ML15182A038: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD  
{{#Wiki_filter:July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:                                )
                                                  )
DTE ELECTRIC COMPANY                              )            Docket No. 50-341-LR
                                                  )
(Fermi Nuclear Power Plant, Unit 2)              )
APPLICANTS SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Boards Order, dated February 27, 2015, DTE Electric Company (DTE or Applicant), hereby supplements its disclosures with respect to the admitted contentions.
: 1.      Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions.      In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosure after testifying witnesses are identified.
: 2.      Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement.
: 3. Tangible Things Other than documents provided or listed, no relevant tangible things have been identified.
Respectfully submitted,
                                                    /s/ signed electronically by Tyson R. Smith Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015 2
DC:775605.1


In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )
Fermi 2 License Renewal                                                                      Attachment A DTE Supplemental Disclosures July 2015  PUBLIC Doc ID Date                  Author                    Recipient                                    Description                              Contention DTE00550  5/14/2015 Michael J Koenemann Randall D Westmoreland                      Revised Calculation and RAI Response      CRAFT8 - SAMA Populations Summary of March 27, 2015 conference call JP4  Mutual SAMAs; CRAFT8 - SAMA DTE00551  5/28/2015 NRC                                                              between NRC and DTE                       Populations JP4  Mutual SAMAs; CRAFT8 - SAMA DTE00552    5/8/2015 DTE                 NRC                                          DTE Reponse to SAMA RAIs                  Populations Randall Westmoreland; Michael Lake; Michael DTE00553  5/14/2015 Angela Rudolph      Koenemann                                    Revised Calculation and RAI Response      CRAFT8 - SAMA Populations Fermi 2 WinMACCS Assessment of Severe    JP4  Mutual SAMAs; CRAFT8 - SAMA DTE00554    5/5/2015 Enercon                                                          Accident Consequences, Rev. 1            Populations DTE00555    5/5/2015 DTE                 DTE                                         RAI Response Review and Approval Record  CRAFT8 - SAMA Populations
)
)
) Docket No. 50-341-LR APPLICANT'S SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Board's Order, dated February 27, 2015, DTE Electric Company ("DTE" or "Applicant"), hereby supplements its disclosures with respect to the admitted contentions.
: 1. Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosu re after testifying witnesses are identified. 2. Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties' disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and  


subject to disclosure under the parties' disclosure agreement.
July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:                                )
2 3. Tangible Things  Other than documents provided or listed, no relevant tangible things have been identified.
                                                  )
Respectfully submitted,
DTE ELECTRIC COMPANY                              )            Docket No. 50-341-LR
                                                  )
(Fermi Nuclear Power Plant, Unit 2)              )
CERTIFICATION OF SUPPLEMENTAL DISCLOSURES I, Jon P. Christinidis do hereby state as follows:
: 1.      I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
: 2.     A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
: 3.      I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of May 30, 2015.
: 4.      I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.


    /s/ signed electronically by                 Tyson R. Smith Darani M. Reddick Winston & Strawn LLP
Executed in accord with 10 C.F.R. § 2.304(d),
                            /s/ signed electronically by Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 Dated at Detroit, Michigan this 1st day of July 2015 2
DC:775606.1


1700 K Street, NW
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of:                                 )
 
                                                  )
Washington, DC 20006 Jon P. Christinidis DTE Electric Company
DTE ELECTRIC COMPANY                              )             Docket No. 50-341-LR
 
                                                  )
One Energy Plaza
(Fermi Nuclear Power Plant, Unit 2)               )
 
CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing APPLICANTS SUPPLEMENTAL DISCLOSURES and CERTIFICATION OF SUPPLEMENTAL DISCLOSURES have been served via the Electronic Information Exchange (EIE) this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.
Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015
Respectfully submitted,
 
                                                        /s/ signed electronically by Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015}}
DC:775605.1 Fermi2LicenseRenewal DTESupplementalDisclosuresJuly2015PUBLIC AttachmentA DocIDDateAuthorRecipientDescriptionContentionDTE005505/14/2015MichaelJKoenemannRandallDWestmorelandRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005515/28/2015 NRC SummaryofMarch27,2015conferencecallbetweenNRCandDTE JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005525/8/2015DTENRCDTEReponsetoSAMARAIs JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005535/14/2015AngelaRudolph RandallWestmoreland;MichaelLake;MichaelKoenemannRevisedCalculationandRAIResponseCRAFT 8-SAMAPopulationsDTE005545/5/2015Enercon Fermi2WinMACCSAssessmentofSevereAccidentConsequences,Rev.1 JP 4MutualSAMAs;CRAFT 8-SAMAPopulationsDTE005555/5/2015DTE DTE RAIResponseReviewandApprovalRecordCRAFT 8-SAMAPopulations July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )
)  
)  
) Docket No. 50-341-LR CERTIFICATION OF SUPPLEMENTAL DISCLOSURES  I, Jon P. Christinidis do hereby state as follows:
: 1. I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
: 2. A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
: 3. I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of May 30, 2015.
: 4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.
 
