{{#Wiki_filter:Appendix C Job Performance Measure Form ES-C-1 Worksheet 2016 Systems  
{{#Wiki_filter:Appendix C                         Job Performance Measure             Form ES-C-1 Worksheet SIM JPM A Developed By:      ______________________________        Date: ___________
- Control Room JPM A (Rev_011116) NUREG 1021, Revision 10
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:        ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Systems - Control Room JPM A (Rev_011116)         NUREG 1021, Revision 10


SIM JPM A      Developed By:
Appendix C                                         Page 2 of 22                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
______________________________
Task Title:             Operation With High Switchyard           JPM No.:     2016 Systems - Control Voltage                                                Room JPM A (Alternate Path)
Date:  ___________
K/A  
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training Appendix C Page 2 of 22 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Operation With High Switchyard Voltage JPM No.: 2016 Systems  
- Control Room JPM A (Alternate Path)     K/A  


==Reference:==
==Reference:==
062 A2.08 (2.7/3.0)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom                Simulator        X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* Plant is at 100% power.
* Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
* AOP-031, Operation with High Switchyard Voltage, has been completed up to step 21.
* You are the BOP.
* D IAC is in service with A and B IACs in AUTO.
* The DSDG is secured and aligned for AUTO.
* The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.
Initiating Cue:            The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.
2016 Systems - Control Room JPM A                                          NUREG 1021, Revision 10


062 A 2.0 8 (2.7/3.0)    Examinee:  NRC Examiner:
Appendix C                                     Page 3 of 22                       Form ES-C-1 Job Performance Measure Worksheet Task Standard:           The operator will transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3) in an effort to lower Switchyard Voltage; and when Breaker 50/20 fails to automatically OPEN, the operator will manually open it per AOP-31. Ultimately, the voltage on 480V Bus E-2 will be lowered to less than 502 volts.
Facility Evaluator:
Required Materials:     None General  
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
Plant is at 100% power.
Due to abnormal conditions on the Grid, 480V Bus E
-2 currently exceeds 505 Volts.
AOP-031, Operation with High Switchyard Voltage, has been completed up to step
: 21. You are the BOP.
    "D" IAC is in service with "A" and "B" IACs in AUTO.
The DSDG is secured and aligned for AUTO.
The Load on Emergency Bus E
-1 has NOT been altered since entering this AOP.
Initiating Cue:
The CRS has directed you to continue with AOP
-031 until 480V Bus E
-2 voltage is restored to less than 505 Volts.
 
Appendix C Page 3 of 22 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 Task Standard:
The operator will transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3) in an effort to lower Switchyard Voltage; and when Breaker 50/20 fails to automatically OPEN, the operator will manually open it per AOP-31. Ultimately, the voltage on 480V Bus E
-2 will be lowered to less than 50 2 volts. Required Materials:
None   General  


==References:==
==References:==
AOP-031 (Operation with High Switchyard Voltage), Rev 15 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:              Handout 1: Control Room Copy of AOP-031 marked up for this JPM to Step 21.
Time Critical Task:    NO Validation Time:        11 minutes Critical Step Justification Step 21      This step is critical because inserting the synchroscope key into 4 KV TIES Synchroscope Key Switch is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).
Step 22      This step is critical because placing the Synchroscope Switch to the BUS 3 & 4 position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).
Step 24      This step is critical because momentarily placing the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).
Alternate Path Critical Step Justification Step 27      This step is critical because depressing the THINK pushbutton and placing the control switch for BKR 52/20 to the OPEN (TRIP) position is necessary to manually open Breaker 52/20.
2016 Systems - Control Room JPM A                                    NUREG 1021, Revision 10


AOP-0 31 (Operation with High Switchyard Voltage), Rev 1 5  OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45  Handouts: Handout 1: Control Room Copy of AOP-0 31 marked up for this JPM to Step 2 1. Time Critical Task: NO  Validation Time:
Appendix C                                   Page 4 of 22                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
11 minutes      Critical Step Justification Step 21 This step is critical because inse r ting the synchroscope key into 4 KV TIES Synchroscope Key Switch is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3)
. Step 22 This step is critical because placing the Synchroscope Switch to the BUS 3 & 4 position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3). Step 24 This step is critical because momentarily placing the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3)
. Alternate Path Critical Step Justification Step 27 This step is critical because depressing the THINK pushbutton and placing the control switch for BKR 52/20 to the OPEN (TRIP) position is necessary to manually open Breaker 52/20.
Appendix C Page 4 of 22 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ A as follows:
: 1. Construct Scenario File 006_JPM_ A as follows:
ICO V4160B4BRK20 f:TRIP_FAIL, (Breaker 52/20 Fails to Auto OPEN)
* ICO V4160B4BRK20 f:TRIP_FAIL, (Breaker 52/20 Fails to Auto OPEN)
IMF EPS09 f:239.25, (Overvoltage on Bus E
* IMF EPS09 f:239.25, (Overvoltage on Bus E-2; > 506 Volts, due to High Switchyard Voltage)
-2; > 506 Volts, due to High Switchyard Voltage)  (Conditional) $006_52_20_TRIP DCO V4160B4BRK20 (Remove Breaker 52/20 failure on Control Switch to TRIP)
  *   (Conditional) $006_52_20_TRIP DCO V4160B4BRK20 (Remove Breaker 52/20 failure on Control Switch to TRIP)
: 2. Reset simulator to IC
: 2. Reset simulator to IC-5, 100% Power.
-5 , 100% Power. 3. Place in RUN and allow time to stabilize
: 3. Place in RUN and allow time to stabilize.
. 4. Execute Scenario File 006_JPM_ A
: 4. Execute Scenario File 006_JPM_ A
: 5. Ensure that the following components are aligned:
: 5. Ensure that the following components are aligned:
C Charging Pump is RUNNING HVH-3 and HVH-4 are RUNNING HVA-1B is RUNNING HVH-5B is OFF HVE-2B is OFF 6. Call up QP E1E2 at the BOP Desk.
* C Charging Pump is RUNNING
: 7. Perform the actions of AOP-31 up to Step 2 1.
* HVH-3 and HVH-4 are RUNNING
: 8. Stabilize the plant
* HVA-1B is RUNNING
.
* HVH-5B is OFF
: 9. Freeze the Simulator
* HVE-2B is OFF
.
: 6. Call up QP E1E2 at the BOP Desk.
OR 1. Reset Simulator to Temporary Snap IC
: 7. Perform the actions of AOP-31 up to Step 21.
-600 (July, 201 5). 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 8. Stabilize the plant.
-411. 3. Call up QP E1E2 at the BOP Desk.
: 9. Freeze the Simulator.
OR
: 1. Reset Simulator to Temporary Snap IC-600 (July, 2015).
: 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 3. Call up QP E1E2 at the BOP Desk.
: 4. Place Simulator in Run when Operator assumes the watch.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10


Appendix C Page 5 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 22                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM A NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
STEP 1:         Check Emergency Bus E-2 Voltage - Greater than 505 Volts (Step 21).
STEP 1: Check Emergency Bus E
___ SAT STANDARD:       The operator observes ERFIS (QP E1E2) and recognizes that Bus E-2 Voltage is approximately 506.5 volts.
-2 Voltage  
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
- Greater than 505 Volts (Step 21).
NOTE: Transferring the following safety related components will cause voltage to rise. This step is designed to protect components.
STANDARD: The operator observes ERFIS (QP E1E2) and recognizes that Bus E-2 Voltage is approximately 50 6.5 volts. EXAMINER'S CUE:
STEP 2:       Check Instrument Air as follows:
NONE   EXAMINER'S NOTE:
: a. Check Instrument Air Compressor B - Running in Manual
NONE BOOTH OPERATOR CUE:
___ SAT (Step 22.a.)
NONE COMMENTS:
___ SAT    ___ UNSAT  NOTE: Transferring the following safety related components will cause voltage to rise. This step is designed to protect components.
STEP 2: Check Instrument Air as follows:
: a. Check Instrument Air Compressor B  
- Running in Manual (Step 22.a.)
RNO: Go to Step 23
RNO: Go to Step 23
___ UNSAT STANDARD: The operator reads the Note, and proceeds.
The operator recognizes that Instrument Air Compressor B is in AUTO as stated in the Initial Cue. The operator addresses the RNO.
EXAMINERS CUE:                If the operator requests status of IAC B, remind the operator that the Cue sheet stated that IACs A and B were in AUTO.
EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            If the operator contacts the AO, as the AO, report that IAC A and B are in AUTO.
COMMENTS:
2016 Systems - Control Room JPM A                                      NUREG 1021, Revision 10
Appendix C                                  Page 6 of 22                        Form ES-C-1 PERFORMANCE INFORMATION NOTE: For conditions where it may not be possible to reduce emergency bus voltages below 505 volts AND running of the EDG is required to ensure that the EDG is operable, testing of the EDG may be performed with concurrence from the system engineer if the system engineer determines that such testing does not constitute a long term degradation risk.
STEP 3:        Check EDG B Status as Follows:
: a. Check Main Generator - ON LINE (Step 23.a.)
___ SAT STANDARD:      The operator reads the Note, and proceeds.
The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that
___ UNSAT the Main Generator is ON Line.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
STEP 4:        Check EDG B Status as Follows:
: b. Check EMERGENCY DIESEL GENERATOR B - RUNNING (Step 23.b.)
___ SAT STANDARD:      The operator observes the B EDG Green OFF status light is LIT and concludes that the B EDG is NOT running.
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
Appendix C                                    Page 7 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 5:      Check EDG B Status as Follows:
: b. RNO: Postpone EDG B testing while in the AOP. Go to Step
: 24. Check EMERGENCY DIESEL GENERATOR B - RUNNING                    ___ SAT (Step 23.b. RNO)
STANDARD:    The operator proceeds to Step 24.                                        ___ UNSAT EXAMINERS CUE:              If the operator informs the CRS to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the CRS.
EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          If the operator contacts the System Engineer to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the System Engineer.
COMMENTS:
STEP 6:      Log the Time That Any of the Following Equipment Is OR Was Running Above 505 Volts.
* INSTRUMENT AIR COMPRESSOR B
* EDG B PRE-LUBE OIL PUMP                                              ___ SAT
* Fuel Oil Transfer Pump B (Step 24)
STANDARD:    The operator recognizes that NONE of these components are                ___ UNSAT running.
EXAMINERS CUE:                Inform operator that another operator will track the run times.
EXAMINERS NOTE:              The B IAC is in AUTO and the B EDG is NOT RUNNING.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
Appendix C                                    Page 8 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 7:        Check Load On Emergency Bus E HAS BEEN RAISED USING STEP 18.
(Step 25)
Go to Step 27                                                          ___ SAT (Step 25 RNO)
STANDARD:      The operator recognizes that load on Emergency Bus E-1 has NOT been raised based on information given in the Initial Cue.            ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              This would have been completed in Step 18 of AOP-031, which was bypassed.
BOOTH OPERATOR CUE:          NONE COMMENTS:
STEP 8:      Raise Load On Emergency BUS E-2 As Follows:
: a. Check Charging Pump C - Running
___ SAT (Step 27.a)
STANDARD:      The operator observes the C Charging Pump Red status light is LIT and the Green status light is OFF (Or equivalent) and concludes    ___ UNSAT that Charging Pump C is running.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10


STANDARD: The operator reads the Note, and proceeds.
Appendix C                                 Page 9 of 22                   Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Raise Load On Emergency BUS E-2 As Follows:
The operator recognizes that Instrument Air Compressor "B" is in AUTO as stated in the Initial Cue. The operator addresses the RNO. EXAMINER'S CUE:
: b. Verify CV RECIRC FANS - RUNNING
If the operator request s status of IAC "B", remind the operator that the Cue sheet stated that IACs "A" and "B" were in AUTO.
                - HVH-3
EXAMINER'S NOTE:
___ SAT
NONE  BOOTH OPERATOR CUE:
                - HVH-4 (Step 27.b)
If the operator contacts the AO, as the AO, report that IAC "A" and "B" are in AUTO.
___ UNSAT STANDARD:     The operator observes the HVH-3 Red ON status light is LIT and concludes that HVH-3 is running.
COMMENTS:      ___ SAT    ___ UNSAT Appendix C Page 6 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
The operator observes the HVH-4 Red ON status light is LIT and concludes that HVH-4 is running.
- Control Room JPM A NUREG 1021, Revision 10 NOTE: For conditions where it may not be possible to reduce emergency bus voltages below 505 volts AND running of the EDG is required to ensure that the EDG is operable, testing of the EDG may be performed with concurrence from the system engineer if the system engineer determines that such testing does not constitute a long term degradation risk.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
STEP 3: Check EDG "B" Status as Follows:
STEP 10:       Check CONT RM AIR HANDLING HVA-1B - RUNNING (Step 27.c)
: a. Check Main Generator
___ SAT STANDARD:     The operator observes the HVA-1B Red ON status light is LIT and concludes that HVH-1B is running.
- ON LINE (Step 23.a.)
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
STANDARD: The operator reads the Note, and proceeds.
2016 Systems - Control Room JPM A                               NUREG 1021, Revision 10
The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE   BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT  STEP 4: Check EDG "B" Status as Follows:
: b. Check EMERGENCY DIESEL GENERATOR B
- RUNNING (Step 23.b.)
STANDARD: The operator observes the "B" EDG Green OFF status light is LIT and concludes that the "B" EDG is NOT running
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 7 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM A NUREG 1021, Revision 10 STEP 5:  Check EDG "B" Status as Follows:
: b. RNO: Postpone EDG "B" testing while in the AOP. Go to Step 24. Check EMERGENCY DIESEL GENERATOR B
- RUNNING (Step 23.b. RNO)
STANDARD: The operator proceeds to Step 24. EXAMINER'S CUE:
If the operator informs the CRS to postpone EMERGENCY DIESEL GENERATOR "B" testing while in this procedure, acknowledge as the CRS.
EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
If the operator contacts the System Engineer to postpone EMERGENCY DIESEL GENERATOR "B" testing while in this procedure, acknowledge as the System Engineer.


COMMENTS:       ___ SAT   ___ UNSAT   STEP 6: Log the Time That Any of the Following Equipment Is OR Was Running Above 505 Volts.
Appendix C                                  Page 10 of 22                    Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     Check CRDM COOLING FAN, HVH-5B - RUNNING (Step 27.d)
INSTRUMENT AIR COMPRESSOR B EDG B PRE-LUBE OIL PUMP Fuel Oil Transfer Pump B (Step 24) STANDARD: The operator recognizes that NONE of these components are running. EXAMINER'S CUE:
___ SAT STANDARD:    The operator observes the HVH-5B Green OFF status light is LIT and concludes that HVH-5B is NOT RUNNING, and proceeds to the RNO.                                                                  ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
Inform operator that another operator will track the run times.
STEP 12:      Transfer CRDM COOLING FANS as follows:
: 1. Start HVH-5B
: 2. Stop HVH-5A (Step 27.d RNO)
___ SAT STANDARD:     The operator places the HVH-5B control switch to START and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT The operator places the HVH-5A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              E-2 Voltage should lower to approx. 506.3 Volts.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10


EXAMINER'S NOTE:
Appendix C                                 Page 11 of 22                     Form ES-C-1 PERFORMANCE INFORMATION STEP 13:     Check AUX BLDG EXH FAN, HVE-2B - RUNNING (Step 27.e)
The "B" IAC is in AUTO and the "B" EDG is NOT RUNNING. BOOTH OPERATOR CUE:
___ SAT STANDARD:     The operator observes the HVE-2B Green OFF status light is LIT and concludes that HVE-2B is NOT running, and proceeds to the RNO.
NONE  COMMENTS:
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 8 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STEP 14:      Transfer AUX BLDG EXH FANs as follows:
- Control Room JPM A NUREG 1021, Revision 10 STEP 7: Check Load On Emergency Bus E HAS BEEN RAISED USING STEP 18. (Step 25) Go to Step 27 (Step 25 RNO)
: 1) Start HVE-2B
STANDARD: The operator recognizes that load on Emergency Bus E
: 2) Stop HVE-2A (Step 27.e RNO)
-1 has NOT been raised based on information given in the Initial Cue. EXAMINER'S CUE:
___ SAT STANDARD:     The operator places the HVE-2B control switch to START and observes the Red status light is LIT and the Green status light is   ___ UNSAT OFF.
NONE EXAMINER'S NOTE:
The operator places the HVE-2A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
This would have been completed in Step 18 of AOP
EXAMINERS CUE:              NONE EXAMINERS NOTE:              E-2 Voltage should lower to approx. 506.2 Volts.
-031, which was bypassed.
BOOTH OPERATOR CUE:          NONE COMMENTS:
BOOTH OPERATOR CUE:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 8: Raise Load On Emergency BUS E
-2 As Follows:
: a. Check Charging Pump C
- Running (Step 27.a)
STANDARD: The operator observes the "C" Charging Pump Red status light is LIT and the Green status light is OFF (Or equivalent) and concludes that Charging Pump "C" is running.


EXAMINER'S CUE:
Appendix C                                 Page 12 of 22                     Form ES-C-1 PERFORMANCE INFORMATION STEP 15:     Check RHR - IN SERVICE.
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT
___ UNSAT Appendix C Page 9 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 9: Raise Load On Emergency BUS E
-2 As Follows:
: b. Verify CV RECIRC FANS
- RUNNING -  HVH  HVH-4 (Step 27.b)
STANDARD: The operator observes the HVH
-3 Red ON status light is LIT and concludes that HVH-3 is running.      The operator observes the HVH
-4 Red ON status light is LIT and concludes that HVH-4 is running.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT    STEP 10: Check CONT RM AIR HANDLING HVA
-1B - RUNNING  (Step 27.c)
STANDARD:  The operator observes the HVA
-1 B Red ON status light is LIT and concludes that HVH-1B is running. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 10 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 11: Check CRDM COOLING FAN, HVH
-5B - RUNNING                            (Step 27.d)
STANDARD: The operator observes the HVH-5B Green OFF status light is LIT and concludes that HVH
-5B is NOT RUNNING, and proceeds to the RNO. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT  STEP 12: Transfer CRDM COOLING FANS as follows:
: 1. Start HVH-5B 2. Stop HVH-5A (Step 27.d RNO)
STANDARD: The operator places the HVH-5B control switch to START and observes the Red status light is LIT and the Green status light is OFF.      The operator places the HVH-5A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
E-2 Voltage should lower to approx. 50 6.3 Volts. BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 11 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 13: Check AUX BLDG EXH FAN, HVE
-2B - RUNNING  (Step 27.e)
STANDARD: The operator observes the HVE-2B Green OFF status light is LIT and concludes that HVE-2B is NOT running, and proceeds to the RNO. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:          ___ SAT    ___ UNSAT  STEP 14:  Transfer AUX BLDG EXH FANs as follows: 1) Start HVE-2B 2) Stop HVE-2A (Step 27.e RNO)
STANDARD: The operator places the HV E-2 B control switch to START and observes the Red status light is LIT and the Green status light is OFF. The operator places the HV E-2A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
E-2 Voltage should lower to approx. 50 6.2 Volts. BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 12 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 15: Check RHR  
- IN SERVICE.
(Step 27. f)
(Step 27. f)
STANDARD: The operator recognizes that the plant is in Mode 1 and determines that RHR is NOT is IN SERVICE. The operator addresses the RNO and proceeds to Step 28
___ SAT STANDARD:     The operator recognizes that the plant is in Mode 1 and determines that RHR is NOT is IN SERVICE. The operator addresses the RNO and proceeds to Step 28.
. EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 16:     Check Emergency BUS E-2 Voltage - GREATER THAN 505 VOLTS (Step 28)
NONE BOOTH OPERATOR CUE: NONE COMMENTS:           ___ SAT    ___ UNSAT  STEP 16: Check Emergency BUS E
___ SAT STANDARD:     The operator observes Bus E-2 Voltage on ERFIS to be greater than 505 Volts (506.2 volts).
-2 Voltage  
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
- GREATER THAN 505 VOLTS (Step 28) STANDARD: The operator observes Bus E-2 Voltage on ERFIS to be greater than 505 Volts (506.2 volts)
2016 Systems - Control Room JPM A                                   NUREG 1021, Revision 10
.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT Appendix C Page 13 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM A NUREG 1021, Revision 10 STEP 17:  Check DSDG Status As Follows:
: a. Check Main Generator
- ON LINE (Step 29.a)
STANDARD: The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT  STEP 18:  Check DSDG Status As Follows: b. Check DSDG
- RUNNING (Step 29.b)
STANDARD: The operator recognizes that DSDG is secured and aligned for AUTO as stated in the Initial Cue. The operator addresses the RNO. EXAMINER'S CUE:
If the operator request s status of the DSDG, remind the operator that the Cue sheet stated that the DSDG was secured and aligned for AUTO
. EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
If the operator contacts the AO, as the AO, report that the DSDG is secured and aligned for AUTO.


Appendix C                                  Page 13 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 17:      Check DSDG Status As Follows:
: a. Check Main Generator - ON LINE (Step 29.a)
___ SAT STANDARD:    The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line.                                        ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
STEP 18:      Check DSDG Status As Follows:
: b. Check DSDG - RUNNING (Step 29.b)
___ SAT STANDARD:    The operator recognizes that DSDG is secured and aligned for AUTO as stated in the Initial Cue. The operator addresses the          ___ UNSAT RNO.
EXAMINERS CUE:              If the operator requests status of the DSDG, remind the operator that the Cue sheet stated that the DSDG was secured and aligned for AUTO.
EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          If the operator contacts the AO, as the AO, report that the DSDG is secured and aligned for AUTO.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 14 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
- Control Room JPM A NUREG 1021, Revision 10 STEP 19: Check DSDG Status As Follows:
 
Appendix C                                   Page 14 of 22                     Form ES-C-1 PERFORMANCE INFORMATION STEP 19:     Check DSDG Status As Follows:
: b. RNO: Postpone DSDG testing while in this AOP. Go to Step 30.
: b. RNO: Postpone DSDG testing while in this AOP. Go to Step 30.
(Step 29.b RNO)
(Step 29.b RNO)
STANDARD: The operator proceeds to step 30.
___ SAT STANDARD:     The operator proceeds to step 30.
EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:                 If operator informs the CRS to postpone DSDG testing while in this procedure, acknowledge as the CRS.
If operator informs the CRS to postpone DSDG testing while in this procedure, acknowledge as the CRS. EXAMINER'S NOTE:
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             If the operator contacts the System Engineer to postpone DSDG testing while in this procedure, acknowledge as the System Engineer.
NONE BOOTH OPERATOR CUE:
COMMENTS:
If the operator contacts the System Engineer to postpone DSDG testing while in this procedure, acknowledge as the System Engineer. COMMENTS:  
STEP 20:      Check 4KV BUS 3-4 TIE, BKR 52 OPEN (Step 30)
___ SAT STANDARD:    The operator observes 4KV BUS 3-4 TIE, BKR 52-19 Green status light is LIT and Red status light is OFF, and determines that BKR 52-19 IS OPEN.                                                          ___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:                BKR 52-19 indicates OPEN (TRIP) by GREEN light lit.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
 
Appendix C                                Page 15 of 22                    Form ES-C-1 PERFORMANCE INFORMATION STEP 21:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                  CRITICAL follows:                                                              STEP
: a. Insert the Synchroscope Key into 4 KV TIES Synchroscope Key Switch
___ SAT (Step 31.a)
STANDARD:    The operator inserts the synchroscope key into 4 KV TIES          ___ UNSAT Synchroscope Key Switch.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
STEP 22:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                  CRITICAL follows:                                                              STEP
: b. Place the Synchroscope Switch to the BUS 3 & 4 position (Step 31.b)                                                        ___ SAT STANDARD:    The operator rotates the Synchroscope Switch clockwise to the BUS 3 & 4 position.                                                ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10
 
Appendix C                                Page 16 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 23:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:
___ SAT
: c. Verify the Synchroscope comes to approximately the 12 oclock position.
(Step 31.c)
___ UNSAT STANDARD:    The operator observes that the Synchroscope is pointing to the 12 oclock position.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
STEP 24:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                    CRITICAL follows:                                                                STEP
: d. Momentarily place the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position.
___ SAT (Step 31.d)
STANDARD:    The operator momentarily places the control switch for BKR 52/19    ___ UNSAT to the CLOSE position.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10


___ SAT    ___ UNSAT  STEP 20:  Check 4KV BUS 3
Appendix C                                 Page 17 of 22                   Form ES-C-1 PERFORMANCE INFORMATION STEP 25:     Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:
-4 TIE, BKR 52 OPEN (Step 30)  STANDARD: The operator observes 4KV BUS 3-4 TIE, BKR 52
___ SAT
-19 Green status light is LIT and Red status light is OFF, and determines that BKR 52-19 IS OPEN. EXAMINER'S CUE:
: e. Check BKR 52/19 - CLOSED (Step 31.e)
NONE EXAMINER'S NOTE:
___ UNSAT STANDARD:     The operator observes that the BKR 52/19 Red status light is LIT and the Green status light is OFF.
BKR 52-19 indicates OPEN (TRIP) by GREEN light lit. BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             BKR 52-19 indicates CLOSED with RED light lit.
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 15 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
BOOTH OPERATOR CUE:           NONE COMMENTS:
- Control Room JPM A NUREG 1021, Revision 10 STEP 21: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: a. Insert the Synchroscope Key into 4 KV TIES Synchroscope Key Switch (Step 31.a)
STEP 26:     Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:
STANDARD: The operator inse rts the synchroscope key into 4 KV TIES Synchroscope Key Switch.
___ SAT
EXAMINER'S CUE:
: f. Check UNIT AUX TO 4 KV BUS 4 BKR, 52/20 - OPEN (Step 31.f)
NONE  EXAMINER'S NOTE:
___ UNSAT STANDARD:     The operator observes that the BKR 52/20 Red status light has remained LIT and the Green status light has remained OFF; and concludes that BKR 52/20 has remained in the CLOSED position (Alternate Path). The operator will address the RNO.
NONE  BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             BKR 52/20 indicates CLOSED with RED light lit.
NONE COMMENTS:      CRITICAL STEP
___ SAT   ___ UNSAT  STEP 22:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: b. Place the Synchroscope Switch to the BUS 3 & 4 position (Step 31.b)
STANDARD: The operator rotates the Synchroscope Switch clockwise to the BUS 3 & 4 position.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 16 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 23:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: c. Verify the Synchroscope comes to approximately the 12 o'clock position. (Step 31.c)
STANDARD: The operator observes that the Synchroscope is pointing to the 12 o'clock position.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE COMMENTS:        ___ SAT    ___ UNSAT  STEP 24:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: d. Momentarily place the Control Switch for 4KV BUS 3
-4 TIE, BKR 52/19 to the CLOSE position.
(Step 31.d)
STANDARD: The operator momentarily places the control switch for BKR 52/19 to the CLOSE position.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 17 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 25:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: e. Check BKR 52/19  
- CLOSED (Step 31.e)
STANDARD: The operator observes that the BKR 52/19 Red status light is LIT and the Green status light is OFF
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
BKR 52-19 indicates CLOSED with RED light lit.
BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 26: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: f. Check UNIT AUX TO 4 KV BUS 4 BKR, 52/20  
- OPEN (Step 31.f)
STANDARD: The operator observes that the BKR 52/20 Red status light has remained LIT and the Green status light has remained OFF; and concludes that BKR 52/20 has remained in the CLOSED position (Alternate Path). The operator will address the RNO.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
BKR 52/20 indicates CLOSED with RED light lit.
BKR 52/20 should have automatically opened when BKR 52/19 was CLOSED (A failure has prevented it from doing so).
BKR 52/20 should have automatically opened when BKR 52/19 was CLOSED (A failure has prevented it from doing so).
BOOTH OPERATOR CUE:
BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 18 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10
- Control Room JPM A NUREG 1021, Revision 10 STEP 27: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: f. RNO: Perform the following Simultaneously depress the THINK pushbutton AND place the control switch for BKR 52/20 to the OPEN position. (Step 31.f RNO)
 
STANDARD: The operator simultaneously depresses the THINK pushbutton and places the control switch for BKR 52/20 to the OPEN (TRIP) position, and observes that the Green status light is LIT and the Red status light is OFF
Appendix C                                   Page 18 of 22                         Form ES-C-1 PERFORMANCE INFORMATION STEP 27:     Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                         CRITICAL follows:                                                                      STEP
. EXAMINER'S CUE:
: f. RNO: Perform the following
NONE EXAMINER'S NOTE:
* Simultaneously depress the THINK pushbutton AND                 ___ SAT place the control switch for BKR 52/20 to the OPEN position.
BKR 52/20 indicates OPEN (TRIP) with GREEN light lit.
(Step 31.f RNO)
When this occurs Bus E
___ UNSAT STANDARD:     The operator simultaneously depresses the THINK pushbutton and places the control switch for BKR 52/20 to the OPEN (TRIP) position, and observes that the Green status light is LIT and the Red status light is OFF.
-2 voltage will drop to 484.8 volts.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               BKR 52/20 indicates OPEN (TRIP) with GREEN light lit. When this occurs Bus E-2 voltage will drop to 484.8 volts.
BOOTH OPERATOR CUE:
BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE COMMENTS:         CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 19 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM A                                    NUREG 1021, Revision 10
- Control Room JPM A NUREG 1021, Revision 10 STEP 28: Place the 4 KV TIES Synchroscope Key Switch to the mid position.
 
Appendix C                                 Page 19 of 22                   Form ES-C-1 PERFORMANCE INFORMATION STEP 28:     Place the 4 KV TIES Synchroscope Key Switch to the mid position.
(Step 31.g)
(Step 31.g)
STANDARD: The operator rotates the Synchroscope Switch counter-clockwise to the mid position. EXAMINER'S CUE:
STANDARD:     The operator rotates the Synchroscope Switch counter-clockwise to
NONE EXAMINER'S NOTE:
___ SAT the mid position.
NONE BOOTH OPERATOR CUE:
EXAMINERS CUE:                 NONE
NONE COMMENTS:
___ UNSAT EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 29:             Check the following:
STEP 29:       Check the following:
Emergency BUS E
* Emergency BUS E-1 Voltage - LESS THAN 505 VOLTS AND
-1 Voltage  
* Emergency BUS E-2 Voltage - LESS THAN 505 VOLTS (Step 32)                                               ___ SAT STANDARD:     The operator observes that Bus E-1 voltage is 488.9 volts.
- LESS THAN 505 VOLTS AND Emergency BUS E
___ UNSAT The operator observes that Bus E-2 voltage is 484.8 volts.
-2 Voltage  
EXAMINERS CUE:                When operator identifies that BOTH Bus E-1 and E-2 are less than 505 VOLTS inform the operator that this completes the JPM.
- LESS THAN 505 VOLTS (Step 32) STANDARD: The operator observes that Bus E
EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
-1 voltage is 488.9 volts.
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10
 
Appendix C                                Page 20 of 22                    Form ES-C-1 PERFORMANCE INFORMATION STEP 30:      Check Voltage as Follows: (Continuous Action Step)
* APP-036-E3, SUT PRI OVER/UNDER VOLTAGE -
EXTINGUISHED AND
* WEST 115KV BUS VOLTAGE - LESS THAN 119 KV                  ___ SAT AND
* Emergency BUS E-1 Voltage - LESS THAN 502 VOLTS AND                                              ___ UNSAT
* Emergency BUS E-2 Voltage - LESS THAN 502 VOLTS (Step 33)
STANDARD:    The operator observes that APP-036-E3 is DARK.
The operator observes that WEST 115KV BUS VOLTAGE is 18.8 KV.
The operator observes that Bus E-1 voltage is 488.9 volts.
The operator observes that Bus E-2 voltage is 484.8 volts.
The operator observes that Bus E-2 voltage is 484.8 volts.
EXAMINER'S CUE:
EXAMINERS CUE:               When operator identifies that BOTH Bus E-1 and E-2 are less than 502 VOLTS inform the operator that this completes the JPM.
When operator identifies that BOTH Bus E
EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
-1 and E-2 are less than 505 VOLTS inform the operator that this completes the JPM.
Terminating Cue:           Evaluation on this JPM is complete.
EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:  
 
___ SAT    ___ UNSAT Appendix C Page 20 of 2 2 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 30:            Check Voltage as Follows: (Continuous Action Step)
APP-036-E3, SUT PRI OVER/UNDER VOLTAGE
- EXTINGUISHED AND  WEST 115KV BUS VOLTAGE
- LESS THAN 119 KV AND  Emergency BUS E
-1 Voltage
- LESS THAN 502 VOLTS AND  Emergency BUS E
-2 Voltage
- LESS THAN 502 VOLTS (Step 33)  STANDARD: The operator observes that APP
-036-E3 is DARK.
The operator observes that WEST 115KV BUS VOLTAGE is 18.8 KV. The operator observes that Bus E
-1 voltage is 488.9 volts.
 
The operator observes that Bus E
-2 voltage is 484.8 volts.
EXAMINER'S CUE:
When operator identifies that BOTH Bus E
-1 and E-2 are less than 502 VOLTS inform the operator that this completes the JPM.
EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:            ___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10


Appendix C Page 21 of 22 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 21 of 22                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM A Examinees Name:
- Control Room JPM A NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM A   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 361: Line 288:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM A                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* Plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
Plant is at 100% power.
* AOP-031, Operation with High Switchyard Voltage, has been completed up to step 21.
Due to abnormal conditions on the Grid, 480V Bus E
* You are the BOP.
-2 currently exceeds 505 Volts.
* D IAC is in service with A and B IACs in AUTO.
AOP-031, Operation with High Switchyard Voltage, has been completed up to step
* The DSDG is secured and aligned for AUTO.
: 21. You are the BOP.
* The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.
  "D" IAC is in service with "A" and "B" IACs in AUTO.
INITIATING CUE:     The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.
The DSDG is secured and aligned for AUTO.
NUREG 1021, Revision 10
The Load on Emergency Bus E
-1 has NOT been altered since entering this AOP.
INITIATING CUE:
The CRS has directed you to continue with AOP
-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM B (Rev_011216) NUREG 1021, Revision 10


SIM JPM B     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM B Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM B (Rev_011216)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 13                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM B NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Transfer From the FRV Bypass             JPM No.:     2016 Systems - Control Valves to the FRVs                                    Room JPM B (Alternate Path)
Transfer From the FRV Bypass Valves to the FRVs JPM No.: 2016 Systems  
K/A  
- Control Room JPM B (Alternate Path)     K/A  


==Reference:==
==Reference:==
059 A4.08 (3.2/2.9)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom                Simulator        X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* A plant startup is in progress with reactor power approximately 19%.
* A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
* The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
* The Turbine is at 1800 RPM (Not synched to the Grid).
* You are the operator assigned to control S/G water level.
* Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.
Initiating Cue:            The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.
Task Standard:              The operator will place the C Feed Reg Valve in AUTO, and then take manual control of the B Feed Reg Valve and stabilize the B S/G level when it is determined that the B Feed Reg Valve has failed to control the B S/G level in AUTO.
2016 Systems - Control Room JPM B                                          NUREG 1021, Revision 10


059 A4.08 (3.2/2.9)
Appendix C                                     Page 3 of 13                         Form ES-C-1 Job Performance Measure Worksheet Required Materials:     None General  
Examinee:  NRC Examiner:
Facility Evaluator:
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1
. Initial Conditions:
A plant startup is in progress with reactor power approximately 1 9%.    "A" and "B" S/G levels are being controlled with the Feed Reg Valves operating in AUTO. The "C" S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve. The Turbine is at 1800 RPM (Not synched to the Grid)
. You are the operator assigned to control S/G water level. Annunciator APP
-003-D4, TAVE/TREF DEV, is an expected alarm.
Initiating Cue:
The CRS has directed you to transfer the "C" S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation
. Task Standard:
The operator will place the "C" Feed Reg Valve in AUTO, and then take m anual control of the "B" Feed Reg Valve and stabilize the "
B" S/G level when it is determined that the "
B" Feed Reg Valve has failed to control the "B" S/G level in AUTO
.
Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM B NUREG 1021, Revision 10 Required Materials:
None   General  


==References:==
==References:==
GP-005 (Power Operation), Rev 128 AOP-010 (Main Feedwater/Condensate Malfunction), Rev 33 Handouts:                Handout 1: Section 6.4 of GP-005 marked up for this JPM through Step 6.12.d for A and B FRVs.
Handout 2: Blank copy of AOP-010 Time Critical Task:      NO Validation Time:        12 minutes NOTE:                    This JPM should be pre-briefed in the Briefing Room.
Critical Step Justification Step 2        This step is critical because adjusting the output of the FCV-499 controller is necessary to place the C Feed Reg Valve in AUTO.
Step 3        This step is critical because depressing the AUTO pushbutton on the FCV-498 controller is necessary to place the C Feed Reg Valve in AUTO.
Step 4        This step is critical because rotating the FCV-499 controller adjust knob counter-clockwise until the controller is at 0% is necessary to place the C Feed Reg Valve in AUTO.
Alternate Path Critical Step Justification Step 5 or 7  This step is critical because placing the FCV-488 controller in MANUAL and stabilizing the B S/G level is necessary to take manual control of the B Feed Reg Valve and stabilize the B S/G level.
2016 Systems - Control Room JPM B                                      NUREG 1021, Revision 10


GP-005 (Power Operation), Rev 128 AOP-0 10 (Main Feedwater/Condensate Malfunction), Rev 33  Handouts: Handout 1: Section 6.4 of GP
Appendix C                                   Page 4 of 13                 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
-005 marked up for this JPM through Step 6.12.d for "A" and "B" FRVs
: 1. Reset simulator to IC-3, 16% Power, Turbine Ready for Synch
. Handout 2: Blank copy of AOP-010  Time Critical Task:
NO  Validation Time:
12 minutes  NOTE: This JPM should be pre
-briefed in the Briefing Room.
Critical Step Justification Step 2 This step is critical because adjusting the output of the FCV
-499 controller is necessary to place the "C" Feed Reg Valve in AUTO
. Step 3 This step is critical because depressing the AUTO pushbutton on the F C V-498 controller is necessary to place the "C" Feed Reg Valve in AUTO
. Step 4 This step is critical because rotating the FCV-499 controller adjust knob counter
-clockwise until the controller is at 0%
is necessary to place the "C" Feed Reg Valve in AUTO
. Alternate Path Critical Step Justification Step 5 or 7 This step is critical because placing the FCV
-4 88 controller in MANUAL and stabilizing the "
B" S/G level is necessary to take manual control of the "B" Feed Reg Valve and stabilize the "B" S/G level
.
Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM B NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Reset simulator to IC
-3, 16% Power, Turbine Ready for Synch
: 2. Place in RUN.
: 2. Place in RUN.
: 3. Perform the following:
: 3. Perform the following:
Raise power to 18
* Raise power to 18-20% by withdrawing control rods.
-20% by withdrawing control rods.
* Adjust FRV Bypasses to 60-90% OPEN.
Adjust FRV Bypasses to 60
* Override CLOSED FCV-1446 (1CFW094 f:normal)
-90% OPEN. Override CLOSED FCV
-1446 (1CFW094 f:normal)
: 4. Ensure the following:
: 4. Ensure the following:
Rx power is between 1 7-20% Tavg is between 551
* Rx power is between 17-20%
-555°F The "C" FRV Bypass Valve OPEN with 60
* Tavg is between 551-555°F
-90% output demand The "C" S/G level is within 2-4% of programmed level (39%)
* The C FRV Bypass Valve OPEN with 60-90% output demand
The "A" and "B" FRV Controllers are in AUTO The "C" FRV Controller is in MANUAL FCV-1446 indicates SHUT
* The C S/G level is within 2-4% of programmed level (39%)
: 5. Insert $006_FRV_BYPASS IMF CFW17 B d:5 r:90 f:0 (5 seconds after FCV-499 ("C" Feed Reg Bypass Valve
* The A and B FRV Controllers are in AUTO
) OPEN indication extinguishes)
* The C FRV Controller is in MANUAL
: 6. Identify APP
* FCV-1446 indicates SHUT
-003-D4, TAVE/TREF DEV, and an expected alarm (Green Dot)
: 5. Insert $006_FRV_BYPASS IMF CFW17B d:5 r:90 f:0 (5 seconds after FCV-499 (C Feed Reg Bypass Valve) OPEN indication extinguishes)
: 6. Identify APP-003-D4, TAVE/TREF DEV, and an expected alarm (Green Dot)
: 7. Place Green Dots on all other LIT annunciators (Expected alarms)
: 7. Place Green Dots on all other LIT annunciators (Expected alarms)
: 8. Acknowledge alarms and stabilize plant. 9. Freeze the Simulator.
: 8. Acknowledge alarms and stabilize plant.
OR 1. Reset Simulator to Temporary Snap IC-601 (January, 201 6). 2. Open Scenario File 006_JPM_B.
: 9. Freeze the Simulator.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
OR
-411.
: 1. Reset Simulator to Temporary Snap IC-601 (January, 2016).
: 2. Open Scenario File 006_JPM_B.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. Place Simulator in Run when Operator assumes the watch.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM B                                NUREG 1021, Revision 10


Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 5 of 13                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM B NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1
START TIME:
. START TIME:
NOTE Section 6.4 Step 12 is a continuous action step that should be performed whenever plant conditions require Feedwater flow through the FRVs and conditions are suitable or automatic S/G water level control.
NOTE Section 6.4 Step 12 is a continuous action step that should be performed whenever plant conditions require Feedwater flow through the FRVs and conditions are suitable or automatic S/G water level control. Feedwater Regulating Valves should be transferred to automatic control one at a time.
Feedwater Regulating Valves should be transferred to automatic control one at a time.
FCV-1446 (Condensate Recirc) is controlled by FS
FCV-1446 (Condensate Recirc) is controlled by FS-1446 (Cond Pmp Recirc VLV Flow Switch). FS-1446 is set to open FCV-1446 at a flow of 1050 gpm with the valve closing at a Condensate System flow of 4200 gpm flow through the GS Condenser and SGBD Heat Exchangers.
-1446 (Cond Pmp Recirc VLV Flow Switch). FS
The Push Button to reset FS-1446 is located in the same enclosure as FS-1446 which is located approximately 15 feet northwest of FCV-1446 on a concrete column.
-1446 is set to open FCV
STEP 1:           WHEN Reactor Power is 15% to 20%, OR the Feedwater Regulating Bypass Valves are 60% to 90% demand signal, THEN shift each Feedwater Regulating Valve to AUTO as follows:             ___ SAT
-1446 at a flow of 1050 gpm with the valve closing at a Condensate System flow of 4200 gpm flow through the GS Condenser and SGBD Heat Exchangers.
* IF FCV-1446 (Condenser Recirc) does NOT indicate SHUT, THEN.
The Push Button to reset FS
(Step 12/12.a).
-1446 is located in the same enclosure as FS
___ UNSAT STANDARD:         The operator reads the Notes, and proceeds.
-1446 which is located approximately 15 feet northwest of FCV
The operator observes reactor power on NR-45 (or equivalent) to be 18%, and proceeds.
-1446 on a concrete column.
The operator observes that FCV-499 Controller output to be between 60-90%, and proceeds.
STEP 1: WHEN Reactor Power is 15% to 20%, OR the Feedwater Regulating Bypass Valves are 60% to 90% demand signal, THEN shift each Feedwater Regulating Valve to AUTO as follows:
The operator observes the FCV-1446 Green status light is LIT and Red status light is OFF, and recognizes that this Step is NOT Applicable, and proceeds.
IF FCV-1446 (Condenser Recirc) does NOT indicate SHUT, THEN--.   (Step 12/12.a
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
). STANDARD: The operator reads the Notes, and proceeds.
2016 Systems - Control Room JPM B                                     NUREG 1021, Revision 10
The operator observes reactor power on NR
-45 (or equivalent) to be 1 8%, and proceeds.
The operator observes that FCV
-499 Controller output to be between 60
-90%, and proceeds.
The operator observes the FCV
-1446 Green status light is LIT and Red status light is OFF, and recognizes that this Step is NOT Applicable, and proceeds
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:     ___ SAT    ___ UNSAT Appendix C Page 6 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM B NUREG 1021, Revision 10 NOTE  With the Turbine not yet loaded, S/G Program Level will be approximately 39% based on First Stage Pressure. STEP 2: Ensure Feed Flow is trending with Steam Flow and S/G Levels are within 1% of program level.
(Step 12.b
). STANDARD: The operator reads the Note, and proceeds.
The operator observes "C" S/G Feed Flow is trending with Steam Flow, and that "C" S/G level is NOT within 1% of programmed level
. The operator adjusts the output of the FCV
-49 9 controller as needed to adjust the feed flow trend and/or "C" S/G level within 1% of programmed level
. EXAMINER'S CUE:
APP-003-D4, which is an expected alarm, may alarm during this time. If so, state that the OATC will address this alarm.
It may be necessary to provide this cue throughout the JPM. EXAMINER'S NOTE:
S/G programmed level is 39%.


