| {{#Wiki_filter:No: I-13-043 December 5, 2013 CONTACT: Diane Screnci 610-337-5300 Neil Sheehan 610 | | {{#Wiki_filter:No: I-13-043 December 5, 2013 CONTACT: Diane Screnci 610-337-5300 Neil Sheehan 610-337-5331 NRC to Hold Open House, Meeting Dec. 18 in Hampton, N.H., to Discuss Reviews of Seabrook Nuclear Power Plant Concrete Degradation The Nuclear Regulatory Commission staff has scheduled a public open house and a public meeting for Dec. 18 to discuss work being performed by the owner of the Seabrook nuclear power plant to address concrete degradation at the facility. The plant is located in Seabrook, N.H., and is owned and operated by NextEra. |
| -337-5331 NRC to Hold Open House, Meeting Dec. 18 in Hampton, N.H. | | The sessions, which were rescheduled from Oct. 9 due to the federal government shutdown, will be held at the Best Western Plus - The Inn at Hampton, at 815 Lafayette Road in Hampton, N.H. The open house will begin at 5 p.m. and allow for one-on-one discussions between NRC staff and members of the public on the topic. During the formal meeting, set to start at 6 p.m., NRC staff and NextEra will discuss the subject. The second part of the meeting will provide an opportunity for audience members to ask questions of the NRC staff. |
| , to Discuss Reviews of Seabrook Nuclear Power Plant Concrete Degradation The Nuclear Regulatory Commission staff has scheduled a public open house and a public meeting for Dec. 18 to discuss work being performed by the owner of the Seabrook nuclear power plant to address concrete degradation at the facility. The plant is located in Seabrook, N.H. | | We have held earlier meetings in the vicinity of the Seabrook plant on this subject, which helped the public to better understand this issue and provided valuable feedback to the NRC, NRC Region I Administrator Bill Dean said. The meeting on December 18 will afford another opportunity for members of the public to learn the status of our reviews in this area and the companys activities to deal with this issue, as well as provide audience members with a chance to once again share their perspectives. |
| , and is owned and operated by NextEra | | The concrete degradation at Seabrook is caused by alkali silica reaction, or ASR. This is a chemical combining of reactive silica from the concrete aggregate with the alkali from the cement paste in the presence of moisture. (Aggregates are inert granular materials, such as sand, gravel or crushed stone that, along with water and cement paste, are an essential ingredient in concrete.) The result of the reaction is a gel, which can expand and cause micro-cracks in the concrete. |
| . | |
| The sessions, which were rescheduled from Oct. 9 due to the federal government shutdown, will be held at the Best Western Plus | |
| - The Inn at Hampton, at 815 Lafayette Road in Hampton, N.H. The open house will begin at 5 p.m. and allow for one | |
| -on-one discussions between NRC staff and members of the public on the topic. During the formal meeting, set to start at 6 p.m., NRC staff and NextEra will discuss the subject. The second part of the meeting will provide an opportunity for audience members to ask questions of the NRC staff. | |
| | |
| "We have held earlier meetings in the vicinity of the Seabrook plant on this subject, which helped the public to better understand this issue and provided valuable feedback to the NRC," NRC Region I Administrator Bill Dean said. "The meeting on December 18 will afford another opportunity for members of the public to learn the status of our reviews in this area and the company's activities to deal with this issue, as well as provide audience members with a chance to once again share their perspectives."
