{{#Wiki_filter:CONTACT: Eric A. Ruesch, RIV/DRS  817-200-1126
{{#Wiki_filter:February 26, 2016 MEMORANDUM TO:           Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:                    Troy W. Pruett, Director/RA/
Division of Reactor Projects Region IV


February 26, 2016
==SUBJECT:==
CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.
If you have any questions or desire additional details, please contact me at 817-200-1248.
 
==Enclosure:==


MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support  Office of Nuclear Reactor Regulation
Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:
M. Scott, RI              J. Clark, RIV M. Franke, RII            R. Lantz, RIV P. Louden, RIII            T. Hipschman, RIV M. Dapas, RIV              J. Peralta, NRR K. Kennedy, RIV            N. Sanfilippo, NRR A. Vegel, RIV CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126


FROM: Troy W. Pruett, Director/RA/
ML16057A123 SUNSI Review          ADAMS              Publicly Available      Non-Sensitive    Keyword:
Division of Reactor Projects Region IV
By: ERuesch              Yes  No        Non-Publicly Available  Sensitive        RGN-002 OFFICE        DRS/IPAT TL:DRS/IPAT D:DRS              D:DRP NAME          ERuesch    THipschman      AVegel        TPruett SIGNATURE /RA/          /RA/            /RA/          /RA/
DATE          2/25/16    2/25/16        2/25/16      2/26/16


==SUBJECT:==
Page: Page 1 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Arkansas Nuclear One (ANO)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
CY 2015 BASELINE INSPECTION COMPLETION
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                5                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                2                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete 7111108P        Inservice Inspection Activities - PWR                  Annually                3                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                2                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually              17                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              15                  14      Complete 7111115        Operability Determinations                            Annually              26                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              47                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                3                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              21                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                5                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 2 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Arkansas Nuclear One (ANO)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                2                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                7                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                5                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 3 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Callaway (CALL)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Complete      by reference iaw IMC 0306 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              10                  3      Complete 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108P        Inservice Inspection Activities - PWR                  Annually                0                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              18                  14      Complete 7111115        Operability Determinations                            Annually              17                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                3                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              26                  15      Complete      completed in previous year(s) 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Complete 7111122        Surveillance Testing                                  Annually              18                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                4                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 4 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Callaway (CALL)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                4                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 5 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Cooper (CNS)                                          Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              13                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete 7111108G        Inservice Inspection Activities - BWR                  Annually                0                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                9                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              17                  14      Complete 7111115        Operability Determinations                            Annually              18                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                6                  3      Complete 7111119        Post Maintenance Testing                              Annually              22                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      by reference iaw IMC 0306 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              16                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                8                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                2                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 6 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Cooper (CNS)                                          Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                8                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                6                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 7 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Comanche Peak (CP)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              13                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              6                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              4                  2      Complete      completed in previous year(s) 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              16                  14      Complete 7111115        Operability Determinations                            Annually              22                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                3                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      by reference iaw IMC 0306 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Complete 7111122        Surveillance Testing                                  Annually              18                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                2                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 8 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Comanche Peak (CP)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                9                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 9 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Diablo Canyon (DIAB)                                  Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                2                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually              10                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              20                  14      Complete 7111115        Operability Determinations                            Annually              19                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              43                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                7                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              24                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually              16                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                4                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 10 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Diablo Canyon (DIAB)                                  Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                7                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually              10                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 11 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Fort Calhoun (FCS)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                7                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              15                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            3                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              22                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Complete      by reference iaw IMC 0306 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              5                  3      Complete 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                2                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete      completed in previous year(s) 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                2                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually              13                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                9                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              19                  14      Complete 7111115        Operability Determinations                            Annually              49                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              24                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              19                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually              10                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 12 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Fort Calhoun (FCS)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                2                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually              12                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually              19                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 13 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Grand Gulf (GG)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              21                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              4                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108G        Inservice Inspection Activities - BWR                  Annually                0                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              15                  14      Complete 7111115        Operability Determinations                            Annually              18                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                0                  2      Complete      full sample not available 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              23                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                0                  1      Complete      opportunity to apply full procedure not available 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 14 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Grand Gulf (GG)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                2                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 15 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Palo Verde (PALO)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            3                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              4                  2      Complete 7111108P        Inservice Inspection Activities - PWR                  Annually                2                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                2                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                9                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                9                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              16                  14      Complete 7111115        Operability Determinations                            Annually              24                  22      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              54                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              21                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              22                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                5                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 16 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Palo Verde (PALO)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              35                  35      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                8                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                9                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 17 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: River Bend (RBS)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete      completed in previous year(s) 7111108G        Inservice Inspection Activities - BWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              14                  14      Complete 7111115        Operability Determinations                            Annually              16                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              38                  23      Complete 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              26                  15      Complete      completed in previous year(s) 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              20                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                6                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 18 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: River Bend (RBS)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                2                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                9                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 19 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: South Texas Project (STP)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              21                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              5                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              4                  2      Complete 7111108P        Inservice Inspection Activities - PWR                  Annually                2                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              20                  14      Complete 7111115        Operability Determinations                            Annually              20                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              43                  23      Complete 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              21                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                4                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              23                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                7                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 20 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: South Texas Project (STP)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                3                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 21 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Waterford (WAT)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                5                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              14                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              4                  4      Complete 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                2                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete      completed in previous year(s) 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              19                  14      Complete 7111115        Operability Determinations                            Annually              18                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              37                  23      Complete 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              21                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      full sample not available 7111121        Component Design Bases Inspection                      Triennial              24                  15      Complete      completed in previous year(s) 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Complete 7111122        Surveillance Testing                                  Annually              17                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                4                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 22 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Waterford (WAT)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                6                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 23 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Wolf Creek (WC)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              13                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              20                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              8                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                2                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              19                  14      Complete 7111115        Operability Determinations                            Annually              17                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              37                  23      Complete 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              18                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                4                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 24 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Wolf Creek (WC)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                8                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                5                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 25 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Columbia Generating Station (WNP)                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              16                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              7                  4      Complete 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108G        Inservice Inspection Activities - BWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                0                  1      Complete      opportunity to apply full procedure not available 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              15                  14      Complete 7111115        Operability Determinations                            Annually              17                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              39                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      by reference iaw IMC 0306 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              16                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                5                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 26 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Columbia Generating Station (WNP)                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                7                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.  
February 26, 2016 MEMORANDUM TO:            Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM:                    Troy W. Pruett, Director/RA/
Division of Reactor Projects Region IV


==SUBJECT:==
CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.
The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.
If you have any questions or desire additional details, please contact me at 817-200-1248.  
If you have any questions or desire additional details, please contact me at 817-200-1248.