BOOTH OPERATOR CUE:
Appendix C                                      Page 6 of 13                        Form ES-C-1 PERFORMANCE INFORMATION NOTE With the Turbine not yet loaded, S/G Program Level will be approximately 39% based on First Stage Pressure.
NONE COMMENTS:  
STEP 2:        Ensure Feed Flow is trending with Steam Flow and S/G Levels are            CRITICAL within 1% of program level.                                                  STEP (Step 12.b).
___ SAT STANDARD: The operator reads the Note, and proceeds.
The operator observes C S/G Feed Flow is trending with Steam Flow, and that C S/G level is NOT within 1% of programmed level.        ___ UNSAT The operator adjusts the output of the FCV-499 controller as needed to adjust the feed flow trend and/or C S/G level within 1% of programmed level.
EXAMINERS CUE:                APP-003-D4, which is an expected alarm, may alarm during this time. If so, state that the OATC will address this alarm.
It may be necessary to provide this cue throughout the JPM.
EXAMINERS NOTE:                S/G programmed level is 39%.
BOOTH OPERATOR CUE:             NONE COMMENTS:
2016 Systems - Control Room JPM B                                      NUREG 1021, Revision 10


CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 7 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       Depress the Auto pushbutton on the FRV controller.                   CRITICAL (Step 12.c)                                                             STEP STANDARD:     The operator observes that C S/G level is within 1% of programmed level.                                                   ___ SAT The operator depresses the AUTO pushbutton on the FCV-498 controller, and observes the White AUTO light is LIT.               ___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
- Control Room JPM B NUREG 1021, Revision 10 STEP 3: Depress the Auto pushbutton on the FRV controller.
2016 Systems - Control Room JPM B                                 NUREG 1021, Revision 10
(Step 12.c)
STANDARD: The operator observes that "C" S/G level is within 1% of programmed level
. The operator depresses the AUTO pushbutton on the F C V-498 controller, and observes the White AUTO light is LIT.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM B NUREG 1021, Revision 10 STEP 4: IF ANY Feedwater Regulating Bypass Valve is NOT closed, THEN slowly close it  (Step 12.c.1)
STANDARD: The operator observes FCV
-499 to be OPEN, and rotates the controller adjust knob counter
-clockwise, and observes the controller output move toward 0%
. The operator observes the FCV
-498 Red and Green status light is LIT, and the controller output start to rise from 0%.
EXAMINER'S CUE:
S/G level may drop as much as 5% while the FRV adjusts automatically, and this may result in an APP
-006 deviation alarm (This is normal and expected). However, the operator may take action per AOP
-010, and place the FRV controller in MANUAL.
If so, when the "C" S/G level is under the operator's control, report as I&C that troubleshooting has been conducted (Using time compression), and it has been determined that the FCV
-498 controller is operating properly. EXAMINER'S NOTE:
NONE    BOOTH OPERATOR CUE:
NONE  COMMENTS:            CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 9 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM B NUREG 1021, Revision 10 STEP 5: Ensure each FRV in AUTO is maintaining programmed S/G level.
(Step 12.d)  STANDARD: The operator observes that "C" S/G level is stabilized and concludes that the "C" FRV (FCV
-498) is maintaining programmed S/G level in AUTO. The operator observes one or more of the following:
  "B" Feed flow as indicated on FR
-488 starts to lower "B" S/G level as indicated on FR
-488 starts to lower FCV-488 controller output starts to lower FCV-488 Green status light is LIT, Red status light is OFF APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL  (Alternate Path)
The operator depresses the MANUAL pushbutton on the F C V-488 controller, and observes the White AUTO light is Extinguished; and the "B" S/G is stabilized (i.e. under the operator control)
. (If so, Terminate JPM)
OR  The operator addresses AOP
-010. (If so, continue to subsequent Steps)  EXAMINER'S CUE:
If the operator addresses AOP
-010, provide the operator with a copy of Handout 2, and continue.
EXAMINER'S NOTE:
5 seconds after the "C" FRBV is closed the "B" FRV controller will fail causing FCV
-488 to CLOSE.
The operator is expected to take manual control of FCV-488 using the guidance for Prompt and Prudent actions in OMM
-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure


of automatic systems to perform or respond correctly.); or by entering AOP
Appendix C                                    Page 8 of 13                    Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 4:      IF ANY Feedwater Regulating Bypass Valve is NOT closed, THEN              STEP slowly close it (Step 12.c.1)
-010. If the operator addresses AOP-010, continue.
___ SAT STANDARD:    The operator observes FCV-499 to be OPEN, and rotates the controller adjust knob counter-clockwise, and observes the controller output move toward 0%.
___ UNSAT The operator observes the FCV-498 Red and Green status light is LIT, and the controller output start to rise from 0%.
EXAMINERS CUE:            S/G level may drop as much as 5% while the FRV adjusts automatically, and this may result in an APP-006 deviation alarm (This is normal and expected).
However, the operator may take action per AOP-010, and place the FRV controller in MANUAL.
If so, when the C S/G level is under the operators control, report as I&C that troubleshooting has been conducted (Using time compression), and it has been determined that the FCV-498 controller is operating properly.
EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE: NONE COMMENTS:
2016 Systems - Control Room JPM B                                    NUREG 1021, Revision 10


BOOTH OPERATOR CUE:
Appendix C                                     Page 9 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       Ensure each FRV in AUTO is maintaining programmed S/G level.              CRITICAL (Step 12.d)                                                                 STEP STANDARD:     The operator observes that C S/G level is stabilized and concludes that the C FRV (FCV-498) is maintaining programmed S/G level in        ___ SAT AUTO.
NONE  COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
The operator observes one or more of the following:
- Control Room JPM B NUREG 1021, Revision 10 STEP 6: CHECK FRVs  OPERATING PROPERLY (MANUAL OR AUTO):
* B Feed flow as indicated on FR-488 starts to lower                   ___ UNSAT
FCV478  FCV488 FCV498  (AOP-010 Step 1)   STANDARD: The operator observes one or more of the following:
* B S/G level as indicated on FR-488 starts to lower
  "B" Feed flow as indicated on FR
* FCV-488 controller output starts to lower
-488 starts to lower "B" S/G level as indicated on FR
* FCV-488 Green status light is LIT, Red status light is OFF
-488 starts to lower FCV-488 controller output starts to lower FCV-488 Green status light is LIT, Red status light is OFF APP-006-E1, S/G B NAR RANGE LO/LO
* APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL (Alternate Path)
-LO LEVEL   The operator proceeds to Step 1 RNO.
The operator depresses the MANUAL pushbutton on the FCV-488 controller, and observes the White AUTO light is Extinguished; and the B S/G is stabilized (i.e. under the operator control). (If so, Terminate JPM)
OR The operator addresses AOP-010. (If so, continue to subsequent Steps)
EXAMINERS CUE:                If the operator addresses AOP-010, provide the operator with a copy of Handout 2, and continue.
EXAMINERS NOTE:              5 seconds after the C FRBV is closed the B FRV controller will fail causing FCV-488 to CLOSE.
The operator is expected to take manual control of FCV-488 using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.); or by entering AOP-010. If the operator addresses AOP-010, continue.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM B                                    NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                                  Page 10 of 13                  Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      CHECK FRVs  OPERATING PROPERLY (MANUAL OR AUTO):
NONE EXAMINER'S NOTE:
FCV478 FCV488 FCV498                                                            ___ SAT (AOP-010 Step 1)
NONE       BOOTH OPERATOR CUE:
___ UNSAT STANDARD:    The operator observes one or more of the following:
NONE COMMENTS:
* B Feed flow as indicated on FR-488 starts to lower
___ SAT
* B S/G level as indicated on FR-488 starts to lower
___ UNSAT  STEP 7: PERFORM the following:
* FCV-488 controller output starts to lower
ENSURE FRV for affected S/G(s) in manual control.
* FCV-488 Green status light is LIT, Red status light is OFF
ATTEMPT to stabilize S/G level using FRV and/or FRV Bypass Valves by matching steam flow with feed flow.
* APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL The operator proceeds to Step 1 RNO.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
STEP 7:       PERFORM the following:                                               CRITICAL ENSURE FRV for affected S/G(s) in manual control.                       STEP ATTEMPT to stabilize S/G level using FRV and/or FRV Bypass Valves by matching steam flow with feed flow.
STOP any load change in progress.
STOP any load change in progress.
If unable to control S/G level, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.
If unable to control S/G level, THEN TRIP the reactor and GO TO     ___ SAT EOPE0, Reactor Trip Or Safety Injection.
(AOP-010 Step 1 RNO)   STANDARD: The operator places FCV
(AOP-010 Step 1 RNO)
-498 controller in MANUAL and stabilizes the "B" S/G level
___ UNSAT STANDARD:     The operator places FCV-498 controller in MANUAL and stabilizes the B S/G level.
. EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Systems - Control Room JPM B                                NUREG 1021, Revision 10
NONE BOOTH OPERATOR CUE: NONE COMMENTS: CRITICAL STEP    ___ SAT


___ UNSAT Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 11 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 8:       CHECK Reactor Trip Setpoint  BEING APPROACHED (AOP-010 Step 2)
- Control Room JPM B NUREG 1021, Revision 10 STEP 8: CHECK Reactor Trip Setpoint  BEING APPROACHED (AOP-010 Step 2)   STANDARD: The operator observes that the "
___ SAT STANDARD:     The operator observes that the B S/G level is stabilized.
B" S/G level is stabilized
EXAMINERS CUE:                 NONE
. EXAMINER'S CUE:
___ UNSAT EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE  EXAMINER'S NOTE:
STEP 9:       IF a reactor trip setpoint is approached, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.
NONE BOOTH OPERATOR CUE:
GO TO Step 4.                                                         ___ SAT (AOP-010 Step 2 RNO)
NONE COMMENTS:     ___ SAT
STANDARD:     The operator observes that the B S/G level is stabilized.           ___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
___ UNSAT  STEP 9: IF a reactor trip setpoint is approached, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.
Terminating Cue:               Evaluation on this JPM is complete.
GO TO Step 4.
(AOP-010 Step 2 RNO)   STANDARD: The operator observes that the "B" S/G level is stabilized
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:   ___ SAT
___ UNSAT        Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM B                                  NUREG 1021, Revision 10


Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 12 of 13                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM B Examinees Name:
- Control Room JPM B NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM B   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:   Question Documentation:
Time to Complete:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM B                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A plant startup is in progress with reactor power approximately 19%.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
A plant startup is in progress with reactor power approximately 19%.     "A" and "B" S/G levels are being controlled with the Feed Reg Valves operating in AUTO. The "C" S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve. The Turbine is at 1800 RPM (Not synched to the Grid)
* The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
. You are the operator assigned to control S/G water level. Annunciator APP
* The Turbine is at 1800 RPM (Not synched to the Grid).
-003-D4, TAVE/TREF DEV, is an expected alarm. INITIATING CUE:
* You are the operator assigned to control S/G water level.
The CRS has directed you to transfer the "C" S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation
* Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.
.
INITIATING CUE:     The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
NUREG 1021, Revision 10
- Control Room JPM C (Rev_011116) NUREG 1021, Revision 10


SIM JPM C     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM C Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM C (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 17 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                           Page 2 of 17                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM C NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Restore PRT to Normal Operating           JPM No.:   2016 Systems - Control Conditions                                            Room JPM C (Alternate Path)
Restore PRT to Normal Operating Conditions JPM No.: 2016 Systems  
- Control Room JPM C (Alternate Path)
K/A  
K/A  


==Reference:==
==Reference:==
007 A1.01 (2.9/3.1)
007 A1.01 (2.9/3.1)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:     X Classroom                 Simulator         X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM
* The plant is at 100% power.
) and Handout 1
* APP-003-D3, PRT HI/LO LEVEL, has alarmed.
. Initial Conditions:
* The cause of the low level is known leakage from the PRT to the RCDT.
The plant is at 100% power.
* PRT level is stable at 67%.
APP-003-D3, PRT HI/LO LEVEL, has alarmed. The cause of the low level is known leakage from the PRT to the RCDT. PRT level is stable at 67%
Initiating Cue:
. Initiating Cue:
* The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
The CRS has directed you to restore PRT level to normal IAW OP
* All of the prerequisites of Section 4.0 are complete.
-103, Pressurizer Relief Tank Control System
Task Standard:             The operator will refill the PRT in accordance with Section 8.2.2 of OP-103; and then diagnose and relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.
. All of the prerequisites of Section 4.0 are complete.
Required Materials:         None General  
Task Standard:
The operator will refill the PRT in accordance with Section 8.2.2 of OP
-103; and then diagnose and relieve the hydraulic lock on RC
-519B in accordance with Section 8.4.1 of OP
-103. Required Materials:
None   General  


==References:==
==References:==
OP-103 (Pressurizer Relief Tank Control System), Rev 21 2016 Systems - Control Room JPM C                                          NUREG 1021, Revision 10
Appendix C                                      Page 3 of 17                        Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Blank Copy of OP-103 Time Critical Task:    NO Validation Time:        10 minutes NOTE:                  This JPM should be pre-briefed in the briefing room.
Critical Step Justification Step 2        This step is critical because placing a PW Pump control switch to START is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 3        This step is critical because placing the RC-519C control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 4        This step is critical because placing the RC-519A and B control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 9        This step is critical because placing the RC-519A and B control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 10      This step is critical because placing the RC-519C control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Alternate Path Critical Step Justification Step 15      This step is critical because cycling RC-519C open and closed is necessary to relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10


OP-103 (Pressurizer Relief Tank Control System), Rev 21 Appendix C Page 3 of 17 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
Appendix C                                   Page 4 of 17                         Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM C NUREG 1021, Revision 10 Handouts: Handout 1: Blank Copy of OP
-103  Time Critical Task:
NO  Validation Time:
10 minutes  NOTE: This JPM should be pre
-briefed in the briefing room.
Critical Step Justification Step 2 This step is critical because placing a PW Pump control switch to START is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 3 This step is critical because placing the RC
-519C control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 4 This step is critical because placing the RC
-519A and B control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 9 This step is critical because placing the RC
-519A and B control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 1 0 This step is critical because placing the RC
-519C control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Alternate Path Critical Step Justification Step 1 5 This step is critical because cycling RC-519C open and closed is necessary to relieve the hydraulic lock on RC
-519B in accordance with Section 8.4.1 of OP
-103.
Appendix C Page 4 of 17 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ C as follows:
: 1. Construct Scenario File 006_JPM_ C as follows:
IOR doRCSAAO212d e:006_RC_519AB_OPEN f:ON (Over
* IOR doRCSAAO212d e:006_RC_519AB_OPEN f:ON (Over-Ride RC-519B to OPEN when Switch taken to OPEN)
-Ride RC-519B to OPEN when Switch taken to OPEN)
* IOR do CNMAOO086J e:006_519AB_OPEN f:OFF (Over-Ride RC-519A/B CIV Indication to OFF)
IOR do CNMAOO086J e:006_519AB_OPEN f:OFF (Over
To be inserted after RC-519C is CLOSED during Initial Fill of PRT (JPM Step 12)
-Ride RC-519A/B CIV Indication to OFF)
  * $006_RC_519C_OPEN DOR doRCSAAO212D (Removes Over-Ride for RC-519B when RC-519C is OPEN)
To be inserted after RC
  * $600_RC_519C_OPEN DOR doCNMAOO086J (Removes Over-Ride on RC-519A/B CIV Indication)
-519C is CLOSED during Initial Fill of PRT (JPM Step
: 2. Reset simulator to IC-5, 100% Power.
: 12) $006_RC_519C_OPEN DOR doRCSAAO212D (Removes Over
: 3. Place in RUN, execute Scenario File 006_JPM_C and allow time to stabilize.
-Ride for RC
: 4. Drain PRT to 67% (Open RC-523 until PRT level 67% and Close RC-523.
-519B when RC-519C is OPEN)
: 5. Verify PRT conditions as follows: 103°F temperature, 67% level and 3 psig pressure.
  $600_RC_519C_OPEN DOR doCNMAOO086J (Removes Over
: 6. Stabilize the plant.
-Ride on RC
: 7. Freeze the Simulator.
-519A/B CIV Indication)
OR
: 2. Reset simulator to IC
: 1. Reset Simulator to Temporary Snap IC-602 (July, 2015).
-5 , 100% Power. 3. Place in RUN , execute Scenario File 006_JPM_C and allow time to stabilize
: 2. Scenario File 006_JPM_ C NOTE:         Booth Instructor verify that two additional overrides are available to be inserted at Step 11 of this JPM.
.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. (Open RC-523 until PRT level 67% and Close RC
: 4. Place Simulator in Run when Operator assumes the watch.
-523. 5. Verify PRT conditions as follows: 1 03°F temperature, 67% level and 3 psig pressure
2016 Systems - Control Room JPM C                                  NUREG 1021, Revision 10
. 6. Stabilize the plant
. 7. Freeze the Simulator. OR 1. Reset Simulator to Temporary Snap IC
-602 (July, 201 5). 2. Scenario File 006_JPM_ C NOTE:   Booth Instructor verify that two additional overrides are available to be inserted at Step 1 1 of this JPM
. 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
-411. 4. Place Simulator in Run when Operator assumes the watch.


Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                       Page 5 of 17                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM C NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1
START TIME:
. START TIME:
NOTE:
NOTE: PRT temperatures of greater than 120
PRT temperatures of greater than 120°F should be reduced by alternately adding Primary Water to the PRT and draining the PRT. (SER 93-007)
°F should be reduced by alternately adding Primary Water to the PRT and draining the PRT. (SER 93
Maximum cooling effect can be achieved by leaving the added Primary Water in the PRT for at least 10 minutes prior to draining. (SER 93-007)
-007) Maximum cooling effect can be achieved by leaving the added Primary Water in the PRT for at least 10 minutes prior to draining. (SER 93
STEP 1:         Verify the following initial conditions are satisfied:
-007)   STEP 1: Verify the following initial conditions are satisfied:
: a. All prerequisites of Section 4.0 are complete
: a. All prerequisites of Section 4.0 are complete
: b. Pressurizer Relief Tank level is less than 80%.
: b. Pressurizer Relief Tank level is less than 80%.                         ___ SAT
: c. Draining the PRT is NOT in progress.
: c. Draining the PRT is NOT in progress.
(Step 8.2.2.1)
(Step 8.2.2.1)
STANDARD: The operator reads the Notes, and proceeds.
STANDARD: The operator reads the Notes, and proceeds.                                       ___ UNSAT The operator Verifies all initial conditions satisfied (Initial Cue).
The operator Verifies all initial conditions satisfied (Initial Cue)
EXAMINERS CUE:                   If asked, section 4.0 prerequisites are complete.
. EXAMINER'S CUE:
EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:               NONE COMMENTS:
If asked, section 4.0 prerequisites are complete.
2016 Systems - Control Room JPM C                                          NUREG 1021, Revision 10
EXAMINER'S NOTE:
 
NONE BOOTH OPERATOR CUE:
Appendix C                                   Page 6 of 17                       Form ES-C-1 PERFORMANCE INFORMATION CAUTION Operating two Primary Water Pumps can cause inadvertent filling of the RCS if the RCS is depressurized and vented through a PORV when two Primary Water Pumps are operating. Water may makeup to the RCS via the PRT spargers if the PRT is filled faster than it can vent.
NONE COMMENTS:                 ___ SAT    ___ UNSAT Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STEP 2:       Verify a Primary Water Pump is OPERATING.                                   CRITICAL (Step 8.2.2.2)                                                               STEP STANDARD: The operator reads the Caution, and proceeds.
- Control Room JPM C NUREG 1021, Revision 10 CAUTION Operating two Primary Water Pumps can cause inadvertent filling of the RCS if the RCS is depressurized and vented through a PORV when two Primary Water Pumps are operating. Water may makeup to the RCS via the PRT spargers if the PRT is filled faster than it can vent.
___ SAT The operator observes the A and B Primary Water Pump Green status lights are LIT and the Red status lights are OFF, and determines that neither PW Pump is RUNNING.
STEP 2: Verify a Primary Water Pump is OPERATING.
___ UNSAT The operator places the A Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
(Step 8.2.2.
OR The operator places the B Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
: 2)
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               The A Primary Water Pump is in AUTO, set-up for Auto Makeup.
STANDARD: The operator reads the Caution, and proceeds.
The operator may start either the A or the B Primary Water Pump.
The operator observes the "A" and "B" Primary Water Pump Green status lights are LIT and the Red status lights are OFF, and determines that neither PW Pump is RUNNING.
BOOTH OPERATOR CUE:            NONE COMMENTS:
The operator places the "A" Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF. OR The operator places the "B" Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
2016 Systems - Control Room JPM C                                      NUREG 1021, Revision 10
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
The "A" Primary Water Pump is in AUTO, set
-up for Auto Makeup.
The operator may start either the "A" or the "B" Primary Water Pump.


BOOTH OPERATOR CUE
Appendix C                                   Page 7 of 17                       Form ES-C-1 PERFORMANCE INFORMATION STEP 3:     Open RC-519C, PW TO PRT ISO                                                 CRITICAL (Step 8.2.2.3)                                                               STEP STANDARD: The operator places the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF. ___ SAT EXAMINERS CUE:             NONE EXAMINERS NOTE:             NONE                                                       ___ UNSAT BOOTH OPERATOR CUE:         NONE COMMENTS:
:  NONE  COMMENTS:
STEP 4:     Open RC-519A & B, PW TO CV ISO                                             CRITICAL (Step 8.2.2.4)                                                               STEP STANDARD: The operator places and HOLDS the RC-519A & B Control Switch to OPEN and observes the Red status lights are LIT and the Green status       ___ SAT lights are OFF.
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
EXAMINERS CUE:             NONE
- Control Room JPM C NUREG 1021, Revision 10 STEP 3: Open RC-519C, PW TO PRT ISO (Step 8.2.2.
___ UNSAT EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
: 3) STANDARD: The operator place s the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF.
2016 Systems - Control Room JPM C                                     NUREG 1021, Revision 10
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE   COMMENTS:
CRITICAL STEP
___ SAT    ___ UNSAT  STEP 4: Open RC-519A & B, PW TO CV ISO (Step 8.2.2.
: 4) STANDARD: The operator place s and HOLDS the RC-519 A & B Control Switch to OPEN and observes the Red status lights are LIT and the Green status lights are OFF.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:   NONE   COMMENTS:         CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM C NUREG 1021, Revision 10 STEP 5: Monitor PRT for rising level (Step 8.2.2.
: 5)  STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.


EXAMINER'S CUE:
Appendix C                                    Page 8 of 17                    Form ES-C-1 PERFORMANCE INFORMATION STEP 5:      Monitor PRT for rising level (Step 8.2.2.5)
NONE EXAMINER'S NOTE:
STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.                ___ SAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              The normal PRT Level band is 70-80%.                  ___ UNSAT It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
The normal PRT Level band is 70
BOOTH OPERATOR CUE:          NONE COMMENTS:
-80%.     It is expected that APP
STEP 6:      IF the expected rise in level does NOT occur, THEN stop filling AND investigate.
-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
(Step 8.2.2.6)
BOOTH OPERATOR CUE:
___ SAT STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.
NONE   COMMENTS:      
EXAMINERS CUE:              NONE
___ UNSAT EXAMINERS NOTE:             The normal PRT Level band is 70-80%.
It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
BOOTH OPERATOR CUE:           NONE COMMENTS:
2016 Systems - Control Room JPM C                                  NUREG 1021, Revision 10


___ SAT    ___ UNSAT  STEP 6: IF the expected rise in level does NOT occur, THEN stop filling AND investigate.
Appendix C                                        Page 9 of 17                          Form ES-C-1 PERFORMANCE INFORMATION NOTE: Increasing PRT level will cause PRT pressure to rise, possibly to the high pressure alarm setpoint of 5 psig.
(Step 8.2.2.
STEP 7:        Recognize/report PRT Hi Pressure alarm (APP-003 C3) received.
: 6)  STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.
Monitors PRT pressure and reports value and that it is an expected alarm due to filling                                                            ___ SAT STANDARD: The operator reads the Note, and proceeds.
EXAMINER'S CUE:
The operator checks PRT pressure >5 psig due to filling, informs the          ___ UNSAT CRS it is an expected alarm EXAMINERS CUE:                   As CRS, acknowledge report EXAMINERS NOTE:                 This is an expected alarm as the procedure note states. It is not expected that the operator will address the alarm and/or condition until after filling is completed. If the operator does address this alarm, if it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.
NONE  EXAMINER'S NOTE:
BOOTH OPERATOR CUE:               NONE COMMENTS:
The normal PRT Level band is 70
2016 Systems - Control Room JPM C                                      NUREG 1021, Revision 10
-80%.     It is expected that APP
-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
BOOTH OPERATOR CUE:
NONE   COMMENTS:      


___ SAT    ___ UNSAT Appendix C Page 9 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 10 of 17                         Form ES-C-1 PERFORMANCE INFORMATION STEP 8:     WHEN PRT level is between 70% and 80%, THEN perform the following:
- Control Room JPM C NUREG 1021, Revision 10 NOTE: Increasing PRT level will cause PRT pressure to rise, possibly to the high pressure alarm setpoint of 5 psig.
STEP 7: Recognize/report PRT Hi Pressure alarm (APP
-003 C3) received. Monitors PRT pressure and reports value and that it is an expected alarm due to filling STANDARD: The operator reads the Note, and proceeds.
The operator checks PRT pressure >5 psig due to filling, informs the CRS it is an expected alarm EXAMINER'S CUE:
As CRS, acknowledge report EXAMINER'S NOTE:
This is an expected alarm as the procedure note states. It is not expected that the operator will address the alarm and/or condition until after filling is completed. If the operator does address this alarm, if it decided to vent the PRT to reduce pressure, state that "Another Operator will address this alarm."
BOOTH OPERATOR CUE:    NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 8: WHEN PRT level is between 70% and 80%, THEN perform the following:
: a. Stop the Primary Water Pump
: a. Stop the Primary Water Pump
: b. Verify one Primary Water pump is in AUTO.
: b. Verify one Primary Water pump is in AUTO.                               ___ SAT (Step 8.2.2.7a&b)
(Step 8.2.2.7a&b)
STANDARD: If the A Primary Water Pump was previously started, the operator places the A Primary Water Pump Control Switch to STOP and               ___ UNSAT observes the Green status light is LIT and the Red status light is OFF.
STANDARD: If the "A" Primary Water Pump was previously started, the operator places the "A" Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
The operator places the A Primary Water Pump Control Switch to AUTO.
The operator places the "A" Primary Water Pump Control Switch to AUTO. OR   If the "B" Primary Water Pump was previously started, the operator places the "B" Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
OR If the B Primary Water Pump was previously started, the operator places the B Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10
NONE BOOTH OPERATOR CUE:   NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
 
- Control Room JPM C NUREG 1021, Revision 10 STEP 9: Close RC-519A & B (Step 8.2.2.7c)
Appendix C                                   Page 11 of 17                       Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Close RC-519A & B                                                           CRITICAL (Step 8.2.2.7c)                                                               STEP STANDARD: The operator places and holds the RC-519A & B Control Switch to CLOSE and observes the RC-519A Green status light is LIT and the           ___ SAT Red status light is OFF.
STANDARD: The operator place s and holds the RC-519A & B Control Switch to CLOSE and observes the RC
The operator observes that the RC-519B Red and Green status lights are LIT (Alternate Path - Mitigated in a later Step).                     ___ UNSAT The operator reports to the CRS that RC-519B has not fully CLOSED.
-519A Green status light is LIT and the Red status light is OFF. The operator observes that the RC
EXAMINERS CUE:               As CRS, acknowledge report If a request is made to cycle RC-519A & B to attempt to verify RC-519B operation, as CRS then respond no do not cycle the valve EXAMINERS NOTE:               A single Control Switch controls both valves BOOTH OPERATOR CUE:            NONE COMMENTS:
-519B Red and Green status lights are LIT (Alternate Path
STEP 10:    Close RC-519C                                                              CRITICAL (Step 8.2.2.7d)                                                              STEP STANDARD: The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF. ___ SAT EXAMINERS CUE:                    NONE EXAMINERS NOTE:                  NONE                                                ___ UNSAT BOOTH OPERATOR CUE:                Insert the last two commands IAW 006_JPM_C File to remove over-rides once RC-519C is closed.
- Mitigated in a later Step
COMMENTS:
). The operator reports to the CRS that RC
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10
-519B has not fully CLOSED.
 
EXAMINER'S CUE:
Appendix C                                    Page 12 of 17                        Form ES-C-1 PERFORMANCE INFORMATION STEP 11:    IF PRT level is greater than or equal to 83% OR PRT temperature is greater than 120°F, THEN lower the PRT level in accordance with the appropriate Section of this procedure, Draining the PRT When Pressurizer Temperature is Greater Than Or Equal to 200°F OR                ___ SAT Draining the PRT When Pressurizer Temperature is Less Than 200°F. (Step 8.2.2.8)
As CRS, acknowledge report If a request is made to cycle RC
STANDARD: The operator observes PRT level on LI-470 (or ERFIS) is <83% and              ___ UNSAT PRT temperature on TI-471 (or ERFIS) is <120&deg;F EXAMINERS CUE:                NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
-519A & B to attempt to verify RC
STEP 12:    IF RC-519A or RC-519B do NOT fully close, THEN relieve the hydraulic lock in accordance with the Relieving Hydraulic Lock on RC-519A AND RC-519B Section of this procedure (Alternate Path - RC-519B Hydraulic Lock has previously occurred and is Mitigated Here).                                                                      ___ SAT (Step 8.2.2.9)
-519B operation, as CRS then respond no do not cycle the valve EXAMINER'S NOTE:
STANDARD: The operator reviews the OP-103 Table Of Contents and determines that Section 8.4.1 is required, and proceeds to this section.              ___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:              If the operator addresses APP-003-C3 prior to addressing the hydraulic lock, when it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.
A single Control Switch controls both valves
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10


BOOTH OPERATOR CUE:    NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 1 0: Close RC-519C  (Step 8.2.2.7d)
Appendix C                                   Page 13 of 17                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: The RCS System Engineer WILL need to be NOTIFIED WHEN the following section is PERFORMED to relieve hydraulic lock on RC-519A AND RC-519B for Engineering Trending Purposes.
STANDARD: The operator place s the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
STEP 13:     Relieving Hydraulic Lock on RC-519A AND RC-519B:
EXAMINER'S CUE:
Verify the following initial conditions are satisfied:
NONE  EXAMINER'S NOTE:
: a. RC-519A & B, PW TO CV ISO, control switch is in the CLOSE position and one OR both valves indicate in mid position.           ___ SAT (Step 8.4.1.a)
NONE  BOOTH OPERATOR CUE: Insert the last two commands IAW 006_JPM_C File to remove over
-rides once RC
-519C is closed. COMMENTS:      CRITICAL STEP  ___ SAT
___ UNSAT Appendix C Page 12 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 1 1: IF PRT level is greater than or equal to 83% OR PRT temperature is greater than 120&deg;F, THEN lower the PRT level in accordance with the appropriate Section of this procedure, Draining the PRT When Pressurizer Temperature is Greater Than Or Equal to 200&deg;F OR Draining the PRT When Pressurizer Temperature is Less Than 200&deg;F. (Step 8.2.2.8)
STANDARD: The operator observes PRT level on LI-470 (or ERFIS) is <83% and PRT temperature on TI-471 (or ERFIS) is <120&deg;F EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:    NONE  COMMENTS:            ___ SAT    ___ UNSAT  STEP 1 2: IF RC-519A or RC
-519B do NOT fully close, THEN relieve the hydraulic lock in accordance with the Relieving Hydraulic Lock on RC
-519A AND RC
-519B Section of this procedure (Alternate Path
- RC-519B Hydraulic Lock has previously occurred and is Mitigated Here).  (Step 8.2.2.
: 9)  STANDARD: The operator reviews the OP
-103 Table Of Contents and determines that Section 8.4.1 is required, and proceeds to this section.
EXAMINER'S CUE:
NONE    EXAMINER'S NOTE:
If the operator addresses APP
-003-C3 prior to addressing the hydraulic lock, when it decided to vent the PRT to reduce pressure, state that "Another Operator will address this alarm."
BOOTH OPERATOR CUE:    NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 NOTE: The RCS System Engineer WILL need to be NOTIFIED WHEN the following section is PERFORMED to relieve hydraulic lock on RC
-519A AND RC-519B for Engineering Trending Purposes. STEP 1 3: Relieving Hydraulic Lock on RC
-519A AND RC
-519B: Verify the following initial conditions are satisfied:
: a. RC-519A & B, PW TO CV ISO, control switch is in the CLOSE position and one OR both valves indicate in mid position.
(Step 8.4.1.a)
STANDARD: The operator reads the Note, and proceeds.
STANDARD: The operator reads the Note, and proceeds.
The operator observes the RC
___ UNSAT The operator observes the RC-519A Green status light is LIT and the Red status light is OFF.
-519A Green status light is LIT and the Red status light is OFF.
The operator observes the RC-519B Red and Green status lights are LIT.
The operator observes the RC
EXAMINERS CUE:               If the operator notifies the CRS or the System Engineer, acknowledge as the CRS.
-519B Red and Green status lights are LIT. EXAMINER'S CUE:
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
If the operator notifies the CRS or the System Engineer, acknowledge as the CRS.
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10
EXAMINER'S NOTE:
 
NONE BOOTH OPERATOR CUE:
Appendix C                                     Page 14 of 17                       Form ES-C-1 PERFORMANCE INFORMATION STEP 14:     Verify the Post Accident Sampling System is NOT in operation.
NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 1 4: Verify the Post Accident Sampling System is NOT in operation.
(Step 8.4.1.b)
(Step 8.4.1.b)
STANDARD: Operator verifies PASS is not operating
STANDARD:     Operator verifies PASS is not operating                                   ___ SAT EXAMINERS CUE:                  If asked about the status of this system, ask the operator what they would expect the status to be in the current plant condition. THEN, indicate that the    ___ UNSAT system is as expected.
EXAMINERS NOTE:                  The PASS is ONLY operated under accident conditions, which do NOT exist.
BOOTH OPERATOR CUE:              NONE COMMENTS:
STEP 15:    IF RC-519B is indicating in mid position, THEN cycle RC-519C, PW              CRITICAL TO PRT ISO                                                                      STEP (Step 8.4.2)
STANDARD: The operator places the RC-519C Control Switch to OPEN and                      ___ SAT observes the Red status light is LIT and the Green status light is OFF.
The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.      ___ UNSAT The operator observes the RC-519B Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:                  If the operator informs the CRS of the valve position change, acknowledge as the CRS.
EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM C                                      NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                                   Page 15 of 17                     Form ES-C-1 PERFORMANCE INFORMATION STEP 16:     IF RC-519A is indicating in mid position, THEN perform the following:
If asked about the status of this system, ask the operator what they would expect the status to be in the current plant condition. THEN, indicate that the system is as expected.
EXAMINER'S NOTE:
The PASS is ONLY operated under accident conditions, which do NOT exist.
BOOTH OPERATOR CUE:
NONE  COMMENTS:            ___ SAT    ___ UNSAT  STEP 1 5: IF RC-519B is indicating in mid position, THEN cycle RC
-519C, PW TO PRT ISO (Step 8.4.2)
STANDARD: The operator place s the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF.
The operator place s the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
The operator observes the RC
-519B Green status light is LIT and the Red status light is OFF.
EXAMINER'S CUE:
If the operator informs the CRS of the valve position change, acknowledge as the CRS.
EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 1 6: IF RC-519A is indicating in mid position, THEN perform the following:
: a. Verify neither Primary Water Pump is OPERATING.
: a. Verify neither Primary Water Pump is OPERATING.
: b. Close breaker 15 on Power Panel 27.
: b. Close breaker 15 on Power Panel 27.
: c. Open HCV-4176, CDT ISOLATION.
: c. Open HCV-4176, CDT ISOLATION.                                         ___ SAT
: d. Open HCV-4174, PZR RELIEF TANK ISOLATION.
: d. Open HCV-4174, PZR RELIEF TANK ISOLATION.
: e. Close HCV-4176, CDT ISOLATION.
: e. Close HCV-4176, CDT ISOLATION.
: f. Close HCV-4174, PZR RELIEF TANK ISOLATION.
: f. Close HCV-4174, PZR RELIEF TANK ISOLATION.
: g. Open breaker 15 on Power Panel 27.
: g. Open breaker 15 on Power Panel 27.                                   ___ UNSAT (Step 8.4.1.3)
(Step 8.4.1.3)
STANDARD: The operator recognizes the sub-steps under Section 8.4.1.3 are not applicable and annotates the steps with N/A EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
STANDARD: The operator recognizes the sub
NOTE: Power Panel 27 is located on the west side of the PASS panel.
-steps under Section 8.4.1.3 are not applicable and annotates the steps with "N/A" EXAMINER'S CUE:
STEP 17:     IF RC-519A OR RC-519B is still indicating mid position, THEN declare the valve out of service AND refer to ITS LCO 3.6.3.
NONE EXAMINER'S NOTE: NONE BOOTH OPERATOR CUE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  NOTE: Power Panel 27 is located on the west side of the PASS panel.
STEP 1 7: IF RC-519A OR RC
-519B is still indicating mid position, THEN declare the valve out of service AND refer to ITS LCO 3.6.3.
(Step 8.4.1.4)
(Step 8.4.1.4)
STANDARD: The operator reads the Note, and proceeds.
___ SAT STANDARD: The operator reads the Note, and proceeds.
The operator recognizes this step is N/A and marks it N/A
The operator recognizes this step is N/A and marks it N/A
___ UNSAT EXAMINERS CUE:                Inform the operator you will have another operator restore PRT pressure to normal EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
Terminating Cue:              Evaluation on this JPM is complete.
STOP TIME:
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                             Page 16 of 17                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM C Examinees Name:
Inform the operator you will have another operator restore PRT pressure to normal EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM C   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:   Time to Complete:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM C                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* APP-003-D3, PRT HI/LO LEVEL, has alarmed.
The plant is at 100% power.
* The cause of the low level is known leakage from the PRT to the RCDT.
APP-003-D3, PRT HI/LO LEVEL, has alarmed. The cause of the low level is known leakage from the PRT to the RCDT. PRT level is stable at 67%.       INITIATING CUE:
* PRT level is stable at 67%.
The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System
INITIATING CUE:
. All of the prerequisites of Section 4.0 are complete.
* The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
 
