ML13114A734: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:ES-301 Control Room/In
{{#Wiki_filter:ES-301                             Control Room/In-Plant Systems Outline                               Form ES-301-2 Facility: _Byron Nuclear Station_______                           Date of Examination: _02/29/2013__________
-Plant Systems Outline Form ES-301-2   Facility: _Byron Nuclear Station_______
Exam Level: RO               / SRO-I     / SRO-U                 Operating Test No.: __2013301___________
Date of Examination:
                              @
_02/29/2013__________
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
Exam Level: RO / SRO-I / SRO-U       Operating Test No.: __2013301___________
Safety System / JPM Title                                     Type Code*
Control Room Systems
Function
@ (8 for RO; 7 for SRO
: a. Purification / Excess Letdown Operation                                             P, D, S                 1
-I; 2 or 3 for SRO
: b. Purification / Letdown Orifice Operation                                                 N, S                   2
-U) System / JPM Title Type Code*
: c. RHR / Swap to HL Recirc                                                           M,A,EN,L,S                 3
Safety Function a. Purification / Excess Letdown Operation P, D, S 1 b. Purification / Letdown Orifice Operation N, S 2 c. RHR / Swap to HL Recirc M,A,EN,L,S 3 d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S e. CS / Align CS for Recirc D,A,E,EN,L,S 5 f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6 g. Change RM-11 Setpoints in Preparation for WGDT Release D, S 9 h. Prepare U-1 for RSDP Ops D, L, S 8 In-Plant Systems
: d. SX / Align SX Twr for LOCA Conditions                                             D,A,E,EN,L,S               4S
@ (3 for RO; 3 for SRO
: e. CS / Align CS for Recirc                                                           D,A,E,EN,L,S                 5
-I; 3 or 2 for SRO
: f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G                                       D, S                   6
-U) i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1 j. DC Elec / Place Battery on Equalize Charge N, A 6 k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S  @ All control room (and in
: g. Change RM-11 Setpoints in Preparation for WGDT Release                                   D, S                   9
-plant) systems must be different and serve different safety functions; in
: h. Prepare U-1 for RSDP Ops                                                               D, L, S                 8
-plant systems and functions may overlap those tested in the control room.
                      @
* Type Codes Criteria for RO / SRO
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
: i. RSP / Trip the Reactor Outside the Control Room                                   D, A, E, EN                 1
-plant (L)ow-Power (N)ew or (M)odified from bank including 1(A)
: j. DC Elec / Place Battery on Equalize Charge                                             N, A                   6
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3  9 / 8 / 4  1 / 1 / 1  1 /  1 /  1  2 /  2 /  1  3 /  3 /  2 (randomly selected) 1 / 1 / 1 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2   Facility:  _Byron Nuclear Station_______
: k. FP Cool / Align FP Cooling for CV Pp                                               D, E, L, R             4S
Date of Examination: _02/29/2013__________
  @         All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
Exam Level: RO  / SRO-I  / SRO-U        Operating Test No.:  __2013301___________
* Type Codes                       Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                     4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                   9/8/4 (E)mergency or abnormal in-plant                                                     1/1/1 (L)ow-Power                                                                           1/1/1 (N)ew or (M)odified from bank including 1(A)                                         2/2/1 (P)revious 2 exams                                                         3 /  3 /  2 (randomly selected)
Control Room Systems
(R)CA                                                                                 1/1/1 (S)imulator
@ (8 for RO; 7 for SRO
 