==Enclosure:==
==Enclosure:==


Baseline Inspection Completion by Site    (IR Report 8a)  
Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:
M. Scott, RI              J. Clark, RIV M. Franke, RII            R. Lantz, RIV P. Louden, RIII            T. Hipschman, RIV M. Dapas, RIV              J. Peralta, NRR K. Kennedy, RIV            N. Sanfilippo, NRR A. Vegel, RIV CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126
 
ML16057A123 SUNSI Review          ADAMS              Publicly Available      Non-Sensitive    Keyword:
By: ERuesch              Yes  No        Non-Publicly Available  Sensitive        RGN-002 OFFICE        DRS/IPAT TL:DRS/IPAT D:DRS              D:DRP NAME          ERuesch    THipschman      AVegel        TPruett SIGNATURE /RA/          /RA/            /RA/          /RA/
DATE          2/25/16    2/25/16        2/25/16      2/26/16
 
Page: Page 1 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Arkansas Nuclear One (ANO)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                5                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                2                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete 7111108P        Inservice Inspection Activities - PWR                  Annually                3                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                2                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually              17                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              15                  14      Complete 7111115        Operability Determinations                            Annually              26                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              47                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                3                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              21                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                5                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 2 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Arkansas Nuclear One (ANO)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                2                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                7                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                5                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 3 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Callaway (CALL)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Complete      by reference iaw IMC 0306 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              10                  3      Complete 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108P        Inservice Inspection Activities - PWR                  Annually                0                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              18                  14      Complete 7111115        Operability Determinations                            Annually              17                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                3                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              26                  15      Complete      completed in previous year(s) 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Complete 7111122        Surveillance Testing                                  Annually              18                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                4                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 4 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Callaway (CALL)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                4                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 5 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Cooper (CNS)                                          Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              13                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete 7111108G        Inservice Inspection Activities - BWR                  Annually                0                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                9                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              17                  14      Complete 7111115        Operability Determinations                            Annually              18                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                6                  3      Complete 7111119        Post Maintenance Testing                              Annually              22                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      by reference iaw IMC 0306 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              16                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                8                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                2                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 6 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Cooper (CNS)                                          Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                8                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                6                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 7 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Comanche Peak (CP)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              13                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              6                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              4                  2      Complete      completed in previous year(s) 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              16                  14      Complete 7111115        Operability Determinations                            Annually              22                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                3                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      by reference iaw IMC 0306 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Complete 7111122        Surveillance Testing                                  Annually              18                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                2                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 8 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Comanche Peak (CP)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status     Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                9                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 9 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Diablo Canyon (DIAB)                                  Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                2                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually              10                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              20                  14      Complete 7111115        Operability Determinations                            Annually              19                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              43                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                7                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              24                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually              16                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                4                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 10 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Diablo Canyon (DIAB)                                  Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                7                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually              10                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 11 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Fort Calhoun (FCS)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                7                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              15                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            3                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              22                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Complete      by reference iaw IMC 0306 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              5                  3      Complete 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                2                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete      completed in previous year(s) 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                2                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually              13                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                9                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              19                  14      Complete 7111115        Operability Determinations                            Annually              49                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              24                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              19                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually              10                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 12 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Fort Calhoun (FCS)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                2                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually              12                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually              19                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 13 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Grand Gulf (GG)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              21                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              4                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108G        Inservice Inspection Activities - BWR                  Annually                0                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              15                  14      Complete 7111115        Operability Determinations                            Annually              18                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              0                  23      Not Applicable completion not required during this inspection cycle 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                0                  2      Complete      full sample not available 7111121        Component Design Bases Inspection                      Triennial              22                  15      Complete 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              23                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                0                  1      Complete      opportunity to apply full procedure not available 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
 
Page: Page 14 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Grand Gulf (GG)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                       Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                2                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


cc w/enclosure: M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV 
Page: Page 15 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Palo Verde (PALO)                                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            3                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              4                  2      Complete 7111108P        Inservice Inspection Activities - PWR                  Annually                2                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                2                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                9                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                9                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              16                  14      Complete 7111115        Operability Determinations                            Annually              24                  22      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              54                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              21                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              22                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                5                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