* All of the prerequisites of Section 4.0 are complete.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
NUREG 1021, Revision 10
- Control Room JPM D (Rev_01 12 16) NUREG 1021, Revision 10        


SIM JPM D       Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM D Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM D (Rev_011216)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training  


Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                           Page 2 of 13                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                                 Task No.:
- Control Room JPM D NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Reactor Startup with Ejected Control JPM No.:           2016 Systems - Control Rod                                                      Room JPM D (Alternate Path)
Reactor Startup with Ejected Control Rod JPM No.: 2016 Systems  
- Control Room JPM D (Alternate Path)
K/A  
K/A  


==Reference:==
==Reference:==
001 A1.06 (4.1/4.4)
001 A1.06 (4.1/4.4)
Examinee: NRC Examiner:
Examinee:                                                       NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                             Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:       X Classroom                 Simulator       X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* The plant is stabilized at 2% power.
: 1. Initial Conditions:
* The RCS is at normal operating temperature and pressure.
The plant is stabilized at 2% power
* A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
. The RCS is at normal operating temperature and pressure
* You are the OATC.
. A plant startup is in progress IAW GP
* The BOP is temporarily outside the Control Room.
-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.
Initiating Cue:             The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.
: 7. You are the OATC.
Task Standard:             The operator will start to raise reactor power to 3-5%. Then, the operator will manually trip the reactor, attempt to manually actuate Safety Injection and manually start SI Pumps in response to an ejected rod.
The BOP is temporarily outside the Control Room.
Required Materials:         None General  
Initiating Cue:
The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.
8 of GP-003. Task Standard:
The operator will start to raise reactor power to 3
-5%. Then, the operator will manually trip the reactor, attempt to manually actuate Safety Injection and manually start SI Pumps in response to an ejected rod. Required Materials:
None   General  


==References:==
==References:==
GP-003 (Normal Plant Startup From Hot Shutdown to Critical), Rev 105 2016 Systems - Control Room JPM D                                            NUREG 1021, Revision 10


GP-003 (Normal Plant Startup From Hot Shutdown to Critical), Rev 105 Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                     Page 3 of 13                     Form ES-C-1 Job Performance Measure Worksheet APP-004 (First Out Reactor Trips), Rev 18 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 AOP-001 (Malfunction of Reactor Control System), Rev 33 AOP-016 (Excessive Primary Plant Leakage), Rev 23 AOP-019 (Malfunction of RCS Pressure Control), Rev 20 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:               Handout 1: Section 8.4 of GP-003 marked up for this JPM to Step 8.4.7.
- Control Room JPM D NUREG 1021, Revision 10 APP-004 (First Out Reactor Trips), Rev 18 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 AOP-001 (Malfunction of Reactor Control System), Rev 33 AOP-016 (Excessive Primary Plant Leakage), Rev 23 AOP-019 (Malfunction of RCS Pressure Control), Rev 20 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45   Handouts: Handout 1: Section 8.4 of GP
Time Critical Task:     NO Validation Time:         5 minutes NOTE:                   This JPM should be pre-briefed in the Briefing Room.
-003 marked up for this JPM to Step 8.4.7. Time Critical Task:
Critical Step Justification Step 1       This step is critical because placing the Manual Rod Control Switch to the OUT position is necessary to raise and then stabilize power between 3-5%.
NO   Validation Time:
Step 2       This step is critical because pressing one of two Rx Trip pushbuttons is necessary to manually trip the reactor.
5 minutes   NOTE: This JPM should be pre
Step 8       This step is critical because pressing BOTH SI pushbuttons is necessary to manually attempt to actuate SI.
-briefed in the Briefing Room.
Alternate Path Critical Step Justification Step 9       This step is critical because placing the A and the C SI Pump Control Switches to START is necessary to manually start SI Pumps in response to an ejected rod.
Critical Step Justification Step 1 This step is critical because placing the Manual Rod Control Switch to the OUT position is necessary to raise and then stabilize power between 3
2016 Systems - Control Room JPM D                                      NUREG 1021, Revision 10
-5%. Step 2 This step is critical because pressing one of two Rx Trip pushbuttons is necessary to manually trip the reactor
. Step 8 This step is critical because pressing BOTH SI pushbuttons is necessary to manually attempt to actuate SI
. Alternate Path Critical Step Justification Step 9 This step is critical because placing the "A" and the "C" SI Pump Control Switches to START is necessary to manually start SI Pumps in response to an ejected rod


Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                 Page 4 of 13                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM D NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ D as follows:
: 1. Construct Scenario File 006_JPM_ D as follows:
I MF SIS01A, f:FAIL_TO_INITIATE , (SI Train "A" Fails to AUTO/MANUAL actuate) I MF SIS01B, f:FAIL_TO_INITIATE, (SI Train "A" Fails to AUTO/MANUAL actuate)
* IMF SIS01A, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
IMF RPS01A f:FAILURE_TO_OPEN, AUTO IMF RPS01B f:FAILURE_TO_OPEN, AUTO Event 1: $006_ROD_OUT_ARMED IMF CRF05A d:5 f:2000, H-8 (Ejected Control Rod) 2. Reset simulator to IC
* IMF SIS01B, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
-1 , 10-8amps IR and raise power to 2% and stabilize
* IMF RPS01A f:FAILURE_TO_OPEN, AUTO
. 3. Place in RUN, execute Scenario File 006_JPM_D and allow time to stabilize.
* IMF RPS01B f:FAILURE_TO_OPEN, AUTO
: 4. Ensure actions of GP-003 up to Step 8.4.7 are complete
* Event 1: $006_ROD_OUT_ARMED IMF CRF05A d:5 f:2000, H-8 (Ejected Control Rod)
. 5. Stabilize the plant
: 2. Reset simulator to IC-1, 10-8amps IR and raise power to 2% and stabilize.
.
: 3. Place in RUN, execute Scenario File 006_JPM_D and allow time to stabilize.
: 6. Freeze the Simulator. OR 1. Reset Simulator to Temporary Snap IC
: 4. Ensure actions of GP-003 up to Step 8.4.7 are complete.
-603 (August, 201 5). 2. Scenario File 006_JPM_ D
: 5. Stabilize the plant.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 6. Freeze the Simulator.
-411. 4. Place Simulator in Run when Operator assumes the watch.
OR
: 1. Reset Simulator to Temporary Snap IC-603 (August, 2015).
: 2. Scenario File 006_JPM_ D
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM D                                NUREG 1021, Revision 10


Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 13                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM D NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
STEP 1:       ADJUST control rods as necessary to achieve the following while             CRITICAL continuing with this procedure:                                               STEP RCS Tavg between 547&deg;F and 551&deg;F                                           ___ SAT Reactor Power 3% to less than or equal to 5%.
STEP 1: ADJUST control rods as necessary to achieve the following while continuing with this procedure:
(Step 8.4.8).
RCS Tavg between 547&deg;F and 551&deg;F Reactor Power 3% to less than or equal to 5%.
___ UNSAT STANDARD:       The operator places the Manual Rod Control Switch to the OUT position to raise reactor power between 3-5%, and Tavg between 547&deg;F and 551&deg;F.
(Step 8.4.8). STANDARD: The operator plac es the Manual Rod Control Switch to the OUT position to raise reactor power between 3-5%, and Tavg between 547&deg;F and 551&deg;F
The operator will observe that an event unrelated to the reactor startup is occurring.
. The operator will observe that an event unrelated to the reactor startup is occurring
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 An Ejected Rod will occur shortly after the rod withdrawal has commenced.
.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
An Ejected Rod will occur shortly after the rod withdrawal has commenced.
Shortly afterwards, the following indications will be available to the operator:
Shortly afterwards, the following indications will be available to the operator:
Several RTGB Annunciators alarm Rod Bottom light for Control Rod H
* Several RTGB Annunciators alarm
-8 is LIT SUR is positive and rising Neutron flux is rising RCS pressure is lowering Pzr level is lowering Charging Pump speed is rising
* Rod Bottom light for Control Rod H-8 is LIT
* SUR is positive and rising
* Neutron flux is rising
* RCS pressure is lowering
* Pzr level is lowering
* Charging Pump speed is rising COMMENTS:
2016 Systems - Control Room JPM D                                        NUREG 1021, Revision 10
 
Appendix C                                    Page 6 of 13                      Form ES-C-1 PERFORMANCE INFORMATION STEP 2:      Diagnose LOCA and manually trip Rx                                        CRITICAL STEP STANDARD:    The operator observes RTGB alarms and indications and manually trips the Rx by pressing one of two Rx Trip pushbuttons.                ___ SAT The operator proceeds to EOP-E-0.
___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              The operator may address one or more APPs, enter AOP-001, AOP-016, or AOP-019.
The operator may manually trip the reactor based on Attachment 3, Control Band and Trip Limit Guidance, of OMM-022, Emergency Operating Procedures Users Guide.
Since the first four actions of EOP-E-0 are Immediate Actions, the operator will likely NOT address the procedure (EOP-E-0) until the Immediate Actions are complete.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM D                                    NUREG 1021, Revision 10


COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 6 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                               Page 7 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       CHECK Reactor Trip:
- Control Room JPM D NUREG 1021, Revision 10 STEP 2: Diagnose LOCA and manually trip Rx STANDARD: The operator observes RTGB alarms and indications and manually trips the Rx by pressing one of two Rx Trip pushbuttons
Reactor Trip AND Bypass Breakers  OPEN Rod position indicators  FULLY INSERTED Rod Bottom Lights  ILLUMINATED                                     ___ SAT Neutron Flux  LOWERING (EOP-E-0 Step 1)
. The operator proceeds to EOP
___ UNSAT STANDARD:     The operator observes parameters and determines that the Rx is tripped.
-E-0. EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 4:       CHECK Turbine Trip:
The operator may address one or more APP s , enter AOP-001, A OP-016, or AOP-019.      The operator may manually trip the reactor based on Attachment 3, Control Band and Trip Limit Guidance, of OMM-022, Emergency Operating Procedures User's Guide
Both Turbine Stop Valves  CLOSED All MSR Purge AND Shutoff Valves  CLOSED                           ___ SAT (EOP-E-0 Step 2)
.      Since the first four actions of EOP
STANDARD:     The operator observes parameters and determines that the Turbine   ___ UNSAT is tripped.
-E-0 are Immediate Actions, the operator will likely NOT address the procedure (EOP
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
-E-0) until the Immediate Actions are complete. BOOTH OPERATOR CUE: NONE  COMMENTS:
2016 Systems - Control Room JPM D                              NUREG 1021, Revision 10
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM D NUREG 1021, Revision 10 STEP 3: CHECK Reactor Trip:
Reactor Trip AND Bypass Breakers  OPEN Rod position indicators  FULLY INSERTED Rod Bottom Lights  ILLUMINATED Neutron Flux  LOWERING (EOP-E-0 Step 1)   STANDARD: The operator observes parameters and determines that the Rx is tripped. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 4: CHECK Turbine Trip: Both Turbine Stop Valves  CLOSED All MSR Purge AND Shutoff Valves  CLOSED (EOP-E-0 Step 2)
STANDARD: The operator observes parameters and determines that the Turbine is tripped.


EXAMINER'S CUE:
Appendix C                                 Page 8 of 13                           Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       CHECK Power To AC EMERGENCY BUSSES:
NONE  EXAMINER'S NOTE:
CHECK Bus E1 OR E2  AT LEAST ONE ENERGIZED CHECK Bus E1 AND E2  BOTH ENERGIZED (EOP-E-0 Step 3)                                                         ___ SAT STANDARD:     The operator observes E-1/E-2 bus voltage and determines that both E-1 and E-2 are energized.                                           ___ UNSAT EXAMINERS CUE:             NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
NONE  BOOTH OPERATOR CUE:
STEP 6:       CHECK SI Status:
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM D NUREG 1021, Revision 10 STEP 5: CHECK Power To AC EMERGENCY BUSSES:
CHECK Bus E1 OR E2  AT LEAST ONE ENERGIZED CHECK Bus E1 AND E2  BOTH ENERGIZED (EOP-E-0 Step 3)
STANDARD: The operator observes E-1/E-2 bus voltage and determines that both E-1 and E-2 are energized
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT  STEP 6: CHECK SI Status:
CHECK if SI is actuated:
CHECK if SI is actuated:
SI annunciators  ANY ILLUMINATED OR SI equipment  AUTO STARTED (EOP-E-0 Step 4/4.a)   STANDARD: The operator observes SI annunciators are LIT, and proceeds
SI annunciators  ANY ILLUMINATED                                   ___ SAT OR SI equipment  AUTO STARTED (EOP-E-0 Step 4/4.a)
. EXAMINER'S CUE:
___ UNSAT STANDARD:     The operator observes SI annunciators are LIT, and proceeds.
NONE EXAMINER'S NOTE:
EXAMINERS CUE:             NONE EXAMINERS NOTE:             If the SI annunciators are not lit, the operator will perform the step 4.a RNO (It is expected that the criteria to automatically actuate safety injection will either occur or be close to occurring during the performance of this step).
If the SI annunciators are not lit, the operator will perform the step 4.a RNO (It is expected that the criteria to automatically actuate safety injection will either occur or be close to occurring during the performance of this step).
SI equipment will NOT auto start.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM D                                    NUREG 1021, Revision 10


SI equipment will NOT auto start.
Appendix C                                   Page 9 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:     CHECK BOTH trains of SI actuated:
BOOTH OPERATOR CUE:
SI Pumps  TWO RUNNING RHR Pumps  BOTH RUNNING                                               ___ SAT (EOP-E-0 Step 4.b)
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STANDARD:     The operator observes the A and C SI Pumps Green status lights   ___ UNSAT are LIT, and Red status lights are EXTINGUISHED.
- Control Room JPM D NUREG 1021, Revision 10 STEP 7: CHECK BOTH trains of SI actuated:
The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED The operator proceeds to the RNO.
SI Pumps  TWO RUNNING RHR Pumps  BOTH RUNNING (EOP-E-0 Step 4.b)   STANDARD: The operator observes the "A" and "C" SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED
EXAMINERS CUE:                NONE EXAMINERS NOTE:                SI equipment will NOT auto start.
.
BOOTH OPERATOR CUE:            NONE COMMENTS:
The operator observes the "A" and "B" RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED The operator proceeds to the RNO.
2016 Systems - Control Room JPM D                                NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                                   Page 10 of 13                       Form ES-C-1 PERFORMANCE INFORMATION STEP 8:     Manually ACTUATE SI by depressing BOTH SI pushbuttons.
NONE  EXAMINER'S NOTE:
(EOP-E-0 Step 4.b RNO)                                                       CRITICAL STEP STANDARD:     The operator presses BOTH SI pushbuttons.                                 ___ SAT The operator observes the A and C SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
SI equipment will NOT auto start.
___ UNSAT The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
BOOTH OPERATOR CUE:
(Alternate Path).
NONE  COMMENTS:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               Upon completion of the EOP-E-0 Immediate Actions the operator may obtain EOP-E-0 and verify the Immediate Actions, BEFORE proceeding.
___ SAT    ___ UNSAT Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
If so, the operator will likely review the EOP-E-0 Foldout Page, as well.
- Control Room JPM D NUREG 1021, Revision 10 STEP 8: Manually ACTUATE SI by depressing BOTH SI pushbuttons.
BOOTH OPERATOR CUE:             NONE COMMENTS:
(EOP-E-0 Step 4.b RNO
2016 Systems - Control Room JPM D                                       NUREG 1021, Revision 10
)   STANDARD: The operator presses BOTH SI pushbuttons
. The operator observes the "A" and "C" SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
The operator observes the "A" and "B" RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
(Alternate Path)
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
Upon completion of the EOP
-E-0 Immediate Actions the operator may obtain EOP
-E-0 and verify the Immediate Actions, BEFORE proceeding.
If so, the operator will likely review the EOP
-E-0 Foldout Page, as well.
BOOTH OPERATOR CUE:
NONE COMMENTS:         CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 11 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM D NUREG 1021, Revision 10 STEP 9: Manually start both SI Pumps.
(Step 5.3.1.c of OMM
-022)  STANDARD: The operator places the "A" SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
The operator places the "C" SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This action may be taken at the time that the operator realizes that the manual SI actuation pushbuttons have failed to start the SI equipment using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure


of automatic systems to perform or respond correctly.)       If the operator addresses EOP
Appendix C                                    Page 11 of 13                    Form ES-C-1 PERFORMANCE INFORMATION STEP 9:      Manually start both SI Pumps.                                            CRITICAL (Step 5.3.1.c of OMM-022)                                                    STEP
-E-0 to verify the Immediate Actions upon completion of Step 4, and the SI Pumps have NOT been started, the operator will address Attachment 1 (With the BOP out of the Control Room) and manually start the SI Pumps (Step 1 and Step 1 RNO
___ SAT STANDARD:      The operator places the A SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
).
___ UNSAT The operator places the C SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
BOOTH OPERATOR CUE:
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This action may be taken at the time that the operator realizes that the manual SI actuation pushbuttons have failed to start the SI equipment using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.)
NONE COMMENTS:       CRITICAL STEP
If the operator addresses EOP-E-0 to verify the Immediate Actions upon completion of Step 4, and the SI Pumps have NOT been started, the operator will address Attachment 1 (With the BOP out of the Control Room) and manually start the SI Pumps (Step 1 and Step 1 RNO).
___ SAT    ___ UNSAT          Terminating Cue:
BOOTH OPERATOR CUE:           NONE COMMENTS:
Evaluation on this JPM is complete.
Terminating Cue:               Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM D                                    NUREG 1021, Revision 10


Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 12 of 13                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM D Examinees Name:
- Control Room JPM D NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM D   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,081: Line 797:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM D                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is stabilized at 2% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The RCS is at normal operating temperature and pressure.
The plant is stabilized at 2% power.
* A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
The RCS is at normal operating temperature and pressure. A plant startup is in progress IAW GP
* You are the OATC.
-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7. You are the OATC.
* The BOP is temporarily outside the Control Room.
The BOP is temporarily outside the Control Room.
INITIATING CUE:     The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.
 
NUREG 1021, Revision 10
INITIATING CUE:
The CRS has directed you to pull control rods to stabilize reactor power between 3
-5% by continuing with Step 8.4.8 of GP
-003.
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM E (Rev_011116) NUREG 1021, Revision 10


SIM JPM E     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM E Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM E (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 18 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 18                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- Control Room JPM E NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Transfer to Long Term Recirculation     JPM No.:     2016 Systems -
Transfer to Long Term Recirculation JPM No.: 2016 Systems  
Control Room JPM E (Alternate Path)
- Control Room JPM E (Alternate Path)
K/A  
K/A  


==Reference:==
==Reference:==
EPE 011 EA1.11 (4.2/4.2)
EPE 011 EA1.11 (4.2/4.2)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator       X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* A large break LOCA has occurred.
: 1. Initial Conditions:
* The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
A large break LOCA has occurred
* RHR Cold Leg Recirculation flow is 3000 gpm.
. The plant is currently on Cold Leg Recirculation IAW EOP
Initiating Cue:             The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.
-ES-1.3, Transfer to Cold Leg Recirculation
THIS IS A TIME CRITICAL JPM Task Standard:             The operator will align for Long Term Recirculation per EOP-ES-1.4, and align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.
. RHR Cold Leg Recirculation   Initiating Cue:
Required Materials:         None General  
The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation
. THIS IS A TIME CRITICAL JPM Task Standard:
The operator will align for Long Term Recirculation per EOP
-ES-1.4, and align only the B RHR Pump for operation when it is determined that SI
-863A has failed to OPEN
. Required Materials:
None   General  


==References:==
==References:==
EOP-ES-1.3 (Transfer to Cold Leg Recirculation), Rev 0 2016 Systems - Control Room JPM E                                          NUREG 1021, Revision 10


E OP-ES-1.3 (Transfer to Cold Leg Recirculation), Rev 0 Appendix C Page 3 of 18 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                     Page 3 of 18                       Form ES-C-1 Job Performance Measure Worksheet EOP-ES-1.4 (Transfer to Long Term Recirculation), Rev 0 OMM-22 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:             Handout 1: Blank Copy of EOP-ES-1.4.
- Control Room JPM E NUREG 1021, Revision 10 EOP-ES-1.4 (Transfer to Long Term Recirculation), Rev 0 OMM-22 (Emergency Operating Procedures User's Guide), Rev 45   Handouts: Handout 1: Blank Copy of EOP
Time Critical Task:   YES - Siemens fuel Analysis for LBLOCA, ESR 99- 00273 indicates that the operator must Restore Core cooling flow within 6 minutes when transferring to Piggy-Back Mode (Maximum of 6 minutes of no flow when transferring to the Piggy-Back Mode)
-ES-1.4. Time Critical Task:
Validation Time:       10 minutes Critical Step Justification Step 3       This step is critical because placing the A RHR Pump Control Switch to STOP is necessary to align for Long Term Recirculation per EOP-ES-1.4.
YES - Siemen's fuel Analysis for LBLOCA, ESR 99
Step 4       This step is critical because placing the RHR-759A and 759B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.
- 00273 indicates that the operator must Restore Core cooling flow within 6 minutes when transferring to Piggy
Step 5       This step is critical because placing the SI-863B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.
-Back Mode (Maximum of 6 minutes of no flow when transferring to the Piggy
Step 6       This step is critical because placing the SI-866A Control Switch to OPEN is OPEN is necessary to align for Long Term Recirculation per EOP-ES-1.4.
-Back Mode)
Step 7       This step is critical because placing the SI-870A and B Control Switches to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.
Validation Time:
Step 11       This step is critical because placing the A or C SI Pump Control Switch to START is necessary to align for Long Term Recirculation per EOP-ES-1.4.
1 0 minutes       Critical Step Justification Step 3 This step is critical because placing the A RHR Pump Control Switch to STOP is necessary to align for Long Term Recirculation per EOP
Alternate Path Critical Step Justification Step 10       This step is critical because placing the B RHR Pump Control Switch to START is necessary to align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.
-ES-1.4. Step 4 This step is critical because placing the RHR
2016 Systems - Control Room JPM E                                    NUREG 1021, Revision 10
-759A and 759B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 5 This step is critical because placing the SI
-863B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 6 This step is critical because placing the SI
-866A Control Switch to OPEN is OPEN is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 7 This step is critical because placing the SI
-870A and B Control Switches to CLOSE is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 11 This step is critical because placing the A or C SI Pump Control Switch to START is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Alternate Path Critical Step Justification Step 10 This step is critical because placing the B RHR Pump Control Switch to START is necessary to align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN


Appendix C Page 4 of 18 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                 Page 4 of 18                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM E NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ E as follows:
: 1. Construct Scenario File 006_JPM_ E as follows:
IOR diSISAAI201 f:CLOSE (RHR Loop Recirc SI-863A fails to OPEN)
* IOR diSISAAI201 f:CLOSE (RHR Loop Recirc SI-863A fails to OPEN)
: 2. Reset simulator to IC
: 2. Reset simulator to IC-28, (Cold Leg Recirculation).
-28 , (Cold Leg Recirculation)
: 3. Place in RUN, execute Scenario File 006_JPM_E and allow time to stabilize.
.
: 4. Perform the following:
: 3. Place in RUN
* Stop A Primary Water Pump and place in AUTO
, execute Scenario File 006_JPM_E and allow time to stabilize
* CLOSE FCV-114A and place in AUTO
. 4. Perform the following:
* Place Controller FCV-114A in AUTO
Stop "A" Primary Water Pump and place in AUTO CLOSE FCV-114A and place in AUTO Place Controller FCV
: 5. Acknowledge alarms on RR-1 and APP-036.
-114A in AUTO
: 6. Freeze the Simulator.
: 5. Acknowledge alarms on RR
OR
-1 and APP-036. 6. Freeze the Simulator
: 1. Reset Simulator to Temporary Snap IC-604 (August, 2015).
. OR 1. Reset Simulator to Temporary Snap IC
: 2. Place Simulator in Run, acknowledge alarms on RR-1 and APP-036, and Freeze Simulator.
-604 (August, 201 5). 2. Place Simulator in Run, acknowledge alarms on RR
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
-1 and APP-036, and Freeze Simulator.
: 4. Place Simulator in Run when operator assumes the watch.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
2016 Systems - Control Room JPM E                              NUREG 1021, Revision 10
-411. 4. Place Simulator in Run when operator assumes the watch.


Appendix C Page 5 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 5 of 18                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM E NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
NOTE: FOLDOUT for EOPES1.4 is in effect.
NOTE: FOLDOUT for EOPES1.4 is in effect.
STEP 1: CHECK Condition Below  ANY PRESENT APP001D4, RHR PIT A HIHI LEVEL  ILLUMINATED OR APP001D5, RHR PIT B HIHI LEVEL  ILLUMINATED OR EITHER RHR Pit level indication  GREATER THAN 24 INCHES PERFORM the following:
STEP 1:       CHECK Condition Below  ANY PRESENT APP001D4, RHR PIT A HIHI LEVEL  ILLUMINATED OR                                                                   ___ SAT APP001D5, RHR PIT B HIHI LEVEL  ILLUMINATED OR EITHER RHR Pit level indication  GREATER THAN 24 INCHES
___ UNSAT PERFORM the following:
MONITOR RHR Pit indications.
MONITOR RHR Pit indications.
IF ANY of the RHR Pit level conditions noted occur, THEN GO TO EPP24, Isolation Of Leakage In The RHR Pump Pit.
IF ANY of the RHR Pit level conditions noted occur, THEN GO TO EPP24, Isolation Of Leakage In The RHR Pump Pit.
GO TO Step 3. (Step 1 and 1 RNO). STANDARD: The operator reads the Note, and proceeds.
GO TO Step 3.
(Step 1 and 1 RNO).
STANDARD:       The operator reads the Note, and proceeds.
The operator reviews the Foldout Page Criteria.
The operator reviews the Foldout Page Criteria.
The operator observes APP-001-D4 and D5 are extinguished, and that LI-615 A and B are both less than 24 inches; and determines that there is no RHR Pit leakage and proceeds to Step 3.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM E                                    NUREG 1021, Revision 10


The operator observes APP
Appendix C                                 Page 6 of 18                     Form ES-C-1 PERFORMANCE INFORMATION STEP 2:       DETERMINE Needed RHR Alignment:
-001-D4 and D5 are extinguished, and that LI-615 A and B are both less than 24 inches; and determines that there is no RHR Pit leakage and proceeds to Step 3
CHECK RHR System alignment  IN PIGGYBACK MODE
.
___ SAT OBSERVE the CAUTION prior to Step 5 AND GO TO Step 5.
EXAMINER'S CUE:
(Step 3 and 3 RNO.)
NONE  EXAMINER'S NOTE:
___ UNSAT STANDARD: The operator observes SI-863A and B Green status lights are LIT, and Red status lights are OFF (Or equivalent) and determines that RHR is NOT in PIGGY-BACK Mode and proceeds to the Caution prior to Step 5.
NONE  BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE  COMMENTS:              ___ SAT    ___ UNSAT Appendix C Page 6 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
CAUTION: Steps 5 through 8 must be performed without delay to minimize the time without flow through the core.
- Control Room JPM E NUREG 1021, Revision 10 STEP 2: DETERMINE Needed RHR Alignment:
2016 Systems - Control Room JPM E                                NUREG 1021, Revision 10
CHECK RHR System alignment  IN PIGGYBACK MODE OBSERVE the CAUTION prior to Step 5 AND GO TO Step 5.
(Step 3 and 3 RNO
.) STANDARD: The operator observes SI
-863A and B Green status lights are LIT, and Red status lights are OFF (Or equivalent) and determines that RHR is NOT in P I GG Y-BACK Mode and proceeds to the Caution prior to Step 5. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:  


___ SAT    ___ UNSAT   CAUTION: Steps 5 through 8 must be performed without delay to minimize the time without flow through the core.
Appendix C                                  Page 7 of 18                      Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 3:      ALIGN Equipment To Obtain The Following Conditions:                        STEP STOP ALL RHR Pumps (Step 5/5.a)
STANDARD:      The operator reads the Caution, and proceeds.                          ___ SAT The operator places the A RHR Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light   ___ UNSAT is OFF.
The operator observes the B RHR Pump Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:              NONE EXAMINERS NOTE:             The operator will likely read through Steps 5-8 ahead of time before performing actions.
APP-001-A7, RHR HX LO FLOW, is an expected alarm.
BOOTH OPERATOR CUE:          NONE COMMENTS:
TIME CRITICAL START TIME: ________
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


Appendix C Page 7 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 8 of 18                       Form ES-C-1 PERFORMANCE INFORMATION STEP 4:     ALIGN Equipment To Obtain The Following Conditions:                       CRITICAL CLOSE RHR HX Discharge Valves                                                STEP RHR759A RHR759B (Step 5/5.b)                                                             ___ SAT STANDARD:     The operator places the RHR-759A Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light
- Control Room JPM E NUREG 1021, Revision 10 STEP 3: ALIGN Equipment To Obtain The Following Conditions:
___ UNSAT is OFF.
STOP ALL RHR Pumps (Step 5/5.a) STANDARD: The operator reads the Caution, and proceeds.
The operator places the RHR-759B Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


The operator places the "A" RHR Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF. The operator observes the "B" RHR Pump Green status light is LIT and the Red status light is OFF
Appendix C                                       Page 9 of 18                       Form ES-C-1 PERFORMANCE INFORMATION STEP 5:         ALIGN Equipment To Obtain The Following Conditions:                       CRITICAL OPEN RHR Loop Recirc Valves                                                 STEP SI863A SI863B                                                                   ___ SAT (Step 5/5.c)
.
STANDARD:         The operator places the SI-863A Control Switch to OPEN and
EXAMINER'S CUE:
___ UNSAT observes that the Green status light remains LIT and the Red status light remains OFF (Alternate Path - mitigated in subsequent steps).
NONE EXAMINER'S NOTE:
The operator places the SI-863B Control Switch to OPEN and observes that the Red status light is LIT and the Green status light is OFF.
The operator will likely read through Steps 5-8 ahead of time before performing actions.
EXAMINERS CUE:                 If operator reports the failure of SI-863A to OPEN, acknowledge as the CRS.
APP-001-A7, RHR HX LO FLOW, is an expected alarm. BOOTH OPERATOR CUE:
EXAMINERS NOTE:                 The operator should not stop the procedure, the procedure is designed to subsequently mitigate the failure of SI-863A to OPEN.
NONE  COMMENTS:    TIME CRITICAL START TIME: ________
The operator may place the SI-863A Control Switch back to CLOSE.
CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 8 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
BOOTH OPERATOR CUE:              NONE COMMENTS:
- Control Room JPM E NUREG 1021, Revision 10 STEP 4: ALIGN Equipment To Obtain The Following Conditions:
CAUTION: Opening SI866A AND SI866B, Hot Leg Injection Valves, with only one SI pump running will result in SI Pump runout.
CLOSE RHR HX Discharge Valves RHR759A RHR759B (Step 5/5.b)  STANDARD: The operator places the RHR
2016 Systems - Control Room JPM E                                        NUREG 1021, Revision 10
-759A Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF. The operator places the RHR
-759B Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 9 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 STEP 5: ALIGN Equipment To Obtain The Following Conditions:
OPEN RHR Loop Recirc Valves SI863A SI863B (Step 5/5.c) STANDARD: The operator places the SI
-863A Control Switch to OPEN and observes that the Green status light remains LIT and the Red status light remains OFF (Alternate Path
- mitigated in subsequent steps). The operator places the SI
-863B Control Switch to OPEN and observes that the Red status light is LIT and the Green status light is OFF. EXAMINER'S CUE:
If operator reports the failure of SI
-863 A to OPEN, acknowledge as the CRS.
EXAMINER'S NOTE:
The operator should not stop the procedure, the procedure is designed to subsequently mitigate the failure of SI
-863A to OPEN.


The operator may place the SI
Appendix C                                Page 10 of 18                        Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      ALIGN For Hot Leg Recirculation:                                          CRITICAL OPEN SI866A, LOOP 3 HOT LEG INJ Valve                                      STEP (Step 6/6.a)
-863A Control Switch back to CLOSE.
STANDARD:      The operator reads the Caution, and proceeds.                          ___ SAT The operator places the key-operated SI-866A Control Switch to OPEN and observes that SI-866A Red status light is LIT and the          ___ UNSAT Green status light is OFF.
BOOTH OPERATOR CUE:
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE COMMENTS:      CRITICAL STEP ___ SAT   ___ UNSAT   CAUTION: Opening SI866A AND SI866B, Hot Leg Injection Valves, with only one SI pump running will result in SI Pump runout.
STEP 7:      ALIGN For Hot Leg Recirculation:                                          CRITICAL CLOSE BIT Outlet Valves:                                                    STEP SI870A SI870B (Step 6/6.b)                                                              ___ SAT STANDARD:      The operator places the SI-870A Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light
___ UNSAT is OFF.
The operator places the SI-870B Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:               NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


Appendix C Page 10 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 11 of 18                   Form ES-C-1 PERFORMANCE INFORMATION CAUTION: RHR759A AND RHR759B, RHR HX Discharge Valves, are closed. The RHR Pumps will run deadheaded AND are subject to damage UNTIL the SI pumps are started.
- Control Room JPM E NUREG 1021, Revision 10 STEP 6: ALIGN For Hot Leg Recirculation:
STEP 8:       ESTABLISH Hot Leg Recirculation Flow:
OPEN SI866A, LOOP 3 HOT LEG INJ Valve (Step 6/6.a) STANDARD: The operator reads the Caution, and proceeds.
CHECK RHR759A, RHR HX A DISCH Valve CLOSED                          ___ SAT (Step 7/7.a)
The operator places the key-operated SI-866A Control Switch to OPEN and observes that SI
STANDARD:       The operator reads the Caution, and proceeds.
-866A Red status light is LIT and the Green status light is OFF.
___ UNSAT The operator observes the RHR-759A Green status light is LIT, and Red status light is OFF.
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 9:       ESTABLISH Hot Leg Recirculation Flow:
NONE BOOTH OPERATOR CUE:
CHECK SI863A, RHR LOOP RECIRC Valve  OPEN (Step 7/7.b)
NONE COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 7: ALIGN For Hot Leg Recirculation:
___ SAT STANDARD:       The operator observes the SI-863A Green status light is LIT and determines that SI-863A is CLOSED (Alternate Path), and proceeds to Step 7.b RNO.
CLOSE BIT Outlet Valves:
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               The operator has previously attempted to OPEN this valve, and it failed to OPEN. This procedure will address the compensatory actions now.
SI870A SI870B (Step 6/6.b) STANDARD: The operator places the SI
BOOTH OPERATOR CUE:             NONE COMMENTS:
-870A Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF. The operator places the SI
2016 Systems - Control Room JPM E                                 NUREG 1021, Revision 10
-870B Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 11 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM E NUREG 1021, Revision 10 CAUTION: RHR759A AND RHR759B, RHR HX Discharge Valves, are closed. The RHR Pumps will run deadheaded AND are subject to damage UNTIL the SI pumps are started.
STEP 8: ESTABLISH Hot Leg Recirculation Flow:
CHECK RHR759A, RHR HX A DISCH Valve  CLOSED (Step 7/7.a)  STANDARD: The operator reads the Caution, and proceeds.
The operator observes the RHR-759A Green status light is LIT, and Red status light is OFF.