-I; 2 or 3 for SRO
ES-301                            Control Room/In-Plant Systems Outline                              Form ES-301-2 Facility: _Byron Nuclear Station_______                          Date of Examination: _02/29/2013__________
-U)  System / JPM Title Type Code*
Exam Level: RO              / SRO-I      / SRO-U                Operating Test No.: __2013301___________
Safety Function  a. Purification / Excess Letdown Operation P, D, S 1  b. Purification / Letdown Orifice Operation N, S  2  c. RHR / Swap to HL Recirc M,A,EN,L,S 3 d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S  e. CS / Align CS for Recirc D,A,E,EN,L,S 5  f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, 6 g. n/a  n/a 9  h. Prepare U-1 for RSDP Ops D, L, S  8  In-Plant Systems
                              @
@ (3 for RO; 3 for SRO
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
-I; 3 or 2 for SRO
Safety System / JPM Title                                      Type Code*
-U) i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1  j. DC Elec / Place Battery on Equalize Charge N, A  6  k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S  @ All control room (and in
Function
-plant) systems must be different and serve different safety functions; in
: a. Purification / Excess Letdown Operation                                              P, D, S                1
-plant systems and functions may overlap those tested in the control room.
: b. Purification / Letdown Orifice Operation                                                N, S                  2
* Type Codes Criteria for RO / SRO
: c. RHR / Swap to HL Recirc                                                          M,A,EN,L,S                  3
-I / SRO-U  (A)lternate path (C)ontrol room (D)irect from bank  (E)mergency or abnormal in
: d. SX / Align SX Twr for LOCA Conditions                                              D,A,E,EN,L,S              4S
-plant  (L)ow-Power  (N)ew or (M)odified from bank including 1(A)
: e. CS / Align CS for Recirc                                                          D,A,E,EN,L,S                5
(P)revious 2 exams (R)CA  (S)imulator 4-6 / 4-6 / 2-3  9 /  8 /  4  1 /  1 /  1  1 /  1 /  1  2 /  2 /  1  3 /  3 /  2 (randomly selected) 1 / 1 / 1 ES-301 Control Room/In
: f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G                                      D, S                   6
-Plant Systems Outline Form ES-301-2    Facility: _Byron Nuclear Station_______
: g. n/a                                                                                      n/a                  9
Date of Examination: _02/29/2013__________
: h. Prepare U-1 for RSDP Ops                                                                D, L, S                 8
Exam Level: RO  / SRO-I  / SRO-U        Operating Test No.: __2013301___________
                      @
Control Room Systems
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
@ (8 for RO; 7 for SRO
: i. RSP / Trip the Reactor Outside the Control Room                                  D, A, E, EN                 1
-I; 2 or 3 for SRO
: j. DC Elec / Place Battery on Equalize Charge                                            N, A                  6
-U)  System / JPM Title Type Code*
: k. FP Cool / Align FP Cooling for CV Pp                                                D, E, L, R              4S
Safety Function  a. n/a n/a   b. Purification / Letdown Orifice Operation N, S  2 c. n/a  n/a    d. n/a  n/a    e. CS / Align CS for Recirc D,A,E,EN,L,S 5  f. n/a      g. n/a  n/a 9  h. n/a  n/a    In-Plant Systems
  @          All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
@ (3 for RO; 3 for SRO
* Type Codes                        Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                      4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                    9/8/4 (E)mergency or abnormal in-plant                                                      1/1/1 (L)ow-Power                                                                          1/1/1 (N)ew or (M)odified from bank including 1(A)                                         2/2/1 (P)revious 2 exams                                                        3 /  3 / 2 (randomly selected)
-I; 3 or 2 for SRO
(R)CA                                                                                1/1/1 (S)imulator
-U)  i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1  j. DC Elec / Place Battery on Equalize Charge N, A 6  k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S  @ All control room (and in
 
