facility licensee shall approve the outline, examination, and test

before they are submitted to the NRC for review and approval. All materials shall be complete

and ready-to-use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

M. Nazar 2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021, contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications, medical certifications, and waiver

requests (if any) at least 30 days before the first examination date. If the applications are not

received at least 30 days before the examination date, a postponement may be necessary.

Signed applications certifying that all training has been completed should be submitted at least

14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget (OMB) under approval number 3150-0018, which expires on

February 28, 2013. The public reporting burden for this collection of information is estimated to

average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and

maintaining the data needed, writing the examinations, and completing and reviewing the

collection of information. Send comments on any aspect of this collection of information,

including suggestions for reducing the burden, to the Information and Records Management

Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by

Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and

Budget, Washington, DC 20503.

The NRC may neither conduct nor sponsor, and a person is not required to respond to, an

information collection, unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its

enclosures will be available electronically for public inspection in the NRC Public Document

Room or from the Publicly Available Records (PARS) component of the NRCs document

system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-

rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. James has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

M. Nazar 3

procedures and guidelines, please contact Mr. Gerry Laska at (404) 997- 4626, (Internet E-mail:

gerard.laska@nrc.gov), or me at (404) 997- 4550, (Internet E-mail:malcolm.widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch 1

Division of Reactor Safety

Docket Nos. 50-250, 50-251

License Nos. DRP-31, DPR-41

cc: (See page 4)

_________________________ x SUNSI REVIEW COMPLETE x FORM 665 ATTACHED

OFFICE RII: DRS RII: DRS

SIGNATURE RA/GL RA/MW

NAME G. Laska M. WIDMANN

DATE 09/26/2012 09/26/2012

E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

M. Nazar 4

cc: Mitch S. Ross

Alison Brown Vice President and General Counsel

Nuclear Licensing Nuclear

Florida Power & Light Company Florida Power & Light Company

Electronic Mail Distribution Electronic Mail Distribution

Larry Nicholson Cynthia Becker

Director (Acting) Chief

Licensing Florida Bureau of Radiation Control

Florida Power & Light Company Department of Health

Electronic Mail Distribution Electronic Mail Distribution

Michael Kiley Senior Resident Inspector

Site Vice President Turkey Point Nuclear Generating Station

Turkey Point Nuclear Plant U.S. Nuclear Regulatory Commission

Florida Power and Light Company 9762 SW 344th St.

Electronic Mail Distribution Florida City, FL 33035

Niel Batista Attorney General

Emergency Management Coordinator Department of Legal Affairs

Department of Emergency Management The Capitol PL-01

and Homeland Security Tallahassee, FL 32399-1050

Electronic Mail Distribution

County Manager of Miami-Dade County

Paul Freeman 111 NW 1st Street, 29th Floor

Vice President Miami, FL 33128

Organizational Effectiveness

Florida Power & Light Company George Gretsas

Electronic Mail Distribution City Manager

City of Homestead

Peter Wells Electronic Mail Distribution

Vice President

Outage Support CFAM Florida Power and Light Company

Florida Power & Light Company ATTN: Mr. Brian Stamp

Electronic Mail Distribution Training Manager

Turkey Point Nuclear Plant

Robert J. Tomonto 9760 SW 344th Street

Licensing Manager Homestead, FL 33035

Turkey Point Nuclear Plant

Florida Power & Light Company

Electronic Mail Distribution

Eric McCartney

Plant General Manager

Turkey Point Nuclear Plant

Florida Power and Light Company

Electronic Mail Distribution

Letter to Mano Nazar from Malcolm T. Widmann dated

SUBJECT: TURKEY POINT NUCLEAR PLANT - NOTIFICATION OF LICENSED

OPERATOR INITIAL EXAMINATION 05000250/2013301 AND

05000251/2013301

Distribution:

RIDSNRRDIRS

PUBLIC

RidsNrrPMTurkeyPoint Resource