EXAMINER'S CUE:
Appendix C                                 Page 12 of 18                       Form ES-C-1 PERFORMANCE INFORMATION STEP 10:     ESTABLISH Hot Leg Recirculation Flow:                                     CRITICAL PERFORM the following:                                                     STEP CLOSE RHR759B, RHR HX B DISCH Valve.
NONE  EXAMINER'S NOTE:
OPEN SI863B, RHR LOOP RECIRC Valve.                                     ___ SAT CLOSE SI863A, RHR LOOP RECIRC Valve.
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT    STEP 9: ESTABLISH Hot Leg Recirculation Flow:
CHECK SI863A, RHR LOOP RECIRC Valve  OPEN (Step 7/7.b)  STANDARD: The operator observes the SI
-863A Green status light is LIT and determines that SI
-863A is CLOSED (Alternate Path), and proceeds to Step 7.b RNO
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
The operator has previously attempted to OPEN this valve, and it failed to OPEN. This procedure will address the compensatory actions now.
BOOTH OPERATOR CUE:
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 12 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 STEP 10: ESTABLISH Hot Leg Recirculation Flow:
PERFORM the following:
CLOSE RHR759B, RHR HX B DISCH Valve.
OPEN SI863B, RHR LOOP RECIRC Valve.
CLOSE SI863A, RHR LOOP RECIRC Valve.
START RHR Pump B.
START RHR Pump B.
GO TO Step 8.
GO TO Step 8.
(Step 7/7.b RNO)  STANDARD: The operator observes the RHR-759B Green status light is LIT and the Red status light is OFF.
(Step 7/7.b RNO)                                                         ___ UNSAT STANDARD:      The operator observes the RHR-759B Green status light is LIT and the Red status light is OFF.
The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.
The operator places the SI-863A Control Switch in the CLOSE position and observes the Green status light is LIT and the Red status light is OFF.
The operator places the B RHR Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
The operator proceeds to Step 8.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10
 
Appendix C                                    Page 13 of 18                Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 11:    START One SI Pump                                                        STEP (Step 8)
STANDARD:      The operator places the A or C SI Pump Control Switch to      ___ SAT START, and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
TIME CRITICAL STOP TIME: ________ (Less than 6 Minutes)
STEP 12:    CHECK Indicated Flow On The Appropriate Flow Meters:
PATH            FLOW METERS SI-866B          FI-940, SI Hot Leg Header Flow FI-933, SI Loop 2 Hot Leg Flow                    ___ SAT SI-866A          FI-940, SI Hot Leg Header Flow FI-932, SI Loop 3 Hot Leg Flow (Step 9)
___ UNSAT STANDARD:      The operator observes FI-940 and determines flow to be 640-680 gpm.
The operator observes FI-932 and determines flow to be 580-600 gpm.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM E                                NUREG 1021, Revision 10
 
Appendix C                                  Page 14 of 18                        Form ES-C-1 PERFORMANCE INFORMATION CAUTION: The operator should be sure that cavitation is taking place prior to transitioning to steps that attempt to mitigate screen blockage. The actions taken are beyond design basis AND should NOT be taken unless warranted. Stable indication on FI605 may also be used as an aid in determining if cavitation is present in subsequent steps when RHR759A OR RHR759B AND RHR 744A OR RHR744B are open.
STEP 13:        CHECK RHR Pump Discharge Pressure  STABLE PI602A PI602B                                                                    ___ SAT (Step 10)
STANDARD:        The operator reads the caution, and proceeds.                          ___ UNSAT The operator observes PI-602B to be 160 psig.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10
 
Appendix C                                  Page 15 of 18                      Form ES-C-1 PERFORMANCE INFORMATION STEP 14:    DETERMINE If Flow Should Be Established To Cold Legs as follows:
CHECK RCS pressure  LESS THAN 275 PSIG CHECK RHR Cold Leg Recirculation flow indicated in EOPES1.3,          ___ SAT Transfer To Cold Leg Recirculation CHECK CV Sump Screen status  HAS REMAINED CLEAR DURING RECIRCULATION
___ UNSAT CHECK ALL of the following AVAILABLE
* FI605, RHR TOTAL FLOW
* RHR759A AND RHR759B, RHR HX Discharge Valves
* SI863A AND SI863B, RHR LOOP RECIRC Valves
* RHR Pumps A AND B (Step 11a-d and 11.d RNO)
STANDARD:     The operator observes PR-444 (or equivalent) to be 5 psig.
The operator recalls that 3000 gpm of flow existed in the Cold Legs before this procedure started.
The operator observes RHR discharge pressure to be steady at 150 psig (or equivalent), and determines that no RHR Pump cavitation is occurring.
The operator observes 0 gpm on FI-605.
The operator observes the RHR-759A Green status light is LIT, and the Red status light is OFF.
The operator observes the RHR-759B Green status light is LIT, and the Red status light is OFF.
The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.
The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.
The operator places the SI
The operator observes the SI-863A Green status light is LIT and the Red status light is OFF.
-863A Control Switch in the CLOSE position and observes the Green status light is LIT and the Red status light is OFF.
The operator recognizes that SI-863A is NOT available, and proceeds to Step 16.
The operator places the "B" RHR Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF. The operator proceeds to Step 8.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
EXAMINER'S CUE:
2016 Systems - Control Room JPM E                                   NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE  BOOTH OPERATOR CUE:
Appendix C                                 Page 16 of 18                     Form ES-C-1 PERFORMANCE INFORMATION STEP 15:     CHECK Time Since Hot Leg Recirculation Established  GREATER THAN 16 HOURS WHEN 16 hours have elapsed, THEN GO TO Step 17.                       ___ SAT (Step 16 and 16 RNO)
NONE  COMMENTS:        CRITICAL STEP
STANDARD:     The operator recognizes that the procedure must be stopped for 16 hours, and reports that the procedure must be placed on hold.       ___ UNSAT EXAMINERS CUE:             Another operator will continue with this procedure EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 13 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Terminating Cue:             Evaluation on this JPM is complete.
- Control Room JPM E NUREG 1021, Revision 10 STEP 11: START One SI Pump (Step 8)  STANDARD: The operator places the "A" or "C" SI Pump Control Switch to START, and observes the Red status light is LIT and the Green status light is OFF
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        TIME CRITICAL STOP TIME: ________ (Less than 6 Minutes)
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 12: CHECK Indicated Flow On The Appropriate Flow Meters:
PATH FLOW METERS SI-866B FI-940, SI Hot Leg Header Flow FI-933, SI Loop 2 Hot Leg Flow SI-866A FI-940, SI Hot Leg Header Flow FI-932, SI Loop 3 Hot Leg Flow (Step 9)  STANDARD: The operator observes FI
-940 and determines flow to be 6 4 0-680 gpm. The operator observes FI
-932 and determines flow to be 580-600 gpm. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 14 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 CAUTION: The operator should be sure that cavitation is taking place prior to transitioning to steps that attempt to mitigate screen blockage. The actions taken are beyond design basis AND should NOT be taken unless warranted. Stable indication on FI605 may also be used as an aid in determining if cavitation is present in subsequent steps when RHR759A OR RHR759B AND RHR744A OR RHR744B are open.
STEP 13: CHECK RHR Pump Discharge Pressure  STABLE  PI602A PI602B (Step 10)  STANDARD: The operator reads the caution, and proceeds.
The operator observes PI
-602B 60 psig. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT Appendix C Page 15 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM E NUREG 1021, Revision 10 STEP 14: DETERMINE If Flow Should Be Established To Cold Legs as follows:
CHECK RCS pressure  LESS THAN 275 PSIG CHECK RHR Cold Leg Recirculation flow indicated in EOPES1.3, Transfer To Cold Leg Recirculation CHECK CV Sump Screen status  HAS REMAINED CLEAR DURING RECIRCULATION CHECK ALL of the following  AVAILABLE  FI605, RHR TOTAL FLOW RHR759A AND RHR759B, RHR HX Discharge Valves SI863A AND SI863B, RHR LOOP RECIRC Valves RHR Pumps A AND B (Step 11a-d and 11.d RNO
)  STANDARD: The operator observes PR-444 (or equivalent) to be 5 psig.
The operator recalls that 3000 gpm of flow existed in the Cold Legs before this procedure started
. The operator observes RHR discharge pressure to be steady at 150 psig (or equivalent), and determines that no RHR Pump cavitation is occurring.
The operator observes 0 gpm on FI
-605. The operator observes the RHR
-759 A Green status light is LIT, and the Red status light is OFF.
The operator observes the RHR
-759B Green status light is LIT, and the Red status light is OFF.
The operator observes the SI
-863B Red status light is LIT and the Green status light is OFF.
The operator observes the SI
-863A Green status light is LIT and the Red status light is OFF.
The operator recognizes that SI
-863A is NOT available, and proceeds to Step 16
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 16 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 STEP 15: CHECK Time Since Hot Leg Recirculation Established  GREATER THAN 16 HOURS WHEN 16 hours have elapsed, THEN GO TO Step 17.
(Step 16 and 16 RNO
STANDARD: The operator recognizes that the procedure must be stopped for 16 hours, and reports that the procedure must be placed on hold
. EXAMINER'S CUE:
Another operator will continue with this procedure EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:             ___ SAT    ___ UNSAT          Terminating Cue: Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


Appendix C Page 17 of 18 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 17 of 18                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM E Examinees Name:
- Control Room JPM E NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM E   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,354: Line 999:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM E                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A large break LOCA has occurred.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
A large break LOCA has occurred. The plant is currently on Cold Leg Recirculation IAW EOP
* RHR Cold Leg Recirculation flow is 3000 gpm.
-ES-1.3, Transfer to Cold Leg Recirculation.         INITIATING CUE:
INITIATING CUE:     The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.
The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation
THIS IS A TIME CRITICAL JPM NUREG 1021, Revision 10
. THIS IS A TIME CRITICAL JPM
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM F (Rev_011116) NUREG 1021, Revision 10        


SIM JPM F     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM F Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM F (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                           Page 2 of 15                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM F NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Fill a Safety Injection Accumulator       JPM No.:     2016 Systems - Control Room JPM F K/A  
Fill a Safety Injection Accumulator JPM No.: 2016 Systems  
- Control Room JPM F     K/A  


==Reference:==
==Reference:==
006 A4.02 (4.0/3.8)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing:
Simulated Performance:                                        Actual Performance:        X Classroom                Simulator        X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* The plant is at 100% power.
* SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
* You are the Licensed Dedicated Operator referred to in OP-202.
Initiating Cue:            The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.
Task Standard:              The operator will refill SI Accumulator C to reset the low level alarm without exceeding specified limits.
Required Materials:        None General


0 06 A 4.0 2 (4.0/3.8)    Examinee:  NRC Examiner:
==References:==
Facility Evaluator:
OP-202 (Safety Injection and Containment Vessel Spray System), Rev 98 APP-002 (Engineering Safeguards), Rev 70 2016 Systems - Control Room JPM F                                          NUREG 1021, Revision 10
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
The plant is at 100% power.
SI ACCUM C HI/LO LVL (APP
-002-E4) alarm has been received and actions have been reviewed by the RO
. You are the Licensed Dedicated Operator referred to in OP
-202. Initiating Cue:
The CRS has briefed and directed you to fill SI Accumulator "C" to reset the low level alarm IAW OP
-202, Section 5.2.1. Task Standard:
The operator will refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits.
Required Materials:
None  General


==References:==
Appendix C                                  Page 3 of 15                  Form ES-C-1 Job Performance Measure Worksheet Handouts:           Handout 1: OP-202, Section 5.2.1 marked up as follows:
Step 5.2.1.1.a - Initialed Step 5.2.1.1.b Bullet 1 - Initialed Step 5.2.1.1.b Bullet 2 - NAd Step 5.2.1.1.c - NAd Step 5.2.1.1.d - Initialed Step 5.2.1.1.e (1) and (2) - NAd Time Critical Task:  NO Validation Time:    8 minutes 2016 Systems - Control Room JPM F                              NUREG 1021, Revision 10


OP-202 (Safety Injection and Containment Vessel Spray System), Rev 9 8 APP-002 (Engineering Safeguards), Rev 70
Appendix C                                    Page 4 of 15                          Form ES-C-1 Job Performance Measure Worksheet Critical Step Justification Step 2      This step is critical because placing the SI-869 Normal/Defeat switch in the NORMAL position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Control power must be aligned to the valve to allow for RTGB operation).
Step 4      This step is critical because placing the SI-869 control switch to the OPEN position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Open valve to align flowpath to SI Accumulator).
Step 5      This step is critical because placing an SI Pump control switch to the START position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Provides adequate flow and pressure to fill the SI Accumulator).
Step 7      This step is critical because placing the SI-851C control switch to the OPEN position, and then closing it within limits is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (align fill path to appropriate accumulator and to secure filling at desired level).
Step 8     This step is critical because placing the operating SI Pump control switch to STOP and returning it to the MID position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (secure fill source and prevent operating on recirculation for an extended period).
Step 10    This step is critical because placing the SI-869 control switch to the CLOSED position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (realign SI-869 to its normal Mode 1 alignment).
Step 11    This step is critical because placing the SI-869 Normal/Defeat switch in the DEFEAT position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (properly align SI-869 Control Power Defeat Switch as required for Mode 1).
2016 Systems - Control Room JPM F                                      NUREG 1021, Revision 10


Appendix C Page 3 of 15 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
Appendix C                                   Page 5 of 15                 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM F NUREG 1021, Revision 10 Handouts: Handout 1:
: 1. Reset simulator to IC-5, 100% Power.
OP-202, Section 5.2.1 marked up as follows:
Step 5.2.1.1.a
- Initialed Step 5.2.1.1.b Bullet 1
- Initialed Step 5.2.1.1.b Bullet 2 - NA'd Step 5.2.1.1.c
- NA'd Step 5.2.1.1.d
- Initialed Step 5.2.1.1.e (1) and (2)
- NA'd  Time Critical Task:
NO  Validation Time:
8 minutes Appendix C Page 4 of 15 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 Critical Step Justification Step 2 This step is critical because placing the SI-869 Normal/Defeat switch in the NORMAL position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (Control power must be aligned to the valve to allow for RTGB operation)
. Step 4 This step is critical because placing the SI-869 control switch to the OPEN position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (Open valve to align flowpath to SI Accumulator)
. Step 5 This step is critical because placing an SI Pump control switch to the START position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (Provides adequate flow and pressure to fill the SI Accumulator)
. Step 7 This step is critical because placing the SI
-851C control switch to the OPEN position, and then closing it within limits is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (align fill path to appropriate accumulator and to secure filling at desired level)
. Step 8 This step is critical because placing the operating SI Pump control switch to STOP and returning it to the MID position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (secure fill source and prevent operating on recirculation for an extended period)
. Step 10 This step is critical because placing the SI
-869 control switch to the CLOSED position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (realign SI
-869 to its normal Mode 1 alignment)
. Step 11 This step is critical because placing the SI
-869 Normal/Defeat switch in the DEFEAT position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (properly align SI
-869 Control Power Defeat Switch as required for Mode 1)
.
Appendix C Page 5 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Reset simulator to IC
-5 , 100% Power.
: 2. Lower the C SI Accumulator Level as follows:
: 2. Lower the C SI Accumulator Level as follows:
OPEN SI-852C WHEN APP-002-B4, SI ACCUM C HI/LO LVL, is LIT, CLOSE SI
* OPEN SI-852C
-852C Check C SI Accumulator level at 64%
* WHEN APP-002-B4, SI ACCUM C HI/LO LVL, is LIT, CLOSE SI-852C
* Check C SI Accumulator level at 64%
: 3. Place in RUN and allow time to stabilize.
: 3. Place in RUN and allow time to stabilize.
: 4. Freeze the Simulator
: 4. Freeze the Simulator.
.
OR
OR 1. Reset Simulator to Temporary Snap IC
: 1. Reset Simulator to Temporary Snap IC-605 (August, 2015).
-605 (August, 201 5). 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
-411. 3. Place Simulator in Run when Operator assumes the watch.
: 3. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM F                              NUREG 1021, Revision 10
 
Appendix C                                    Page 6 of 15                      Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
START TIME:
STEP 1:          Check open SI-856A, SI PUMP RECIRC and SI-856B, SI PUMP RECIRC (Steps 5.2.1.2.a and b).
___ SAT STANDARD:        The operator observes SI-856A and B RED lights are LIT and the Green status lights are OFF.
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                The operator may use ERFIS to monitor SI Accumulator C level. (ERFIS: QP ACCUM C)
The Control Switches for these valves are located on the CV Sump Recirc Panel on the apron section of the RTGB below APP-002.
BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM F                                    NUREG 1021, Revision 10
 
Appendix C                                      Page 7 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 2:          ENSURE the Control Power Defeat switch for SI-869 is in the            CRITICAL NORMAL position (Step 5.2.1.c)                                            STEP STANDARD:        The operator places the SI-869 NORMAL/DEFEAT key switch in              ___ SAT the NORMAL position and observes the Amber status light is LIT.
EXAMINERS CUE:                  If the operator requests an AO check breaker status,    ___ UNSAT report that all requested breakers are open.
EXAMINERS NOTE:                Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
BOOTH OPERATOR CUE:              NONE COMMENTS:
NOTE Based upon the numerous indications available to the Dedicated Operator of an SI actuation at the RTGB and the immediate response to isolate the SI Accumulator flowpath, an LCO declaration for SI Pump OR SI Flowpath Operability is NOT required.
The following step is a continuous action step which shall be performed when the stated condition is met.
2016 Systems - Control Room JPM F                                      NUREG 1021, Revision 10
 
Appendix C                                  Page 8 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      IF an SI actuation is received during filling, THEN IMMEDIATELY CLOSE the applicable SI Accumulator makeup valve AND PERFORM Step 5.2.1.2.m to restore the SI System lineup. (Step 5.2.1.d)                                                              ___ SAT STANDARD:    The operator reads the Notes, and proceeds.
___ UNSAT The operator reads step and acknowledges continuous actions step in the event of an SI actuation.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
STEP 4:      Open SI-869, SI HOT LEG HDR. (Step 5.2.1.2.e)                          CRITICAL STEP STANDARD:    The operator places the SI-869 Control Switch in the OPEN position and observes the Red status light LIT and the Green status light is    ___ SAT OFF.
EXAMINERS CUE:              NONE
___ UNSAT EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM F                                  NUREG 1021, Revision 10
 
Appendix C                                      Page 9 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 5:        Start an SI Pump. (Step 5.2.1.2.f)                                          CRITICAL STEP STANDARD:      The operator will make an announcement regarding the pump start.
___ SAT The operator places an SI Pump Control Switch in the START position and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                  Starting the SI Pump will cause APP-002-C3, BIT HDR HI PRESS, to alarm (Expected). The operator may address the APP.
The announcement of the Pump start is NOT critical BOOTH OPERATOR CUE:              NONE COMMENTS:
NOTE: If the cooling unit for the train of the SI pump started is NOT operable, the opposite train unit can be started by placing its AUTO/RUN switch on the power supply breaker to RUN.
STEP 6:        ENSURE at least one SI Pump Area Cooling unit (HVH-6A OR HVH-6B OR both) is operating. (Step 5.2.1.2.g)
STANDARD:      The operator reads the Note, and proceeds.                                ___ SAT The operator observes the HVH-6A Red status light is LIT and the Green status light is OFF if the A SI Pump is started.
___ UNSAT The operator observes the HVH-6B Red status light is LIT and the Green status light is OFF if the C SI Pump is started.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                  The non-operating HVH Unit Green status light is LIT.
BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM F                                    NUREG 1021, Revision 10
 
Appendix C                                      Page 10 of 15                      Form ES-C-1 PERFORMANCE INFORMATION NOTE: The following are pressure and level limits/alarms for the SI Accumulators:
* High Pressure Alarm                    646 psig
* Normal Operating Pressure              630 psig
* High Level Alarm                        75 percent
* Low Level Alarm                        67 percent CAUTION Filling the SI Accumulators can result in rapid indicated level changes due to the narrow span (approx. 14 inches) associated with the SI Accumulator level instruments and should be closely monitored.
STEP 7:          IF SI Accumulator C is to be filled, THEN perform the following:        CRITICAL (Step 5.2.1.2.j)                                                            STEP
: 1)    Open SI-851C, MAKEUP.
: 2)    Monitor the level and pressure of SI Accumulator C.
: 3)    When desired level is obtained, then close SI-851C.                ___ SAT STANDARD:        The operator reads the Note and the Caution, and proceeds.
The operator places the SI-851C Control Switch to OPEN and              ___ UNSAT observes the Red status light is LIT and the Green status light is OFF.
The operator observes LI-928 and PI-929 and LI-930 and PI-931 during filling.
When the accumulator level is > 67% and < 75% and accumulator pressure is > 614 psig and < 646 psig, the operator places the SI-851C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:                    NONE EXAMINERS NOTE:                  APP-002-E4 will clear during the filling process.
It is acceptable if the C Accumulator Hi Level Annunciator (APP-002-E4) alarms during filling, as long as the TS LCO maximum level of 80.4% is NOT exceeded.
BOOTH OPERATOR CUE:                NONE COMMENTS:
2016 Systems - Control Room JPM F                                      NUREG 1021, Revision 10


Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                               Page 11 of 15                       Form ES-C-1 PERFORMANCE INFORMATION STEP 8:       Stop the operating SI Pump. (Step 5.2.1.2.k)                           CRITICAL STEP STANDARD:     The operator places the operating SI Pump Control Switch in the STOP position and observes the Green status light is LIT and the     ___ SAT Red status light is OFF.
- Control Room JPM F NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
EXAMINERS CUE:               NONE
)  Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
___ UNSAT EXAMINERS NOTE:             APP-002-C3 will clear when the SI Pump is stopped.
: 1. START TIME:
BOOTH OPERATOR CUE:           NONE COMMENTS:
STEP 1: Check open SI
STEP 9:       Verify both SI Pump Area Cooling units are OFF. (Step 5.2.1.2.l)
-856A, SI PUMP RECIRC and SI
: 1)   HVH-6A
-856B, SI PUMP RECIRC (Steps 5.2.1.2.a and b).
: 2)    HVH-6B
STANDARD: The operator observes SI-856A and B RED lights are LIT and the Green status lights are OFF
___ SAT STANDARD:     The operator observes the HVH-6A Green status light is LIT and the Red status light is OFF.
. EXAMINER'S CUE:
The operator observes the HVH-6B Green status light is LIT and the   ___ UNSAT Red status light is OFF.
NONE  EXAMINER'S NOTE:
EXAMINERS CUE:              NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
The operator may use ERFIS to monitor SI Accumulator "C" level. (ERFIS: QP ACCUM C)
2016 Systems - Control Room JPM F                                 NUREG 1021, Revision 10
The Control Switches for these valves are located on the CV Sump Recirc Panel on the apron section of the RTGB below APP
-002.
BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT
___ UNSAT Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 2: ENSURE the Control Power Defeat switch for SI
-869 is in the NORMAL position (Step 5.2.1.c)   STANDARD: The operator places the SI-869 NORMAL/DEFEAT key switch in the NORMAL position and observes the Amber status light is LIT
. EXAMINER'S CUE:
If the operator requests an AO check breaker status, report that all requested breakers are open.
EXAMINER'S NOTE:
Key switch for SI
-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
BOOTH OPERATOR CUE:
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT  NOTE  Based upon the numerous indications available to the Dedicated Operator of an SI actuation at the RTGB and the immediate response to isolate the SI Accumulator flowpath, an LCO declaration for SI Pump OR SI Flowpath Operability is NOT required. The following step is a continuous action step which shall be performed when the stated condition is met.
Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM F NUREG 1021, Revision 10 STEP 3: IF an SI actuation is received during filling, THEN IMMEDIATELY CLOSE the applicable SI Accumulator makeup valve AND PERFORM Step 5.2.1.2.m to restore the SI System lineup.  (Step 5.2.1.d)
STANDARD: The operator reads the Notes, and proceeds.


The operator reads step and acknowledges continuous actions step in the event of an SI actuation.
Appendix C                                    Page 12 of 15                        Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 10:         Close SI-869, SI HOT LEG HDR. (Step 5.2.1.2.m)                             STEP STANDARD:       The operator places the SI-869 Control Switch in the CLOSE position and observes the Green status light LIT and the Red status     ___ SAT light is OFF.
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE
NONE  EXAMINER'S NOTE:
___ UNSAT EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE BOOTH OPERATOR CUE:
NOTE: In Mode 1, 2 OR 3 the Control Power Defeat switch for SI-869 should be in the DEFEAT position. In Mode 5 OR 6 the Control Power Defeat switch for SI-869 should be in the NORMAL position. In Mode 4 the position of the Control Power Defeat switch for SI-869 is determined by GP-002 OR GP-007.
NONE  COMMENTS:
2016 Systems - Control Room JPM F                                     NUREG 1021, Revision 10
___ SAT    ___ UNSAT  STEP 4: Open SI-869, SI HOT LEG HDR. (Step 5.2.1.2.e)   STANDARD: The operator places the SI
-869 Control Switch in the OPEN position and observes the Red status light LIT and the Green status light is OFF.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:   CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 5: Start an SI Pump. (Step 5.2.1.2.f)  STANDARD: The operator will make an announcement regarding the pump start.
The operator places an SI Pump Control Switch in the START position and observes the Red status light is LIT and the Green status light is OFF.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
Starting the SI Pump will cause APP
-002-C3, BIT HDR HI PRESS, to alarm (Expected). The operator may address the APP.
The announcement of the Pump start is NOT critical BOOTH OPERATOR CUE:
NONE  COMMENTS:    CRITICAL STEP
___ SAT    ___ UNSAT  NOTE: If the cooling unit for the train of the SI pump started is NOT operable, the opposite train unit can be started by placing its AUTO/RUN switch on the power supply breaker to RUN.
STEP 6: ENSURE at least one SI Pump Area Cooling unit (HVH
-6A OR HVH-6B OR both) is operating. (Step 5.2.1.2.g)  STANDARD: The operator reads the Note, and proceeds.
The operator observes the HVH-6A Red status light is LIT and the Green status light is OFF if the "A" SI Pump is started
. The operator observes the HVH-6B Red status light is LIT and the Green status light is OFF if the "C" SI Pump is started
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
The non-operating HVH Unit Green status light is LIT. BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM F NUREG 1021, Revision 10 NOTE:  The following are pressure and level limits/alarms for the SI Accumulators:
High Pressure Alarm                      646 psig Normal Operating Pressure            630 psig High Level Alarm 75 percent Low Level Alarm                              67 percent CAUTION Filling the SI Accumulators can result in rapid indicated level changes due to the narrow span (approx. 14 inches) associated with the SI Accumulator level instruments and should be closely monitored.
STEP 7: IF SI Accumulator "C" is to be filled, THEN perform the following:
(Step 5.2.1.2.j) 1) Open SI-851C, MAKEUP.
: 2) Monitor the level and pressure of SI Accumulator "C".
: 3) When desired level is obtained, then close SI
-851C. STANDARD: The operator reads the Note and the Caution, and proceeds.
The operator places the SI-851C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF. The operator observes LI
-928 and PI
-929 and LI
-930 and PI
-931 during filling.
When the accumulator level is
> 67% and < 75% and accumulator pressure is > 614 psig and < 646 psig, the operator places the SI-851C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
APP-00 2-E4 will clear during the filling process.
It is acceptable if the "C" Accumulator Hi Level Annunciator (APP
-002-E4) alarms during filling, as long as the TS LCO maximum level of 80.4% is NOT exceeded.


BOOTH OPERATOR CUE:
Appendix C                                 Page 13 of 15                     Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     ENSURE the Control Power Defeat switch for SI-869 in the position     CRITICAL determined by plant status. (Step 5.2.1.2.n)                             STEP STANDARD:     The operator reads the Note, and proceeds.
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 11 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
___ SAT The operator places the SI-869 NORMAL/DEFEAT key switch in the DEFEAT position and observes the Amber status light is OFF.
- Control Room JPM F NUREG 1021, Revision 10 STEP 8: Stop the operating SI Pump. (Step 5.2.1.2.k)  STANDARD: The operator places the operating SI Pump Control Switch in the STOP position and observes the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:             NA                                                     ___ UNSAT EXAMINERS NOTE:             Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
EXAMINER'S CUE:
BOOTH OPERATOR CUE:         NONE COMMENTS:
NONE EXAMINER'S NOTE:
Terminating Cue:           Evaluation on this JPM is complete.
APP-002-C3 will clear when the SI Pump is stopped. BOOTH OPERATOR CUE:
NONE  COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT    STEP 9: Verify both SI Pump Area Cooling units are OFF. (Step 5.2.1.2.l) 1) HVH-6A 2) HVH-6B  STANDARD: The operator observes the HVH-6A Green status light is LIT and the Red status light is OFF
.
The operator observes the HVH-6B Green status light is LIT and the Red status light is OFF
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 12 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 10:  Close SI-869, SI HOT LEG HDR. (Step 5.2.1.2.m)  STANDARD: The operator places the SI
-869 Control Switch in the CLOSE position and observes the Green status light LIT and the Red status light is OFF.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:          CRITICAL STEP
___ SAT    ___ UNSAT  NOTE:  In Mode 1, 2 OR 3 the Control Power Defeat switch for SI
-869 should be in the DEFEAT position. In Mode 5 OR 6 the Control Power Defeat switch for SI
-869 should be in the NORMAL position. In Mode 4 the position of the Control Power Defeat switch for SI
-869 is determined by GP-002 OR GP-007.
Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 11: ENSURE the Control Power Defeat switch for SI
-869 in the position determined by plant status. (Step 5.2.1.2.n)   STANDARD: The operator reads the Note, and proceeds.
The operator places the SI-869 NORMAL/DEFEAT key switch in the DEFEAT position and observes the Amber status light is OFF
. EXAMINER'S CUE:
NA EXAMINER'S NOTE:
Key switch for SI
-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
BOOTH OPERATOR CUE: NONE COMMENTS:         CRITICAL STEP
___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM F                                  NUREG 1021, Revision 10


Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 14 of 15                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM F Examinees Name:
- Control Room JPM F NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM F   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,570: Line 1,148:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM F                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
The plant is at 100% power.
* You are the Licensed Dedicated Operator referred to in OP-202.
SI ACCUM C HI/LO LVL (APP
INITIATING CUE:     The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.
-002-E4) alarm has been received and actions have been reviewed by the RO.
NUREG 1021, Revision 10
You are the Licensed Dedicated Operator referred to in OP
-202. INITIATING CUE:
The CRS has briefed and directed you to fill SI Accumulator "C" to reset the low level alarm IAW OP
-202, Section 5.2.1.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM G (Rev_011116) NUREG 1021, Revision 10


SIM JPM G     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM G Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM G (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 10                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM G NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Remove Source Range Channel N-           JPM No.:     2016 Systems - Control 31 From Service                                        Room JPM G K/A  
Remove Source Range Channel N
-31 From Service JPM No.: 2016 Systems  
- Control Room JPM G     K/A  


==Reference:==
==Reference:==
015 A4.03 (3.8/3.9)
015 A4.03 (3.8/3.9)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:     X Classroom               Simulator         X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
: 1. Initial Conditions:
* SR Channel N-31 has just failed low.
A plant startup is in progress in accordance with GP
-003, Normal Plant Startup From Hot Shutdown to Critical
. SR Channel N
-31 has just failed low.
Initiating Cue:
Initiating Cue:
The CRS has directed you to remove SR Channel N
* The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
-31 from service IAW OWP-011 , Nuclear Instrumentation
* The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.
. The latest Revision of OWP
Task Standard:             The operator will remove SR Channel N-31 from service IAW NI-5 of OWP-011.
-011 has been verified to be Rev 24, and the associated Work Request is 16
Required Materials:         None General  
-02. Task Standard:
The operator will remove SR Channel N
-31 from service IAW NI-5 of OWP-011. Required Materials:
None   General  


==References:==
==References:==
OWP-011 (Nuclear Instrumentation), Rev 24 GP-003, Normal Plant Startup From Hot Shutdown to Critical, Rev 105 2016 Systems - Control Room JPM G                                          NUREG 1021, Revision 10


OWP-011 (Nuclear Instrumentation), Rev 2 4  GP-003, Normal Plant Startup From Hot Shutdown to Critical, Rev 105
Appendix C                                      Page 3 of 10                      Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Blank Copy of OWP-11.
Time Critical Task:    NO Validation Time:      7 minutes Critical Step Justification Step 2        This step is critical because removing NI-31 from ERFIS Scan is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.
Step 4        This step is critical because placing the Start Up Rate Channel Select Switch to the N32, N35 or N36 is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.
Step 5        This step is critical because placing the NI-31 Level Trip Bypass Switch to the BYPASS position is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.
2016 Systems - Control Room JPM G                                      NUREG 1021, Revision 10


Appendix C Page 3 of 10 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
Appendix C                                   Page 4 of 10                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM G NUREG 1021, Revision 10 Handouts: Handout 1: Blank Copy of OWP
: 1. Reset simulator to IC-8, (47.25 hours tripped, Critical at 48 hours).
-11. Time Critical Task:
: 2. Place in RUN and allow time to stabilize.
NO  Validation Time:
7 minutes      Critical Step Justification Step 2 This step is critical because removing NI
-31 from ERFIS Scan is necessary to remove SR Channel N
-31 from service IAW NI-5 of OWP-011. Step 4 This step is critical because placing the Start Up Rate Channel Select Switch to the N32, N35 or N36 is necessary to remove SR Channel N
-31 from service IAW NI-5 of OWP-011. Step 5 This step is critical because placing the NI
-31 Level Trip Bypass Switch to the BYPASS position is necessary to remove SR Channel N
-31 from service IAW NI-5 of OWP-011.
Appendix C Page 4 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM G NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Reset simulator to IC
-8 , (47.25 hours tripped, Critical at 48 hours
).
: 2. Place in RUN and allow time to stabilize
.
: 3. Perform the following:
: 3. Perform the following:
Rod Bank Select Switch to SBB Withdrawal SBB rods to 225 Steps Rod Bank Select Switch to M Withdrawal CBA rods to 22 Steps Place Audio Count Rate Selector in the N31 position Place the Startup Rate Channel Select Switch in the N31 position
* Rod Bank Select Switch to SBB
: 4. Insert Malfunction NIS0 1A , Final: 1 (SR N-31 fails LOW
* Withdrawal SBB rods to 225 Steps
5. Acknowledge alarms and stabilize the plant
* Rod Bank Select Switch to M
. 6. Freeze the Simulator
* Withdrawal CBA rods to 22 Steps
. OR 1. Reset Simulator to Temporary Snap IC
* Place Audio Count Rate Selector in the N31 position
-606 (August, 201 5). 2. Place Simulator in Run when Operator assumes the watch.
* Place the Startup Rate Channel Select Switch in the N31 position
: 4. Insert Malfunction NIS01A, Final: 1 (SR N-31 fails LOW)
: 5. Acknowledge alarms and stabilize the plant.
: 6. Freeze the Simulator.
OR
: 1. Reset Simulator to Temporary Snap IC-606 (August, 2015).
: 2. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM G                                    NUREG 1021, Revision 10
 
Appendix C                                    Page 5 of 10                          Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
START TIME:
STEP 1:        Obtain and review the procedure.
(OWP-011, NI-5, Steps 1-7).
___ SAT STANDARD:        The operator reviews Handout 1 and identifies that NI-5 must be addressed.
The operator verifies that Revision 24 is the latest revision (Initial
___ UNSAT Cue), and prints their name, signs and dates Step 1.
Operator reviews Steps 2-7.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                The operator may use Green Dots to flag the expected annunciators.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM G                                        NUREG 1021, Revision 10


Appendix C Page 5 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     Complete Step 8:                                                         CRITICAL REMOVE NI-31 from ERFIS SCAN: NIN0031A.                                     STEP (NI-5 Valve, Breaker, Switch Lineup).
- Control Room JPM G NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
___ SAT STANDARD:     The operator selects F3 on ERFIS (Master Menu)
)  Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. START TIME:
STEP 1: Obtain and review the procedure
.    (OWP-011, NI-5, Step s 1-7). STANDARD: The operator reviews Handout 1 and identifies that NI
-5 must be addressed.
The operator verifies that Revision 24 is the latest revision (Initial Cue), and prints their name, signs and dates Step 1. Operator reviews Steps 2
-7. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
The operator may use Green Dots to flag the expected annunciators.
BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM G NUREG 1021, Revision 10 STEP 2: Complete Step 8:
REMOVE NI-31 from ERFIS SCAN: NIN0031A.
(NI-5 Valve, Breaker, Switch Lineup
). STANDARD: The operator selects F3 on ERFIS (Master Menu)
The operator selects ADMIN (Administrative Functions Menu)
The operator selects ADMIN (Administrative Functions Menu)
The operator selects DR (Del/Res Point From/To S can or Alarm)
___ UNSAT The operator selects DR (Del/Res Point From/To Scan or Alarm)
 
The operator depresses the DELETE SCAN pushbutton The operator enters Point I.D. NIN0031A EXAMINERS CUE:               NONE EXAMINERS NOTE:             This can be checked on ERFIS as follows:
The operator depresses the DELETE SCAN pushbutton The operator enters Point I.D. NIN0031A EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This can be checked on ERFIS as follows:
Select F3 (Master Menu)
Select F3 (Master Menu)
Select REAL (Real Time Data Menu)
Select REAL (Real Time Data Menu)
Select DBO (Point Information/Value Display)
Select DBO (Point Information/Value Display)
Enter NNI0031A Observe QUALITY to be DEL
Enter NNI0031A Observe QUALITY to be DEL BOOTH OPERATOR CUE:           NONE COMMENTS:
 
STEP 3:     Complete Step 8:
BOOTH OPERATOR CUE:
AUDIO COUNT RATE CHANNEL - CHANNEL SELECTOR Switch (NI-5 Valve, Breaker, Switch Lineup).
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 3: Complete Step 8:
___ SAT STANDARD:     The operator pulls and rotates the Audio Count Rate Channel Selector Switch counter-clockwise to the N32 position, and initials the Selected to SR 32 block on the NI-5 Valve, Breaker, Switch Lineup.
AUDIO COUNT RATE CHANNEL  
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             This switch is on the Audio Count Rate Drawer BOOTH OPERATOR CUE:           NONE COMMENTS:
- CHANNE L SELECTOR Switch (NI-5 Valve, Breaker, Switch Lineup
2016 Systems - Control Room JPM G                                  NUREG 1021, Revision 10
). STANDARD: The operator pulls and rotates the Audio Count Rate Channel Selector Switch counter-clockwise to the N32 position, and initials the Selected to SR 32 block on the NI-5 Valve, Breaker, Switch Lineup. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This switch is on the Audio Count Rate Drawer BOOTH OPERATOR CUE:
NONE COMMENTS:  


___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 7 of 10                   Form ES-C-1 PERFORMANCE INFORMATION STEP 4:     Complete Step 8:                                                         CRITICAL START UP RATE CHANNEL SELECT Switch
- Control Room JPM G NUREG 1021, Revision 10 STEP 4: Complete Step 8:
* STEP (NI-5 Valve, Breaker, Switch Lineup).
START UP RATE CHANNEL SELECT Switch *
STANDARD:     The operator places the Start Up Rate Channel Select Switch to the
(NI-5 Valve, Breaker, Switch Lineup
___ SAT N32; records the selected instrument in the NI block position, and initials the NI-5 Valve, Breaker, Switch Lineup.
). STANDARD: The operator places the Start Up Rate Channel Select Switch to the N32; records the selected instrument in the NI block position, and initials the NI
EXAMINERS CUE:                 NONE
-5 Valve, Breaker, Switch Lineup.
___ UNSAT EXAMINERS NOTE:               This switch is on the Comparator and Rate Drawer BOOTH OPERATOR CUE:            NONE COMMENTS:
EXAMINER'S CUE:
STEP 5:      Complete Step 8:                                                        CRITICAL LEVEL TRIP Switch                                                          STEP (NI-5 Valve, Breaker, Switch Lineup).
NONE  EXAMINER'S NOTE:
___ SAT STANDARD:      The operator places the NI-31 Level Trip Bypass Switch to the BYPASS position, and initials the NI-5 Valve, Breaker, Switch Lineup.
This switch is on the Comparator and Rate Drawer
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:                The operator will acknowledge APP-005-D4, NIS TRIP/DROP ROD BYPASS, as an expected alarm.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM G                                  NUREG 1021, Revision 10


BOOTH OPERATOR CUE:
Appendix C                                     Page 8 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 6:     Complete Step 8:
NONE  COMMENTS:
NIS TRIP BYPASS NI-31 Status Light (NI-5 Valve, Breaker, Switch Lineup).
CRITICAL STEP
___ SAT STANDARD:     The operator observes the NI-31 LEVEL TRIP BYPASS status light is LIT and initials the NI-5 Valve, Breaker, Switch Lineup.
___ SAT    ___ UNSAT  STEP 5: Complete Step 8:
EXAMINERS CUE:                 NONE
LEVEL TRIP Switch (NI-5 Valve, Breaker, Switch Lineup
___ UNSAT EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
). STANDARD: The operator places the NI
STEP 7:     Complete Step 8:
-31 Level Trip Bypass Switch to the BYPASS position, and initials the NI
HIGH FLUX AT SHUTDOWN Switch (NI-5 Valve, Breaker, Switch Lineup).
-5 Valve, Breaker, Switch Lineup. EXAMINER'S CUE:
___ SAT STANDARD:     The operator places the NI-High Flux At Shutdown Switch to the BLOCK position, and initials the NI-5 Valve, Breaker, Switch Lineup.
NONE  EXAMINER'S NOTE:
The operator signs and dates Step 8 of NI-5.
The operator will acknowledge APP
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               The operator will acknowledge APP-005-B1, HI FLUX AT SHUTDOWN ALARM BLOCK, as an expected alarm.
-005-D4, NIS TRIP/DROP ROD BYPASS, as an expected alarm.
BOOTH OPERATOR CUE:             NONE COMMENTS:
BOOTH OPERATOR CUE:
Terminating Cue:               Evaluation on this JPM is complete.
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM G NUREG 1021, Revision 10 STEP 6: Complete Step 8:
NIS TRIP BYPASS NI
-31 Status Light (NI-5 Valve, Breaker, Switch Lineup
). STANDARD: The operator observes the NI
-31 LEVEL TRIP BYPASS status light is LIT and initials the NI-5 Valve, Breaker, Switch Lineup.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT  STEP 7: Complete Step 8:
HIGH FLUX AT SHUTDOWN Switch (NI-5 Valve, Breaker, Switch Lineup
). STANDARD: The operator places the NI
-High Flux At Shutdown Switch to the BLOCK position, and initials the NI
-5 Valve, Breaker, Switch Lineup.
The operator signs and dates Step 8 of NI
-5. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
The operator will acknowledge APP
-005-B1, HI FLUX AT SHUTDOWN ALARM BLOCK, as an expected alarm.
BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT        Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM G                                    NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 9 of 10                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM G Examinees Name:
- Control Room JPM G NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM G   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 1,747: Line 1,270:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM G                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* SR Channel N-31 has just failed low.
A plant startup is in progress in accordance with GP
-003, Normal Plant Startup From Hot Shutdown to Critical.
SR Channel N
-31 has just failed low.
INITIATING CUE:
INITIATING CUE:
The CRS has directed you to remove SR Channel N
* The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
-31 from service IAW OWP
* The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.
-011 , Nuclear Instrumentation
NUREG 1021, Revision 10
. The latest Revision of OWP
-011 has been verified to be Rev 24, and the associated Work Request is 16
-02.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM H (Rev_011116) NUREG 1021, Revision 10


SIM JPM H     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM H Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM H (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 16 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 16                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM H NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Start a Reactor Coolant Pump             JPM No.:     2016 Systems - Control Room JPM H K/A  
Start a Reactor Coolant Pump JPM No.: 2016 Systems  
- Control Room JPM H     K/A  


==Reference:==
==Reference:==
003 A4.03 (2.8/2.5)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom                  Simulator      X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
* The A RCP is running.
* It is intended to start the B RCP next.
* Section 8.1 of OP-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
* It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.
Initiating Cue:            The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.
Task Standard:              The operator will start the B RCP IAW OP-101.
Required Materials:        None 2016 Systems - Control Room JPM H                                          NUREG 1021, Revision 10