| |
| | |
| The concrete degradation at Seabrook is caused by alkali silica reaction, or ASR. This is a chemical combining of reactive silica from the concrete aggregate with the alkali from the cement paste in the presence of moisture. (Aggregates are inert granular materials, such as sand, gravel or crushed stone that, along with water and cement paste, are an essential ingredient in concrete.) The result of the reaction is a gel, which can expand and cause micro | |
| -cracks in the concrete. | |
| After the ASR problem was identified at the plant in 2010, the NRC in May 2012 issued a Confirmatory Action Letter (CAL) to NextEra confirming that it would complete a variety of actions in response to the condition. On Oct. 9, 2013, the NRC announced that the CAL was being closed out after the agency confirmed through inspections that the actions committed to by the company were being met. | | After the ASR problem was identified at the plant in 2010, the NRC in May 2012 issued a Confirmatory Action Letter (CAL) to NextEra confirming that it would complete a variety of actions in response to the condition. On Oct. 9, 2013, the NRC announced that the CAL was being closed out after the agency confirmed through inspections that the actions committed to by the company were being met. |
|
| |
|
| Page l 2 While NRC inspections have determined that ASR
| | While NRC inspections have determined that ASR-affected structures at the plant remain capable of performing their safety functions, the NRC will continue to provide focused oversight of the companys ongoing actions to resolve the issue. This includes NRC review of the results of the testing program being conducted at the University of Texas-Austin, as well as of the on-site monitoring of ASR progression in the plants concrete structures. |
| -affected structures at the plant remain capable of performing their safety functions, the NRC will continue to provide focused oversight of the company's ongoing actions to resolve the issue. This includes NRC review of the results of the testing program being conducted at the University of Texas | | More information about the NRCs reviews of Seabrook concrete degradation can be found on an agency webpage devoted to that topic. |
| -Austin, as well as of the on | | Page l 2}} |
| -site monitoring of ASR progression in the plant's concrete structures. | |
| | |
| More information about the NRC's reviews of Seabrook concrete degradation can be found on an agency webpage devoted to that topic.}} | |
|
---|
Category:Press Release
MONTHYEARML22131A1432022-05-0606 May 2022 News Release-I-22-006: NRC to Hold Public Meeting to Discuss Seabrook Station 2021 Safety Performance Press Release-I-21-004, NRC to Hold Virtual Meeting to Discuss 2020 Performance of Seabrook Nuclear Power Plant2021-05-24024 May 2021 Press Release-I-21-004: NRC to Hold Virtual Meeting to Discuss 2020 Performance of Seabrook Nuclear Power Plant Press Release-I-20-021, NRC Names New Senior Resident Inspector at Seabrook Station2020-10-20020 October 2020 Press Release-I-20-021: NRC Names New Senior Resident Inspector at Seabrook Station Press Release-I-20-006, NRC to Hold Virtual Meeting to Discuss 2019 Performance of Seabrook Nuclear Power Plant2020-05-20020 May 2020 Press Release-I-20-006: NRC to Hold Virtual Meeting to Discuss 2019 Performance of Seabrook Nuclear Power Plant Press Release-19-038, NRC Atomic Safety and Licensing Board to Hold Hearing, Take Limited Appearance Statements on Seabrook License Amendment2019-08-21021 August 2019 Press Release-19-038: NRC Atomic Safety and Licensing Board to Hold Hearing, Take Limited Appearance Statements on Seabrook License Amendment Press Release-I-19-018, New NRC Resident Inspector Assigned to Seabrook Nuclear Power Plant2019-07-12012 July 2019 Press Release-I-19-018: New NRC Resident Inspector Assigned to Seabrook Nuclear Power Plant Press Release-I-19-008, NRC to Hold Public Meeting to Discuss 2018 Performance of Seabrook Nuclear Power Plant2019-04-11011 April 2019 Press Release-I-19-008: NRC to Hold Public Meeting to Discuss 2018 Performance of Seabrook Nuclear Power Plant Press Release-19-013, NRC Renews Seabrook Station Operating License2019-03-12012 March 2019 Press Release-19-013: NRC Renews Seabrook Station Operating License Press Release-I-19-003, NRC to Hold Public Meeting to Discuss Licensing Actions for Seabrook Nuclear Power Plant2019-02-0606 February 2019 Press Release-I-19-003: NRC to Hold Public Meeting to Discuss Licensing Actions for Seabrook Nuclear Power Plant Press Release-I-18-009, NRC to Hold Public Meeting to Discuss 2017 