SUNSI Review By:  ERuesch ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP    NAME ERuesch THipschman AVegel TPruett    SIGNATURE /RA/ /RA/ /RA/ /RA/    DATE 2/25/16 2/25/16 2/25/16 2/26/16 Page:Page 1 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
Page: Page 16 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Palo Verde (PALO)                                     Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
45 (01/01/2015 - 12/31/2015)
Sample               Minimum Procedure      Title                                                  Frequency      Completed             Sample      Status    Note 71124.02       Occupational ALARA                                    Biennial                2                  1      Complete 71124.03       Airbore Radioactivity                                  Biennial               1                  1      Complete   completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial               1                  1      Complete   completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial               1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial               1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                         Biennial               1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial               1                  1      Complete 71151          Performance Indicator Verfication                     Annually              35                 35     Complete 71151          Performance Indicator Verfication                     Annually                3                  3      Complete 71151          Performance Indicator Verfication                     Not Applicable          1                  1      Complete 71152          PI&R                                                   Annually                8                  6      Complete 71152B          PI&R (Biennial)                                       Biennial               1                  1      Complete   completed in previous year(s) 71153          Followup of Events and NOED                           Annually                9                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Arkansas Nuclear One (ANO)7111101 Adverse Weather Protection A nnuall y 54 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 21 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial32 Complete7111108PInservice Inspection Activities - PWR A nnuall y 31 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial21 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y178 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1514 Complete7111115Operability Determinations A nnuall y2619 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4723 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 32 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2114 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 51 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 2 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Arkansas Nuclear One (ANO)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial21 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 76 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 51 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 3 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Callaway (CALL)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial04 Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial103 Complete7111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWR A nnuall y 01 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1814 Complete7111115Operability Determinations A nnuall y1715 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 33 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial2615 Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Complete7111122Surveillance Testing A nnuall y1814 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 41 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 4 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Callaway (CALL)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 41 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 5 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Cooper (CNS)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1312 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial32 Complete7111108GInservice Inspection Activities - BWR A nnuall y 01 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 98 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1714 Complete7111115Operability Determinations A nnuall y1815 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 63 Complete7111119Post Maintenance Testing A nnuall y2220 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1614 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 81 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial21 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 6 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Cooper (CNS)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 86 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 61 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 7 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Comanche Peak (CP)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1312 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial64 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial42 Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1614 Complete7111115Operability Determinations A nnuall y2219 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 33 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Complete7111122Surveillance Testing A nnuall y1814 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 21 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 8 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Comanche Peak (CP)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 91 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 9 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Diablo Canyon (DIAB)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 21 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y108 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y2014 Complete7111115Operability Determinations A nnuall y1919 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 73 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2414 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y161 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 43 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 10 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Diablo Canyon (DIAB)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 76 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y101 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 11 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Fort Calhoun (FCS)7111101 Adverse Weather Protection A nnuall y 74 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1512 Complete7111104SEquipment  AlignmentSemiannually32 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2216 Complete7111105TFire Protection [Triennial]Triennial04 Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial53 Complete7111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 21 Complete7111107THeat Sink PerformanceTriennial32 Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial21 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y138 Complete7111112QMaintenance Effectiveness A nnuall y 98 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1914 Complete7111115Operability Determinations A nnuall y4915 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2420 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1914 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y101 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 12 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Fort Calhoun (FCS)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial21 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y126 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y191 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 13 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Grand Gulf (GG)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2116 Complete7111105TFire Protection [Triennial]Triennial44 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWR A nnuall y 01 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1514 Complete7111115Operability Determinations A nnuall y1815 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 02 Complete full sample not available7111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2314 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 01 Completeopportunity to apply full procedure not available7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 14 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Grand Gulf (GG)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 21 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 15 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Palo Verde (PALO)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually32 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial42 Complete7111108PInservice Inspection Activities - PWR A nnuall y 21 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial21 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 98 Complete7111112QMaintenance Effectiveness A nnuall y 98 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1614 Complete7111115Operability Determinations A nnuall y2422 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial5423 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2120 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2214 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 51 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 16 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Palo Verde (PALO)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y3535 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 86 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 91 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 17 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:River Bend (RBS)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial32 Completecompleted in previous year(s)7111108GInservice Inspection Activities - BWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial11 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1414 Complete7111115Operability Determinations A nnuall y1615 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3823 Complete7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial2615 Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2014 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 61 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 18 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:River Bend (RBS)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial21 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 91 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 19 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:South Texas Project (STP)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2116 Complete7111105TFire Protection [Triennial]Triennial54 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial42 Complete7111108PInservice Inspection Activities - PWR A nnuall y 21 Complete7111111A A nnual Review A nnuall y 11 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y2014 Complete7111115Operability Determinations A nnuall y2019 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323 Complete7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2120 Complete7111120Refueling and Other Outage Activities A nnuall y 42 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2314 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 71 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 20 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:South Texas Project (STP)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 31 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 21 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Waterford (WAT)7111101 Adverse Weather Protection A nnuall y 54 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1412 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial44 Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 21 Complete7111107THeat Sink PerformanceTriennial32 Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWR A nnuall y 11 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1914 Complete7111115Operability Determinations A nnuall y1815 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723 Complete7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2120 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Complete full sample not available7111121Component Design Bases InspectionTriennial2415 Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Complete7111122Surveillance Testing A nnuall y1714 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 41 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 22 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Waterford (WAT)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 61 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 23 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Wolf Creek (WC)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1312 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2016 Complete7111105TFire Protection [Triennial]Triennial84 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 21 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial11 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1914 Complete7111115Operability Determinations A nnuall y1715 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723 Complete7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1814 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 41 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 24 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Wolf Creek (WC)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 86 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 51 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 25 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Columbia Generating Station (WNP)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1616 Complete7111105TFire Protection [Triennial]Triennial74 Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 01 Completeopportunity to apply full procedure not available7111111BLicensed Operator RequalificationBiennial11 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1514 Complete7111115Operability Determinations A nnuall y1715 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3923 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1614 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 51 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 26 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Columbia Generating Station (WNP)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 71 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
CONTACT: Eric A. Ruesch, RIV/DRS  817-200-1126


February 26, 2016
Page: Page 17 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: River Bend (RBS)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              17                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              0                  4      Not Applicable completion not required during this inspection cycle 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete      completed in previous year(s) 7111108G        Inservice Inspection Activities - BWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              14                  14      Complete 7111115        Operability Determinations                            Annually              16                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              38                  23      Complete 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              26                  15      Complete      completed in previous year(s) 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              20                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                6                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support  Office of Nuclear Reactor Regulation
Page: Page 18 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: River Bend (RBS)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                2                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete 71153          Followup of Events and NOED                            Annually                9                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


FROM: Troy W. Pruett, Director/RA/
Page: Page 19 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: South Texas Project (STP)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Division of Reactor Projects Region IV
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              21                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              5                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              4                  2      Complete 7111108P        Inservice Inspection Activities - PWR                  Annually                2                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              20                  14      Complete 7111115        Operability Determinations                            Annually              20                  19      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              43                  23      Complete 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              21                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                4                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              23                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                7                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


==SUBJECT:==
Page: Page 20 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: South Texas Project (STP)                            Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
CY 2015 BASELINE INSPECTION COMPLETION
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              24                  24      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                3                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.  
Page: Page 21 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Waterford (WAT)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                5                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              14                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              18                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              4                  4      Complete 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Not Applicable completion not required during this inspection cycle 7111106        Flood Protection Measures                              Annually                3                  3      Complete 7111107A        Heat Sink Performance                                  Annually                2                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              3                  2      Complete      completed in previous year(s) 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete      completed in previous year(s) 7111111A        Annual Review                                          Annually                0                  1      Complete      by reference iaw IMC 0306 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              19                  14      Complete 7111115        Operability Determinations                            Annually              18                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              37                  23      Complete 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              21                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      full sample not available 7111121        Component Design Bases Inspection                      Triennial              24                  15      Complete      completed in previous year(s) 7111121M        CDBI (Teams)                                          Triennial              0                  10      Complete 7111121N        CDBI Programs                                          Triennial              0                  6      Complete 7111122        Surveillance Testing                                  Annually              17                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                4                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.
Page: Page 22 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Waterford (WAT)                                       Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
If you have any questions or desire additional details, please contact me at 817-200-1248.  
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete  completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete  completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                   1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                6                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                6                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


