ML13114A734: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:ES-301 Control Room/In | {{#Wiki_filter:ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________ | ||
-Plant Systems Outline Form ES-301-2 | Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________ | ||
Date of Examination: | @ | ||
_02/29/2013__________ | Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U) | ||
Exam Level: | Safety System / JPM Title Type Code* | ||
Control Room Systems | Function | ||
: a. Purification / Excess Letdown Operation P, D, S 1 | |||
-I; 2 or 3 for SRO | : b. Purification / Letdown Orifice Operation N, S 2 | ||
-U) | : c. RHR / Swap to HL Recirc M,A,EN,L,S 3 | ||
: d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S | |||
: e. CS / Align CS for Recirc D,A,E,EN,L,S 5 | |||
-I; 3 or 2 for SRO | : f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6 | ||
-U) | : g. Change RM-11 Setpoints in Preparation for WGDT Release D, S 9 | ||
-plant) systems must be different and serve different safety functions; in | : h. Prepare U-1 for RSDP Ops D, L, S 8 | ||
-plant systems and functions may overlap those tested in the control room. | @ | ||
* Type Codes Criteria for | In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) | ||
-I / SRO-U | : i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 | ||
-plant | : j. DC Elec / Place Battery on Equalize Charge N, A 6 | ||
(P)revious 2 exams (R)CA | : k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S | ||
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected) | |||
(R)CA 1/1/1 (S)imulator | |||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________ | |||
Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________ | |||
@ | |||
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U) | |||
- | Safety System / JPM Title Type Code* | ||
-U) | Function | ||
: a. Purification / Excess Letdown Operation P, D, S 1 | |||
: b. Purification / Letdown Orifice Operation N, S 2 | |||
: c. RHR / Swap to HL Recirc M,A,EN,L,S 3 | |||
: d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S | |||
- | : e. CS / Align CS for Recirc D,A,E,EN,L,S 5 | ||
: f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6 | |||
: g. n/a n/a 9 | |||
: h. Prepare U-1 for RSDP Ops D, L, S 8 | |||
@ | |||
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) | |||
: i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 | |||
: j. DC Elec / Place Battery on Equalize Charge N, A 6 | |||
: k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S | |||
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected) | |||
- | (R)CA 1/1/1 (S)imulator | ||
- | |||
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________ | |||
-plant | Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________ | ||
@ | |||
- | Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U) | ||
Safety System / JPM Title Type Code* | |||
Function | |||
: a. n/a n/a | |||
: b. Purification / Letdown Orifice Operation N, S 2 | |||
: c. n/a n/a | |||
: d. n/a n/a | |||
: e. CS / Align CS for Recirc D,A,E,EN,L,S 5 | |||
: f. n/a | |||
: g. n/a n/a 9 | |||
: h. n/a n/a | |||
@ | |||
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U) | |||
: i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 | |||
: j. DC Elec / Place Battery on Equalize Charge N, A 6 | |||
: k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S | |||
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room. | |||
* Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected) | |||
(R)CA 1/1/1 (S)imulator}} |
Revision as of 19:19, 4 November 2019
ML13114A734 | |
Person / Time | |
---|---|
Site: | Byron |
Issue date: | 04/29/2013 |
From: | Mcneil D NRC/RGN-III/DRS/OLB |
To: | Exelon Generation Co |
References | |
ES-301-2, 50-454/13-301, 50-455/13-301 | |
Download: ML13114A734 (3) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________
Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________
@
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
Safety System / JPM Title Type Code*
Function
- a. Purification / Excess Letdown Operation P, D, S 1
- b. Purification / Letdown Orifice Operation N, S 2
- c. RHR / Swap to HL Recirc M,A,EN,L,S 3
- g. Change RM-11 Setpoints in Preparation for WGDT Release D, S 9
- h. Prepare U-1 for RSDP Ops D, L, S 8
@
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
- j. DC Elec / Place Battery on Equalize Charge N, A 6
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________
Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________
@
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
Safety System / JPM Title Type Code*
Function
- a. Purification / Excess Letdown Operation P, D, S 1
- b. Purification / Letdown Orifice Operation N, S 2
- c. RHR / Swap to HL Recirc M,A,EN,L,S 3
- g. n/a n/a 9
- h. Prepare U-1 for RSDP Ops D, L, S 8
@
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
- j. DC Elec / Place Battery on Equalize Charge N, A 6
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________
Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________
@
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
Safety System / JPM Title Type Code*
Function
- a. n/a n/a
- b. Purification / Letdown Orifice Operation N, S 2
- c. n/a n/a
- d. n/a n/a
- f. n/a
- g. n/a n/a 9
- h. n/a n/a
@
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
- j. DC Elec / Place Battery on Equalize Charge N, A 6
@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)
(R)CA 1/1/1 (S)imulator