Performance of Seabrook Nuclear Power Plant2018-04-25025 April 2018 Press Release-I-18-009: NRC to Hold Public Meeting to Discuss 2017 Performance of Seabrook Nuclear Power Plant Press Release-17-030, Atomic Safety and Licensing Board to Hold Oral Argument on Hearing Request for Seabrook License Amendment2017-06-13013 June 2017 Press Release-17-030: Atomic Safety and Licensing Board to Hold Oral Argument on Hearing Request for Seabrook License Amendment Press Release-I-17-023, NRC to Hold Public Meeting to Discuss 2016 Performance of Seabrook Nuclear Power Plant2017-05-31031 May 2017 Press Release-I-17-023: NRC to Hold Public Meeting to Discuss 2016 Performance of Seabrook Nuclear Power Plant Press Release-I-16-028, NRC Names New Resident Inspector at Seabrook Nuclear Plant2016-09-28028 September 2016 Press Release-I-16-028: NRC Names New Resident Inspector at Seabrook Nuclear Plant Press Release-I-16-019, NRC to Hold Public Meeting on June 21 in Hampton, N.H., Regarding Performance of Seabrook Nuclear Power Plant2016-06-13013 June 2016 Press Release-I-16-019: NRC to Hold Public Meeting on June 21 in Hampton, N.H., Regarding Performance of Seabrook Nuclear Power Plant Press Release-15-047, NRC Issues Final Environmental Report on License Renewal of Seabrook Station Nuclear Power Plant in New Hampshire2015-07-30030 July 2015 Press Release-15-047: NRC Issues Final Environmental Report on License Renewal of Seabrook Station Nuclear Power Plant in New Hampshire Press Release-I-15-029, NRC to Hold Regulatory Performance Public Meeting Regarding Seabrook Nuclear Power Plant on June 182015-06-0909 June 2015 Press Release-I-15-029: NRC to Hold Regulatory Performance Public Meeting Regarding Seabrook Nuclear Power Plant on June 18 Press Release-I-14-027, NRC to Meet with Nextera on June 24th to Discuss Performance of Seabrook Nuclear Power Plant2014-06-13013 June 2014 Press Release-I-14-027: NRC to Meet with Nextera on June 24th to Discuss Performance of Seabrook Nuclear Power Plant Press Release-I-13-043, NRC to Hold Open House, Meeting Dec. 18 in Hampton, N.H., to Discuss Reviews of Seabrook Nuclear Power Plant Concrete Degradation2013-12-0505 December 2013 Press Release-I-13-043: NRC to Hold Open House, Meeting Dec. 18 in Hampton, N.H., to Discuss Reviews of Seabrook Nuclear Power Plant Concrete Degradation Press Release-I-13-040, NRC Assigns New Resident Inspector to Seabrook Station2013-11-19019 November 2013 Press Release-I-13-040: NRC Assigns New Resident Inspector to Seabrook Station Press Release-I-13-035, NRC Closes Out Confirmatory Action Letter on Steps Taken to Address Concrete Degradation at Seabrook Nuclear Plant2013-10-0909 October 2013 Press Release-I-13-035: NRC Closes Out Confirmatory Action Letter on Steps Taken to Address Concrete Degradation at Seabrook Nuclear Plant Press Release-I-13-034, NRC Cancels Open House, Meeting on Concrete Degradation at Seabrook Nuclear Power Plant2013-10-0404 October 2013 Press Release-I-13-034: NRC Cancels Open House, Meeting on Concrete Degradation at Seabrook Nuclear Power Plant Press Release-I-13-033, NRC to Hold Open House, Meeting on Oct. 9 in Hampton, N.H. on Seabrook Nuclear Plant Concrete Degradation Reviews2013-09-26026 September 2013 Press Release-I-13-033: NRC to Hold Open House, Meeting on Oct. 9 in Hampton, N.H. on Seabrook Nuclear Plant Concrete Degradation Reviews Press Release-I-13-025, International Safety Review Team to Perform Follow-up Assessment at Seabrook Nuclear Power Plant2013-05-28028 May 2013 Press Release-I-13-025: International Safety Review Team to Perform Follow-up Assessment at Seabrook Nuclear Power Plant Press Release-I-13-023, NRC Issues Draft Supplement to Draft Environmental Impact Report on Seabrook Nuclear Power Plant License Renewal Application2013-05-0808 May 2013 Press Release-I-13-023: NRC Issues Draft Supplement to Draft Environmental Impact Report on Seabrook Nuclear Power Plant License Renewal Application Press Release-I-13-010, NRC to Hold Open House on March 27th in Hampton, N.H., to Discuss Seabrook Nuclear Power Plant Annual Assessment2013-03-26026 March 2013 Press Release-I-13-010: NRC to Hold Open House on March 27th in Hampton, N.H., to Discuss Seabrook Nuclear Power Plant Annual Assessment Press Release-I-12-049, NRC Creates Web Page Containing Information Regarding Concrete Degradation Issues at Seabrook Nuclear Plant2012-12-10010 December 2012 Press Release-I-12-049: NRC Creates Web Page Containing Information Regarding Concrete Degradation Issues at Seabrook Nuclear Plant Press Release-I-12-046, NRC to Hold Public Meeting, Open House on