==Enclosure:==
Page: Page 23 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Wolf Creek (WC)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                6                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              13                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              20                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              8                  4      Complete      completed in previous year(s) 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                2                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108P        Inservice Inspection Activities - PWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                1                  1      Complete 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              19                  14      Complete 7111115        Operability Determinations                            Annually              17                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              37                  23      Complete 7111118        Plant Modifications                                    Annually                4                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                2                  2      Complete 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              18                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete      completed in previous year(s) 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete      completed in previous year(s) 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                4                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete      completed in previous year(s) 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


Baseline Inspection Completion by Site     (IR Report 8a)  
Page: Page 24 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Wolf Creek (WC)                                      Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status    Note 71124.02        Occupational ALARA                                    Biennial                2                  1      Complete 71124.03        Airbore Radioactivity                                  Biennial                1                  1      Complete 71124.04        Occupational Dose Assessment                          Biennial                1                  1      Complete 71124.05        Radiation Monitoring Instrumentation                  Biennial                1                  1      Complete  completed in previous year(s) 71124.06        Rad Gas & Liquid Treatment                            Biennial                1                  1      Complete  completed in previous year(s) 71124.07        Rad. Environ. Monitoring Prog.                        Biennial                1                  1      Complete  completed in previous year(s) 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial                1                  1      Complete  completed in previous year(s) 71151          Performance Indicator Verfication                      Annually              13                  13      Complete 71151          Performance Indicator Verfication                      Annually                3                  3      Complete 71151          Performance Indicator Verfication                      Not Applicable          1                  1      Complete 71152          PI&R                                                  Annually                8                  6      Complete 71152B          PI&R (Biennial)                                        Biennial                1                  1      Complete  completed in previous year(s) 71153          Followup of Events and NOED                            Annually                5                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


cc w/enclosure: M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV 
Page: Page 25 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Columbia Generating Station (WNP)                    Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
Sample              Minimum Procedure      Title                                                  Frequency      Completed            Sample      Status        Note 7111101        Adverse Weather Protection                            Annually                4                  4      Complete 7111104        Equipment Alignment (Quarterly)                        Annually              12                  12      Complete 7111104S        Equipment Alignment                                    Semiannually            2                  2      Complete 7111105A        Fire Protection - Annual                              Annually                1                  1      Complete 7111105Q        Fire Protection - Quarterly                            Annually              16                  16      Complete 7111105T        Fire Protection [Triennial]                            Triennial              7                  4      Complete 7111105X        Fire Protection - NFPA 805 (Triennial)                Triennial              0                  3      Complete      by reference iaw IMC 0306 7111106        Flood Protection Measures                              Annually                4                  3      Complete 7111107A        Heat Sink Performance                                  Annually                1                  1      Complete 7111107T        Heat Sink Performance                                  Triennial              0                  2      Not Applicable completion not required during this inspection cycle 7111108G        Inservice Inspection Activities - BWR                  Annually                1                  1      Complete 7111111A        Annual Review                                          Annually                0                  1      Complete      opportunity to apply full procedure not available 7111111B        Licensed Operator Requalification                      Biennial                1                  1      Complete      completed in previous year(s) 7111111Q        Licensed Operator Requalification                      Annually                8                  8      Complete 7111112Q        Maintenance Effectiveness                              Annually                8                  8      Complete 7111113        Maint Risk Assessments & Emer Wk Control              Annually              15                  14      Complete 7111115        Operability Determinations                            Annually              17                  15      Complete 7111117T        Changes, Tests, Exper, Perm Mods                      Triennial              39                  23      Complete      completed in previous year(s) 7111118        Plant Modifications                                    Annually                5                  3      Complete 7111119        Post Maintenance Testing                              Annually              20                  20      Complete 7111120        Refueling and Other Outage Activities                  Annually                1                  2      Complete      by reference iaw IMC 0306 7111121        Component Design Bases Inspection                      Triennial              0                  15      Not Applicable completion not required during this inspection cycle 7111121M        CDBI (Teams)                                          Triennial              0                  10      Not Applicable completion not required during this inspection cycle 7111121N        CDBI Programs                                          Triennial              0                  6      Not Applicable completion not required during this inspection cycle 7111122        Surveillance Testing                                  Annually              16                  14      Complete 7111401        Exercise Evaluation                                    Biennial                0                  1      Complete      by reference iaw IMC 0306 7111402        Alert and Notification System Testing                  Biennial                1                  1      Complete 7111403        EP Organizational Staffing/Augmentation                Biennial                1                  1      Complete 7111404        Emrgcy Act Lvl & Emrgcy Pln Chngs                      Annually                5                  1      Complete 7111405        Corct Emergcy Preprdnes Wknes & Defcny                Biennial                1                  1      Complete 7111406        Drill Evaluation                                      Annually                3                  3      Complete 7111408        Exercise Evaluation - Scenario Review                  Biennial                1                  1      Complete      completed in previous year(s) 71124.01        Rad Haz Assess Exposure Controls                      Annually                1                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.