003 A4.03 (2.8/2.5)
Appendix C                                     Page 3 of 16                         Form ES-C-1 Job Performance Measure Worksheet General  
Examinee:  NRC Examiner:
Facility Evaluator:
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
A plant startup is in progress in accordance with GP
-002, Cold Shutdown to Hot Sub
-Critical at No
-Load Tavg. The "A" RCP is running
. It is intended to start the "B" RCP next.
Section 8.1 of OP
-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP
-101, and an AO is standing by to assist in this process.
Initiating Cue:
The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP
-101. Task Standard:
The operator will start the B RCP IAW OP
-101. Required Materials:
None Appendix C Page 3 of 16 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM H NUREG 1021, Revision 10 General  


==References:==
==References:==
OP-101 (Reactor Coolant System and Reactor Coolant Pump Startup and Operation), Rev 74 AD-OP-ALL-1000 (Conduct of Operations) Rev 4 AOP-018 (Reactor Coolant Pump Abnormal Conditions), Rev 31 APP-001 (Miscellaneous NSSS), Rev 60 Technical Specification LCO 3.3.5 (Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation), Amendment 176 Handouts:              Handout 1: Section 8.1 of OP-101 marked up through Step 8.1.1.2.y for this JPM.
Time Critical Task:    NO Validation Time:        10 minutes NOTE:                  This JPM should be pre-briefed in the Briefing Room.
Critical Step Justification Step 2        This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.aa.1&3 is necessary to start the B RCP IAW OP-101.
Step 3        This step is critical because placing the Bearing Lift Pump in the START position, and observing that the LIFT PRESSURE status light is LIT is necessary to start the B RCP IAW OP-101.
Step 6        This step is critical because after 2 minutes with the Bearing Oil Lift Pump running, placing the B RCP Control Switch to the START position is necessary to start the B RCP IAW OP-101.
Step 8        This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.gg.1-6 is necessary to start the B RCP IAW OP-101.
Step 10      This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.ii.1-6. is necessary to start the B RCP IAW OP-101.
2016 Systems - Control Room JPM H                                      NUREG 1021, Revision 10


OP-101 (Reactor Coolant System and Reactor Coolant Pump Startup and Operation), Rev 74  AD-OP-ALL-1000 (Conduct of Operations) Rev 4 AOP-018 (Reactor Coolant Pump Abnormal Conditions), Rev 31 APP-001 (Miscellaneous NSSS), Rev 60  Technical Specification LCO 3.3.5 (Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation), Amendment 176 Handouts: Handout 1: Section 8.1 of OP
Appendix C                                   Page 4 of 16                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
-101 marked up through Step 8.1.1.2.y for this JPM. Time Critical Task:
NO  Validation Time:
1 0 minutes  NOTE: This JPM should be pre
-briefed in the Briefing Room.
Critical Step Justification Step 2 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.aa.1&3 is necessary to start the B RCP IAW OP
-101. Step 3 This step is critical because placing the Bearing Lift Pump in the START position, and observing that the LIFT PRESSURE status light is LIT is necessary to start the B RCP IAW OP
-101. Step 6 This step is critical because after 2 minutes with the Bearing Oil Lift Pump running, placing the B RCP Control Switch to the START position is necessary to start the B RCP IAW OP
-101. Step 8 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.gg.1
-6 is necessary to start the B RCP IAW OP
-101. Step 10 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.ii.1
-6. is necessary to start the B RCP IAW OP
-101.
Appendix C Page 4 of 16 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM H NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ H as follows:
: 1. Construct Scenario File 006_JPM_ H as follows:
IRF EPSL007 f:DEFEAT IRF EPSL008 f:DEFEAT IRF EPSL007 f:NORMAL IRF EPSL008 f:NORMAL
* IRF EPSL007 f:DEFEAT
: 2. Reset simulator to IC
* IRF EPSL008 f:DEFEAT
-35, 0% Power, Mode 3 at NOP/NOT
* IRF EPSL007 f:NORMAL
. 3. Place in RUN execute Scenario File 006_JPM_H, and allow time to stabilize
* IRF EPSL008 f:NORMAL
.
: 2. Reset simulator to IC-35, 0% Power, Mode 3 at NOP/NOT.
: 4. Place PCV-455A in manual and close "B" Loop Spray Valve (PCV-455A). 5. Perform the actions of Section 8.1.1 of OP
: 3. Place in RUN execute Scenario File 006_JPM_H, and allow time to stabilize.
-101 up to Step 8.1.1.2.y. 6. Stabilize the plant
: 4. Place PCV-455A in manual and close "B" Loop Spray Valve (PCV-455A).
.
: 5. Perform the actions of Section 8.1.1 of OP-101 up to Step 8.1.1.2.y.
: 7. Freeze the Simulator
: 6. Stabilize the plant.
.
: 7. Freeze the Simulator.
OR 1. Reset Simulator to Temporary Snap IC
OR
-607 (August, 201 5). 2. Open Scenario File 006_JPM_H.
: 1. Reset Simulator to Temporary Snap IC-607 (August, 2015).
NOTE:   Booth Instructor will need to operate Event s 1-4 when contacted by the operator at JPM Steps 2 , 8 & 10. 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 2. Open Scenario File 006_JPM_H.
-411. 4. Place Simulator in Run when Operator assumes the watch.
NOTE:         Booth Instructor will need to operate Events 1-4 when contacted by the operator at JPM Steps 2, 8 & 10.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM H                                  NUREG 1021, Revision 10


Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 5 of 16                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM H NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
NOTES ITS LCO 3.3.5 allows bypassing Degraded Grid Protection when the Unit is NOT in Mode 1.
NOTES ITS LCO 3.3.5 allows bypassing Degraded Grid Protection when the Unit is NOT in Mode 1. Conservative operating principles have determined that bypassing the Degraded Grid Protection will only be permitted when the Unit is NOT in Mode 1 OR Mode 2. (NCR 151422)
Conservative operating principles have determined that bypassing the Degraded Grid Protection will only be permitted when the Unit is NOT in Mode 1 OR Mode 2. (NCR 151422)
Degraded Grid Voltage Protection is limited to one hour in the DEFEAT position before it shall be returned to NORMAL. (NCR 151422)
Degraded Grid Voltage Protection is limited to one hour in the DEFEAT position before it shall be returned to NORMAL. (NCR 151422)
STEP 1: IF required, THEN ENTER LCO 3.3.5 Action Statement due to bypassing Degraded Grid Protection, AND RECORD time. (Step 8.1.1.2.z). STANDARD: The operator reads the Note, and proceeds.
STEP 1:           IF required, THEN ENTER LCO 3.3.5 Action Statement due to bypassing Degraded Grid Protection, AND RECORD time.
 
(Step 8.1.1.2.z).                                                     ___ SAT STANDARD:         The operator reads the Note, and proceeds.
The operator records the time in the block provided
___ UNSAT The operator records the time in the block provided.
.
The operator informs the CRS that LCO 3.3.5 may need to be entered.
The operator informs the CRS that LCO 3.3.5 may need to be entered. EXAMINER'S CUE:
EXAMINERS CUE:                 As the CRS, acknowledge report.
As the CRS, acknowledge report.
EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
EXAMINER'S NOTE:
2016 Systems - Control Room JPM H                                 NUREG 1021, Revision 10
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:      ___ SAT    ___ UNSAT Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM H NUREG 1021, Revision 10 STEP 2: IF degraded grid protection is in service, THEN DEFEAT the degraded grid voltage protection as follows:
On the front of Bus E
-1, Cubicle 18A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position.
CHECK annunciator APP
-010-F5, DEGRADED GRID E
-1 PROT BYPD, is ILLUMINATED.
On the front of Bus E
-2, Cubicle 28A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position.
CHECK annunciator APP
-010-F6, DEGRADED GRID E
-2 PROT BYPD, is ILLUMINATED.
(Step 8.1.1.2.aa
). STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.aa.1&3
. The operator observes APP-010-F5, DEGRADED GRID E
-1 PROT BYPD, is LIT and is an expected alarm.
 
The operator observes APP-010-F 6, DEGRADED GRID E
-2 PROT BYPD, is LIT and is an expected alarm.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
When directed, defeat Degraded Grid Protection on Bus E-1 RFI  EPS L007, and report back as AO that Steps 8.1.1.2.aa.1 ha s been completed When directed, defeat Degraded Grid Protection on Bus E-2 RFI EPS L 008, and report back as AO that Steps 8.1.1.2.aa.3 has been completed COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT  NOTE: Several starts / stops of the Bearing Oil Lift Pump may be required to prime the pump in a Motor where the Upper Reservoir has been drained and refilled.
 
Appendix C Page 7 of 16 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM H NUREG 1021, Revision 10 STEP 3: START the BRG LIFT PUMP AND CHECK the LIFT PRESSURE light ILLUMINATES.
(Step 8.1.1.2.bb). STANDARD: The operator reads the Note, and proceeds.
The operator places the Bearing Lift Pump "B" Control Switch in the START position, and observes the Red status light is LIT and the Green status light is OFF
.
The operator observes that that the LIFT PRESSURE status light is LI T. EXAMINER'S CUE:
If the operator addresses the CRS/SM about AOP
-018 because of APP
-001-E2, as the SM indicate that the performance of the procedure can be deferred.
EXAMINER'S NOTE:
APP-001-E2, RCP #1 SEAL LEAKOFF LO FLOW, alarms when the Bearing Oil Lift Pump is started. This is because the pump start causes the "B" RCP shaft to be lifted affecting the #1 Seal on the "B" RCP, which will affect the #1 Seal Leakoff flows on the other RCPs. The operator may address the APP, and may address AOP
-018, Reactor Coolant Pump Abnormal Conditions. If so, a NOTE on the Entry Conditions to AOP-018 states that "IF RCP#1 Seal Leakoff flow is below 1 gpm due to plant conditions known to affect


leakoff flow, the SM may defer procedure entry provided the #1 Seal Leakoff flow remains above 0.8 gpm."  BOOTH OPERATOR CUE:
Appendix C                                     Page 6 of 16                       Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 2:      IF degraded grid protection is in service, THEN DEFEAT the                  STEP degraded grid voltage protection as follows:
NONE  COMMENTS:      CRITICAL STEP
* On the front of Bus E-1, Cubicle 18A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position.                                                      ___ SAT
___ SAT    ___ UNSAT Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
* CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is ILLUMINATED.
- Control Room JPM H NUREG 1021, Revision 10 STEP 4: IF RCP Oil Reservoir level annunciator is NOT EXTINGUISHED, THEN REFER to the appropriate Annunciator Procedure.
* On the front of Bus E-2, Cubicle 28A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the                 ___ UNSAT DEFEAT position.
(Step 8.1.1.2.cc
* CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is ILLUMINATED.
). STANDARD: The operator observes that APP
(Step 8.1.1.2.aa).
-001-E8, RCP B OIL RESERV HI/LO LVL, is EXTINGUISHED
STANDARD:       The operator contacts AO and directs performance of Step 8.1.1.2.aa.1&3.
. EXAMINER'S CUE:
The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is LIT and is an expected alarm.
NONE   EXAMINER'S NOTE:
The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is LIT and is an expected alarm.
NONE BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           When directed, defeat Degraded Grid Protection on Bus E-1 RFI EPSL007, and report back as AO that Steps 8.1.1.2.aa.1 has been completed When directed, defeat Degraded Grid Protection on Bus E-2 RFI EPSL008, and report back as AO that Steps 8.1.1.2.aa.3 has been completed COMMENTS:
NONE  COMMENTS:        ___ SAT    ___ UNSAT  STEP 5: NOTIFY RC that RCP's are to be started AND to monitor for changing radiological conditions.
NOTE: Several starts / stops of the Bearing Oil Lift Pump may be required to prime the pump in a Motor where the Upper Reservoir has been drained and refilled.
(Step 8.1.1.2.dd). STANDARD: The operator contacts RC and makes notification
2016 Systems - Control Room JPM H                                  NUREG 1021, Revision 10
. EXAMINER'S CUE:
As RC Supervisor, Acknowledge


EXAMINER'S NOTE:
Appendix C                                    Page 7 of 16                    Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       START the BRG LIFT PUMP AND CHECK the LIFT PRESSURE                    CRITICAL light ILLUMINATES.                                                        STEP (Step 8.1.1.2.bb).
NONE  BOOTH OPERATOR CUE:
___ SAT STANDARD:     The operator reads the Note, and proceeds.
NONE  COMMENTS:
The operator places the Bearing Lift Pump B Control Switch in the START position, and observes the Red status light is LIT and the
___ SAT    ___ UNSAT   CAUTION: Only one Reactor Coolant Pump is to be started at a time.
___ UNSAT Green status light is OFF.
The operator observes that that the LIFT PRESSURE status light is LIT.
EXAMINERS CUE:             If the operator addresses the CRS/SM about AOP-018 because of APP-001-E2, as the SM indicate that the performance of the procedure can be deferred.
EXAMINERS NOTE:            APP-001-E2, RCP #1 SEAL LEAKOFF LO FLOW, alarms when the Bearing Oil Lift Pump is started.
This is because the pump start causes the B RCP shaft to be lifted affecting the #1 Seal on the B RCP, which will affect the #1 Seal Leakoff flows on the other RCPs.
The operator may address the APP, and may address AOP-018, Reactor Coolant Pump Abnormal Conditions. If so, a NOTE on the Entry Conditions to AOP-018 states that IF RCP#1 Seal Leakoff flow is below 1 gpm due to plant conditions known to affect leakoff flow, the SM may defer procedure entry provided the #1 Seal Leakoff flow remains above 0.8 gpm.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10


Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 8 of 16                 Form ES-C-1 PERFORMANCE INFORMATION STEP 4:       IF RCP Oil Reservoir level annunciator is NOT EXTINGUISHED, THEN REFER to the appropriate Annunciator Procedure.
- Control Room JPM H NUREG 1021, Revision 10 STEP 6: WHEN the Brg Lift Pump has operated for a minimum of 2 minutes, THEN START the Reactor Coolant Pump.
(Step 8.1.1.2.cc).
(Step 8.1.1.2.ee). STANDARD: The operator reads the Caution, and proceeds.
___ SAT STANDARD:     The operator observes that APP-001-E8, RCP B OIL RESERV HI/LO LVL, is EXTINGUISHED.
The operator will make a plant announcement prior to starting the RCP. After 2 minutes with the Bearing Oil Lift Pump running, the operator places the B RCP Control Switch to the START position, and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
The operator will observe FI
STEP 5:      NOTIFY RC that RCPs are to be started AND to monitor for changing radiological conditions.
-424 at 118%.
(Step 8.1.1.2.dd).                                                ___ SAT STANDARD:    The operator contacts RC and makes notification.
(Not Critical)
___ UNSAT EXAMINERS CUE:              As RC Supervisor, Acknowledge EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
The operator will observe FI
CAUTION: Only one Reactor Coolant Pump is to be started at a time.
-425 at 118%.
2016 Systems - Control Room JPM H                              NUREG 1021, Revision 10
(Not Critical)
The operator will observe FI
-426 at 117%.
(Not Critical)


The operator will observe "B" RCP #1 Seal Leakoff on FR
Appendix C                                  Page 9 of 16                        Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      WHEN the Brg Lift Pump has operated for a minimum of 2 minutes,          CRITICAL THEN START the Reactor Coolant Pump.                                      STEP (Step 8.1.1.2.ee).
-154B to be 1.24 gpm.
___ SAT STANDARD:    The operator reads the Caution, and proceeds.
The operator will make a plant announcement prior to starting the RCP.
___ UNSAT After 2 minutes with the Bearing Oil Lift Pump running, the operator places the B RCP Control Switch to the START position, and observes the Red status light is LIT and the Green status light is OFF.
The operator will observe FI-424 at 118%. (Not Critical)
The operator will observe FI-425 at 118%. (Not Critical)
The operator will observe FI-426 at 117%. (Not Critical)
The operator will observe B RCP #1 Seal Leakoff on FR-154B to be 1.24 gpm. (Not Critical)
The operator will observe RCS pressure on PR-444 to be 360 psig.
(Not Critical)
(Not Critical)
EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM H                                  NUREG 1021, Revision 10


The operator will observe RCS pressure on PR
Appendix C                                     Page 10 of 16                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:           WHEN a minimum of 50 seconds has elapsed since the Reactor Coolant Pump was started, THEN STOP the BRG LIFT PUMP.
-  (Not Critical)
(Step 8.1.1.2.ff).
EXAMINER'S CUE:
___ SAT STANDARD:         After a minimum of 50 seconds with the B RCP Running, the operator places the Bearing Oil Lift Pump Control Switch to the STOP position, and observes the Green status light is LIT and the
NONE EXAMINER'S NOTE:
___ UNSAT Red status light is OFF.
NONE  BOOTH OPERATOR CUE:
The operator observes that that the LIFT PRESSURE status light is OFF.
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
EXAMINERS CUE:                   NONE EXAMINERS NOTE:                   NONE BOOTH OPERATOR CUE:               NONE COMMENTS:
- Control Room JPM H NUREG 1021, Revision 10 STEP 7: WHEN a minimum of 50 seconds has elapsed since the Reactor Coolant Pump was started, THEN STOP the BRG LIFT PUMP.
CAUTION: Do NOT Restore the Degraded Grid Voltage Protection to NORMAL until the Amber indicating light is Extinguished.
(Step 8.1.1.2.ff). STANDARD: After a minimum of 50 seconds with the B RCP Running, the operator places the Bearing Oil Lift Pump Control Switch to the STOP position, and observes the Green status light is LIT and the Red status light is OFF
. The operator observes that that the LIFT PRESSURE status light is OFF. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT  CAUTION: Do NOT Restore the Degraded Grid Voltage Protection to NORMAL until the Amber indicating light is Extinguished.
NOTE: The Degraded Grid Voltage keylock keys can NOT be removed from switches unless positioned to NORMAL.
NOTE: The Degraded Grid Voltage keylock keys can NOT be removed from switches unless positioned to NORMAL.
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10


Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 11 of 16                         Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 8:     IF E-1 Degraded Grid Voltage Protection is to be returned to                   STEP NORMAL, THEN RESTORE as follows:
- Control Room JPM H NUREG 1021, Revision 10 STEP 8: IF E-1 Degraded Grid Voltage Protection is to be returned to NORMAL, THEN RESTORE as follows:
* Momentarily DEPRESS the amber E-1 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.                     ___ SAT
Momentarily DEPRESS the amber E
* CHECK the amber E-1 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
-1 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.
* PLACE E-1 DEGRADED GRID VOLTAGE key switch to NORMAL.                                                                 ___ UNSAT
CHECK the amber E
* REMOVE key.
-1 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
* IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.3, E-1 Defeat Switch Contact Position Verification.
PLACE E-1 DEGRADED GRID VOLTAGE key switch to NORMAL. REMOVE key. IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.3, E
* ENSURE Relay 27 contacts are RESET by performing the following:
-1 Defeat Switch Contact Position Verification.
ENSURE Relay 27 contacts are RESET by performing the following:
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVA-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVA-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVB-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVB-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVC-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVC-1 AND CHECK that the target flag indicates black.
CHECK annunciator APP
* CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.
-010-F5, DEGRADED GRID E
(Step 8.1.1.2.gg.1-7).
-1 PROT BYPD, is EXTINGUISHED.
STANDARD:     The operator reads the Caution and Note, and proceeds.
(Step 8.1.1.2.gg.1-7). STANDARD: The operator reads the Caution and Note, and proceeds.
The operator contacts AO and directs performance of Step 8.1.1.2.gg.1-6.
The operator contacts AO and directs performance of Step 8.1.1.2.gg.1
The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.
-6. The operator observes APP-010-F5, DEGRADED GRID E
EXAMINERS CUE:               If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.
-1 PROT BYPD, is EXTINGUISHED
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           When directed, return Degraded Grid Protection on Bus E-1 to normal RFI EPSL007, and report back as AO that Steps 8.1.1.2.gg.1-6 have been completed COMMENTS:
. EXAMINER'S CUE:
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10
If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the "C" RCP is started, direct the operator to continue with the procedure as written.
 
EXAMINER'S NOTE:
Appendix C                                 Page 12 of 16                 Form ES-C-1 PERFORMANCE INFORMATION STEP 9:       IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time.
NONE BOOTH OPERATOR CUE:
(Step 8.1.1.2.hh).                                               ___ SAT STANDARD:     The operator records the time in the block provided.
When directed, return Degraded Grid Protection on Bus E-1 to normal RFI EPS L 007, and report back as AO that Steps 8.1.1.2.gg.1
___ UNSAT EXAMINERS CUE:             NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
-6 have been completed COMMENTS:   CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM H                              NUREG 1021, Revision 10
- Control Room JPM H NUREG 1021, Revision 10 STEP 9: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time. (Step 8.1.1.2.hh). STANDARD: The operator records the time in the block provided
 
. EXAMINER'S CUE:
Appendix C                                   Page 13 of 16                         Form ES-C-1 PERFORMANCE INFORMATION STEP 10:     IF E-2 Degraded Grid Voltage Protection is to be returned to                 CRITICAL NORMAL, THEN RESTORE as follows:                                               STEP
NONE   EXAMINER'S NOTE:
* Momentarily DEPRESS the amber E-2 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.                     ___ SAT
NONE BOOTH OPERATOR CUE:
* CHECK the amber E-2 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
* PLACE E-2 DEGRADED GRID VOLTAGE key switch to NORMAL.                                                                 ___ UNSAT
- Control Room JPM H NUREG 1021, Revision 10 STEP 1 0: IF E-2 Degraded Grid Voltage Protection is to be returned to NORMAL, THEN RESTORE as follows:
* REMOVE key.
Momentarily DEPRESS the amber E
* IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.4, E-2 Defeat Switch Contact Position Verification.
-2 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.
* ENSURE relay 27 contacts are RESET by performing the following:
CHECK the amber E
-2 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED. PLACE E-2 DEGRADED GRID VOLTAGE key switch to NORMAL. REMOVE key. IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.4, E
-2 Defeat Switch Contact Position Verification.
ENSURE relay 27 contacts are RESET by performing the following:
o DEPRESS the TARGET RESET pushbutton for relay 27/DVA-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVA-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVB-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVB-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVC-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVC-2 AND CHECK that the target flag indicates black.
CHECK annunciator APP
* CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.
-010-F6, DEGRADED GRID E
(Step 8.1.1.2.ii).
-2 PROT BYPD, is EXTINGUISHED.
STANDARD:     The operator contacts AO and directs performance of Step 8.1.1.2.ii.1-6.
(Step 8.1.1.2.ii). STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.ii.1
The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.
-6. The operator observes APP-010-F 6, DEGRADED GRID E
EXAMINERS CUE:               If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.
-2 PROT BYPD, is EXTINGUISHED
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           When directed, return Degraded Grid Protection on Bus E-2 to normal RFI EPSL008, and report back as AO that Steps 8.1.1.2.ii.1-6 have been completed COMMENTS:
. EXAMINER'S CUE:
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10
If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the "C" RCP is started, direct the operator to continue with the procedure as written.
 
EXAMINER'S NOTE:
Appendix C                                 Page 14 of 16                   Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time.                               ___ SAT (Step 8.1.1.2.jj).
NONE BOOTH OPERATOR CUE:
STANDARD:     The operator records the time in the block provided.
When directed, return Degraded Grid Protection on Bus E-2 to normal RFI EPS L 008, and report back as AO that Steps 8.1.1.2.ii.1
___ UNSAT The operator informs the CRS that the LCO 3.3.5 Action Statement may be able to be exited.
-6 have been completed COMMENTS:     CRITICAL STEP
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Terminating Cue:             Evaluation on this JPM is complete.
- Control Room JPM H NUREG 1021, Revision 10 STEP 1 1: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time. (Step 8.1.1.2.jj). STANDARD: The operator records the time in the block provided
. The operator informs the CRS that the LCO 3.3.5 Action Statement may be able to be exited.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM H                              NUREG 1021, Revision 10


Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 15 of 16                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM H Examinees Name:
- Control Room JPM H NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM H   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,015: Line 1,466:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM H                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The A RCP is running.
A plant startup is in progress in accordance with GP
* It is intended to start the B RCP next.
-002, Cold Shutdown to Hot Sub
* Section 8.1 of OP-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
-Critical at No
* It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.
-Load Tavg. The "A" RCP is running. It is intended to start the "B" RCP next.
INITIATING CUE:     The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.
Section 8.1 of OP
NUREG 1021, Revision 10
-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.     INITIATING CUE:
The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP
-101.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- In-Plant JPM I (Rev_011116) NUREG 1021, Revision 10


In-Plant JPM I     Developed By:
Appendix C                          Job Performance Measure            Form ES-C-1 Worksheet In-Plant JPM I Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:         ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - In-Plant JPM I (Rev_011116)              NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 11                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- In-Plant JPM I NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Locally Establish AFW Flow from         JPM No.:   2016 Systems - In-the SDAFW Pump and Control S/G                      Plant JPM I Levels and Pressures K/A  
Locally Establish AFW Flow from the SDAFW Pump and Control S/G Levels and Pressures JPM No.: 2016 Systems  
- In-Plant JPM I K/A  


==Reference:==
==Reference:==
EPE 055 EA2.01 (3.4/3.7)
EPE 055 EA2.01 (3.4/3.7)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:           X                           Actual Performance:
X Actual Performance:
Classroom               Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
Initial Conditions:
: 1. Initial Conditions:
* The Plant has experienced a loss of onsite and offsite power.
The Plant has experienced a loss of onsite and offsite power
* EOP-ECA-0.0, Loss of All AC Power, has been implemented.
. EOP-ECA-0.0, Loss of All AC Power, has been implemented
* Wide range levels in all three SGs are 55%.
. Wide range levels in all three SGs are 55%.
* Steam Generator pressures are 1075 psig
Steam Generator pressures are 1075 psig The SDAFW Pump has just been started
* The SDAFW Pump has just been started.
. Initiating Cue:
Initiating Cue:             The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.
The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0. Task Standard:
Task Standard:             The operator will control AFW flow to the Steam Generators and align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
The operator will control AFW flow to the Steam Generators and align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
Required Materials:         PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
-ECA-0.0. Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
General  
General  


==References:==
==References:==
EOP-ECA-0.0 (Loss of All AC Power), Rev 4 2016 Systems - In-Plant JPM I                                              NUREG 1021, Revision 10
Appendix C                                      Page 3 of 11                        Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:              Handout 1: Blank copy of Attachment 4 of EOP-ECA-0.0.
Time Critical Task:    NO Validation Time:      7 minutes Critical Step Justification Step 1        This step is critical because throttling the SDAFW Pump Discharge Valves is necessary to control AFW flow to the Steam Generators IAW Attachment 4 of EOP-ECA-0.0.
Step 3        This step is critical because closing IA-297 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 4        This step is critical because opening SDN-13 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 5        This step is critical because closing SDN-29 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 6        This step is critical because opening SDN-28 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 7        This step is critical because opening IA-423 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
2016 Systems - In-Plant JPM I                                        NUREG 1021, Revision 10


E OP-ECA-0.0 (Loss of All AC Power), Rev 4 Appendix C Page 3 of 11 Form ES-C-1  Job Performance Measure Worksheet  2016 Systems
Appendix C                                       Page 4 of 11                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- In-Plant JPM I NUREG 1021, Revision 10 OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45  Handouts: Handout 1: Blank copy of Attachment 4 of EOP
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
-ECA-0.0. Time Critical Task:
START TIME:
NO  Validation Time:
NOTE Flashlights AND ANY handtools needed are located with AOP/EOP/DSP Tool Kits.
7 minutes      Critical Step Justification Step 1 This step is critical because throttling the SDAFW Pump Discharge Valves is necessary to control AFW flow to the Steam Generators IAW Attachment 4 of EOP-ECA-0.0. Step 3 This step is critical because closing IA
-297 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0. Step 4 This step is critical because opening SDN
-13 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0. Step 5 This step is critical because closing SDN
-29 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0. Step 6 This step is critical because opening SDN
-28 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0. Step 7 This step is critical because opening IA
-423 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0.
Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM I NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. START TIME:
NOTE Flashlights AND ANY handtools needed are located with AOP/EOP/DSP Tool Kits.
The S/G Wide Range level indicators LI607A2, LI607B2, AND LI607C2 located in the Secondary Control Panel are powered from PP50 AND should always be available. These channels are credited in the SBO Coping Analysis.
The S/G Wide Range level indicators LI607A2, LI607B2, AND LI607C2 located in the Secondary Control Panel are powered from PP50 AND should always be available. These channels are credited in the SBO Coping Analysis.
STEP 1: Locally THROTTLE The Steam Driven AFW Pump Discharge Valve(s) At The Secondary Control Panel Area To Maintain S/G WR Levels Between 60% AND 67%
CRITICAL STEP 1:         Locally THROTTLE The Steam Driven AFW Pump Discharge                         STEP Valve(s) At The Secondary Control Panel Area To Maintain S/G WR Levels Between 60% AND 67%.
. AFWV214A  S/G A AFWV214B  S/G B AFWV214C  S/G C (Step 1) STANDARD: The operator reads the Notes, and proceeds.
* AFWV214A  S/G A                                                       ___ SAT
* AFWV214B  S/G B
* AFWV214C  S/G C (Step 1)                                                                   ___ UNSAT STANDARD:         The operator reads the Notes, and proceeds.
The operator depresses the AFWV214A, 14B and 14C de-clutch lever and rotates handwheel counterclockwise to increase feedwater flow or clockwise to decrease feedwater flow.
The operator depresses the AFWV214A, 14B and 14C de-clutch lever and rotates handwheel counterclockwise to increase feedwater flow or clockwise to decrease feedwater flow.
AS-FOUND: All three valves are CLOSED (Stems fully inserted)
AS-FOUND:               All three valves are CLOSED (Stems fully inserted)
EXAMINER'S CUE:
EXAMINERS CUE:                   After locating and describing how the three valves are operated, indicate that each valve has been De-Clutched and the handwheel rotated as needed to adjust feedwater flow When appropriate, indicate that each SG WR level is 64% and stable If the operator elects to OPEN the motor breakers for these valves, indicate that another operator will perform this action EXAMINERS NOTE:                  The operator may request that a second operator observe SG WR levels while the remainder of the Attachment is completed COMMENTS:
After locating and describing how the three valves are operated, indicate that each valve has been De
2016 Systems - In-Plant JPM I                                          NUREG 1021, Revision 10
-Clutched and the handwheel rotated as needed to adjust feedwater flow
 
Appendix C                                  Page 5 of 11                        Form ES-C-1 PERFORMANCE INFORMATION STEP 2:      OBSERVE NOTE Prior To Step 10 AND GO TO Step 10 (Step 2)
___ SAT STANDARD: The operator proceeds to Step 10.
___ UNSAT AS-FOUND:            NA EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE COMMENTS:
NOTE IA297 is located at the southeast corner of the Pipe Jungle at an elevation between the feed AND steam lines.
CRITICAL STEP 3:      CLOSE IA297, HDR STOP TO PORV STATION & MSIVS                                STEP (Step 10)
STANDARD:      The operator reads the Note, and proceeds.
___ SAT The operator rotates the IA-297 handwheel in the clockwise direction.
___ UNSAT AS-FOUND:            OPEN (Stem Fully Withdrawn)
EXAMINERS CUE:              The IA-297 handwheel will no longer turn in the clockwise direction and the stem is inserted EXAMINERS NOTE:              Located at the SE corner of Pipe Jungle between the Feed & Steam lines elevation IA-297 is located in the overhead under a catwalk and the operator must climb an installed ladder, or proceed up the stairs to the top floor of the Turbine Building. However, the valve can be seen from below or above, and discussion of operation can take place from one of these two locations COMMENTS:
2016 Systems - In-Plant JPM I                                          NUREG 1021, Revision 10


When appropriate, indicate that each SG WR level is 64% and stable If the operator elects to OPEN the motor breakers for these valves, indicate that another operator will perform this action EXAMINER'S NOTE:
Appendix C                                   Page 6 of 11                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN13 is located at the Steam Dump Nitrogen Accumulator.
The operator may request that a second operator observe SG WR levels while the remainder of the Attachment is completed COMMENTS:  CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 5 of 11 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
STEP 4:     OPEN SDN13, NITROGEN BACK UP SUPPLY                                   CRITICAL (Step 11)                                                                 STEP STANDARD:     The operator reads the Note, and proceeds.
- In-Plant JPM I NUREG 1021, Revision 10 STEP 2: OBSERVE NOTE Prior To Step 10 AND GO TO Step 10 (Step 2)  STANDARD: The operator proceeds to Step 10
___ SAT The operator rotates the SDN-13 handwheel in the counter-clockwise direction.
. AS-FOUND: NA  EXAMINER'S CUE:
___ UNSAT AS-FOUND:           CLOSED (Stem Fully Inserted)
NONE  EXAMINER'S NOTE:
EXAMINERS CUE:               The SDN-13 handwheel will no longer turn in the clockwise direction and the stem is inserted.
NONE  COMMENTS:      ___ SAT    ___ UNSAT  NOTE IA297 is located at the southeast corner of the Pipe Jungle at an elevation between the feed AND steam lines.
EXAMINERS NOTE:             Located at the Steam Dump Nitrogen Accumulator COMMENTS:
STEP 3: CLOSE IA297, HDR STOP TO PORV STATION & MSIVS (Step 10)  STANDARD: The operator reads the Note, and proceeds.
2016 Systems - In-Plant JPM I                                      NUREG 1021, Revision 10
The operator rotates the IA
-297 handwheel in the clockwise direction. AS-FOUND: OPEN (Stem Fully Withdrawn)  EXAMINER'S CUE:
The IA-297 handwheel will no longer turn in the clockwise direction and the stem is inserted  EXAMINER'S NOTE:
Located at the SE corner of Pipe Jungle between the Feed & Steam lines elevation IA-297 is located in the overhead under a catwalk and the operator must climb an installed ladder, or proceed up the stairs to the top floor of the Turbine Building. However, the valve can be seen from below or above, and discussion of operation can take place from one of these two locations COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: SDN13 is located at the Steam Dump Nitrogen Accumulator.
STEP 4: OPEN SDN13, NITROGEN BACK UP SUPPLY (Step 11) STANDARD: The operator reads the Note, and proceeds.
The operator rotates the SDN
-13 handwheel in the counter
-clockwise direction
. AS-FOUND: CLOSED (Stem Fully Inserted) EXAMINER'S CUE:
The SDN-13 handwheel will no longer turn in the clockwise direction and the stem is inserted. EXAMINER'S NOTE:
Located at the Steam Dump Nitrogen Accumulator COMMENTS:  


CRITICAL STEP
Appendix C                                   Page 7 of 11                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN28 AND SDN29 are located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.
___ SAT    ___ UNSAT Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STEP 5:     UNLOCK AND CLOSE SDN29, STEAM LINE PORV NITROGEN                       CRITICAL B/U TO IA TELLTALE DRAIN                                                 STEP (Step 12)
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: SDN28 AND SDN29 are located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.
___ SAT STANDARD:     The operator reads the Note, and proceeds.
STEP 5: UNLOCK AND CLOSE SDN29, STEAM LINE PORV NITROGEN B/U TO IA TELLTALE DRAIN (Step 12) STANDARD: The operator reads the Note, and proceeds.
The operator unlocks and rotates the SDN-29 handwheel in the         ___ UNSAT clockwise direction.
The operator unlocks and rotates the SDN
AS-FOUND:           Locked OPEN (Stem Fully Withdrawn)
-29 handwheel in the clockwise direction
EXAMINERS CUE:               The SDN-29 handwheel will no longer turn in the clockwise direction and the stem is inserted.
. AS-FOUND: Locked OPEN (Stem Fully Withdrawn) EXAMINER'S CUE:
EXAMINERS NOTE:             Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:
The SDN-29 handwheel will no longer turn in the clockwise direction and the stem is inserted. EXAMINER'S NOTE:
STEP 6:      UNLOCK AND OPEN SDN28, NITROGEN BACKUP TO STEAM                        CRITICAL LINE PORVS                                                                STEP (Step 13)
Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck
STANDARD:      The operator unlocks and rotates the SDN-28 handwheel in the        ___ SAT counter-clockwise direction.
AS-FOUND:          Locked CLOSED (Stem Fully Inserted)                            ___ UNSAT EXAMINERS CUE:              The SDN-28 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.
EXAMINERS NOTE:              Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:
2016 Systems - In-Plant JPM I                                      NUREG 1021, Revision 10


COMMENTS:
Appendix C                                  Page 8 of 11                      Form ES-C-1 PERFORMANCE INFORMATION NOTE: IA423 is located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.
CRITICAL STEP ___ SAT    ___ UNSAT  STEP 6: UNLOCK AND OPEN SDN28, NITROGEN BACKUP TO STEAM LINE PORVS (Step 13) STANDARD: The operator unlocks and rotates the SDN
STEP 7:     UNLOCK AND OPEN IA423, NITROGEN TO STEAM LINE PORVS                     CRITICAL (Step 14)                                                                   STEP STANDARD:     The operator reads the Note, and proceeds.
-28 handwheel in the counter-clockwise direction
___ SAT The operator unlocks and rotates the IA-423 handwheel in the counter-clockwise direction.
. AS-FOUND: Locked CLOSED (Stem Fully Inserted) EXAMINER'S CUE:
___ UNSAT AS-FOUND:             Locked CLOSED (Stem Fully Inserted)
The SDN-28 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn. EXAMINER'S NOTE:
EXAMINERS CUE:               The IA-423 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.
Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:       CRITICAL STEP   ___ SAT   ___ UNSAT Appendix C Page 8 of 11 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
EXAMINERS NOTE:             Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: IA423 is located at the southeast corner of the Pipe Jungle on the Mezzanine Deck. STEP 7: UNLOCK AND OPEN IA423, NITROGEN TO STEAM LINE PORVS (Step 14)  STANDARD: The operator reads the Note, and proceeds.
STEP 8:      NOTIFY The Control Room Of The Following:
* S/G level is under control locally                                    ___ SAT
* The S/G Steam Line PORVs have N2 supplied for motive air (Step 15/15.a and b)
STANDARD:      The operator contacts the Control Room and makes the                  ___ UNSAT notifications.
AS-FOUND:            NA EXAMINERS CUE:              As the CRS, acknowledge EXAMINERS NOTE:              NONE COMMENTS:
2016 Systems - In-Plant JPM I                                       NUREG 1021, Revision 10


The operator unlocks and rotates the IA
Appendix C                                   Page 9 of 11                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: When MCC5 is energized, the Control Room will feed S/G A AND S/G C.
-423 handwheel in the counter-clockwise direction
STEP 9:     WHEN Notified From The Control Room, THEN FEED S/G B To 67%
. AS-FOUND: Locked CLOSED (Stem Fully Inserted)
S/G Wide Range Level AND SECURE Feeding (Step 16)
EXAMINER'S CUE:
___ SAT STANDARD:     The operator reads the Note, and proceeds.
The IA-423 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn. EXAMINER'S NOTE:
The operator recognizes that this is a Continuous Action Step, and   ___ UNSAT reports that the Attachment is complete.
Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 8: NOTIFY The Control Room Of The Following:
AS-FOUND:           NA EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
S/G level is under control locally The S/G Steam Line PORVs have N2 supplied for motive air (Step 15/15.a and b
Terminating Cue:               Evaluation on this JPM is complete.
)  STANDARD: The operator contacts the Control Room and makes the notifications
. AS-FOUND: NA  EXAMINER'S CUE:
As the CRS, acknowledge EXAMINER'S NOTE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: When MCC5 is energized, the Control Room will feed S/G A AND S/G C.
STEP 9: WHEN Notified From The Control Room, THEN FEED S/G B To 67% S/G Wide Range Level AND SECURE Feeding (Step 16) STANDARD: The operator reads the Note, and proceeds.
The operator recognizes that this is a Continuous Action Step, and reports that the Attachment is complete
. AS-FOUND: NA EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE   COMMENTS:           ___ SAT    ___ UNSAT            Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - In-Plant JPM I                                      NUREG 1021, Revision 10


Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 10 of 11                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   2016 Systems - In-Plant JPM I Examinees Name:
- In-Plant JPM I NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - In-Plant JPM I Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,165: Line 1,592:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                      Date:
2016 Systems - In-Plant JPM I                                NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The Plant has experienced a loss of onsite and offsite power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* EOP-ECA-0.0, Loss of All AC Power, has been implemented.
The Plant has experienced a loss of onsite and offsite power.
* Wide range levels in all three SGs are 55%.
EOP-ECA-0.0, Loss of All AC Power, has been implemented.
* Steam Generator pressures are 1075 psig
Wide range levels in all three SGs are 55%.
* The SDAFW Pump has just been started.
Steam Generator pressures are 1075 psig The SDAFW Pump has just been started
INITIATING CUE:     The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.
.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
INITIATING CUE:
NUREG 1021, Revision 10
The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0. NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- In-Plant JPM J (Rev_011116) NUREG 1021, Revision 10