-plant) systems must be different and serve different safety functions; in
ES-301                            Control Room/In-Plant Systems Outline                              Form ES-301-2 Facility: _Byron Nuclear Station_______                          Date of Examination: _02/29/2013__________
-plant systems and functions may overlap those tested in the control room.
Exam Level: RO              / SRO-I      / SRO-U                Operating Test No.: __2013301___________
* Type Codes Criteria for  RO / SRO
                              @
-I / SRO-U  (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)
-plant  (L)ow-Power (N)ew or (M)odified from bank including 1(A)
Safety System / JPM Title                                      Type Code*
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3  9 /  8 /  4  1 /  1 /  1  1 /  1 /  1 2 / 2 /  1 3 /  3 /  2 (randomly selected) 1 /  1 /  1}}
Function
: a. n/a                                                                                    n/a
: b. Purification / Letdown Orifice Operation                                                N, S                  2
: c. n/a                                                                                    n/a
: d. n/a                                                                                      n/a
: e. CS / Align CS for Recirc                                                          D,A,E,EN,L,S                5
: f. n/a
: g. n/a                                                                                      n/a                  9
: h. n/a                                                                                       n/a
                      @
In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)
: i. RSP / Trip the Reactor Outside the Control Room                                  D, A, E, EN                 1
: j. DC Elec / Place Battery on Equalize Charge                                            N, A                  6
: k. FP Cool / Align FP Cooling for CV Pp                                                D, E, L, R              4S
  @          All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                        Criteria for RO / SRO-I / SRO-U (A)lternate path                                                                      4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                                    9/8/4 (E)mergency or abnormal in-plant                                                     1/1/1 (L)ow-Power                                                                          1/1/1 (N)ew or (M)odified from bank including 1(A)                                         2/2/1 (P)revious 2 exams                                                        3 / 3 /  2 (randomly selected)
(R)CA                                                                                 1/1/1 (S)imulator}}

Revision as of 19:19, 4 November 2019

2013 Byron Nuclear Station Initial License Examination Forms ES-301-2
ML13114A734
Person / Time
Site: Byron  Constellation icon.png
Issue date: 04/29/2013
From: Mcneil D
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
References
ES-301-2, 50-454/13-301, 50-455/13-301
Download: ML13114A734 (3)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________

Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________

@

Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

Safety System / JPM Title Type Code*

Function

a. Purification / Excess Letdown Operation P, D, S 1
b. Purification / Letdown Orifice Operation N, S 2
c. RHR / Swap to HL Recirc M,A,EN,L,S 3
d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S
e. CS / Align CS for Recirc D,A,E,EN,L,S 5
f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6
g. Change RM-11 Setpoints in Preparation for WGDT Release D, S 9
h. Prepare U-1 for RSDP Ops D, L, S 8

@

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1
j. DC Elec / Place Battery on Equalize Charge N, A 6
k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S

@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________

Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________

@

Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

Safety System / JPM Title Type Code*

Function

a. Purification / Excess Letdown Operation P, D, S 1
b. Purification / Letdown Orifice Operation N, S 2
c. RHR / Swap to HL Recirc M,A,EN,L,S 3
d. SX / Align SX Twr for LOCA Conditions D,A,E,EN,L,S 4S
e. CS / Align CS for Recirc D,A,E,EN,L,S 5
f. AC Elec / Sync a SAT to a Bus Being Fed by a D/G D, S 6
g. n/a n/a 9
h. Prepare U-1 for RSDP Ops D, L, S 8

@

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1
j. DC Elec / Place Battery on Equalize Charge N, A 6
k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S

@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _Byron Nuclear Station_______ Date of Examination: _02/29/2013__________

Exam Level: RO / SRO-I / SRO-U Operating Test No.: __2013301___________

@

Control Room Systems (8 for RO; 7 for SRO-I; 2 or 3 for SRO-U)

Safety System / JPM Title Type Code*

Function

a. n/a n/a
b. Purification / Letdown Orifice Operation N, S 2
c. n/a n/a
d. n/a n/a
e. CS / Align CS for Recirc D,A,E,EN,L,S 5
f. n/a
g. n/a n/a 9
h. n/a n/a

@

In-Plant Systems (3 for RO; 3 for SRO-I; 3 or 2 for SRO-U)

i. RSP / Trip the Reactor Outside the Control Room D, A, E, EN 1
j. DC Elec / Place Battery on Equalize Charge N, A 6
k. FP Cool / Align FP Cooling for CV Pp D, E, L, R 4S

@ All control room (and in-plant) systems must be different and serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank 9/8/4 (E)mergency or abnormal in-plant 1/1/1 (L)ow-Power 1/1/1 (N)ew or (M)odified from bank including 1(A) 2/2/1 (P)revious 2 exams 3 / 3 / 2 (randomly selected)

(R)CA 1/1/1 (S)imulator