SUNSI Review By:  ERuesch ADAMS  Yes    No  Publicly Available  Non-Publicly Available  Non-Sensitive  Sensitive Keyword: RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP    NAME ERuesch THipschman AVegel TPruett    SIGNATURE /RA/ /RA/ /RA/ /RA/    DATE 2/25/16 2/25/16 2/25/16 2/26/16 Page:Page 1 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
Page: Page 26 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4            Site: Columbia Generating Station (WNP)                     Inspection Cycle: 45 (01/01/2015 - 12/31/2015)
45 (01/01/2015 - 12/31/2015)
Sample               Minimum Procedure      Title                                                  Frequency      Completed             Sample      Status    Note 71124.02       Occupational ALARA                                    Biennial               2                  1      Complete 71124.03       Airbore Radioactivity                                  Biennial               1                  1      Complete   completed in previous year(s) 71124.04        Occupational Dose Assessment                          Biennial               1                  1      Complete   completed in previous year(s) 71124.05        Radiation Monitoring Instrumentation                  Biennial               1                  1      Complete 71124.06        Rad Gas & Liquid Treatment                            Biennial               1                  1      Complete 71124.07        Rad. Environ. Monitoring Prog.                         Biennial               1                  1      Complete 71124.08        Solid Waste Proc, Handling, Stor, Transp              Biennial               1                  1      Complete 71151          Performance Indicator Verfication                     Annually              13                  13      Complete 71151          Performance Indicator Verfication                     Annually                3                  3      Complete 71151          Performance Indicator Verfication                     Not Applicable          1                  1      Complete 71152          PI&R                                                   Annually                6                  6      Complete 71152B          PI&R (Biennial)                                       Biennial               1                  1      Complete 71153          Followup of Events and NOED                           Annually                7                  1      Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.}}
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Arkansas Nuclear One (ANO)7111101 Adverse Weather Protection A nnuall y 54 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 21 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial32 Complete7111108PInservice Inspection Activities - PWR A nnuall y 31 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial21 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y178 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1514 Complete7111115Operability Determinations A nnuall y2619 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4723 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 32 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2114 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 51 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 2 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Arkansas Nuclear One (ANO)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial21 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 76 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 51 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 3 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Callaway (CALL)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial04 Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial103 Complete7111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWR A nnuall y 01 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1814 Complete7111115Operability Determinations A nnuall y1715 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 33 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial2615 Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Complete7111122Surveillance Testing A nnuall y1814 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 41 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 4 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Callaway (CALL)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 41 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 5 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Cooper (CNS)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1312 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial32 Complete7111108GInservice Inspection Activities - BWR A nnuall y 01 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 98 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1714 Complete7111115Operability Determinations A nnuall y1815 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 63 Complete7111119Post Maintenance Testing A nnuall y2220 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1614 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 81 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial21 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 6 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Cooper (CNS)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 86 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 61 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 7 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Comanche Peak (CP)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1312 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial64 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial42 Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1614 Complete7111115Operability Determinations A nnuall y2219 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 33 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Complete7111122Surveillance Testing A nnuall y1814 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 21 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 8 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Comanche Peak (CP)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 91 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 9 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Diablo Canyon (DIAB)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 21 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y108 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y2014 Complete7111115Operability Determinations A nnuall y1919 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 73 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2414 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y161 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 43 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 10 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Diablo Canyon (DIAB)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 76 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y101 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 11 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Fort Calhoun (FCS)7111101 Adverse Weather Protection A nnuall y 74 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1512 Complete7111104SEquipment  AlignmentSemiannually32 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2216 Complete7111105TFire Protection [Triennial]Triennial04 Completeby reference iaw IMC 03067111105XFire Protection - NFPA 805 (Triennial)Triennial53 Complete7111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 21 Complete7111107THeat Sink PerformanceTriennial32 Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial21 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y138 Complete7111112QMaintenance Effectiveness A nnuall y 98 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1914 Complete7111115Operability Determinations A nnuall y4915 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2420 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1914 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y101 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 12 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:
Fort Calhoun (FCS)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial21 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y126 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y191 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 13 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Grand Gulf (GG)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2116 Complete7111105TFire Protection [Triennial]Triennial44 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWR A nnuall y 01 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1514 Complete7111115Operability Determinations A nnuall y1815 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial023 Not Applicablecompletion not required during this inspection cycle7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 02 Complete full sample not available7111121Component Design Bases InspectionTriennial2215 Complete7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2314 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 01 Completeopportunity to apply full procedure not available7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 14 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Grand Gulf (GG)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 21 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 15 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Palo Verde (PALO)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually32 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial42 Complete7111108PInservice Inspection Activities - PWR A nnuall y 21 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial21 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 98 Complete7111112QMaintenance Effectiveness A nnuall y 98 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1614 Complete7111115Operability Determinations A