In-Plant JPM J     Developed By:
Appendix C                          Job Performance Measure            Form ES-C-1 Worksheet In-Plant JPM J Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:         ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - In-Plant JPM J (Rev_011116)              NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 10                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- In-Plant JPM J NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Respond to a Loss of Instrument Air     JPM No.:   2016 Systems - In-Plant JPM J K/A  
Respond to a Loss of Instrument Air JPM No.: 2016 Systems  
- In-Plant JPM J     K/A  


==Reference:==
==Reference:==
 
065 AA1.04 (3.5.3.4)
0 65 A A1.0 4 (3.5.3.4)   Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:           X                           Actual Performance:
X Actual Performance:
Classroom               Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout
Initial Conditions:
: 1. Initial Conditions:
* IA Header Pressure is 75 PSIG and lowering.
IA Header Pressure is 75 PSIG and lowering.
* AOP-017, Loss Of Instrument Air, has been entered.
AOP-017, Loss Of Instrument Air, has been entered.
* The Station Air Compressor is under clearance and disassembled
The Station Air Compressor is under clearance and disassembled The Station Air Receiver is depressurized and vented.
* The Station Air Receiver is depressurized and vented.
Initiating Cue:
Initiating Cue:
The CRS has directed you to perform AOP
* The CRS has directed you to perform AOP-017 Step 8.
-017 Step 8
* The Outside AO is standing by to assist as needed.
. The Outside AO is standing by to assist as needed.
Task Standard:             The operator will start IA Compressors A and B and align their discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.
Task Standard:
Required Materials:         PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
The operator will start IA Compressors "A" and "B" and align their discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP
-017. Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
General  
General  


==References:==
==References:==
AOP-017 (Loss of Instrument Air), Rev 43 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 2016 Systems - In-Plant JPM J                                              NUREG 1021, Revision 10
Appendix C                                      Page 3 of 10                      Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Blank Copy of AOP-017.
Time Critical Task:    NO Validation Time:        14 minutes Critical Step Justification Step 6        This step is critical because placing the IA Compressor A & B Control Switches in MANUAL is necessary to start IA Compressors A and B in accordance with Step 8 of AOP-017.
Step 8        This step is critical because rotating the IA3665 handwheel in the counter-clockwise direction is necessary to align the IA Compressors A and B discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.
2016 Systems - In-Plant JPM J                                        NUREG 1021, Revision 10


AOP-01 7 (Loss of Instrument Air), Rev 43  OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45 Appendix C Page 3 of 10 Form ES-C-1  Job Performance Measure Worksheet  2016 Systems
Appendix C                                   Page 4 of 10                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- In-Plant JPM J NUREG 1021, Revision 10 Handouts: Handout 1: Blank Copy of AOP-01 7. Time Critical Task:
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
NO  Validation Time:
START TIME:
14 minutes      Critical Step Justification Step 6 This step is critical because placing the IA Compressor A & B Control Switches in MANUAL is necessary to start IA Compressors "A" and "B" in accordance with Step 8 of AOP
NOTE IA3821 is located on IA Dryer D.
-017. Step 8 This step is critical because rotating the IA3665 handwheel in the counter-clockwise direction is necessary to align the IA Compressors "A" and "B" discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.
Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM J NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. START TIME:
NOTE IA3821 is located on IA Dryer D.
Operator Aid 97OP35 to supply Station Air to Instrument Air is located in the Aux Bldg hallway on the Station Air Receiver.
Operator Aid 97OP35 to supply Station Air to Instrument Air is located in the Aux Bldg hallway on the Station Air Receiver.
STEP 1: DISPATCH Operator(s) To Perform The Following:
STEP 1:         DISPATCH Operator(s) To Perform The Following:
CHECK Station Air Compressor Available For Service:
CHECK Station Air Compressor Available For Service:
SA1, STATION AIR TO RECEIVER  OPEN AND Station Air Compressor Function Switch  ON (Step 8/8.a
SA1, STATION AIR TO RECEIVER  OPEN                                     ___ SAT AND Station Air Compressor Function Switch  ON (Step 8/8.a)
STANDARD: The operator reads the Notes, and proceeds.
___ UNSAT STANDARD:         The operator reads the Notes, and proceeds.
The operator recognizes that SA
The operator recognizes that SA-1 is OOS and proceeds to the RNO.
-1 is OOS and proceeds to the RNO. AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
AS FOUND:               SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
NONE   EXAMINER'S NOTE:
2016 Systems - In-Plant JPM J                                      NUREG 1021, Revision 10
NONE COMMENTS:
 
___ SAT    ___ UNSAT Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     OPEN SA1 AND PLACE the Station Air Compressor Function switch to ON.
- In-Plant JPM J NUREG 1021, Revision 10 STEP 2: OPEN SA1 AND PLACE the Station Air Compressor Function switch to ON. IF the Station Air Compressor is still NOT available for service, THEN GO TO Step 8.d.
IF the Station Air Compressor is still NOT available for service, THEN   ___ SAT GO TO Step 8.d.
(Step 8.a RNO) STANDARD: The operator recognizes that SA
(Step 8.a RNO)
-1 cannot be opened nor can the SAC Function Switch be placed to ON, and proceeds to Step 8.d
___ UNSAT STANDARD:     The operator recognizes that SA-1 cannot be opened nor can the SAC Function Switch be placed to ON, and proceeds to Step 8.d.
. AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
AS FOUND:           SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE   EXAMINER'S NOTE:
STEP 3:     CHECK IA18, AIR DRYER "A" & "B" BYPASS  OPEN (Step 8.d)
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 3: CHECK IA18, AIR DRYER "A" & "B" BYPASS  OPEN (Step 8.d) STANDARD: The operator observes IA
STANDARD:     The operator observes IA-18, and (After Cue) proceeds to the Step       ___ SAT 8.d RNO.
-18, and (After Cue) proceeds to the Step 8.d RNO. AS FOUND: IA-18 stem is fully inserted (Cue as needed)
AS FOUND:           IA-18 stem is fully inserted (Cue as needed)                     ___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
EXAMINER'S CUE:
2016 Systems - In-Plant JPM J                                        NUREG 1021, Revision 10
NONE   EXAMINER'S NOTE:
 
NONE   COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 4:     OPEN IA18, AIR DRYER "A" & "B" BYPASS.
- In-Plant JPM J NUREG 1021, Revision 10 STEP 4: OPEN IA18, AIR DRYER "A" & "B" BYPASS.
(Step 8.d RNO)
(Step 8.d RNO) STANDARD: The operator rotates the IA
___ SAT STANDARD:     The operator rotates the IA-18 handwheel in the counter-clockwise direction.
-18 handwheel in the counter
___ UNSAT AS FOUND:           IA-18 stem is fully inserted (Cue as needed)
-clockwise direction. AS FOUND: IA-18 stem is fully inserted (Cue as needed)
EXAMINERS CUE:               After locating and describing how the valve would be opened, indicate that the stem is fully withdrawn.
EXAMINER'S CUE:
EXAMINERS NOTE:             NONE COMMENTS:
After locating and describing how the valve would be opened, indicate that the stem is fully withdrawn.
STEP 5:     CHECK the following Compressors  RUNNING
EXAMINER'S NOTE:
* INST AIR COMP A
NONE   COMMENTS:         ___ SAT    ___ UNSAT  STEP 5: CHECK the following Compressors  RUNNING INST AIR COMP A INST AIR COMP B (Step 8.e) STANDARD: The operator observes the IA Compressor A Control Switch
* INST AIR COMP B                                                   ___ SAT (Step 8.e)
. The operator observes the IA Compressor B Control Switch
STANDARD:     The operator observes the IA Compressor A Control Switch.
. AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
___ UNSAT The operator observes the IA Compressor B Control Switch.
EXAMINER'S CUE:
AS FOUND:           Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
NONE   COMMENTS:       ___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
2016 Systems - In-Plant JPM J                                         NUREG 1021, Revision 10
- In-Plant JPM J NUREG 1021, Revision 10 STEP 6: START the following compressors:
INST AIR COMP A INST AIR COMP B (Step 8.e RNO)  STANDARD: The operator places the IA Compressor A Control Switch in MANUAL. The operator places the IA Compressor B Control Switch in MANUAL. AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
EXAMINER'S CUE:
After the IA Compressor Control Switches are placed in MANUAL indicate that the motor starts and the compressor is running EXAMINER'S NOTE:
NONE COMMENTS:
CRITICAL STEP
___ SAT    ___ UNSAT  STEP 7: CHECK FCV1740, AIR DRYER HIGH DP FLOW CONTROL valve  OPEN  (Step 8.f)  STANDARD: The operator observes FCV
-1740. AS FOUND: CLOSED (Cue as needed)


EXAMINER'S CUE:
Appendix C                                   Page 7 of 10                         Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      START the following compressors:                                           CRITICAL
After locating and describing how the valve would be verified opened indicate the position indicator is down indicating closed.
* INST AIR COMP A                                                         STEP
EXAMINER'S NOTE:
* INST AIR COMP B (Step 8.e RNO)
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
___ SAT STANDARD:     The operator places the IA Compressor A Control Switch in MANUAL.
- In-Plant JPM J NUREG 1021, Revision 10 STEP 8: OPEN IA3665, AIR DRYER "A" & "B" BYPASS.
___ UNSAT The operator places the IA Compressor B Control Switch in MANUAL.
(Step 8.f RNO) STANDARD: The operator rotates the IA3665 handwheel in the counter
AS FOUND:           Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
-clockwise direction
EXAMINERS CUE:             After the IA Compressor Control Switches are placed in MANUAL indicate that the motor starts and the compressor is running EXAMINERS NOTE:             NONE COMMENTS:
. AS FOUND: CLOSED (Cue as needed)
STEP 7:     CHECK FCV1740, AIR DRYER HIGH DP FLOW CONTROL valve OPEN (Step 8.f)
EXAMINER'S CUE:
___ SAT STANDARD:     The operator observes FCV-1740.
After locating and describing how the valve would be opened indicate the valve has been rotated fully counter-clockwise (stem fully withdrawn)
AS FOUND:           CLOSED (Cue as needed)                                              ___ UNSAT EXAMINERS CUE:             After locating and describing how the valve would be verified opened indicate the position indicator is down indicating closed.
EXAMINER'S NOTE:
EXAMINERS NOTE:            NONE COMMENTS:
NONE   COMMENTS:       CRITICAL STEP  ___ SAT
2016 Systems - In-Plant JPM J                                      NUREG 1021, Revision 10
___ UNSAT    STEP 9: OPEN IA3821, INSTRUMENT AIR DRYER "D" BYPASS (Step 8.g) STANDARD: The operator contacts the Outside AO and directs that IA
-3821 be OPENED. AS FOUND: NA  EXAMINER'S CUE:
As the Outside AO, indicate that IA
-3821 is OPEN.
If the operator starts to proceed to IA
-3821 (In Turbine Building), rather than call the Outside AO to re
-position this valve, indicate that another operator will perform this action and terminate the JPM.


EXAMINER'S NOTE: IA-3821 is located on the "D" IA dryer.
Appendix C                                    Page 8 of 10                          Form ES-C-1 PERFORMANCE INFORMATION STEP 8:      OPEN IA3665, AIR DRYER "A" & "B" BYPASS.                                      CRITICAL (Step 8.f RNO)                                                                  STEP STANDARD:      The operator rotates the IA3665 handwheel in the counter-                  ___ SAT clockwise direction.
COMMENTS:         ___ SAT
AS FOUND:          CLOSED (Cue as needed)                                                ___ UNSAT EXAMINERS CUE:              After locating and describing how the valve would be opened indicate the valve has been rotated fully counter-clockwise (stem fully withdrawn)
___ UNSAT            Terminating Cue:
EXAMINERS NOTE:             NONE COMMENTS:
Evaluation on this JPM is complete.
STEP 9:      OPEN IA3821, INSTRUMENT AIR DRYER "D" BYPASS (Step 8.g)
STANDARD:      The operator contacts the Outside AO and directs that IA-3821 be OPENED.                                                                    ___ SAT AS FOUND:          NA
___ UNSAT EXAMINERS CUE:              As the Outside AO, indicate that IA-3821 is OPEN.
If the operator starts to proceed to IA-3821 (In Turbine Building), rather than call the Outside AO to re-position this valve, indicate that another operator will perform this action and terminate the JPM.
EXAMINERS NOTE:              IA-3821 is located on the D IA dryer.
COMMENTS:
Terminating Cue:               Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - In-Plant JPM J                                          NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                               Page 9 of 10                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   2016 Systems - In-Plant JPM J Examinees Name:
- In-Plant JPM J NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - In-Plant JPM J   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,309: Line 1,713:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                      Date:
2016 Systems - In-Plant JPM J                                NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* IA Header Pressure is 75 PSIG and lowering.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* AOP-017, Loss Of Instrument Air, has been entered.
IA Header Pressure is 75 PSIG and lowering.
* The Station Air Compressor is under clearance and disassembled
AOP-017, Loss Of Instrument Air, has been entered.
* The Station Air Receiver is depressurized and vented.
The Station Air Compressor is under clearance and disassembled The Station Air Receiver is depressurized and vented.
INITIATING CUE:
INITIATING CUE:
The CRS has directed you to perform AOP
* The CRS has directed you to perform AOP-017 Step 8.
-017 Step 8
* The Outside AO is standing by to assist as needed.
. The Outside AO is standing by to assist as needed.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
NUREG 1021, Revision 10
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- In-Plant JPM K (Rev_01 11 16) NUREG 1021, Revision 10


In-Plant JPM K     Developed By:
Appendix C                          Job Performance Measure            Form ES-C-1 Worksheet In-Plant JPM K Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:         ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - In-Plant JPM K (Rev_011116)              NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 14 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 14                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- In-Plant JPM K NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Loss of North SW Header in the           JPM No.:       2016 Systems - In-Auxiliary Building                                      Plant JPM K K/A  
Loss of North SW Header in the Auxiliary Building JPM No.: 2016 Systems  
- In-Plant JPM K     K/A  


==Reference:==
==Reference:==
APE 062 AA2.01 (2.9/3.5)
APE 062 AA2.01 (2.9/3.5)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:           X                           Actual Performance:
X Actual Performance:
Classroom                 Simulator             Plant         X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. Initial Conditions:
Initial Conditions:
The plant is at 100% power
* The plant is at 100% power.
. The North SW header has ruptured inside the Auxiliary Building
* The North SW header has ruptured inside the Auxiliary Building.
. The Control Room has implemented AOP
* The Control Room has implemented AOP-022 (Loss of Service Water) for a leak in the North header.
-022 (Loss of Service Water) for a leak in the North header.
Initiating Cue:             The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.
Initiating Cue:
Task Standard:             The operator will isolate the intact SW header from the ruptured header, isolate the leak, and align cooling water to critical loads IAW Attachment 6 of AOP-022.
The CRS has directed you to isolate the leak IAW Attachment 6 of AOP
Required Materials:         PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
-022. Task Standard:
Flashlight Magnifying Glass General  
The operator will isolate the intact SW header from the ruptured header, isolate the leak, and align cooling water to critical loads IAW Attachment 6 of A O P-022. Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
Flashlight Magnifying Glass General  


==References:==
==References:==
AOP-022 (Loss of Service Water), Rev 35 2016 Systems - In-Plant JPM K                                              NUREG 1021, Revision 10
Appendix C                                      Page 3 of 14                        Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Plant Drawing G-190199 (Service & Cooling Water Flow Diagram) Rev 72 Figure 9.2.1-1, Flow Diagram Service and Cooling Water, Rev 26 Handouts:                Handout 1: Blank Copy of Attachment 6 of AOP-022.
Handout 2: Figure 9.2.1-1, Flow Diagram Service and Cooling Water, with the leak location marked.
Time Critical Task:      NO Validation Time:        14 minutes Critical Step Justification Step 1        This step is critical because closing either SW-18 or SW-19 is necessary to isolate the ruptured header from intact header.
Step 2        This step is critical because closing SW-740 and SW-102 is necessary to isolate the ruptured header from intact header.
Step 4        This step is critical because placing Instrument Air Compressor B in OFF is necessary to prevent damage to the compressor.
Step 7        This step is critical because cross-connecting the Booster Pump Suction is necessary to isolate the leak and align cooling water to critical loads (SW-25 must be closed to prevent reinitiating the leak, SW-26 and SW-27 must be opened to supply cooling water to vital equipment, SW-503 must be closed to prevent reinitiating the leak and SW-200A must be opened to provide emergency make up to the IVSW Tank).
Step 9        This step is critical because Closing SW-53 and Opening SW-83 is necessary to align cooling water to critical loads (EDGs).
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10


AOP-022 (Loss of Service Water), Rev 35 Appendix C Page 3 of 14 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                     Page 4 of 14                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- In-Plant JPM K NUREG 1021, Revision 10 OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45  Plant Drawing G-190199 (Service & Cooling Water Flow Diagram)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
Rev 72  Figure 9.2.1
START TIME:
-1, Flow Diagram Service and Cooling Water, Rev 26 Handouts: Handout 1: Blank Copy of Attachment 6 of AOP-022. Handout 2: Figure 9.2.1
CAUTION Electrically rated boots and gloves must be worn in the Auxiliary Building where flooding is in progress.
-1, Flow Diagram Service and Cooling Water , with the leak location marked
NOTE Dielectric rubber boots and low voltage electrical gloves are available in the AOP/DSP/EOP Equipment storage Locker inside the Auxiliary Building.
. Time Critical Task:
STEP 1:          Close One Of The Following Valves In The Auxiliary Building              CRITICAL Hallway :                                                                    STEP
NO  Validation Time:
* SW-18, North & South Supply HDR X-Conn (Chain Operated)
14 minutes      Critical Step Justification Step 1 This step is critical because closing either SW-18 or SW-19 is necessary to isolate the ruptured header from intact header
OR
. Step 2 This step is critical because closing SW
* SW-19, North & South Supply HDR X-Conn (Chain Operated)
-740 and SW
(Step 1)
-102 is necessary to isolate the ruptured header from intact header
___ SAT STANDARD:        The operator pulls either the SW-18 or SW-19 chain operator to rotate valve handwheel in the clockwise direction, and observes the area for water.
. Step 4 This step is critical because placing Instrument Air Compressor "B" in OFF is necessary to prevent damage to the compressor
___ UNSAT AS FOUND:        Both Valves Are Open EXAMINERS CUE:                  The operator reads the Caution and Note, and proceeds.
. Step 7 This step is critical because cross-connecting the Booster Pump Suction is necessary to isolate the leak and align cooling water to critical loads (SW-25 must be closed to prevent reinitiating the leak , SW-26 and SW-27 must be opened to supply cooling water to vital equipment , SW-503 must be closed to prevent reinitiating the leak and SW
After locating and describing how either valve would be closed then indicate the selected valve has been rotated full clockwise and the pointer indicates Closed.
-200A must be opened to provide emergency make up to the IVSW Tank
IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
). Step 9 This step is critical because Closing SW-53 and Opening SW-83 is necessary to align cooling water to critical loads (EDGs). 
EXAMINERS NOTE:                  The valve handwheels face opposite directions.
Ensure operator turns the selected handwheel via the chain in the proper direction.
COMMENTS:
2016 Systems - In-Plant JPM K                                          NUREG 1021, Revision 10


Appendix C Page 4 of 14 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 14                       Form ES-C-1 PERFORMANCE INFORMATION NOTE SW-102 is located overhead East of CCW Pump B on top of horizontal header supported by adjustable pipe support.
- In-Plant JPM K NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
STEP 2:       Close The Following Valves In The CCW Pump Room:                           CRITICAL STEP
)  Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. START TIME:
* SW-740, CCW Heat Exchanger "B" Return
CAUTION Electrically rated boots and gloves must be worn in the Auxiliary Building where flooding is in progress. NOTE Dielectric rubber boots and low voltage electrical gloves are available in the AOP/DSP/EOP Equipment storage Locker inside the Auxiliary Building.
* SW-102, HVH-7B Supply (Step 2)
STEP 1: Close One Of The Following Valves In The Auxiliary Building Hallway :  SW-18, North & South Supply HDR X
STANDARD:       The operator reads the Note, and proceeds.                               ___ SAT The operator rotates the SW-740 and SW-102 handwheels in the clockwise direction.
-Conn (Chain Operated)
___ UNSAT AS FOUND:       Both Valves Open (SW-740 Pointer Indicates POS 1 And SW-102 Stem Is Fully Withdrawn).
OR  SW-19, North & South Supply HDR X
EXAMINERS CUE:                   After locating and describing how both valves would be closed, indicate the valves have been rotated full clockwise, the SW-740 pointer indicates Closed and the SW-102 stem is fully inserted.
-Conn (Chain Operated)
EXAMINERS NOTE:                 SW-102 is located overhead east of CCW Pump B on top of horizontal header supported by adjustable pipe support.
(Step 1)  STANDARD: The operator pulls either the SW-18 or SW-19 chain operator to rotate valve handwheel in the clockwise direction, and observes the area for water
. AS FOUND: Both Valves Are Open EXAMINER'S CUE:
The operator reads the Caution and Note, and proceeds. After locating and describing how either valve would be closed then indicate the selected valve has been rotated full clockwise and the pointer indicates "Closed".
IF asked i f any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
EXAMINER'S NOTE:
The valve handwheels face opposite directions. Ensure operator turns the selected handwheel via the chain in the proper direction.
COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 5 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM K NUREG 1021, Revision 10 NOTE SW-102 is located overhead East of CCW Pump B on top of horizontal header supported by adjustable pipe support.
STEP 2: Close The Following Valves In The CCW Pump Room:
SW-740, CCW Heat Exchanger "B" Return SW-102, HVH-7B Supply (Step 2) STANDARD: The operator reads the Note, and proceeds.
The operator rotates the SW-740 and SW
-102 handwheels in the clockwise direction.
AS FOUND: Both Valves Open (SW
-740 Pointer Indicates "POS 1" And SW-102 Stem Is Fully Withdrawn).
EXAMINER'S CUE:
After locating and describing how both valves would be closed, indicate the valves have been rotated full clockwise, the SW
-740 pointer indicates "Closed" and the SW
-102 stem is fully inserted.
EXAMINER'S NOTE:
SW-102 is located overhead east of CCW Pump "B" on top of horizontal header supported by adjustable pipe support.
SW-102 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
SW-102 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
COMMENTS:
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10


COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 6 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 6 of 14                   Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       Notify Control Room Personnel That Steps 1 And 2 of Attachment 6 Are Complete (Step 3)                                                             ___ SAT STANDARD:     The operator contacts the Control Room and reports Steps 1 and 2 of Attachment 6 are complete.
- In-Plant JPM K NUREG 1021, Revision 10 STEP 3: Notify Control Room Personnel That Steps 1 And 2 of Attachment 6 Are Complete (Step 3) STANDARD: The operator contacts the Control Room and reports Steps 1 and 2 of Attachment 6 are complete.
___ UNSAT AS FOUND:     NONE EXAMINERS CUE:               When contacted, as CRS then acknowledge the report from the operator EXAMINERS NOTE:               NONE COMMENTS:
AS FOUND: NONE EXAMINER'S CUE:
STEP 4:       Place Instrument Air Compressor B Control Switch In The OFF           CRITICAL Position                                                                 STEP (Step 4)
When contacted, as CRS then acknowledge the report from the operator EXAMINER'S NOTE:
STANDARD:     The operator places the Instrument Air Compressor B Control Switch in OFF position
NONE COMMENTS:
___ SAT AS FOUND:     IA Compressor B Control Switch is in AUTO EXAMINERS CUE:               After locating and describing how the B IA compressor would be placed in OFF indicate the   ___ UNSAT Control Switch has been rotated to the middle position OFF.
___ SAT    ___ UNSAT  STEP 4: Place Instrument Air Compressor B Control Switch In The OFF Position (Step 4) STANDARD: The operator places the Instrument Air Compressor "B" Control Switch in OFF position AS FOUND: IA Compressor B Control Switch is in AUTO EXAMINER'S CUE:
EXAMINERS NOTE:               NONE COMMENTS:
After locating and describing how the "B" IA compressor would be placed in "OFF" indicate the Control Switch has been rotated to the middle position "OFF".
2016 Systems - In-Plant JPM K                                     NUREG 1021, Revision 10
EXAMINER'S NOTE:
NONE COMMENTS:       CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 7 of 14 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM K NUREG 1021, Revision 10 CAUTION  Subsequent actions to cross
-connect cooling water to plant components should not be performed if the leak will be reinitiated.
NOTE  SW-53, North Supply HDR To "B" TRN Components In Aux Bldg, is located in Auxiliary Building hallway, midway between Instrument Air Dryers A and B, above third cable tray.
STEP 5: Check leak location
- Downstream of SW
-53. (Step 5)  STANDARD: The operator reads the caution and Note, and proceeds.
The operator uses the SW flow diagram marked with the leak location (Handout 2), and observes the area for water and determines leak is NOT Downstream of SW
-53; and goes to step 5 RNO which directs the operator to Step 9  AS FOUND: NONE  EXAMINER'S CUE:
IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
EXAMINER'S NOTE:
NONE COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 8 of 14 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- In-Plant JPM K NUREG 1021, Revision 10 STEP 6:  Check Leak Location
- Upstream of SW
-25, North HDR Supply To SW Booster Pump (Step 9)  STANDARD: The operator determines the leak is upstream of SW
-25. AS FOUND: NONE EXAMINER'S CUE:
IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.


EXAMINER'S NOTE:
Appendix C                                    Page 7 of 14                      Form ES-C-1 PERFORMANCE INFORMATION CAUTION Subsequent actions to cross-connect cooling water to plant components should not be performed if the leak will be reinitiated.
NONE  COMMENTS:        ___ SAT    ___ UNSAT  NOTE   SW Booster Pump B may be operated as required after the suction path is established from the South Service Water Header.
NOTE SW-53, North Supply HDR To "B" TRN Components In Aux Bldg, is located in Auxiliary Building hallway, midway between Instrument Air Dryers A and B, above third cable tray.
Closing SW
STEP 5:          Check leak location - Downstream of SW-53.
-503, SW Pump Supply To IVSW Tank, also isolates SW to the Penetration Coolers.
(Step 5)
STANDARD:        The operator reads the caution and Note, and proceeds.
The operator uses the SW flow diagram marked with the leak            ___ SAT location (Handout 2), and observes the area for water and determines leak is NOT Downstream of SW-53; and goes to step 5 RNO which directs the operator to Step 9
___ UNSAT AS FOUND:              NONE EXAMINERS CUE:                  IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
EXAMINERS NOTE:                  NONE COMMENTS:
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10


Appendix C Page 9 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 8 of 14                       Form ES-C-1 PERFORMANCE INFORMATION STEP 6:       Check Leak Location - Upstream of SW-25, North HDR Supply To SW Booster Pump (Step 9)
- In-Plant JPM K NUREG 1021, Revision 10 STEP 7: Cross-Connect SW Booster Pump Suction Supply As Follows:
___ SAT STANDARD:     The operator determines the leak is upstream of SW-25.
: a. Close SW-25, North HDR Supply To SW Booster Pumps
AS FOUND:      NONE
: b. Open SW-26, SW Booster Pump Suction Cross
___ UNSAT EXAMINERS CUE:                IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
-Connect c. Open SW-27, SW Booster Pump Suction Cross
EXAMINERS NOTE:              NONE COMMENTS:
-Connect d. Close SW-503, SW Pump Supply To IVSW Tank
NOTE
: e. Open SW-200A, SWBP "A" TO IVSW Tank Supply (Step 10)  STANDARD: The operator reads the Notes, and proceeds.
* SW Booster Pump B may be operated as required after the suction path is established from the South Service Water Header.
The operator rotates the T-handle locking device counter
* Closing SW-503, SW Pump Supply To IVSW Tank, also isolates SW to the Penetration Coolers.
-clockwise on SW-25, and rotates the handwheel clockwise.
2016 Systems - In-Plant JPM K                                      NUREG 1021, Revision 10
The operator rotates the T-handle locking device counter
-clockwise on SW-26, and rotates the handwheel counter
-clockwise.


The operator rotates the T-handle locking device counter
Appendix C                                  Page 9 of 14                      Form ES-C-1 PERFORMANCE INFORMATION STEP 7:      Cross-Connect SW Booster Pump Suction Supply As Follows:                CRITICAL
-clockwise on SW-27, and rotates the handwheel counter
: a. Close SW-25, North HDR Supply To SW Booster Pumps                      STEP
-clockwise.
: b. Open SW-26, SW Booster Pump Suction Cross-Connect
: c. Open SW-27, SW Booster Pump Suction Cross-Connect
: d. Close SW-503, SW Pump Supply To IVSW Tank
: e. Open SW-200A, SWBP "A" TO IVSW Tank Supply (Step 10)                                                          ___ SAT STANDARD:    The operator reads the Notes, and proceeds.
___ UNSAT The operator rotates the T-handle locking device counter-clockwise on SW-25, and rotates the handwheel clockwise.
The operator rotates the T-handle locking device counter-clockwise on SW-26, and rotates the handwheel counter-clockwise.
The operator rotates the T-handle locking device counter-clockwise on SW-27, and rotates the handwheel counter-clockwise.
The operator rotates the SW-503 handwheel clockwise.
The operator rotates the SW-503 handwheel clockwise.
The operator rotates the SW-200A handwheel counter
The operator rotates the SW-200A handwheel counter-clockwise.
-clockwise.
AS FOUND:     SW-25 & SW-503, OPEN SW-26, SW-27 & SW-200A, CLOSED EXAMINERS CUE:               After locating and describing how each valve would be operated then indicate the selected valve has been rotated full counter-clockwise and the stem is fully withdrawn for the OPEN valves and rotated full clockwise with the stem fully inserted for the CLOSED valves SW-26 and 200A is located above the A SW Booster Pump.
AS FOUND: SW-25 & SW-503 , OPEN SW-26, SW-27 & SW-200A , CLOSED EXAMINER'S CUE:
SW-503 is located above the vent duct above the B SW Booster Pump, and requires a ladder.
After locating and describing how each valve would be operated then indicate the selected valve has been rotated full counter-clockwise and the stem is fully withdrawn for the "OPEN" valves and rotated full clockwise with the stem fully inserted for the "CLOSED" valves SW-26 and 200A is located above the A SW Booster Pump. SW-503 is located above the vent duct above the B SW Booster Pump, and requires a ladder.
EXAMINERS NOTE:             NONE COMMENTS:
EXAMINER'S NOTE:
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10
NONE COMMENTS:   CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 10 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
 
- In-Plant JPM K NUREG 1021, Revision 10 STEP 8: Notify Control Room Personnel That Step 10 Is Complete And SW Has Been Cross
Appendix C                                   Page 10 of 14                   Form ES-C-1 PERFORMANCE INFORMATION STEP 8:         Notify Control Room Personnel That Step 10 Is Complete And SW Has Been Cross-Connected To Supply SW Booster Pump B (Step 11)
-Connected To Supply SW Booster Pump B (Step 11)   STANDARD: The operator contacts the Control Room and reports SW has been cross-connected to supply SW Booster Pump "B".
___ SAT STANDARD:       The operator contacts the Control Room and reports SW has been cross-connected to supply SW Booster Pump B.
AS FOUND: NONE EXAMINER'S CUE:
___ UNSAT AS FOUND:       NONE EXAMINERS CUE:                   When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE:                   NONE COMMENTS:
When contacted, as CRS acknowledge the report from the operator EXAMINER'S NOTE:
NOTE
NONE COMMENTS:           ___ SAT    ___ UNSAT  NOTE   SW-83, Diesel Supply Cross
* SW-83, Diesel Supply Cross-Connect, is located at the North end of Emergency Diesel Generator A.
-Connect, is located at the North end of Emergency Diesel Generator A. Cross-connecting Service Water to the Emergency Diesel Generators will also cross
* Cross-connecting Service Water to the Emergency Diesel Generators will also cross-connect Service Water to HVH-6B, HVH-8B, and Instrument Air Compressor B.
-connect Service Water to HVH
* A ladder is required for access to SW-53, North Supply HDR To "B" TRN Components In Aux BLDG.
-6B, HVH-8B, and Instrument Air Compressor B. A ladder is required for access to SW
2016 Systems - In-Plant JPM K                                    NUREG 1021, Revision 10
-53, North Supply HDR To "B" TRN Components In Aux BLDG.
 
Appendix C Page 11 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 11 of 14                         Form ES-C-1 PERFORMANCE INFORMATION STEP 9:       Cross-Connect Service Water Supply To EDGs AS Follows:                   CRITICAL STEP
- In-Plant JPM K NUREG 1021, Revision 10 STEP 9: Cross-Connect Service Water Supply To EDGs AS Follows:
: a. Close SW-53
: a. Close SW-53 b. Open SW-83 (Step 12) STANDARD: The operator reads the Notes, and proceeds.
: b. Open SW-83 (Step 12)
The operator rotates the SW-53 handwheel in the clockwise direction.
STANDARD:     The operator reads the Notes, and proceeds.                             ___ SAT The operator rotates the SW-53 handwheel in the clockwise direction.
The operator rotates the SW-8 3 handwheel in the counter
___ UNSAT The operator rotates the SW-83 handwheel in the counter-clockwise direction.
-clockwise direction.
AS FOUND:     SW-53 is OPEN, SW-83 is CLOSED EXAMINERS CUE:               After locating and describing how each valve would be operated indicate that the SW-53 handwheel has been rotated full clockwise and the stem is fully inserted, and that the SW-83 handwheel has been rotated full counter-clockwise with the stem fully withdrawn.
AS FOUND: SW-53 is OPEN, SW-83 is CLOSED EXAMINER'S CUE:
EXAMINERS NOTE:             SW-53 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
After locating and describing how each valve would be operated indicate that the SW
There is a label identifying the location of SW-53 on the vent duct above the walkway between the IA Dryers A and B.
-53 handwheel has been rotated full clockwise and the stem is fully inserted, and that the SW
-83 handwheel has been rotated full counter
-clockwise with the stem fully withdrawn.
EXAMINER'S NOTE:
SW-53 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
There is a label identifying the location of SW
-53 on the vent duct above the walkway between the IA Dryers A and B.
SW-83 is located in the A EDG Vault Room. This room requires Control Room/WCCS permission to enter the room. The examiner will either need to get permission to enter, or open the door and observe the valve without entering the room (The valve can be seen from the open doorway).
SW-83 is located in the A EDG Vault Room. This room requires Control Room/WCCS permission to enter the room. The examiner will either need to get permission to enter, or open the door and observe the valve without entering the room (The valve can be seen from the open doorway).
COMMENTS:   CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 12 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
COMMENTS:
- In-Plant JPM K NUREG 1021, Revision 10 STEP 10: Notify Control Room Personnel That SW Has Been Cross
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10
-Connected To Supply The Following Equipment:
 
EDG B Instrument Air Compressor B HVH-6B HVH-8B (Step 13) STANDARD: The operator contacts the Control Room and reports that SW has been cross
Appendix C                                 Page 12 of 14                     Form ES-C-1 PERFORMANCE INFORMATION STEP 10:     Notify Control Room Personnel That SW Has Been Cross-Connected To Supply The Following Equipment:
-connected to supply the above equipment AS FOUND: NONE EXAMINER'S CUE:
* EDG B
When contacted, as CRS acknowledge the report from the operator EXAMINER'S NOTE: NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 11: Notify Control Room Personnel That Attachment 6 Is Complete (Step 14) STANDARD: The operator contacts the control room and reports that Attachment 6 is complete AS FOUND: NONE EXAMINER'S CUE: When contacted, as CRS acknowledge that Attachment 6 is complete EXAMINER'S NOTE:
* Instrument Air Compressor B                                         ___ SAT
NONE COMMENTS:       ___ SAT    ___ UNSAT          Terminating Cue:
* HVH-6B
Evaluation on this JPM is complete.
* HVH-8B (Step 13)
___ UNSAT STANDARD:     The operator contacts the Control Room and reports that SW has been cross-connected to supply the above equipment AS FOUND:     NONE EXAMINERS CUE:                 When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE:               NONE COMMENTS:
STEP 11:       Notify Control Room Personnel That Attachment 6 Is Complete (Step 14)
STANDARD:     The operator contacts the control room and reports that Attachment   ___ SAT 6 is complete AS FOUND:     NONE
___ UNSAT EXAMINERS CUE:                 When contacted, as CRS acknowledge that Attachment 6 is complete EXAMINERS NOTE:               NONE COMMENTS:
Terminating Cue:               Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - In-Plant JPM K                                      NUREG 1021, Revision 10


Appendix C Page 13 of 14 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 13 of 14                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   2016 Systems - In-Plant JPM K Examinees Name:
- In-Plant JPM K NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - In-Plant JPM K   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,507: Line 1,879:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                      Date:
2016 Systems - In-Plant JPM K                                NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The North SW header has ruptured inside the Auxiliary Building.
The plant is at 100% power.
* The Control Room has implemented AOP-022 (Loss of Service Water) for a leak in the North header.
The North SW header has ruptured inside the Auxiliary Building.
INITIATING CUE:    The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.
The Control Room has implemented AOP
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
-022 (Loss of Service Water) for a leak in the North header.
NUREG 1021, Revision 10


INITIATING CUE:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM A Developed By:      ______________________________        Date: ___________
The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022. NOTE:  No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
Instructor/Developer Concurred By:      ______________________________        Date: ___________
Line Superintendent/Supervisor SRO Approved By:        ______________________________        Date: ___________
Superintendent/Supervisor Training 2016 Systems - Control Room JPM A (Rev_011116)        NUREG 1021, Revision 10


Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
Appendix C                                         Page 2 of 22                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM A (Rev_011116) NUREG 1021, Revision 10
Task Title:             Operation With High Switchyard           JPM No.:     2016 Systems - Control Voltage                                                Room JPM A (Alternate Path)
 
K/A  
SIM JPM A      Developed By:
______________________________
Date:  ___________
Instructor/Developer Concurred By:
______________________________
Date:  ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date:  ___________
Superintendent/Supervisor Training Appendix C Page 2 of 22 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Operation With High Switchyard Voltage JPM No.: 2016 Systems  
- Control Room JPM A (Alternate Path)     K/A  


==Reference:==
==Reference:==
062 A2.08 (2.7/3.0)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom                Simulator        X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* Plant is at 100% power.
* Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
* AOP-031, Operation with High Switchyard Voltage, has been completed up to step 21.
* You are the BOP.
* D IAC is in service with A and B IACs in AUTO.
* The DSDG is secured and aligned for AUTO.
* The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.
Initiating Cue:            The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.
2016 Systems - Control Room JPM A                                          NUREG 1021, Revision 10


062 A 2.0 8 (2.7/3.0)    Examinee:  NRC Examiner:
Appendix C                                     Page 3 of 22                       Form ES-C-1 Job Performance Measure Worksheet Task Standard:           The operator will transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3) in an effort to lower Switchyard Voltage; and when Breaker 50/20 fails to automatically OPEN, the operator will manually open it per AOP-31. Ultimately, the voltage on 480V Bus E-2 will be lowered to less than 502 volts.
Facility Evaluator:
Required Materials:     None General  
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
Plant is at 100% power.
Due to abnormal conditions on the Grid, 480V Bus E
-2 currently exceeds 505 Volts.
AOP-031, Operation with High Switchyard Voltage, has been completed up to step
: 21. You are the BOP.
    "D" IAC is in service with "A" and "B" IACs in AUTO.
The DSDG is secured and aligned for AUTO.
The Load on Emergency Bus E
-1 has NOT been altered since entering this AOP.
Initiating Cue:
The CRS has directed you to continue with AOP
-031 until 480V Bus E
-2 voltage is restored to less than 505 Volts.
 