Dec. 11 to Update Public in Reviews of Concrete Degradation at Seabrook Nuclear Plant2012-11-29029 November 2012 Press Release-I-12-046: NRC to Hold Public Meeting, Open House on Dec. 11 to Update Public in Reviews of Concrete Degradation at Seabrook Nuclear Plant Press Release-I-12-036, NRC to Increase Oversight of Concrete Degradation Reviews Involving Seabrook2012-09-14014 September 2012 Press Release-I-12-036: NRC to Increase Oversight of Concrete Degradation Reviews Involving Seabrook Press Release-I-12-034, NRC Assigns New Resident Inspector to Seabrook Nuclear Plant2012-08-30030 August 2012 Press Release-I-12-034: NRC Assigns New Resident Inspector to Seabrook Nuclear Plant Press Release-I-12-033, NRC Cites Seabrook Nuclear Power Plant for Inspection Finding of Low to Moderate Safety Significance2012-08-0707 August 2012 Press Release-I-12-033: NRC Cites Seabrook Nuclear Power Plant for Inspection Finding of Low to Moderate Safety Significance Press Release-12-071, NRC Issues Safety Evaluation Report with Open Items for Seabrook Nuclear Plant License Renewal Application2012-06-0808 June 2012 Press Release-12-071: NRC Issues Safety Evaluation Report with Open Items for Seabrook Nuclear Plant License Renewal Application Press Release-I-12-019, NRC to Hold Public Meeting, Open House in Hampton, N.H., to Discuss Seabrook Nuclear Power Plant Annual Assessment2012-04-20020 April 2012 Press Release-I-12-019: NRC to Hold Public Meeting, Open House in Hampton, N.H., to Discuss Seabrook Nuclear Power Plant Annual Assessment Press Release-I-11-031, NRC to Seek Public Input on Sept. 15 on Draft Report Assessing Possible Environmental Impacts of Seabrook License Extension2011-09-0101 September 2011 Press Release-I-11-031: NRC to Seek Public Input on Sept. 15 on Draft Report Assessing Possible Environmental Impacts of Seabrook License Extension Press Release-11-159, NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants2011-08-26026 August 2011 Press Release-11-159: NRC Makes Preparations for Approach of Hurricane Irene; Dispatches Additional Inspectors to Nuclear Plants Press Release-11-145, NRC Seeks Public Input on Draft Environmental Report for Seabrook Nuclear Plant License Renewal, Meeting Sept. 152011-08-0202 August 2011 Press Release-11-145: NRC Seeks Public Input on Draft Environmental Report for Seabrook Nuclear Plant License Renewal, Meeting Sept. 15 Press Release-I-11-020, International Safety Review Team Visits Seabrook Nuclear Plant2011-06-0707 June 2011 Press Release-I-11-020: International Safety Review Team Visits Seabrook Nuclear Plant Press Release-I-11-019, NRC to Hold Public Meeting on June 8th in Seabrook, N.H., to Discuss Annual Assessment of Seabrook Nuclear Power Plant2011-06-0101 June 2011 Press Release-I-11-019: NRC to Hold Public Meeting on June 8th in Seabrook, N.H., to Discuss Annual Assessment of Seabrook Nuclear Power Plant Press Release-10-206, Licensing Board to Hear Oral Argument Nov. 30 in Portsmouth, N.H., on Seabrook Nuclear Power Plant License Renewal2010-11-10010 November 2010 Press Release-10-206: Licensing Board to Hear Oral Argument Nov. 30 in Portsmouth, N.H., on Seabrook Nuclear Power Plant License Renewal Press Release-10-154, National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study2010-09-0303 September 2010 Press Release-10-154: National Academy of Sciences Seeks Nominations for Experts to Conduct NRC-Sponsored Cancer Risk Study Press Release-I-10-036, NRC to Discuss Process for Review of License Renewal Application for Seabrook Nuclear Plant, Seek Input on Environmental Review2010-08-0404 August 2010 Press Release-I-10-036: NRC to Discuss Process for Review of License Renewal Application for Seabrook Nuclear Plant, Seek Input on Environmental Review Press Release-10-128, NRC Announces Opportunity for Hearing on Application to Renew Operating License for Seabrook Nuclear Power Plant2010-07-20020 July 2010 Press Release-10-128: NRC Announces Opportunity for Hearing on Application to Renew Operating License for Seabrook Nuclear Power Plant Press Release-10-104, NRC Announces Availability of License Renewal Application for Seabrook Nuclear Power Plant2010-06-16016 June 2010 Press Release-10-104: NRC Announces Availability of License Renewal Application for Seabrook Nuclear Power Plant Press Release-I-10-017, NRC to Hold Public Meeting on April 14 in Seabrook, N.H. to Discuss Annual Assessment of Seabrook Nuclear Power Plant2010-04-0707 April 2010 Press Release-I-10-017: NRC to Hold Public Meeting on April 14 in Seabrook, N.H. to Discuss Annual Assessment of Seabrook Nuclear Power Plant Press