nnuall y2422 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial5423 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2120 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2214 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 51 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 16 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Palo Verde (PALO)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y3535 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 86 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 91 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 17 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:River Bend (RBS)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1716 Complete7111105TFire Protection [Triennial]Triennial04 Not Applicablecompletion not required during this inspection cycle7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial32 Completecompleted in previous year(s)7111108GInservice Inspection Activities - BWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial11 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1414 Complete7111115Operability Determinations A nnuall y1615 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3823 Complete7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial2615 Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2014 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 61 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 18 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:River Bend (RBS)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial21 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 91 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 19 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:South Texas Project (STP)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2116 Complete7111105TFire Protection [Triennial]Triennial54 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial42 Complete7111108PInservice Inspection Activities - PWR A nnuall y 21 Complete7111111A A nnual Review A nnuall y 11 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y2014 Complete7111115Operability Determinations A nnuall y2019 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial4323 Complete7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2120 Complete7111120Refueling and Other Outage Activities A nnuall y 42 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y2314 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 71 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 20 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:South Texas Project (STP)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y2424 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 31 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 21 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Waterford (WAT)7111101 Adverse Weather Protection A nnuall y 54 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1412 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1816 Complete7111105TFire Protection [Triennial]Triennial44 Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Not Applicablecompletion not required during this inspection cycle7111106Flood Protection Measures A nnuall y 33 Complete7111107AHeat Sink Performance A nnuall y 21 Complete7111107THeat Sink PerformanceTriennial32 Completecompleted in previous year(s)7111108PInservice Inspection Activities - PWR A nnuall y 11 Completecompleted in previous year(s)7111111A A nnual Review A nnuall y 01 Completeby reference iaw IMC 03067111111BLicensed Operator RequalificationBiennial11 Complete7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1914 Complete7111115Operability Determinations A nnuall y1815 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723 Complete7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2120 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Complete full sample not available7111121Component Design Bases InspectionTriennial2415 Completecompleted in previous year(s)7111121MCDBI (Teams)Triennial010 Complete7111121NCDBI ProgramsTriennial06 Complete7111122Surveillance Testing A nnuall y1714 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 41 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 22 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Waterford (WAT)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 61 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 23 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Wolf Creek (WC)7111101 Adverse Weather Protection A nnuall y 64 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1312 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y2016 Complete7111105TFire Protection [Triennial]Triennial84 Completecompleted in previous year(s)7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 21 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108PInservice Inspection Activities - PWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 11 Complete7111111BLicensed Operator RequalificationBiennial11 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1914 Complete7111115Operability Determinations A nnuall y1715 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3723 Complete7111118Plant Modifications A nnuall y 43 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 22 Complete7111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1814 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Completecompleted in previous year(s)7111403EP Organizational Staffing/AugmentationBiennial11 Completecompleted in previous year(s)7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 41 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Completecompleted in previous year(s)7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Complete71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 24 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Wolf Creek (WC)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Complete71124.04Occupational Dose AssessmentBiennial11 Complete71124.05Radiation Monitoring InstrumentationBiennial11 Completecompleted in previous year(s)71124.06Rad Gas & Liquid TreatmentBiennial11 Completecompleted in previous year(s)71124.07Rad. Environ. Monitoring Prog.Biennial11 Completecompleted in previous year(s)71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Completecompleted in previous year(s)71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 86 Complete71152BPI&R (Biennial)Biennial11 Completecompleted in previous year(s)71153Followup of Events and NOED A nnuall y 51 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 25 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Columbia Generating Station (WNP)7111101 Adverse Weather Protection A nnuall y 44 Complete7111104Equipment Alignment (Quarterly)
A nnuall y1212 Complete7111104SEquipment  AlignmentSemiannually22 Complete7111105AFire Protection -  Annual A nnuall y 11 Complete7111105QFire Protection - Quarterly A nnuall y1616 Complete7111105TFire Protection [Triennial]Triennial74 Complete7111105XFire Protection - NFPA 805 (Triennial)Triennial03 Completeby reference iaw IMC 03067111106Flood Protection Measures A nnuall y 43 Complete7111107AHeat Sink Performance A nnuall y 11 Complete7111107THeat Sink PerformanceTriennial02 Not Applicablecompletion not required during this inspection cycle7111108GInservice Inspection Activities - BWR A nnuall y 11 Complete7111111A A nnual Review A nnuall y 01 Completeopportunity to apply full procedure not available7111111BLicensed Operator RequalificationBiennial11 Completecompleted in previous year(s)7111111QLicensed Operator Requalification A nnuall y 88 Complete7111112QMaintenance Effectiveness A nnuall y 88 Complete7111113Maint Risk Assessments & Emer Wk Control A nnuall y1514 Complete7111115Operability Determinations A nnuall y1715 Complete7111117TChanges, Tests, Exper, Perm ModsTriennial3923 Completecompleted in previous year(s)7111118Plant Modifications A nnuall y 53 Complete7111119Post Maintenance Testing A nnuall y2020 Complete7111120Refueling and Other Outage Activities A nnuall y 12 Completeby reference iaw IMC 03067111121Component Design Bases InspectionTriennial015 Not Applicablecompletion not required during this inspection cycle7111121MCDBI (Teams)Triennial010 Not Applicablecompletion not required during this inspection cycle7111121NCDBI ProgramsTriennial06 Not Applicablecompletion not required during this inspection cycle7111122Surveillance Testing A nnuall y1614 Complete7111401Exercise EvaluationBiennial01 Completeby reference iaw IMC 03067111402 Alert and Notification System TestingBiennial11 Complete7111403EP Organizational Staffing/AugmentationBiennial11 Complete7111404Emrgcy Act Lvl & Emrgcy Pln Chngs A nnuall y 51 Complete7111405Corct Emergcy Preprdnes Wknes & DefcnyBiennial11 Complete7111406Drill Evaluation A nnuall y 33 Complete7111408Exercise Evaluation - Scenario ReviewBiennial11 Completecompleted in previous year(s)71124.01Rad Haz Assess Exposure Controls A nnuall y 11 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.
Page:Page 26 of 26 02/25/2016 15:35:12 IR Report 8aBaseline Inspection Completion By SiteInspection Cycle:
45 (01/01/2015 - 12/31/2015)
ProcedureTitleFrequencyStatusNote Sample Completed Minimum SampleRegion No:4Site:Columbia Generating Station (WNP)71124.02Occupational ALARABiennial21 Complete71124.03 A irbore Radioactivit yBiennial11 Completecompleted in previous year(s)71124.04Occupational Dose AssessmentBiennial11 Completecompleted in previous year(s)71124.05Radiation Monitoring InstrumentationBiennial11 Complete71124.06Rad Gas & Liquid TreatmentBiennial11 Complete71124.07Rad. Environ. Monitoring Prog.Biennial11 Complete71124.08Solid Waste Proc, Handling, Stor, TranspBiennial11 Complete71151Performance Indicator Verfication A nnuall y1313 Complete71151Performance Indicator Verfication A nnuall y 33 Complete71151Performance Indicator VerficationNot Applicable11 Complete71152PI&R A nnuall y 66 Complete71152BPI&R (Biennial)Biennial11 Complete71153Followup of Events and NOED A nnuall y 71 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, an d 46.}}