Appendix C Page 3 of 22 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 Task Standard:
The operator will transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3) in an effort to lower Switchyard Voltage; and when Breaker 50/20 fails to automatically OPEN, the operator will manually open it per AOP-31. Ultimately, the voltage on 480V Bus E
-2 will be lowered to less than 50 2 volts. Required Materials:
None   General  


==References:==
==References:==
AOP-031 (Operation with High Switchyard Voltage), Rev 15 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:              Handout 1: Control Room Copy of AOP-031 marked up for this JPM to Step 21.
Time Critical Task:    NO Validation Time:        11 minutes Critical Step Justification Step 21      This step is critical because inserting the synchroscope key into 4 KV TIES Synchroscope Key Switch is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).
Step 22      This step is critical because placing the Synchroscope Switch to the BUS 3 & 4 position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).
Step 24      This step is critical because momentarily placing the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).
Alternate Path Critical Step Justification Step 27      This step is critical because depressing the THINK pushbutton and placing the control switch for BKR 52/20 to the OPEN (TRIP) position is necessary to manually open Breaker 52/20.
2016 Systems - Control Room JPM A                                    NUREG 1021, Revision 10


AOP-0 31 (Operation with High Switchyard Voltage), Rev 1 5  OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45  Handouts: Handout 1: Control Room Copy of AOP-0 31 marked up for this JPM to Step 2 1. Time Critical Task: NO  Validation Time:
Appendix C                                   Page 4 of 22                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
11 minutes      Critical Step Justification Step 21 This step is critical because inse r ting the synchroscope key into 4 KV TIES Synchroscope Key Switch is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3)
. Step 22 This step is critical because placing the Synchroscope Switch to the BUS 3 & 4 position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3). Step 24 This step is critical because momentarily placing the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3)
. Alternate Path Critical Step Justification Step 27 This step is critical because depressing the THINK pushbutton and placing the control switch for BKR 52/20 to the OPEN (TRIP) position is necessary to manually open Breaker 52/20.
Appendix C Page 4 of 22 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ A as follows:
: 1. Construct Scenario File 006_JPM_ A as follows:
ICO V4160B4BRK20 f:TRIP_FAIL, (Breaker 52/20 Fails to Auto OPEN)
* ICO V4160B4BRK20 f:TRIP_FAIL, (Breaker 52/20 Fails to Auto OPEN)
IMF EPS09 f:239.25, (Overvoltage on Bus E
* IMF EPS09 f:239.25, (Overvoltage on Bus E-2; > 506 Volts, due to High Switchyard Voltage)
-2; > 506 Volts, due to High Switchyard Voltage)  (Conditional) $006_52_20_TRIP DCO V4160B4BRK20 (Remove Breaker 52/20 failure on Control Switch to TRIP)
  *   (Conditional) $006_52_20_TRIP DCO V4160B4BRK20 (Remove Breaker 52/20 failure on Control Switch to TRIP)
: 2. Reset simulator to IC
: 2. Reset simulator to IC-5, 100% Power.
-5 , 100% Power. 3. Place in RUN and allow time to stabilize
: 3. Place in RUN and allow time to stabilize.
. 4. Execute Scenario File 006_JPM_ A
: 4. Execute Scenario File 006_JPM_ A
: 5. Ensure that the following components are aligned:
: 5. Ensure that the following components are aligned:
C Charging Pump is RUNNING HVH-3 and HVH-4 are RUNNING HVA-1B is RUNNING HVH-5B is OFF HVE-2B is OFF 6. Call up QP E1E2 at the BOP Desk.
* C Charging Pump is RUNNING
: 7. Perform the actions of AOP-31 up to Step 2 1.
* HVH-3 and HVH-4 are RUNNING
: 8. Stabilize the plant
* HVA-1B is RUNNING
.
* HVH-5B is OFF
: 9. Freeze the Simulator
* HVE-2B is OFF
.
: 6. Call up QP E1E2 at the BOP Desk.
OR 1. Reset Simulator to Temporary Snap IC
: 7. Perform the actions of AOP-31 up to Step 21.
-600 (July, 201 5). 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 8. Stabilize the plant.
-411. 3. Call up QP E1E2 at the BOP Desk.
: 9. Freeze the Simulator.
OR
: 1. Reset Simulator to Temporary Snap IC-600 (July, 2015).
: 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 3. Call up QP E1E2 at the BOP Desk.
: 4. Place Simulator in Run when Operator assumes the watch.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10


Appendix C Page 5 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 22                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM A NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
STEP 1:         Check Emergency Bus E-2 Voltage - Greater than 505 Volts (Step 21).
STEP 1: Check Emergency Bus E
___ SAT STANDARD:       The operator observes ERFIS (QP E1E2) and recognizes that Bus E-2 Voltage is approximately 506.5 volts.
-2 Voltage  
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
- Greater than 505 Volts (Step 21).
NOTE: Transferring the following safety related components will cause voltage to rise. This step is designed to protect components.
STANDARD: The operator observes ERFIS (QP E1E2) and recognizes that Bus E-2 Voltage is approximately 50 6.5 volts. EXAMINER'S CUE:
STEP 2:       Check Instrument Air as follows:
NONE   EXAMINER'S NOTE:
: a. Check Instrument Air Compressor B - Running in Manual
NONE BOOTH OPERATOR CUE:
___ SAT (Step 22.a.)
NONE COMMENTS:
___ SAT    ___ UNSAT  NOTE: Transferring the following safety related components will cause voltage to rise. This step is designed to protect components.
STEP 2: Check Instrument Air as follows:
: a. Check Instrument Air Compressor B  
- Running in Manual (Step 22.a.)
RNO: Go to Step 23
RNO: Go to Step 23
___ UNSAT STANDARD: The operator reads the Note, and proceeds.
The operator recognizes that Instrument Air Compressor B is in AUTO as stated in the Initial Cue. The operator addresses the RNO.
EXAMINERS CUE:                If the operator requests status of IAC B, remind the operator that the Cue sheet stated that IACs A and B were in AUTO.
EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            If the operator contacts the AO, as the AO, report that IAC A and B are in AUTO.
COMMENTS:
2016 Systems - Control Room JPM A                                      NUREG 1021, Revision 10
Appendix C                                  Page 6 of 22                        Form ES-C-1 PERFORMANCE INFORMATION NOTE: For conditions where it may not be possible to reduce emergency bus voltages below 505 volts AND running of the EDG is required to ensure that the EDG is operable, testing of the EDG may be performed with concurrence from the system engineer if the system engineer determines that such testing does not constitute a long term degradation risk.
STEP 3:        Check EDG B Status as Follows:
: a. Check Main Generator - ON LINE (Step 23.a.)
___ SAT STANDARD:      The operator reads the Note, and proceeds.
The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that
___ UNSAT the Main Generator is ON Line.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
STEP 4:        Check EDG B Status as Follows:
: b. Check EMERGENCY DIESEL GENERATOR B - RUNNING (Step 23.b.)
___ SAT STANDARD:      The operator observes the B EDG Green OFF status light is LIT and concludes that the B EDG is NOT running.
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
Appendix C                                    Page 7 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 5:      Check EDG B Status as Follows:
: b. RNO: Postpone EDG B testing while in the AOP. Go to Step
: 24. Check EMERGENCY DIESEL GENERATOR B - RUNNING                    ___ SAT (Step 23.b. RNO)
STANDARD:    The operator proceeds to Step 24.                                        ___ UNSAT EXAMINERS CUE:              If the operator informs the CRS to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the CRS.
EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          If the operator contacts the System Engineer to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the System Engineer.
COMMENTS:
STEP 6:      Log the Time That Any of the Following Equipment Is OR Was Running Above 505 Volts.
* INSTRUMENT AIR COMPRESSOR B
* EDG B PRE-LUBE OIL PUMP                                              ___ SAT
* Fuel Oil Transfer Pump B (Step 24)
STANDARD:    The operator recognizes that NONE of these components are                ___ UNSAT running.
EXAMINERS CUE:                Inform operator that another operator will track the run times.
EXAMINERS NOTE:              The B IAC is in AUTO and the B EDG is NOT RUNNING.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
Appendix C                                    Page 8 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 7:        Check Load On Emergency Bus E HAS BEEN RAISED USING STEP 18.
(Step 25)
Go to Step 27                                                          ___ SAT (Step 25 RNO)
STANDARD:      The operator recognizes that load on Emergency Bus E-1 has NOT been raised based on information given in the Initial Cue.            ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              This would have been completed in Step 18 of AOP-031, which was bypassed.
BOOTH OPERATOR CUE:          NONE COMMENTS:
STEP 8:      Raise Load On Emergency BUS E-2 As Follows:
: a. Check Charging Pump C - Running
___ SAT (Step 27.a)
STANDARD:      The operator observes the C Charging Pump Red status light is LIT and the Green status light is OFF (Or equivalent) and concludes    ___ UNSAT that Charging Pump C is running.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10


STANDARD: The operator reads the Note, and proceeds.
Appendix C                                 Page 9 of 22                   Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Raise Load On Emergency BUS E-2 As Follows:
The operator recognizes that Instrument Air Compressor "B" is in AUTO as stated in the Initial Cue. The operator addresses the RNO. EXAMINER'S CUE:
: b. Verify CV RECIRC FANS - RUNNING
If the operator request s status of IAC "B", remind the operator that the Cue sheet stated that IACs "A" and "B" were in AUTO.
                - HVH-3
EXAMINER'S NOTE:
___ SAT
NONE  BOOTH OPERATOR CUE:
                - HVH-4 (Step 27.b)
If the operator contacts the AO, as the AO, report that IAC "A" and "B" are in AUTO.
___ UNSAT STANDARD:     The operator observes the HVH-3 Red ON status light is LIT and concludes that HVH-3 is running.
COMMENTS:      ___ SAT    ___ UNSAT Appendix C Page 6 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
The operator observes the HVH-4 Red ON status light is LIT and concludes that HVH-4 is running.
- Control Room JPM A NUREG 1021, Revision 10 NOTE: For conditions where it may not be possible to reduce emergency bus voltages below 505 volts AND running of the EDG is required to ensure that the EDG is operable, testing of the EDG may be performed with concurrence from the system engineer if the system engineer determines that such testing does not constitute a long term degradation risk.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
STEP 3: Check EDG "B" Status as Follows:
STEP 10:       Check CONT RM AIR HANDLING HVA-1B - RUNNING (Step 27.c)
: a. Check Main Generator
___ SAT STANDARD:     The operator observes the HVA-1B Red ON status light is LIT and concludes that HVH-1B is running.
- ON LINE (Step 23.a.)
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
STANDARD: The operator reads the Note, and proceeds.
2016 Systems - Control Room JPM A                               NUREG 1021, Revision 10
The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE   BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT  STEP 4: Check EDG "B" Status as Follows:
: b. Check EMERGENCY DIESEL GENERATOR B
- RUNNING (Step 23.b.)
STANDARD: The operator observes the "B" EDG Green OFF status light is LIT and concludes that the "B" EDG is NOT running
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 7 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM A NUREG 1021, Revision 10 STEP 5:  Check EDG "B" Status as Follows:
: b. RNO: Postpone EDG "B" testing while in the AOP. Go to Step 24. Check EMERGENCY DIESEL GENERATOR B
- RUNNING (Step 23.b. RNO)
STANDARD: The operator proceeds to Step 24. EXAMINER'S CUE:
If the operator informs the CRS to postpone EMERGENCY DIESEL GENERATOR "B" testing while in this procedure, acknowledge as the CRS.
EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
If the operator contacts the System Engineer to postpone EMERGENCY DIESEL GENERATOR "B" testing while in this procedure, acknowledge as the System Engineer.


COMMENTS:       ___ SAT   ___ UNSAT   STEP 6: Log the Time That Any of the Following Equipment Is OR Was Running Above 505 Volts.
Appendix C                                  Page 10 of 22                    Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     Check CRDM COOLING FAN, HVH-5B - RUNNING (Step 27.d)
INSTRUMENT AIR COMPRESSOR B EDG B PRE-LUBE OIL PUMP Fuel Oil Transfer Pump B (Step 24) STANDARD: The operator recognizes that NONE of these components are running. EXAMINER'S CUE:
___ SAT STANDARD:    The operator observes the HVH-5B Green OFF status light is LIT and concludes that HVH-5B is NOT RUNNING, and proceeds to the RNO.                                                                  ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
Inform operator that another operator will track the run times.
STEP 12:      Transfer CRDM COOLING FANS as follows:
: 1. Start HVH-5B
: 2. Stop HVH-5A (Step 27.d RNO)
___ SAT STANDARD:     The operator places the HVH-5B control switch to START and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT The operator places the HVH-5A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              E-2 Voltage should lower to approx. 506.3 Volts.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10


EXAMINER'S NOTE:
Appendix C                                 Page 11 of 22                     Form ES-C-1 PERFORMANCE INFORMATION STEP 13:     Check AUX BLDG EXH FAN, HVE-2B - RUNNING (Step 27.e)
The "B" IAC is in AUTO and the "B" EDG is NOT RUNNING. BOOTH OPERATOR CUE:
___ SAT STANDARD:     The operator observes the HVE-2B Green OFF status light is LIT and concludes that HVE-2B is NOT running, and proceeds to the RNO.
NONE  COMMENTS:
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 8 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STEP 14:      Transfer AUX BLDG EXH FANs as follows:
- Control Room JPM A NUREG 1021, Revision 10 STEP 7: Check Load On Emergency Bus E HAS BEEN RAISED USING STEP 18. (Step 25) Go to Step 27 (Step 25 RNO)
: 1) Start HVE-2B
STANDARD: The operator recognizes that load on Emergency Bus E
: 2) Stop HVE-2A (Step 27.e RNO)
-1 has NOT been raised based on information given in the Initial Cue. EXAMINER'S CUE:
___ SAT STANDARD:     The operator places the HVE-2B control switch to START and observes the Red status light is LIT and the Green status light is   ___ UNSAT OFF.
NONE EXAMINER'S NOTE:
The operator places the HVE-2A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
This would have been completed in Step 18 of AOP
EXAMINERS CUE:              NONE EXAMINERS NOTE:              E-2 Voltage should lower to approx. 506.2 Volts.
-031, which was bypassed.
BOOTH OPERATOR CUE:          NONE COMMENTS:
BOOTH OPERATOR CUE:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 8: Raise Load On Emergency BUS E
-2 As Follows:
: a. Check Charging Pump C
- Running (Step 27.a)
STANDARD: The operator observes the "C" Charging Pump Red status light is LIT and the Green status light is OFF (Or equivalent) and concludes that Charging Pump "C" is running.


EXAMINER'S CUE:
Appendix C                                 Page 12 of 22                     Form ES-C-1 PERFORMANCE INFORMATION STEP 15:     Check RHR - IN SERVICE.
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT
___ UNSAT Appendix C Page 9 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 9: Raise Load On Emergency BUS E
-2 As Follows:
: b. Verify CV RECIRC FANS
- RUNNING -  HVH  HVH-4 (Step 27.b)
STANDARD: The operator observes the HVH
-3 Red ON status light is LIT and concludes that HVH-3 is running.      The operator observes the HVH
-4 Red ON status light is LIT and concludes that HVH-4 is running.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT    STEP 10: Check CONT RM AIR HANDLING HVA
-1B - RUNNING  (Step 27.c)
STANDARD:  The operator observes the HVA
-1 B Red ON status light is LIT and concludes that HVH-1B is running. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 10 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 11: Check CRDM COOLING FAN, HVH
-5B - RUNNING                            (Step 27.d)
STANDARD: The operator observes the HVH-5B Green OFF status light is LIT and concludes that HVH
-5B is NOT RUNNING, and proceeds to the RNO. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT  STEP 12: Transfer CRDM COOLING FANS as follows:
: 1. Start HVH-5B 2. Stop HVH-5A (Step 27.d RNO)
STANDARD: The operator places the HVH-5B control switch to START and observes the Red status light is LIT and the Green status light is OFF.      The operator places the HVH-5A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
E-2 Voltage should lower to approx. 50 6.3 Volts. BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 11 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 13: Check AUX BLDG EXH FAN, HVE
-2B - RUNNING  (Step 27.e)
STANDARD: The operator observes the HVE-2B Green OFF status light is LIT and concludes that HVE-2B is NOT running, and proceeds to the RNO. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:          ___ SAT    ___ UNSAT  STEP 14:  Transfer AUX BLDG EXH FANs as follows: 1) Start HVE-2B 2) Stop HVE-2A (Step 27.e RNO)
STANDARD: The operator places the HV E-2 B control switch to START and observes the Red status light is LIT and the Green status light is OFF. The operator places the HV E-2A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
E-2 Voltage should lower to approx. 50 6.2 Volts. BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 12 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 15: Check RHR  
- IN SERVICE.
(Step 27. f)
(Step 27. f)
STANDARD: The operator recognizes that the plant is in Mode 1 and determines that RHR is NOT is IN SERVICE. The operator addresses the RNO and proceeds to Step 28
___ SAT STANDARD:     The operator recognizes that the plant is in Mode 1 and determines that RHR is NOT is IN SERVICE. The operator addresses the RNO and proceeds to Step 28.
. EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 16:     Check Emergency BUS E-2 Voltage - GREATER THAN 505 VOLTS (Step 28)
NONE BOOTH OPERATOR CUE: NONE COMMENTS:           ___ SAT    ___ UNSAT  STEP 16: Check Emergency BUS E
___ SAT STANDARD:     The operator observes Bus E-2 Voltage on ERFIS to be greater than 505 Volts (506.2 volts).
-2 Voltage  
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
- GREATER THAN 505 VOLTS (Step 28) STANDARD: The operator observes Bus E-2 Voltage on ERFIS to be greater than 505 Volts (506.2 volts)
2016 Systems - Control Room JPM A                                   NUREG 1021, Revision 10
.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT Appendix C Page 13 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM A NUREG 1021, Revision 10 STEP 17:  Check DSDG Status As Follows:
: a. Check Main Generator
- ON LINE (Step 29.a)
STANDARD: The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT  STEP 18:  Check DSDG Status As Follows: b. Check DSDG
- RUNNING (Step 29.b)
STANDARD: The operator recognizes that DSDG is secured and aligned for AUTO as stated in the Initial Cue. The operator addresses the RNO. EXAMINER'S CUE:
If the operator request s status of the DSDG, remind the operator that the Cue sheet stated that the DSDG was secured and aligned for AUTO
. EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
If the operator contacts the AO, as the AO, report that the DSDG is secured and aligned for AUTO.


Appendix C                                  Page 13 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 17:      Check DSDG Status As Follows:
: a. Check Main Generator - ON LINE (Step 29.a)
___ SAT STANDARD:    The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line.                                        ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
STEP 18:      Check DSDG Status As Follows:
: b. Check DSDG - RUNNING (Step 29.b)
___ SAT STANDARD:    The operator recognizes that DSDG is secured and aligned for AUTO as stated in the Initial Cue. The operator addresses the          ___ UNSAT RNO.
EXAMINERS CUE:              If the operator requests status of the DSDG, remind the operator that the Cue sheet stated that the DSDG was secured and aligned for AUTO.
EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          If the operator contacts the AO, as the AO, report that the DSDG is secured and aligned for AUTO.
COMMENTS:
COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 14 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
- Control Room JPM A NUREG 1021, Revision 10 STEP 19: Check DSDG Status As Follows:
 
Appendix C                                   Page 14 of 22                     Form ES-C-1 PERFORMANCE INFORMATION STEP 19:     Check DSDG Status As Follows:
: b. RNO: Postpone DSDG testing while in this AOP. Go to Step 30.
: b. RNO: Postpone DSDG testing while in this AOP. Go to Step 30.
(Step 29.b RNO)
(Step 29.b RNO)
STANDARD: The operator proceeds to step 30.
___ SAT STANDARD:     The operator proceeds to step 30.
EXAMINER'S CUE:
___ UNSAT EXAMINERS CUE:                 If operator informs the CRS to postpone DSDG testing while in this procedure, acknowledge as the CRS.
If operator informs the CRS to postpone DSDG testing while in this procedure, acknowledge as the CRS. EXAMINER'S NOTE:
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             If the operator contacts the System Engineer to postpone DSDG testing while in this procedure, acknowledge as the System Engineer.
NONE BOOTH OPERATOR CUE:
COMMENTS:
If the operator contacts the System Engineer to postpone DSDG testing while in this procedure, acknowledge as the System Engineer. COMMENTS:  
STEP 20:      Check 4KV BUS 3-4 TIE, BKR 52 OPEN (Step 30)
___ SAT STANDARD:    The operator observes 4KV BUS 3-4 TIE, BKR 52-19 Green status light is LIT and Red status light is OFF, and determines that BKR 52-19 IS OPEN.                                                          ___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:                BKR 52-19 indicates OPEN (TRIP) by GREEN light lit.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM A                                  NUREG 1021, Revision 10
 
Appendix C                                Page 15 of 22                    Form ES-C-1 PERFORMANCE INFORMATION STEP 21:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                  CRITICAL follows:                                                              STEP
: a. Insert the Synchroscope Key into 4 KV TIES Synchroscope Key Switch
___ SAT (Step 31.a)
STANDARD:    The operator inserts the synchroscope key into 4 KV TIES          ___ UNSAT Synchroscope Key Switch.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
STEP 22:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                  CRITICAL follows:                                                              STEP
: b. Place the Synchroscope Switch to the BUS 3 & 4 position (Step 31.b)                                                        ___ SAT STANDARD:    The operator rotates the Synchroscope Switch clockwise to the BUS 3 & 4 position.                                                ___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10
 
Appendix C                                Page 16 of 22                      Form ES-C-1 PERFORMANCE INFORMATION STEP 23:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:
___ SAT
: c. Verify the Synchroscope comes to approximately the 12 oclock position.
(Step 31.c)
___ UNSAT STANDARD:    The operator observes that the Synchroscope is pointing to the 12 oclock position.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
STEP 24:      Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                    CRITICAL follows:                                                                STEP
: d. Momentarily place the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position.
___ SAT (Step 31.d)
STANDARD:    The operator momentarily places the control switch for BKR 52/19    ___ UNSAT to the CLOSE position.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10


___ SAT    ___ UNSAT  STEP 20:  Check 4KV BUS 3
Appendix C                                 Page 17 of 22                   Form ES-C-1 PERFORMANCE INFORMATION STEP 25:     Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:
-4 TIE, BKR 52 OPEN (Step 30)  STANDARD: The operator observes 4KV BUS 3-4 TIE, BKR 52
___ SAT
-19 Green status light is LIT and Red status light is OFF, and determines that BKR 52-19 IS OPEN. EXAMINER'S CUE:
: e. Check BKR 52/19 - CLOSED (Step 31.e)
NONE EXAMINER'S NOTE:
___ UNSAT STANDARD:     The operator observes that the BKR 52/19 Red status light is LIT and the Green status light is OFF.
BKR 52-19 indicates OPEN (TRIP) by GREEN light lit. BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             BKR 52-19 indicates CLOSED with RED light lit.
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 15 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
BOOTH OPERATOR CUE:           NONE COMMENTS:
- Control Room JPM A NUREG 1021, Revision 10 STEP 21: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: a. Insert the Synchroscope Key into 4 KV TIES Synchroscope Key Switch (Step 31.a)
STEP 26:     Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:
STANDARD: The operator inse rts the synchroscope key into 4 KV TIES Synchroscope Key Switch.
___ SAT
EXAMINER'S CUE:
: f. Check UNIT AUX TO 4 KV BUS 4 BKR, 52/20 - OPEN (Step 31.f)
NONE  EXAMINER'S NOTE:
___ UNSAT STANDARD:     The operator observes that the BKR 52/20 Red status light has remained LIT and the Green status light has remained OFF; and concludes that BKR 52/20 has remained in the CLOSED position (Alternate Path). The operator will address the RNO.
NONE  BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             BKR 52/20 indicates CLOSED with RED light lit.
NONE COMMENTS:      CRITICAL STEP
___ SAT   ___ UNSAT  STEP 22:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: b. Place the Synchroscope Switch to the BUS 3 & 4 position (Step 31.b)
STANDARD: The operator rotates the Synchroscope Switch clockwise to the BUS 3 & 4 position.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 16 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 23:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: c. Verify the Synchroscope comes to approximately the 12 o'clock position. (Step 31.c)
STANDARD: The operator observes that the Synchroscope is pointing to the 12 o'clock position.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE COMMENTS:        ___ SAT    ___ UNSAT  STEP 24:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: d. Momentarily place the Control Switch for 4KV BUS 3
-4 TIE, BKR 52/19 to the CLOSE position.
(Step 31.d)
STANDARD: The operator momentarily places the control switch for BKR 52/19 to the CLOSE position.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 17 of 22 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 25:  Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: e. Check BKR 52/19  
- CLOSED (Step 31.e)
STANDARD: The operator observes that the BKR 52/19 Red status light is LIT and the Green status light is OFF
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
BKR 52-19 indicates CLOSED with RED light lit.
BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 26: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: f. Check UNIT AUX TO 4 KV BUS 4 BKR, 52/20  
- OPEN (Step 31.f)
STANDARD: The operator observes that the BKR 52/20 Red status light has remained LIT and the Green status light has remained OFF; and concludes that BKR 52/20 has remained in the CLOSED position (Alternate Path). The operator will address the RNO.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
BKR 52/20 indicates CLOSED with RED light lit.
BKR 52/20 should have automatically opened when BKR 52/19 was CLOSED (A failure has prevented it from doing so).
BKR 52/20 should have automatically opened when BKR 52/19 was CLOSED (A failure has prevented it from doing so).
BOOTH OPERATOR CUE:
BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 18 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10
- Control Room JPM A NUREG 1021, Revision 10 STEP 27: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows: f. RNO: Perform the following Simultaneously depress the THINK pushbutton AND place the control switch for BKR 52/20 to the OPEN position. (Step 31.f RNO)
 
STANDARD: The operator simultaneously depresses the THINK pushbutton and places the control switch for BKR 52/20 to the OPEN (TRIP) position, and observes that the Green status light is LIT and the Red status light is OFF
Appendix C                                   Page 18 of 22                         Form ES-C-1 PERFORMANCE INFORMATION STEP 27:     Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as                         CRITICAL follows:                                                                      STEP
. EXAMINER'S CUE:
: f. RNO: Perform the following
NONE EXAMINER'S NOTE:
* Simultaneously depress the THINK pushbutton AND                 ___ SAT place the control switch for BKR 52/20 to the OPEN position.
BKR 52/20 indicates OPEN (TRIP) with GREEN light lit.
(Step 31.f RNO)
When this occurs Bus E
___ UNSAT STANDARD:     The operator simultaneously depresses the THINK pushbutton and places the control switch for BKR 52/20 to the OPEN (TRIP) position, and observes that the Green status light is LIT and the Red status light is OFF.
-2 voltage will drop to 484.8 volts.
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               BKR 52/20 indicates OPEN (TRIP) with GREEN light lit. When this occurs Bus E-2 voltage will drop to 484.8 volts.
BOOTH OPERATOR CUE:
BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE COMMENTS:         CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 19 of 22 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM A                                    NUREG 1021, Revision 10
- Control Room JPM A NUREG 1021, Revision 10 STEP 28: Place the 4 KV TIES Synchroscope Key Switch to the mid position.
 
Appendix C                                 Page 19 of 22                   Form ES-C-1 PERFORMANCE INFORMATION STEP 28:     Place the 4 KV TIES Synchroscope Key Switch to the mid position.
(Step 31.g)
(Step 31.g)
STANDARD: The operator rotates the Synchroscope Switch counter-clockwise to the mid position. EXAMINER'S CUE:
STANDARD:     The operator rotates the Synchroscope Switch counter-clockwise to
NONE EXAMINER'S NOTE:
___ SAT the mid position.
NONE BOOTH OPERATOR CUE:
EXAMINERS CUE:                 NONE
NONE COMMENTS:
___ UNSAT EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 29:             Check the following:
STEP 29:       Check the following:
Emergency BUS E
* Emergency BUS E-1 Voltage - LESS THAN 505 VOLTS AND
-1 Voltage  
* Emergency BUS E-2 Voltage - LESS THAN 505 VOLTS (Step 32)                                               ___ SAT STANDARD:     The operator observes that Bus E-1 voltage is 488.9 volts.
- LESS THAN 505 VOLTS AND Emergency BUS E
___ UNSAT The operator observes that Bus E-2 voltage is 484.8 volts.
-2 Voltage  
EXAMINERS CUE:                When operator identifies that BOTH Bus E-1 and E-2 are less than 505 VOLTS inform the operator that this completes the JPM.
- LESS THAN 505 VOLTS (Step 32) STANDARD: The operator observes that Bus E
EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
-1 voltage is 488.9 volts.
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10
 
Appendix C                                Page 20 of 22                    Form ES-C-1 PERFORMANCE INFORMATION STEP 30:      Check Voltage as Follows: (Continuous Action Step)
* APP-036-E3, SUT PRI OVER/UNDER VOLTAGE -
EXTINGUISHED AND
* WEST 115KV BUS VOLTAGE - LESS THAN 119 KV                  ___ SAT AND
* Emergency BUS E-1 Voltage - LESS THAN 502 VOLTS AND                                              ___ UNSAT
* Emergency BUS E-2 Voltage - LESS THAN 502 VOLTS (Step 33)
STANDARD:    The operator observes that APP-036-E3 is DARK.
The operator observes that WEST 115KV BUS VOLTAGE is 18.8 KV.
The operator observes that Bus E-1 voltage is 488.9 volts.
The operator observes that Bus E-2 voltage is 484.8 volts.
The operator observes that Bus E-2 voltage is 484.8 volts.
EXAMINER'S CUE:
EXAMINERS CUE:               When operator identifies that BOTH Bus E-1 and E-2 are less than 502 VOLTS inform the operator that this completes the JPM.
When operator identifies that BOTH Bus E
EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
-1 and E-2 are less than 505 VOLTS inform the operator that this completes the JPM.
Terminating Cue:           Evaluation on this JPM is complete.
EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:  
 
___ SAT    ___ UNSAT Appendix C Page 20 of 2 2 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM A NUREG 1021, Revision 10 STEP 30:            Check Voltage as Follows: (Continuous Action Step)
APP-036-E3, SUT PRI OVER/UNDER VOLTAGE
- EXTINGUISHED AND  WEST 115KV BUS VOLTAGE
- LESS THAN 119 KV AND  Emergency BUS E
-1 Voltage
- LESS THAN 502 VOLTS AND  Emergency BUS E
-2 Voltage
- LESS THAN 502 VOLTS (Step 33)  STANDARD: The operator observes that APP
-036-E3 is DARK.
The operator observes that WEST 115KV BUS VOLTAGE is 18.8 KV. The operator observes that Bus E
-1 voltage is 488.9 volts.
 
The operator observes that Bus E
-2 voltage is 484.8 volts.
EXAMINER'S CUE:
When operator identifies that BOTH Bus E
-1 and E-2 are less than 502 VOLTS inform the operator that this completes the JPM.
EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:            ___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM A                                NUREG 1021, Revision 10


Appendix C Page 21 of 22 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 21 of 22                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM A Examinees Name:
- Control Room JPM A NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM A   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 2,864: Line 2,162:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM A                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* Plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
Plant is at 100% power.
* AOP-031, Operation with High Switchyard Voltage, has been completed up to step 21.
Due to abnormal conditions on the Grid, 480V Bus E
* You are the BOP.
-2 currently exceeds 505 Volts.
* D IAC is in service with A and B IACs in AUTO.
AOP-031, Operation with High Switchyard Voltage, has been completed up to step
* The DSDG is secured and aligned for AUTO.
: 21. You are the BOP.
* The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.
  "D" IAC is in service with "A" and "B" IACs in AUTO.
INITIATING CUE:     The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.
The DSDG is secured and aligned for AUTO.
NUREG 1021, Revision 10
The Load on Emergency Bus E
-1 has NOT been altered since entering this AOP.
INITIATING CUE:
The CRS has directed you to continue with AOP
-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM B (Rev_011216) NUREG 1021, Revision 10


SIM JPM B     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM B Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM B (Rev_011216)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 13                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM B NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Transfer From the FRV Bypass             JPM No.:     2016 Systems - Control Valves to the FRVs                                    Room JPM B (Alternate Path)
Transfer From the FRV Bypass Valves to the FRVs JPM No.: 2016 Systems  
K/A  
- Control Room JPM B (Alternate Path)     K/A  


==Reference:==
==Reference:==
059 A4.08 (3.2/2.9)
Examinee:                                                    NRC Examiner:
Facility Evaluator:                                          Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom                Simulator        X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* A plant startup is in progress with reactor power approximately 19%.
* A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
* The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
* The Turbine is at 1800 RPM (Not synched to the Grid).
* You are the operator assigned to control S/G water level.
* Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.
Initiating Cue:            The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.
Task Standard:              The operator will place the C Feed Reg Valve in AUTO, and then take manual control of the B Feed Reg Valve and stabilize the B S/G level when it is determined that the B Feed Reg Valve has failed to control the B S/G level in AUTO.
2016 Systems - Control Room JPM B                                          NUREG 1021, Revision 10


059 A4.08 (3.2/2.9)
Appendix C                                     Page 3 of 13                         Form ES-C-1 Job Performance Measure Worksheet Required Materials:     None General  
Examinee:  NRC Examiner:
Facility Evaluator:
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1
. Initial Conditions:
A plant startup is in progress with reactor power approximately 1 9%.    "A" and "B" S/G levels are being controlled with the Feed Reg Valves operating in AUTO. The "C" S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve. The Turbine is at 1800 RPM (Not synched to the Grid)
. You are the operator assigned to control S/G water level. Annunciator APP
-003-D4, TAVE/TREF DEV, is an expected alarm.
Initiating Cue:
The CRS has directed you to transfer the "C" S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation
. Task Standard:
The operator will place the "C" Feed Reg Valve in AUTO, and then take m anual control of the "B" Feed Reg Valve and stabilize the "
B" S/G level when it is determined that the "
B" Feed Reg Valve has failed to control the "B" S/G level in AUTO
.
Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM B NUREG 1021, Revision 10 Required Materials:
None   General  


==References:==
==References:==
GP-005 (Power Operation), Rev 128 AOP-010 (Main Feedwater/Condensate Malfunction), Rev 33 Handouts:                Handout 1: Section 6.4 of GP-005 marked up for this JPM through Step 6.12.d for A and B FRVs.
Handout 2: Blank copy of AOP-010 Time Critical Task:      NO Validation Time:        12 minutes NOTE:                    This JPM should be pre-briefed in the Briefing Room.
Critical Step Justification Step 2        This step is critical because adjusting the output of the FCV-499 controller is necessary to place the C Feed Reg Valve in AUTO.
Step 3        This step is critical because depressing the AUTO pushbutton on the FCV-498 controller is necessary to place the C Feed Reg Valve in AUTO.
Step 4        This step is critical because rotating the FCV-499 controller adjust knob counter-clockwise until the controller is at 0% is necessary to place the C Feed Reg Valve in AUTO.
Alternate Path Critical Step Justification Step 5 or 7  This step is critical because placing the FCV-488 controller in MANUAL and stabilizing the B S/G level is necessary to take manual control of the B Feed Reg Valve and stabilize the B S/G level.
2016 Systems - Control Room JPM B                                      NUREG 1021, Revision 10


GP-005 (Power Operation), Rev 128 AOP-0 10 (Main Feedwater/Condensate Malfunction), Rev 33  Handouts: Handout 1: Section 6.4 of GP
Appendix C                                   Page 4 of 13                 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
-005 marked up for this JPM through Step 6.12.d for "A" and "B" FRVs
: 1. Reset simulator to IC-3, 16% Power, Turbine Ready for Synch
. Handout 2: Blank copy of AOP-010  Time Critical Task:
NO  Validation Time:
12 minutes  NOTE: This JPM should be pre
-briefed in the Briefing Room.
Critical Step Justification Step 2 This step is critical because adjusting the output of the FCV
-499 controller is necessary to place the "C" Feed Reg Valve in AUTO
. Step 3 This step is critical because depressing the AUTO pushbutton on the F C V-498 controller is necessary to place the "C" Feed Reg Valve in AUTO
. Step 4 This step is critical because rotating the FCV-499 controller adjust knob counter
-clockwise until the controller is at 0%
is necessary to place the "C" Feed Reg Valve in AUTO
. Alternate Path Critical Step Justification Step 5 or 7 This step is critical because placing the FCV
-4 88 controller in MANUAL and stabilizing the "
B" S/G level is necessary to take manual control of the "B" Feed Reg Valve and stabilize the "B" S/G level
.
Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM B NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Reset simulator to IC
-3, 16% Power, Turbine Ready for Synch
: 2. Place in RUN.
: 2. Place in RUN.
: 3. Perform the following:
: 3. Perform the following:
Raise power to 18
* Raise power to 18-20% by withdrawing control rods.
-20% by withdrawing control rods.
* Adjust FRV Bypasses to 60-90% OPEN.
Adjust FRV Bypasses to 60
* Override CLOSED FCV-1446 (1CFW094 f:normal)
-90% OPEN. Override CLOSED FCV
-1446 (1CFW094 f:normal)
: 4. Ensure the following:
: 4. Ensure the following:
Rx power is between 1 7-20% Tavg is between 551
* Rx power is between 17-20%
-555&deg;F The "C" FRV Bypass Valve OPEN with 60
* Tavg is between 551-555&deg;F
-90% output demand The "C" S/G level is within 2-4% of programmed level (39%)
* The C FRV Bypass Valve OPEN with 60-90% output demand
The "A" and "B" FRV Controllers are in AUTO The "C" FRV Controller is in MANUAL FCV-1446 indicates SHUT
* The C S/G level is within 2-4% of programmed level (39%)
: 5. Insert $006_FRV_BYPASS IMF CFW17 B d:5 r:90 f:0 (5 seconds after FCV-499 ("C" Feed Reg Bypass Valve
* The A and B FRV Controllers are in AUTO
) OPEN indication extinguishes)
* The C FRV Controller is in MANUAL
: 6. Identify APP
* FCV-1446 indicates SHUT
-003-D4, TAVE/TREF DEV, and an expected alarm (Green Dot)
: 5. Insert $006_FRV_BYPASS IMF CFW17B d:5 r:90 f:0 (5 seconds after FCV-499 (C Feed Reg Bypass Valve) OPEN indication extinguishes)
: 6. Identify APP-003-D4, TAVE/TREF DEV, and an expected alarm (Green Dot)
: 7. Place Green Dots on all other LIT annunciators (Expected alarms)
: 7. Place Green Dots on all other LIT annunciators (Expected alarms)
: 8. Acknowledge alarms and stabilize plant. 9. Freeze the Simulator.
: 8. Acknowledge alarms and stabilize plant.
OR 1. Reset Simulator to Temporary Snap IC-601 (January, 201 6). 2. Open Scenario File 006_JPM_B.
: 9. Freeze the Simulator.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
OR
-411.
: 1. Reset Simulator to Temporary Snap IC-601 (January, 2016).
: 2. Open Scenario File 006_JPM_B.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. Place Simulator in Run when Operator assumes the watch.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM B                                NUREG 1021, Revision 10


Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 5 of 13                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM B NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1
START TIME:
. START TIME:
NOTE Section 6.4 Step 12 is a continuous action step that should be performed whenever plant conditions require Feedwater flow through the FRVs and conditions are suitable or automatic S/G water level control.
NOTE Section 6.4 Step 12 is a continuous action step that should be performed whenever plant conditions require Feedwater flow through the FRVs and conditions are suitable or automatic S/G water level control. Feedwater Regulating Valves should be transferred to automatic control one at a time.
Feedwater Regulating Valves should be transferred to automatic control one at a time.
FCV-1446 (Condensate Recirc) is controlled by FS
FCV-1446 (Condensate Recirc) is controlled by FS-1446 (Cond Pmp Recirc VLV Flow Switch). FS-1446 is set to open FCV-1446 at a flow of 1050 gpm with the valve closing at a Condensate System flow of 4200 gpm flow through the GS Condenser and SGBD Heat Exchangers.
-1446 (Cond Pmp Recirc VLV Flow Switch). FS
The Push Button to reset FS-1446 is located in the same enclosure as FS-1446 which is located approximately 15 feet northwest of FCV-1446 on a concrete column.
-1446 is set to open FCV
STEP 1:           WHEN Reactor Power is 15% to 20%, OR the Feedwater Regulating Bypass Valves are 60% to 90% demand signal, THEN shift each Feedwater Regulating Valve to AUTO as follows:             ___ SAT
-1446 at a flow of 1050 gpm with the valve closing at a Condensate System flow of 4200 gpm flow through the GS Condenser and SGBD Heat Exchangers.
* IF FCV-1446 (Condenser Recirc) does NOT indicate SHUT, THEN.
The Push Button to reset FS
(Step 12/12.a).
-1446 is located in the same enclosure as FS
___ UNSAT STANDARD:         The operator reads the Notes, and proceeds.
-1446 which is located approximately 15 feet northwest of FCV
The operator observes reactor power on NR-45 (or equivalent) to be 18%, and proceeds.
-1446 on a concrete column.
The operator observes that FCV-499 Controller output to be between 60-90%, and proceeds.
STEP 1: WHEN Reactor Power is 15% to 20%, OR the Feedwater Regulating Bypass Valves are 60% to 90% demand signal, THEN shift each Feedwater Regulating Valve to AUTO as follows:
The operator observes the FCV-1446 Green status light is LIT and Red status light is OFF, and recognizes that this Step is NOT Applicable, and proceeds.
IF FCV-1446 (Condenser Recirc) does NOT indicate SHUT, THEN--.   (Step 12/12.a
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
). STANDARD: The operator reads the Notes, and proceeds.
2016 Systems - Control Room JPM B                                     NUREG 1021, Revision 10
The operator observes reactor power on NR
-45 (or equivalent) to be 1 8%, and proceeds.
The operator observes that FCV
-499 Controller output to be between 60
-90%, and proceeds.
The operator observes the FCV
-1446 Green status light is LIT and Red status light is OFF, and recognizes that this Step is NOT Applicable, and proceeds
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:     ___ SAT    ___ UNSAT Appendix C Page 6 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM B NUREG 1021, Revision 10 NOTE  With the Turbine not yet loaded, S/G Program Level will be approximately 39% based on First Stage Pressure. STEP 2: Ensure Feed Flow is trending with Steam Flow and S/G Levels are within 1% of program level.
(Step 12.b
). STANDARD: The operator reads the Note, and proceeds.
The operator observes "C" S/G Feed Flow is trending with Steam Flow, and that "C" S/G level is NOT within 1% of programmed level
. The operator adjusts the output of the FCV
-49 9 controller as needed to adjust the feed flow trend and/or "C" S/G level within 1% of programmed level
. EXAMINER'S CUE:
APP-003-D4, which is an expected alarm, may alarm during this time. If so, state that the OATC will address this alarm.
It may be necessary to provide this cue throughout the JPM. EXAMINER'S NOTE:
S/G programmed level is 39%.