2      Executed in accord with 10 C.F.R. § 2.304(d),    /s/ signed electronically by        Jon P. Christinidis DTE Electric Company
 
One Energy Plaza
 
Detroit, Michigan 48226 Dated at Detroit, Michigan
 
this 1st day of July 2015
 
DC:775606.1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: DTE ELECTRIC COMPANY (Fermi Nuclear Power Plant, Unit 2) ) )  
)
)
) Docket No. 50-341-LR CERTIFICATE OF SERVICE   I hereby certify that copies of the foregoing "APPLICANT'S SUPPLEMENTAL DISCLOSURES" and "CERTIFICATION OF SUPPLEMENTAL DISCLOSURES" have been served via the Electronic Information Exchange ("EIE") this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.
Respectfully submitted,  
    /s/ signed electronically by                 Darani M. Reddick Winston & Strawn LLP  
 
1700 K Street, NW  
 
Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015}}

Latest revision as of 09:34, 31 October 2019

DTE Supplemental Disclosures July 2015
ML15182A038
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/01/2015
From: Christinidis J, Reddick D, Tanya Smith
DTE Electric Company, Winston & Strawn, LLP
To:
Atomic Safety and Licensing Board Panel
SECY RAS
References
50-341-LR, ASLBP 14-933-01-LR-BD01, RAS 28000
Download: ML15182A038 (6)


Text

July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )

)

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi Nuclear Power Plant, Unit 2) )

APPLICANTS SUPPLEMENTAL DISCLOSURES Pursuant to 10 C.F.R. § 2.336, the Joint Motion on Mandatory Disclosures dated February 23, 2015, and the Licensing Boards Order, dated February 27, 2015, DTE Electric Company (DTE or Applicant), hereby supplements its disclosures with respect to the admitted contentions.

1. Testifying Witnesses DTE has not yet identified the persons upon whom it will rely as witnesses with respect to the admitted contentions. In accordance with 10 C.F.R. § 2.336(b), DTE will supplement this disclosure after testifying witnesses are identified.
2. Documents and Data Collections A description by category of all non-privileged documents and data compilations in the possession, custody, or control of DTE that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement is provided in Attachment A. DTE did not identify any proprietary documents that are relevant to the admitted contentions and subject to disclosure under the parties disclosure agreement.
3. Tangible Things Other than documents provided or listed, no relevant tangible things have been identified.

Respectfully submitted,

/s/ signed electronically by Tyson R. Smith Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015 2

DC:775605.1

Fermi 2 License Renewal Attachment A DTE Supplemental Disclosures July 2015 PUBLIC Doc ID Date Author Recipient Description Contention DTE00550 5/14/2015 Michael J Koenemann Randall D Westmoreland Revised Calculation and RAI Response CRAFT8 - SAMA Populations Summary of March 27, 2015 conference call JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00551 5/28/2015 NRC between NRC and DTE Populations JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00552 5/8/2015 DTE NRC DTE Reponse to SAMA RAIs Populations Randall Westmoreland; Michael Lake; Michael DTE00553 5/14/2015 Angela Rudolph Koenemann Revised Calculation and RAI Response CRAFT8 - SAMA Populations Fermi 2 WinMACCS Assessment of Severe JP4 Mutual SAMAs; CRAFT8 - SAMA DTE00554 5/5/2015 Enercon Accident Consequences, Rev. 1 Populations DTE00555 5/5/2015 DTE DTE RAI Response Review and Approval Record CRAFT8 - SAMA Populations

July 1, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )

)

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi Nuclear Power Plant, Unit 2) )

CERTIFICATION OF SUPPLEMENTAL DISCLOSURES I, Jon P. Christinidis do hereby state as follows:

1. I am employed as Expert Attorney - Regulatory and Nuclear for DTE Electric Company. Working with other attorneys for the Applicant, I have been responsible for managing the searches, collection, and compilation of documents, data compilations, and tangible things to comply with the mandatory disclosure requirements in 10 C.F.R. § 2.336.
2. A search was conducted of documents, data compilations, and tangible things under the custody and control of the Applicant for the types of information specified in 10 C.F.R. § 2.336(a). The search was based on information and documents reasonably available to the Applicant. The searches encompassed both electronic and paper documents.
3. I hereby certify that to the best of my knowledge, information, and belief all relevant materials required to be disclosed pursuant to 10 C.F.R. § 2.336(a) in the captioned proceeding have been disclosed, and that the disclosures are accurate and complete as of May 30, 2015.
4. I hereby certify under penalty of perjury that the foregoing is true and complete to the best of my knowledge, information, and belief.

Executed in accord with 10 C.F.R. § 2.304(d),

/s/ signed electronically by Jon P. Christinidis DTE Electric Company One Energy Plaza Detroit, Michigan 48226 Dated at Detroit, Michigan this 1st day of July 2015 2

DC:775606.1

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of: )

)

DTE ELECTRIC COMPANY ) Docket No. 50-341-LR

)

(Fermi Nuclear Power Plant, Unit 2) )

CERTIFICATE OF SERVICE I hereby certify that copies of the foregoing APPLICANTS SUPPLEMENTAL DISCLOSURES and CERTIFICATION OF SUPPLEMENTAL DISCLOSURES have been served via the Electronic Information Exchange (EIE) this 1st day of July 2015, which to the best of my knowledge resulted in transmittal of the foregoing to those on the EIE Service List for the captioned proceeding.

Respectfully submitted,

/s/ signed electronically by Darani M. Reddick Winston & Strawn LLP 1700 K Street, NW Washington, DC 20006 COUNSEL FOR DTE ELECTRIC COMPANY Dated at Washington, District of Columbia this 1st day of July 2015