Revision as of 22:39, 30 October 2019

Cy 2015 Baseline Completion
ML16057A123
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 02/26/2016
From: Troy Pruett
NRC/RGN-IV/DRP
To: Scott(Ois) Morris
Division of Inspection and Regional Support
E. Ruesch
References
Download: ML16057A123 (28)


Text

February 26, 2016 MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director/RA/

Division of Reactor Projects Region IV

SUBJECT:

CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.

The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.

If you have any questions or desire additional details, please contact me at 817-200-1248.

Enclosure:

Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:

M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126

ML16057A123 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: ERuesch Yes No Non-Publicly Available Sensitive RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 2/25/16 2/25/16 2/25/16 2/26/16

Page: Page 1 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Arkansas Nuclear One (ANO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 5 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 2 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete 7111108P Inservice Inspection Activities - PWR Annually 3 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 2 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 17 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 26 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 47 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 3 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 21 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 2 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Arkansas Nuclear One (ANO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 2 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 7 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 5 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 3 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Callaway (CALL) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 10 3 Complete 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 0 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 4 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Callaway (CALL) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 4 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 5 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Cooper (CNS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete 7111108G Inservice Inspection Activities - BWR Annually 0 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 9 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 6 3 Complete 7111119 Post Maintenance Testing Annually 22 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 8 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 2 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 6 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Cooper (CNS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 8 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 6 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 7 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Comanche Peak (CP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 6 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 4 2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 22 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 8 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Comanche Peak (CP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 9 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 9 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Diablo Canyon (DIAB) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 2 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 10 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 19 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 7 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 24 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 16 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 4 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 10 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Diablo Canyon (DIAB) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 7 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 10 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 11 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Fort Calhoun (FCS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 7 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 15 12 Complete 7111104S Equipment Alignment Semiannually 3 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 22 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 5 3 Complete 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 2 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 2 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 13 8 Complete 7111112Q Maintenance Effectiveness Annually 9 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 49 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 24 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 19 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 10 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 12 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Fort Calhoun (FCS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 2 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 12 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 19 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 13 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Grand Gulf (GG) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial] Triennial 4 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 0 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 0 2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0 1 Complete opportunity to apply full procedure not available 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 14 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Grand Gulf (GG) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 2 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 15 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Palo Verde (PALO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 3 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 4 2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 2 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 9 8 Complete 7111112Q Maintenance Effectiveness Annually 9 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 24 22 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 54 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 22 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 16 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Palo Verde (PALO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 35 35 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 8 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 9 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 17 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: River Bend (RBS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete completed in previous year(s) 7111108G Inservice Inspection Activities - BWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 1 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete 7111115 Operability Determinations Annually 16 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 38 23 Complete 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 20 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 18 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: River Bend (RBS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 2 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 9 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 19 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: South Texas Project (STP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial] Triennial 5 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 4 2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2 1 Complete 7111111A Annual Review Annually 1 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 20 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 4 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 7 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 20 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: South Texas Project (STP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 3 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 21 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Waterford (WAT) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 5 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 14 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 4 4 Complete 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 2 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 24 15 Complete completed in previous year(s) 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Complete 7111122 Surveillance Testing Annually 17 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 22 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Waterford (WAT) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 6 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 23 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Wolf Creek (WC) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 20 16 Complete 7111105T Fire Protection [Triennial] Triennial 8 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 2 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 1 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 24 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Wolf Creek (WC) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 8 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 5 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 25 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Columbia Generating Station (WNP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 16 16 Complete 7111105T Fire Protection [Triennial] Triennial 7 4 Complete 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 1 1 Complete 7111111A Annual Review Annually 0 1 Complete opportunity to apply full procedure not available 7111111B Licensed Operator Requalification Biennial 1 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 39 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 26 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Columbia Generating Station (WNP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 7 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

February 26, 2016 MEMORANDUM TO: Scott A. Morris, Director Division of Inspection and Regional Support Office of Nuclear Reactor Regulation FROM: Troy W. Pruett, Director/RA/

Division of Reactor Projects Region IV

SUBJECT:

CY 2015 BASELINE INSPECTION COMPLETION During calendar year 2015, Region IV completed the baseline inspection program at all regional reactor licensees subject to the Reactor Oversight Process (ROP). Attached is a table which provides the completion status of individual baseline procedures (IR Report 8a). Please note that this data includes only activities for which the region had responsibility; those portions of the baseline inspection program for which other Nuclear Regulatory Commission organizations are responsible are not included.

The Fort Calhoun Station was transitioned from the Inspection Manual Chapter (IMC) 0305 ROP to IMC 0350 oversight effective December 11, 2011. The station remained in IMC 0350 oversight until April 1, 2015. Inspection activities at Fort Calhoun Station during the first quarter of calendar year 2015 were managed by the IMC 0350 process; the minimum inspection requirements of the ROP did not apply until April 1.

If you have any questions or desire additional details, please contact me at 817-200-1248.

Enclosure:

Baseline Inspection Completion by Site (IR Report 8a) cc w/enclosure:

M. Scott, RI J. Clark, RIV M. Franke, RII R. Lantz, RIV P. Louden, RIII T. Hipschman, RIV M. Dapas, RIV J. Peralta, NRR K. Kennedy, RIV N. Sanfilippo, NRR A. Vegel, RIV CONTACT: Eric A. Ruesch, RIV/DRS 817-200-1126

ML16057A123 SUNSI Review ADAMS Publicly Available Non-Sensitive Keyword:

By: ERuesch Yes No Non-Publicly Available Sensitive RGN-002 OFFICE DRS/IPAT TL:DRS/IPAT D:DRS D:DRP NAME ERuesch THipschman AVegel TPruett SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 2/25/16 2/25/16 2/25/16 2/26/16