Release-I-09-039, NRC, NextEra Energy to Discuss Inspection Finding at Seabrook Nuclear Plant2009-09-24024 September 2009 Press Release-I-09-039: NRC, NextEra Energy to Discuss Inspection Finding at Seabrook Nuclear Plant Press Release-I-09-024, NRC to Discuss Annual Assessment for Seabrook Nuclear Plant at Public Meeting Set for April 30 in Hampton, N.H2009-04-23023 April 2009 Press Release-I-09-024: NRC to Discuss Annual Assessment for Seabrook Nuclear Plant at Public Meeting Set for April 30 in Hampton, N.H Press Release-I-08-038, New NRC Inspector Assigned to Seabrook Station2008-06-0606 June 2008 Press Release-I-08-038: New NRC Inspector Assigned to Seabrook Station Press Release-I-08-012, NRC to Discuss Seabrook Nuclear Plant Annual Assessment at Public Meeting Scheduled for March 25 in Seabrook, N.H2008-03-21021 March 2008 Press Release-I-08-012: NRC to Discuss Seabrook Nuclear Plant Annual Assessment at Public Meeting Scheduled for March 25 in Seabrook, N.H Press Release-I-07-033, - William Raymond Named NRC Senior Resident Inspector at Seabrook Nuclear Power Plant2007-06-0505 June 2007 Press Release-I-07-033 - William Raymond Named NRC Senior Resident Inspector at Seabrook Nuclear Power Plant Press Release-I-07-009, - NRC to Discuss 2006 Assessment for Seabrook Nuclear Plant at Public Meeting Scheduled for March 292007-03-23023 March 2007 Press Release-I-07-009 - NRC to Discuss 2006 Assessment for Seabrook Nuclear Plant at Public Meeting Scheduled for March 29 Press Release-I-06-053, NRC Conducting Special Inspection at Seabrook Nuclear Power Plant2006-09-18018 September 2006 Press Release-I-06-053: NRC Conducting Special Inspection at Seabrook Nuclear Power Plant 2022-05-06
[Table view] |
Text
No: I-13-043 December 5, 2013 CONTACT: Diane Screnci 610-337-5300 Neil Sheehan 610-337-5331 NRC to Hold Open House, Meeting Dec. 18 in Hampton, N.H., to Discuss Reviews of Seabrook Nuclear Power Plant Concrete Degradation The Nuclear Regulatory Commission staff has scheduled a public open house and a public meeting for Dec. 18 to discuss work being performed by the owner of the Seabrook nuclear power plant to address concrete degradation at the facility. The plant is located in Seabrook, N.H., and is owned and operated by NextEra.
The sessions, which were rescheduled from Oct. 9 due to the federal government shutdown, will be held at the Best Western Plus - The Inn at Hampton, at 815 Lafayette Road in Hampton, N.H. The open house will begin at 5 p.m. and allow for one-on-one discussions between NRC staff and members of the public on the topic. During the formal meeting, set to start at 6 p.m., NRC staff and NextEra will discuss the subject. The second part of the meeting will provide an opportunity for audience members to ask questions of the NRC staff.
We have held earlier meetings in the vicinity of the Seabrook plant on this subject, which helped the public to better understand this issue and provided valuable feedback to the NRC, NRC Region I Administrator Bill Dean said. The meeting on December 18 will afford another opportunity for members of the public to learn the status of our reviews in this area and the companys activities to deal with this issue, as well as provide audience members with a chance to once again share their perspectives.
The concrete degradation at Seabrook is caused by alkali silica reaction, or ASR. This is a chemical combining of reactive silica from the concrete aggregate with the alkali from the cement paste in the presence of moisture. (Aggregates are inert granular materials, such as sand, gravel or crushed stone that, along with water and cement paste, are an essential ingredient in concrete.) The result of the reaction is a gel, which can expand and cause micro-cracks in the concrete.
After the ASR problem was identified at the plant in 2010, the NRC in May 2012 issued a Confirmatory Action Letter (CAL) to NextEra confirming that it would complete a variety of actions in response to the condition. On Oct. 9, 2013, the NRC announced that the CAL was being closed out after the agency confirmed through inspections that the actions committed to by the company were being met.
While NRC inspections have determined that ASR-affected structures at the plant remain capable of performing their safety functions, the NRC will continue to provide focused oversight of the companys ongoing actions to resolve the issue. This includes NRC review of the results of the testing program being conducted at the University of Texas-Austin, as well as of the on-site monitoring of ASR progression in the plants concrete structures.