Page: Page 1 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Arkansas Nuclear One (ANO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 5 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 2 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete 7111108P Inservice Inspection Activities - PWR Annually 3 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 2 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 17 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 26 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 47 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 3 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 21 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 2 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Arkansas Nuclear One (ANO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 2 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 7 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 5 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 3 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Callaway (CALL) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 10 3 Complete 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 0 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 18 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 4 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Callaway (CALL) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 4 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 5 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Cooper (CNS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete 7111108G Inservice Inspection Activities - BWR Annually 0 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 9 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 17 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 6 3 Complete 7111119 Post Maintenance Testing Annually 22 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 8 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 2 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 6 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Cooper (CNS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 8 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 6 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 7 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Comanche Peak (CP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 6 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 4 2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 22 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 3 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Complete 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 2 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 8 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Comanche Peak (CP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 9 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 9 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Diablo Canyon (DIAB) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 2 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 10 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 19 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 7 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 24 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 16 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 4 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 10 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Diablo Canyon (DIAB) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 7 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 10 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 11 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Fort Calhoun (FCS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 7 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 15 12 Complete 7111104S Equipment Alignment Semiannually 3 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 22 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Complete by reference iaw IMC 0306 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 5 3 Complete 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 2 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 2 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 13 8 Complete 7111112Q Maintenance Effectiveness Annually 9 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 49 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 24 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 19 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 10 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 12 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Fort Calhoun (FCS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 2 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 12 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 19 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 13 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Grand Gulf (GG) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial] Triennial 4 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 0 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 0 23 Not Applicable completion not required during this inspection cycle 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 0 2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 22 15 Complete 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 0 1 Complete opportunity to apply full procedure not available 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 14 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Grand Gulf (GG) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 2 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 15 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Palo Verde (PALO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 3 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 4 2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 2 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 9 8 Complete 7111112Q Maintenance Effectiveness Annually 9 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 16 14 Complete 7111115 Operability Determinations Annually 24 22 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 54 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 22 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 16 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Palo Verde (PALO) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 35 35 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 8 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 9 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 17 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: River Bend (RBS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 17 16 Complete 7111105T Fire Protection [Triennial] Triennial 0 4 Not Applicable completion not required during this inspection cycle 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete completed in previous year(s) 7111108G Inservice Inspection Activities - BWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 1 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 14 14 Complete 7111115 Operability Determinations Annually 16 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 38 23 Complete 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 26 15 Complete completed in previous year(s) 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 20 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 6 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 18 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: River Bend (RBS) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 2 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 9 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 19 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: South Texas Project (STP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 21 16 Complete 7111105T Fire Protection [Triennial] Triennial 5 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 4 2 Complete 7111108P Inservice Inspection Activities - PWR Annually 2 1 Complete 7111111A Annual Review Annually 1 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 20 14 Complete 7111115 Operability Determinations Annually 20 19 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 43 23 Complete 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 4 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 23 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 7 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 20 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: South Texas Project (STP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 24 24 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 3 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 21 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Waterford (WAT) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 5 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 14 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 18 16 Complete 7111105T Fire Protection [Triennial] Triennial 4 4 Complete 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Not Applicable completion not required during this inspection cycle 7111106 Flood Protection Measures Annually 3 3 Complete 7111107A Heat Sink Performance Annually 2 1 Complete 7111107T Heat Sink Performance Triennial 3 2 Complete completed in previous year(s) 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete completed in previous year(s) 7111111A Annual Review Annually 0 1 Complete by reference iaw IMC 0306 7111111B Licensed Operator Requalification Biennial 1 1 Complete 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 18 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 21 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete full sample not available 7111121 Component Design Bases Inspection Triennial 24 15 Complete completed in previous year(s) 7111121M CDBI (Teams) Triennial 0 10 Complete 7111121N CDBI Programs Triennial 0 6 Complete 7111122 Surveillance Testing Annually 17 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 22 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Waterford (WAT) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 6 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 23 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Wolf Creek (WC) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 6 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 13 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 20 16 Complete 7111105T Fire Protection [Triennial] Triennial 8 4 Complete completed in previous year(s) 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 2 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108P Inservice Inspection Activities - PWR Annually 1 1 Complete 7111111A Annual Review Annually 1 1 Complete 7111111B Licensed Operator Requalification Biennial 1 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 19 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 37 23 Complete 7111118 Plant Modifications Annually 4 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 2 2 Complete 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 18 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete completed in previous year(s) 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete completed in previous year(s) 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 4 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete completed in previous year(s) 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 24 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Wolf Creek (WC) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete 71124.04 Occupational Dose Assessment Biennial 1 1 Complete 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete completed in previous year(s) 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete completed in previous year(s) 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete completed in previous year(s) 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete completed in previous year(s) 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 8 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete completed in previous year(s) 71153 Followup of Events and NOED Annually 5 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 25 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Columbia Generating Station (WNP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 7111101 Adverse Weather Protection Annually 4 4 Complete 7111104 Equipment Alignment (Quarterly) Annually 12 12 Complete 7111104S Equipment Alignment Semiannually 2 2 Complete 7111105A Fire Protection - Annual Annually 1 1 Complete 7111105Q Fire Protection - Quarterly Annually 16 16 Complete 7111105T Fire Protection [Triennial] Triennial 7 4 Complete 7111105X Fire Protection - NFPA 805 (Triennial) Triennial 0 3 Complete by reference iaw IMC 0306 7111106 Flood Protection Measures Annually 4 3 Complete 7111107A Heat Sink Performance Annually 1 1 Complete 7111107T Heat Sink Performance Triennial 0 2 Not Applicable completion not required during this inspection cycle 7111108G Inservice Inspection Activities - BWR Annually 1 1 Complete 7111111A Annual Review Annually 0 1 Complete opportunity to apply full procedure not available 7111111B Licensed Operator Requalification Biennial 1 1 Complete completed in previous year(s) 7111111Q Licensed Operator Requalification Annually 8 8 Complete 7111112Q Maintenance Effectiveness Annually 8 8 Complete 7111113 Maint Risk Assessments & Emer Wk Control Annually 15 14 Complete 7111115 Operability Determinations Annually 17 15 Complete 7111117T Changes, Tests, Exper, Perm Mods Triennial 39 23 Complete completed in previous year(s) 7111118 Plant Modifications Annually 5 3 Complete 7111119 Post Maintenance Testing Annually 20 20 Complete 7111120 Refueling and Other Outage Activities Annually 1 2 Complete by reference iaw IMC 0306 7111121 Component Design Bases Inspection Triennial 0 15 Not Applicable completion not required during this inspection cycle 7111121M CDBI (Teams) Triennial 0 10 Not Applicable completion not required during this inspection cycle 7111121N CDBI Programs Triennial 0 6 Not Applicable completion not required during this inspection cycle 7111122 Surveillance Testing Annually 16 14 Complete 7111401 Exercise Evaluation Biennial 0 1 Complete by reference iaw IMC 0306 7111402 Alert and Notification System Testing Biennial 1 1 Complete 7111403 EP Organizational Staffing/Augmentation Biennial 1 1 Complete 7111404 Emrgcy Act Lvl & Emrgcy Pln Chngs Annually 5 1 Complete 7111405 Corct Emergcy Preprdnes Wknes & Defcny Biennial 1 1 Complete 7111406 Drill Evaluation Annually 3 3 Complete 7111408 Exercise Evaluation - Scenario Review Biennial 1 1 Complete completed in previous year(s) 71124.01 Rad Haz Assess Exposure Controls Annually 1 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.

Page: Page 26 of 26 02/25/2016 15:35:12 Baseline Inspection Completion By Site IR Report 8a Region No: 4 Site: Columbia Generating Station (WNP) Inspection Cycle: 45 (01/01/2015 - 12/31/2015)

Sample Minimum Procedure Title Frequency Completed Sample Status Note 71124.02 Occupational ALARA Biennial 2 1 Complete 71124.03 Airbore Radioactivity Biennial 1 1 Complete completed in previous year(s) 71124.04 Occupational Dose Assessment Biennial 1 1 Complete completed in previous year(s) 71124.05 Radiation Monitoring Instrumentation Biennial 1 1 Complete 71124.06 Rad Gas & Liquid Treatment Biennial 1 1 Complete 71124.07 Rad. Environ. Monitoring Prog. Biennial 1 1 Complete 71124.08 Solid Waste Proc, Handling, Stor, Transp Biennial 1 1 Complete 71151 Performance Indicator Verfication Annually 13 13 Complete 71151 Performance Indicator Verfication Annually 3 3 Complete 71151 Performance Indicator Verfication Not Applicable 1 1 Complete 71152 PI&R Annually 6 6 Complete 71152B PI&R (Biennial) Biennial 1 1 Complete 71153 Followup of Events and NOED Annually 7 1 Complete Note: Biennial samples completed are the total of IPCs 44 and 45. Triennial samples completed are the total of IPCs 44, 45, and 46.