BOOTH OPERATOR CUE:
Appendix C                                      Page 6 of 13                        Form ES-C-1 PERFORMANCE INFORMATION NOTE With the Turbine not yet loaded, S/G Program Level will be approximately 39% based on First Stage Pressure.
NONE COMMENTS:  
STEP 2:        Ensure Feed Flow is trending with Steam Flow and S/G Levels are            CRITICAL within 1% of program level.                                                  STEP (Step 12.b).
___ SAT STANDARD: The operator reads the Note, and proceeds.
The operator observes C S/G Feed Flow is trending with Steam Flow, and that C S/G level is NOT within 1% of programmed level.        ___ UNSAT The operator adjusts the output of the FCV-499 controller as needed to adjust the feed flow trend and/or C S/G level within 1% of programmed level.
EXAMINERS CUE:                APP-003-D4, which is an expected alarm, may alarm during this time. If so, state that the OATC will address this alarm.
It may be necessary to provide this cue throughout the JPM.
EXAMINERS NOTE:                S/G programmed level is 39%.
BOOTH OPERATOR CUE:             NONE COMMENTS:
2016 Systems - Control Room JPM B                                      NUREG 1021, Revision 10


CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 7 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       Depress the Auto pushbutton on the FRV controller.                   CRITICAL (Step 12.c)                                                             STEP STANDARD:     The operator observes that C S/G level is within 1% of programmed level.                                                   ___ SAT The operator depresses the AUTO pushbutton on the FCV-498 controller, and observes the White AUTO light is LIT.               ___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
- Control Room JPM B NUREG 1021, Revision 10 STEP 3: Depress the Auto pushbutton on the FRV controller.
2016 Systems - Control Room JPM B                                 NUREG 1021, Revision 10
(Step 12.c)
STANDARD: The operator observes that "C" S/G level is within 1% of programmed level
. The operator depresses the AUTO pushbutton on the F C V-498 controller, and observes the White AUTO light is LIT.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM B NUREG 1021, Revision 10 STEP 4: IF ANY Feedwater Regulating Bypass Valve is NOT closed, THEN slowly close it  (Step 12.c.1)
STANDARD: The operator observes FCV
-499 to be OPEN, and rotates the controller adjust knob counter
-clockwise, and observes the controller output move toward 0%
. The operator observes the FCV
-498 Red and Green status light is LIT, and the controller output start to rise from 0%.
EXAMINER'S CUE:
S/G level may drop as much as 5% while the FRV adjusts automatically, and this may result in an APP
-006 deviation alarm (This is normal and expected). However, the operator may take action per AOP
-010, and place the FRV controller in MANUAL.
If so, when the "C" S/G level is under the operator's control, report as I&C that troubleshooting has been conducted (Using time compression), and it has been determined that the FCV
-498 controller is operating properly. EXAMINER'S NOTE:
NONE    BOOTH OPERATOR CUE:
NONE  COMMENTS:            CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 9 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM B NUREG 1021, Revision 10 STEP 5: Ensure each FRV in AUTO is maintaining programmed S/G level.
(Step 12.d)  STANDARD: The operator observes that "C" S/G level is stabilized and concludes that the "C" FRV (FCV
-498) is maintaining programmed S/G level in AUTO. The operator observes one or more of the following:
  "B" Feed flow as indicated on FR
-488 starts to lower "B" S/G level as indicated on FR
-488 starts to lower FCV-488 controller output starts to lower FCV-488 Green status light is LIT, Red status light is OFF APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL  (Alternate Path)
The operator depresses the MANUAL pushbutton on the F C V-488 controller, and observes the White AUTO light is Extinguished; and the "B" S/G is stabilized (i.e. under the operator control)
. (If so, Terminate JPM)
OR  The operator addresses AOP
-010. (If so, continue to subsequent Steps)  EXAMINER'S CUE:
If the operator addresses AOP
-010, provide the operator with a copy of Handout 2, and continue.
EXAMINER'S NOTE:
5 seconds after the "C" FRBV is closed the "B" FRV controller will fail causing FCV
-488 to CLOSE.
The operator is expected to take manual control of FCV-488 using the guidance for Prompt and Prudent actions in OMM
-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure


of automatic systems to perform or respond correctly.); or by entering AOP
Appendix C                                    Page 8 of 13                    Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 4:      IF ANY Feedwater Regulating Bypass Valve is NOT closed, THEN              STEP slowly close it (Step 12.c.1)
-010. If the operator addresses AOP-010, continue.
___ SAT STANDARD:    The operator observes FCV-499 to be OPEN, and rotates the controller adjust knob counter-clockwise, and observes the controller output move toward 0%.
___ UNSAT The operator observes the FCV-498 Red and Green status light is LIT, and the controller output start to rise from 0%.
EXAMINERS CUE:            S/G level may drop as much as 5% while the FRV adjusts automatically, and this may result in an APP-006 deviation alarm (This is normal and expected).
However, the operator may take action per AOP-010, and place the FRV controller in MANUAL.
If so, when the C S/G level is under the operators control, report as I&C that troubleshooting has been conducted (Using time compression), and it has been determined that the FCV-498 controller is operating properly.
EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE: NONE COMMENTS:
2016 Systems - Control Room JPM B                                    NUREG 1021, Revision 10


BOOTH OPERATOR CUE:
Appendix C                                     Page 9 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       Ensure each FRV in AUTO is maintaining programmed S/G level.              CRITICAL (Step 12.d)                                                                 STEP STANDARD:     The operator observes that C S/G level is stabilized and concludes that the C FRV (FCV-498) is maintaining programmed S/G level in        ___ SAT AUTO.
NONE  COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
The operator observes one or more of the following:
- Control Room JPM B NUREG 1021, Revision 10 STEP 6: CHECK FRVs  OPERATING PROPERLY (MANUAL OR AUTO):
* B Feed flow as indicated on FR-488 starts to lower                   ___ UNSAT
FCV478  FCV488 FCV498  (AOP-010 Step 1)   STANDARD: The operator observes one or more of the following:
* B S/G level as indicated on FR-488 starts to lower
  "B" Feed flow as indicated on FR
* FCV-488 controller output starts to lower
-488 starts to lower "B" S/G level as indicated on FR
* FCV-488 Green status light is LIT, Red status light is OFF
-488 starts to lower FCV-488 controller output starts to lower FCV-488 Green status light is LIT, Red status light is OFF APP-006-E1, S/G B NAR RANGE LO/LO
* APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL (Alternate Path)
-LO LEVEL   The operator proceeds to Step 1 RNO.
The operator depresses the MANUAL pushbutton on the FCV-488 controller, and observes the White AUTO light is Extinguished; and the B S/G is stabilized (i.e. under the operator control). (If so, Terminate JPM)
OR The operator addresses AOP-010. (If so, continue to subsequent Steps)
EXAMINERS CUE:                If the operator addresses AOP-010, provide the operator with a copy of Handout 2, and continue.
EXAMINERS NOTE:              5 seconds after the C FRBV is closed the B FRV controller will fail causing FCV-488 to CLOSE.
The operator is expected to take manual control of FCV-488 using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.); or by entering AOP-010. If the operator addresses AOP-010, continue.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM B                                    NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                                  Page 10 of 13                  Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      CHECK FRVs  OPERATING PROPERLY (MANUAL OR AUTO):
NONE EXAMINER'S NOTE:
FCV478 FCV488 FCV498                                                            ___ SAT (AOP-010 Step 1)
NONE       BOOTH OPERATOR CUE:
___ UNSAT STANDARD:    The operator observes one or more of the following:
NONE COMMENTS:
* B Feed flow as indicated on FR-488 starts to lower
___ SAT
* B S/G level as indicated on FR-488 starts to lower
___ UNSAT  STEP 7: PERFORM the following:
* FCV-488 controller output starts to lower
ENSURE FRV for affected S/G(s) in manual control.
* FCV-488 Green status light is LIT, Red status light is OFF
ATTEMPT to stabilize S/G level using FRV and/or FRV Bypass Valves by matching steam flow with feed flow.
* APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL The operator proceeds to Step 1 RNO.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
STEP 7:       PERFORM the following:                                               CRITICAL ENSURE FRV for affected S/G(s) in manual control.                       STEP ATTEMPT to stabilize S/G level using FRV and/or FRV Bypass Valves by matching steam flow with feed flow.
STOP any load change in progress.
STOP any load change in progress.
If unable to control S/G level, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.
If unable to control S/G level, THEN TRIP the reactor and GO TO     ___ SAT EOPE0, Reactor Trip Or Safety Injection.
(AOP-010 Step 1 RNO)   STANDARD: The operator places FCV
(AOP-010 Step 1 RNO)
-498 controller in MANUAL and stabilizes the "B" S/G level
___ UNSAT STANDARD:     The operator places FCV-498 controller in MANUAL and stabilizes the B S/G level.
. EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Systems - Control Room JPM B                                NUREG 1021, Revision 10
NONE BOOTH OPERATOR CUE: NONE COMMENTS: CRITICAL STEP    ___ SAT


___ UNSAT Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 11 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 8:       CHECK Reactor Trip Setpoint  BEING APPROACHED (AOP-010 Step 2)
- Control Room JPM B NUREG 1021, Revision 10 STEP 8: CHECK Reactor Trip Setpoint  BEING APPROACHED (AOP-010 Step 2)   STANDARD: The operator observes that the "
___ SAT STANDARD:     The operator observes that the B S/G level is stabilized.
B" S/G level is stabilized
EXAMINERS CUE:                 NONE
. EXAMINER'S CUE:
___ UNSAT EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE  EXAMINER'S NOTE:
STEP 9:       IF a reactor trip setpoint is approached, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.
NONE BOOTH OPERATOR CUE:
GO TO Step 4.                                                         ___ SAT (AOP-010 Step 2 RNO)
NONE COMMENTS:     ___ SAT
STANDARD:     The operator observes that the B S/G level is stabilized.           ___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
___ UNSAT  STEP 9: IF a reactor trip setpoint is approached, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.
Terminating Cue:               Evaluation on this JPM is complete.
GO TO Step 4.
(AOP-010 Step 2 RNO)   STANDARD: The operator observes that the "B" S/G level is stabilized
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:   ___ SAT
___ UNSAT        Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM B                                  NUREG 1021, Revision 10


Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 12 of 13                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM B Examinees Name:
- Control Room JPM B NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM B   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:
Number of Attempts:
Time to Complete:   Question Documentation:
Time to Complete:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM B                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A plant startup is in progress with reactor power approximately 19%.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
A plant startup is in progress with reactor power approximately 19%.     "A" and "B" S/G levels are being controlled with the Feed Reg Valves operating in AUTO. The "C" S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve. The Turbine is at 1800 RPM (Not synched to the Grid)
* The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
. You are the operator assigned to control S/G water level. Annunciator APP
* The Turbine is at 1800 RPM (Not synched to the Grid).
-003-D4, TAVE/TREF DEV, is an expected alarm. INITIATING CUE:
* You are the operator assigned to control S/G water level.
The CRS has directed you to transfer the "C" S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation
* Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.
.
INITIATING CUE:     The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
NUREG 1021, Revision 10
- Control Room JPM C (Rev_011116) NUREG 1021, Revision 10


SIM JPM C     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM C Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM C (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 17 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                           Page 2 of 17                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM C NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Restore PRT to Normal Operating           JPM No.:   2016 Systems - Control Conditions                                            Room JPM C (Alternate Path)
Restore PRT to Normal Operating Conditions JPM No.: 2016 Systems  
- Control Room JPM C (Alternate Path)
K/A  
K/A  


==Reference:==
==Reference:==
007 A1.01 (2.9/3.1)
007 A1.01 (2.9/3.1)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:     X Classroom                 Simulator         X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM
* The plant is at 100% power.
) and Handout 1
* APP-003-D3, PRT HI/LO LEVEL, has alarmed.
. Initial Conditions:
* The cause of the low level is known leakage from the PRT to the RCDT.
The plant is at 100% power.
* PRT level is stable at 67%.
APP-003-D3, PRT HI/LO LEVEL, has alarmed. The cause of the low level is known leakage from the PRT to the RCDT. PRT level is stable at 67%
Initiating Cue:
. Initiating Cue:
* The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
The CRS has directed you to restore PRT level to normal IAW OP
* All of the prerequisites of Section 4.0 are complete.
-103, Pressurizer Relief Tank Control System
Task Standard:             The operator will refill the PRT in accordance with Section 8.2.2 of OP-103; and then diagnose and relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.
. All of the prerequisites of Section 4.0 are complete.
Required Materials:         None General  
Task Standard:
The operator will refill the PRT in accordance with Section 8.2.2 of OP
-103; and then diagnose and relieve the hydraulic lock on RC
-519B in accordance with Section 8.4.1 of OP
-103. Required Materials:
None   General  


==References:==
==References:==
OP-103 (Pressurizer Relief Tank Control System), Rev 21 2016 Systems - Control Room JPM C                                          NUREG 1021, Revision 10
Appendix C                                      Page 3 of 17                        Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Blank Copy of OP-103 Time Critical Task:    NO Validation Time:        10 minutes NOTE:                  This JPM should be pre-briefed in the briefing room.
Critical Step Justification Step 2        This step is critical because placing a PW Pump control switch to START is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 3        This step is critical because placing the RC-519C control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 4        This step is critical because placing the RC-519A and B control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 9        This step is critical because placing the RC-519A and B control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Step 10      This step is critical because placing the RC-519C control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.
Alternate Path Critical Step Justification Step 15      This step is critical because cycling RC-519C open and closed is necessary to relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10


OP-103 (Pressurizer Relief Tank Control System), Rev 21 Appendix C Page 3 of 17 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
Appendix C                                   Page 4 of 17                         Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM C NUREG 1021, Revision 10 Handouts: Handout 1: Blank Copy of OP
-103  Time Critical Task:
NO  Validation Time:
10 minutes  NOTE: This JPM should be pre
-briefed in the briefing room.
Critical Step Justification Step 2 This step is critical because placing a PW Pump control switch to START is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 3 This step is critical because placing the RC
-519C control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 4 This step is critical because placing the RC
-519A and B control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 9 This step is critical because placing the RC
-519A and B control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Step 1 0 This step is critical because placing the RC
-519C control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP
-103. Alternate Path Critical Step Justification Step 1 5 This step is critical because cycling RC-519C open and closed is necessary to relieve the hydraulic lock on RC
-519B in accordance with Section 8.4.1 of OP
-103.
Appendix C Page 4 of 17 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ C as follows:
: 1. Construct Scenario File 006_JPM_ C as follows:
IOR doRCSAAO212d e:006_RC_519AB_OPEN f:ON (Over
* IOR doRCSAAO212d e:006_RC_519AB_OPEN f:ON (Over-Ride RC-519B to OPEN when Switch taken to OPEN)
-Ride RC-519B to OPEN when Switch taken to OPEN)
* IOR do CNMAOO086J e:006_519AB_OPEN f:OFF (Over-Ride RC-519A/B CIV Indication to OFF)
IOR do CNMAOO086J e:006_519AB_OPEN f:OFF (Over
To be inserted after RC-519C is CLOSED during Initial Fill of PRT (JPM Step 12)
-Ride RC-519A/B CIV Indication to OFF)
  * $006_RC_519C_OPEN DOR doRCSAAO212D (Removes Over-Ride for RC-519B when RC-519C is OPEN)
To be inserted after RC
  * $600_RC_519C_OPEN DOR doCNMAOO086J (Removes Over-Ride on RC-519A/B CIV Indication)
-519C is CLOSED during Initial Fill of PRT (JPM Step
: 2. Reset simulator to IC-5, 100% Power.
: 12) $006_RC_519C_OPEN DOR doRCSAAO212D (Removes Over
: 3. Place in RUN, execute Scenario File 006_JPM_C and allow time to stabilize.
-Ride for RC
: 4. Drain PRT to 67% (Open RC-523 until PRT level 67% and Close RC-523.
-519B when RC-519C is OPEN)
: 5. Verify PRT conditions as follows: 103&deg;F temperature, 67% level and 3 psig pressure.
  $600_RC_519C_OPEN DOR doCNMAOO086J (Removes Over
: 6. Stabilize the plant.
-Ride on RC
: 7. Freeze the Simulator.
-519A/B CIV Indication)
OR
: 2. Reset simulator to IC
: 1. Reset Simulator to Temporary Snap IC-602 (July, 2015).
-5 , 100% Power. 3. Place in RUN , execute Scenario File 006_JPM_C and allow time to stabilize
: 2. Scenario File 006_JPM_ C NOTE:         Booth Instructor verify that two additional overrides are available to be inserted at Step 11 of this JPM.
.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. (Open RC-523 until PRT level 67% and Close RC
: 4. Place Simulator in Run when Operator assumes the watch.
-523. 5. Verify PRT conditions as follows: 1 03&deg;F temperature, 67% level and 3 psig pressure
2016 Systems - Control Room JPM C                                  NUREG 1021, Revision 10
. 6. Stabilize the plant
. 7. Freeze the Simulator. OR 1. Reset Simulator to Temporary Snap IC
-602 (July, 201 5). 2. Scenario File 006_JPM_ C NOTE:   Booth Instructor verify that two additional overrides are available to be inserted at Step 1 1 of this JPM
. 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
-411. 4. Place Simulator in Run when Operator assumes the watch.


Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                       Page 5 of 17                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM C NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1
START TIME:
. START TIME:
NOTE:
NOTE: PRT temperatures of greater than 120
PRT temperatures of greater than 120&deg;F should be reduced by alternately adding Primary Water to the PRT and draining the PRT. (SER 93-007)
&deg;F should be reduced by alternately adding Primary Water to the PRT and draining the PRT. (SER 93
Maximum cooling effect can be achieved by leaving the added Primary Water in the PRT for at least 10 minutes prior to draining. (SER 93-007)
-007) Maximum cooling effect can be achieved by leaving the added Primary Water in the PRT for at least 10 minutes prior to draining. (SER 93
STEP 1:         Verify the following initial conditions are satisfied:
-007)   STEP 1: Verify the following initial conditions are satisfied:
: a. All prerequisites of Section 4.0 are complete
: a. All prerequisites of Section 4.0 are complete
: b. Pressurizer Relief Tank level is less than 80%.
: b. Pressurizer Relief Tank level is less than 80%.                         ___ SAT
: c. Draining the PRT is NOT in progress.
: c. Draining the PRT is NOT in progress.
(Step 8.2.2.1)
(Step 8.2.2.1)
STANDARD: The operator reads the Notes, and proceeds.
STANDARD: The operator reads the Notes, and proceeds.                                       ___ UNSAT The operator Verifies all initial conditions satisfied (Initial Cue).
The operator Verifies all initial conditions satisfied (Initial Cue)
EXAMINERS CUE:                   If asked, section 4.0 prerequisites are complete.
. EXAMINER'S CUE:
EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:               NONE COMMENTS:
If asked, section 4.0 prerequisites are complete.
2016 Systems - Control Room JPM C                                          NUREG 1021, Revision 10
EXAMINER'S NOTE:
 
NONE BOOTH OPERATOR CUE:
Appendix C                                   Page 6 of 17                       Form ES-C-1 PERFORMANCE INFORMATION CAUTION Operating two Primary Water Pumps can cause inadvertent filling of the RCS if the RCS is depressurized and vented through a PORV when two Primary Water Pumps are operating. Water may makeup to the RCS via the PRT spargers if the PRT is filled faster than it can vent.
NONE COMMENTS:                 ___ SAT    ___ UNSAT Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STEP 2:       Verify a Primary Water Pump is OPERATING.                                   CRITICAL (Step 8.2.2.2)                                                               STEP STANDARD: The operator reads the Caution, and proceeds.
- Control Room JPM C NUREG 1021, Revision 10 CAUTION Operating two Primary Water Pumps can cause inadvertent filling of the RCS if the RCS is depressurized and vented through a PORV when two Primary Water Pumps are operating. Water may makeup to the RCS via the PRT spargers if the PRT is filled faster than it can vent.
___ SAT The operator observes the A and B Primary Water Pump Green status lights are LIT and the Red status lights are OFF, and determines that neither PW Pump is RUNNING.
STEP 2: Verify a Primary Water Pump is OPERATING.
___ UNSAT The operator places the A Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
(Step 8.2.2.
OR The operator places the B Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
: 2)
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               The A Primary Water Pump is in AUTO, set-up for Auto Makeup.
STANDARD: The operator reads the Caution, and proceeds.
The operator may start either the A or the B Primary Water Pump.
The operator observes the "A" and "B" Primary Water Pump Green status lights are LIT and the Red status lights are OFF, and determines that neither PW Pump is RUNNING.
BOOTH OPERATOR CUE:            NONE COMMENTS:
The operator places the "A" Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF. OR The operator places the "B" Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
2016 Systems - Control Room JPM C                                      NUREG 1021, Revision 10
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
The "A" Primary Water Pump is in AUTO, set
-up for Auto Makeup.
The operator may start either the "A" or the "B" Primary Water Pump.


BOOTH OPERATOR CUE
Appendix C                                   Page 7 of 17                       Form ES-C-1 PERFORMANCE INFORMATION STEP 3:     Open RC-519C, PW TO PRT ISO                                                 CRITICAL (Step 8.2.2.3)                                                               STEP STANDARD: The operator places the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF. ___ SAT EXAMINERS CUE:             NONE EXAMINERS NOTE:             NONE                                                       ___ UNSAT BOOTH OPERATOR CUE:         NONE COMMENTS:
:  NONE  COMMENTS:
STEP 4:     Open RC-519A & B, PW TO CV ISO                                             CRITICAL (Step 8.2.2.4)                                                               STEP STANDARD: The operator places and HOLDS the RC-519A & B Control Switch to OPEN and observes the Red status lights are LIT and the Green status       ___ SAT lights are OFF.
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
EXAMINERS CUE:             NONE
- Control Room JPM C NUREG 1021, Revision 10 STEP 3: Open RC-519C, PW TO PRT ISO (Step 8.2.2.
___ UNSAT EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
: 3) STANDARD: The operator place s the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF.
2016 Systems - Control Room JPM C                                     NUREG 1021, Revision 10
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE   COMMENTS:
CRITICAL STEP
___ SAT    ___ UNSAT  STEP 4: Open RC-519A & B, PW TO CV ISO (Step 8.2.2.
: 4) STANDARD: The operator place s and HOLDS the RC-519 A & B Control Switch to OPEN and observes the Red status lights are LIT and the Green status lights are OFF.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:   NONE   COMMENTS:         CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM C NUREG 1021, Revision 10 STEP 5: Monitor PRT for rising level (Step 8.2.2.
: 5)  STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.


EXAMINER'S CUE:
Appendix C                                    Page 8 of 17                    Form ES-C-1 PERFORMANCE INFORMATION STEP 5:      Monitor PRT for rising level (Step 8.2.2.5)
NONE EXAMINER'S NOTE:
STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.                ___ SAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              The normal PRT Level band is 70-80%.                  ___ UNSAT It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
The normal PRT Level band is 70
BOOTH OPERATOR CUE:          NONE COMMENTS:
-80%.     It is expected that APP
STEP 6:      IF the expected rise in level does NOT occur, THEN stop filling AND investigate.
-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
(Step 8.2.2.6)
BOOTH OPERATOR CUE:
___ SAT STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.
NONE   COMMENTS:      
EXAMINERS CUE:              NONE
___ UNSAT EXAMINERS NOTE:             The normal PRT Level band is 70-80%.
It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
BOOTH OPERATOR CUE:           NONE COMMENTS:
2016 Systems - Control Room JPM C                                  NUREG 1021, Revision 10


___ SAT    ___ UNSAT  STEP 6: IF the expected rise in level does NOT occur, THEN stop filling AND investigate.
Appendix C                                        Page 9 of 17                          Form ES-C-1 PERFORMANCE INFORMATION NOTE: Increasing PRT level will cause PRT pressure to rise, possibly to the high pressure alarm setpoint of 5 psig.
(Step 8.2.2.
STEP 7:        Recognize/report PRT Hi Pressure alarm (APP-003 C3) received.
: 6)  STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.
Monitors PRT pressure and reports value and that it is an expected alarm due to filling                                                            ___ SAT STANDARD: The operator reads the Note, and proceeds.
EXAMINER'S CUE:
The operator checks PRT pressure >5 psig due to filling, informs the          ___ UNSAT CRS it is an expected alarm EXAMINERS CUE:                   As CRS, acknowledge report EXAMINERS NOTE:                 This is an expected alarm as the procedure note states. It is not expected that the operator will address the alarm and/or condition until after filling is completed. If the operator does address this alarm, if it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.
NONE  EXAMINER'S NOTE:
BOOTH OPERATOR CUE:               NONE COMMENTS:
The normal PRT Level band is 70
2016 Systems - Control Room JPM C                                      NUREG 1021, Revision 10
-80%.     It is expected that APP
-003-C3, PRT HI PRESS, is an expected alarm during this evolution.
BOOTH OPERATOR CUE:
NONE   COMMENTS:      


___ SAT    ___ UNSAT Appendix C Page 9 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 10 of 17                         Form ES-C-1 PERFORMANCE INFORMATION STEP 8:     WHEN PRT level is between 70% and 80%, THEN perform the following:
- Control Room JPM C NUREG 1021, Revision 10 NOTE: Increasing PRT level will cause PRT pressure to rise, possibly to the high pressure alarm setpoint of 5 psig.
STEP 7: Recognize/report PRT Hi Pressure alarm (APP
-003 C3) received. Monitors PRT pressure and reports value and that it is an expected alarm due to filling STANDARD: The operator reads the Note, and proceeds.
The operator checks PRT pressure >5 psig due to filling, informs the CRS it is an expected alarm EXAMINER'S CUE:
As CRS, acknowledge report EXAMINER'S NOTE:
This is an expected alarm as the procedure note states. It is not expected that the operator will address the alarm and/or condition until after filling is completed. If the operator does address this alarm, if it decided to vent the PRT to reduce pressure, state that "Another Operator will address this alarm."
BOOTH OPERATOR CUE:    NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 8: WHEN PRT level is between 70% and 80%, THEN perform the following:
: a. Stop the Primary Water Pump
: a. Stop the Primary Water Pump
: b. Verify one Primary Water pump is in AUTO.
: b. Verify one Primary Water pump is in AUTO.                               ___ SAT (Step 8.2.2.7a&b)
(Step 8.2.2.7a&b)
STANDARD: If the A Primary Water Pump was previously started, the operator places the A Primary Water Pump Control Switch to STOP and               ___ UNSAT observes the Green status light is LIT and the Red status light is OFF.
STANDARD: If the "A" Primary Water Pump was previously started, the operator places the "A" Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
The operator places the A Primary Water Pump Control Switch to AUTO.
The operator places the "A" Primary Water Pump Control Switch to AUTO. OR   If the "B" Primary Water Pump was previously started, the operator places the "B" Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
OR If the B Primary Water Pump was previously started, the operator places the B Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.
EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10
NONE BOOTH OPERATOR CUE:   NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
 
- Control Room JPM C NUREG 1021, Revision 10 STEP 9: Close RC-519A & B (Step 8.2.2.7c)
Appendix C                                   Page 11 of 17                       Form ES-C-1 PERFORMANCE INFORMATION STEP 9:     Close RC-519A & B                                                           CRITICAL (Step 8.2.2.7c)                                                               STEP STANDARD: The operator places and holds the RC-519A & B Control Switch to CLOSE and observes the RC-519A Green status light is LIT and the           ___ SAT Red status light is OFF.
STANDARD: The operator place s and holds the RC-519A & B Control Switch to CLOSE and observes the RC
The operator observes that the RC-519B Red and Green status lights are LIT (Alternate Path - Mitigated in a later Step).                     ___ UNSAT The operator reports to the CRS that RC-519B has not fully CLOSED.
-519A Green status light is LIT and the Red status light is OFF. The operator observes that the RC
EXAMINERS CUE:               As CRS, acknowledge report If a request is made to cycle RC-519A & B to attempt to verify RC-519B operation, as CRS then respond no do not cycle the valve EXAMINERS NOTE:               A single Control Switch controls both valves BOOTH OPERATOR CUE:            NONE COMMENTS:
-519B Red and Green status lights are LIT (Alternate Path
STEP 10:    Close RC-519C                                                              CRITICAL (Step 8.2.2.7d)                                                              STEP STANDARD: The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF. ___ SAT EXAMINERS CUE:                    NONE EXAMINERS NOTE:                  NONE                                                ___ UNSAT BOOTH OPERATOR CUE:                Insert the last two commands IAW 006_JPM_C File to remove over-rides once RC-519C is closed.
- Mitigated in a later Step
COMMENTS:
). The operator reports to the CRS that RC
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10
-519B has not fully CLOSED.
 
EXAMINER'S CUE:
Appendix C                                    Page 12 of 17                        Form ES-C-1 PERFORMANCE INFORMATION STEP 11:    IF PRT level is greater than or equal to 83% OR PRT temperature is greater than 120&deg;F, THEN lower the PRT level in accordance with the appropriate Section of this procedure, Draining the PRT When Pressurizer Temperature is Greater Than Or Equal to 200&deg;F OR                ___ SAT Draining the PRT When Pressurizer Temperature is Less Than 200&deg;F. (Step 8.2.2.8)
As CRS, acknowledge report If a request is made to cycle RC
STANDARD: The operator observes PRT level on LI-470 (or ERFIS) is <83% and              ___ UNSAT PRT temperature on TI-471 (or ERFIS) is <120&deg;F EXAMINERS CUE:                NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
-519A & B to attempt to verify RC
STEP 12:    IF RC-519A or RC-519B do NOT fully close, THEN relieve the hydraulic lock in accordance with the Relieving Hydraulic Lock on RC-519A AND RC-519B Section of this procedure (Alternate Path - RC-519B Hydraulic Lock has previously occurred and is Mitigated Here).                                                                      ___ SAT (Step 8.2.2.9)
-519B operation, as CRS then respond no do not cycle the valve EXAMINER'S NOTE:
STANDARD: The operator reviews the OP-103 Table Of Contents and determines that Section 8.4.1 is required, and proceeds to this section.              ___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:              If the operator addresses APP-003-C3 prior to addressing the hydraulic lock, when it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.
A single Control Switch controls both valves
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10


BOOTH OPERATOR CUE:    NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 1 0: Close RC-519C  (Step 8.2.2.7d)
Appendix C                                   Page 13 of 17                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: The RCS System Engineer WILL need to be NOTIFIED WHEN the following section is PERFORMED to relieve hydraulic lock on RC-519A AND RC-519B for Engineering Trending Purposes.
STANDARD: The operator place s the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
STEP 13:     Relieving Hydraulic Lock on RC-519A AND RC-519B:
EXAMINER'S CUE:
Verify the following initial conditions are satisfied:
NONE  EXAMINER'S NOTE:
: a. RC-519A & B, PW TO CV ISO, control switch is in the CLOSE position and one OR both valves indicate in mid position.           ___ SAT (Step 8.4.1.a)
NONE  BOOTH OPERATOR CUE: Insert the last two commands IAW 006_JPM_C File to remove over
-rides once RC
-519C is closed. COMMENTS:      CRITICAL STEP  ___ SAT
___ UNSAT Appendix C Page 12 of 17 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 1 1: IF PRT level is greater than or equal to 83% OR PRT temperature is greater than 120&deg;F, THEN lower the PRT level in accordance with the appropriate Section of this procedure, Draining the PRT When Pressurizer Temperature is Greater Than Or Equal to 200&deg;F OR Draining the PRT When Pressurizer Temperature is Less Than 200&deg;F. (Step 8.2.2.8)
STANDARD: The operator observes PRT level on LI-470 (or ERFIS) is <83% and PRT temperature on TI-471 (or ERFIS) is <120&deg;F EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:    NONE  COMMENTS:            ___ SAT    ___ UNSAT  STEP 1 2: IF RC-519A or RC
-519B do NOT fully close, THEN relieve the hydraulic lock in accordance with the Relieving Hydraulic Lock on RC
-519A AND RC
-519B Section of this procedure (Alternate Path
- RC-519B Hydraulic Lock has previously occurred and is Mitigated Here).  (Step 8.2.2.
: 9)  STANDARD: The operator reviews the OP
-103 Table Of Contents and determines that Section 8.4.1 is required, and proceeds to this section.
EXAMINER'S CUE:
NONE    EXAMINER'S NOTE:
If the operator addresses APP
-003-C3 prior to addressing the hydraulic lock, when it decided to vent the PRT to reduce pressure, state that "Another Operator will address this alarm."
BOOTH OPERATOR CUE:    NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 NOTE: The RCS System Engineer WILL need to be NOTIFIED WHEN the following section is PERFORMED to relieve hydraulic lock on RC
-519A AND RC-519B for Engineering Trending Purposes. STEP 1 3: Relieving Hydraulic Lock on RC
-519A AND RC
-519B: Verify the following initial conditions are satisfied:
: a. RC-519A & B, PW TO CV ISO, control switch is in the CLOSE position and one OR both valves indicate in mid position.
(Step 8.4.1.a)
STANDARD: The operator reads the Note, and proceeds.
STANDARD: The operator reads the Note, and proceeds.
The operator observes the RC
___ UNSAT The operator observes the RC-519A Green status light is LIT and the Red status light is OFF.
-519A Green status light is LIT and the Red status light is OFF.
The operator observes the RC-519B Red and Green status lights are LIT.
The operator observes the RC
EXAMINERS CUE:               If the operator notifies the CRS or the System Engineer, acknowledge as the CRS.
-519B Red and Green status lights are LIT. EXAMINER'S CUE:
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
If the operator notifies the CRS or the System Engineer, acknowledge as the CRS.
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10
EXAMINER'S NOTE:
 
NONE BOOTH OPERATOR CUE:
Appendix C                                     Page 14 of 17                       Form ES-C-1 PERFORMANCE INFORMATION STEP 14:     Verify the Post Accident Sampling System is NOT in operation.
NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 1 4: Verify the Post Accident Sampling System is NOT in operation.
(Step 8.4.1.b)
(Step 8.4.1.b)
STANDARD: Operator verifies PASS is not operating
STANDARD:     Operator verifies PASS is not operating                                   ___ SAT EXAMINERS CUE:                  If asked about the status of this system, ask the operator what they would expect the status to be in the current plant condition. THEN, indicate that the    ___ UNSAT system is as expected.
EXAMINERS NOTE:                  The PASS is ONLY operated under accident conditions, which do NOT exist.
BOOTH OPERATOR CUE:              NONE COMMENTS:
STEP 15:    IF RC-519B is indicating in mid position, THEN cycle RC-519C, PW              CRITICAL TO PRT ISO                                                                      STEP (Step 8.4.2)
STANDARD: The operator places the RC-519C Control Switch to OPEN and                      ___ SAT observes the Red status light is LIT and the Green status light is OFF.
The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.      ___ UNSAT The operator observes the RC-519B Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:                  If the operator informs the CRS of the valve position change, acknowledge as the CRS.
EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM C                                      NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                                   Page 15 of 17                     Form ES-C-1 PERFORMANCE INFORMATION STEP 16:     IF RC-519A is indicating in mid position, THEN perform the following:
If asked about the status of this system, ask the operator what they would expect the status to be in the current plant condition. THEN, indicate that the system is as expected.
EXAMINER'S NOTE:
The PASS is ONLY operated under accident conditions, which do NOT exist.
BOOTH OPERATOR CUE:
NONE  COMMENTS:            ___ SAT    ___ UNSAT  STEP 1 5: IF RC-519B is indicating in mid position, THEN cycle RC
-519C, PW TO PRT ISO (Step 8.4.2)
STANDARD: The operator place s the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF.
The operator place s the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
The operator observes the RC
-519B Green status light is LIT and the Red status light is OFF.
EXAMINER'S CUE:
If the operator informs the CRS of the valve position change, acknowledge as the CRS.
EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 STEP 1 6: IF RC-519A is indicating in mid position, THEN perform the following:
: a. Verify neither Primary Water Pump is OPERATING.
: a. Verify neither Primary Water Pump is OPERATING.
: b. Close breaker 15 on Power Panel 27.
: b. Close breaker 15 on Power Panel 27.
: c. Open HCV-4176, CDT ISOLATION.
: c. Open HCV-4176, CDT ISOLATION.                                         ___ SAT
: d. Open HCV-4174, PZR RELIEF TANK ISOLATION.
: d. Open HCV-4174, PZR RELIEF TANK ISOLATION.
: e. Close HCV-4176, CDT ISOLATION.
: e. Close HCV-4176, CDT ISOLATION.
: f. Close HCV-4174, PZR RELIEF TANK ISOLATION.
: f. Close HCV-4174, PZR RELIEF TANK ISOLATION.
: g. Open breaker 15 on Power Panel 27.
: g. Open breaker 15 on Power Panel 27.                                   ___ UNSAT (Step 8.4.1.3)
(Step 8.4.1.3)
STANDARD: The operator recognizes the sub-steps under Section 8.4.1.3 are not applicable and annotates the steps with N/A EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
STANDARD: The operator recognizes the sub
NOTE: Power Panel 27 is located on the west side of the PASS panel.
-steps under Section 8.4.1.3 are not applicable and annotates the steps with "N/A" EXAMINER'S CUE:
STEP 17:     IF RC-519A OR RC-519B is still indicating mid position, THEN declare the valve out of service AND refer to ITS LCO 3.6.3.
NONE EXAMINER'S NOTE: NONE BOOTH OPERATOR CUE:
NONE COMMENTS:       ___ SAT    ___ UNSAT  NOTE: Power Panel 27 is located on the west side of the PASS panel.
STEP 1 7: IF RC-519A OR RC
-519B is still indicating mid position, THEN declare the valve out of service AND refer to ITS LCO 3.6.3.
(Step 8.4.1.4)
(Step 8.4.1.4)
STANDARD: The operator reads the Note, and proceeds.
___ SAT STANDARD: The operator reads the Note, and proceeds.
The operator recognizes this step is N/A and marks it N/A
The operator recognizes this step is N/A and marks it N/A
___ UNSAT EXAMINERS CUE:                Inform the operator you will have another operator restore PRT pressure to normal EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
Terminating Cue:              Evaluation on this JPM is complete.
STOP TIME:
2016 Systems - Control Room JPM C                                    NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                             Page 16 of 17                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM C Examinees Name:
Inform the operator you will have another operator restore PRT pressure to normal EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
- Control Room JPM C NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM C   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Number of Attempts:   Time to Complete:
Number of Attempts:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM C                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* APP-003-D3, PRT HI/LO LEVEL, has alarmed.
The plant is at 100% power.
* The cause of the low level is known leakage from the PRT to the RCDT.
APP-003-D3, PRT HI/LO LEVEL, has alarmed. The cause of the low level is known leakage from the PRT to the RCDT. PRT level is stable at 67%.       INITIATING CUE:
* PRT level is stable at 67%.
The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System
INITIATING CUE:
. All of the prerequisites of Section 4.0 are complete.
* The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
 
* All of the prerequisites of Section 4.0 are complete.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
NUREG 1021, Revision 10
- Control Room JPM D (Rev_01 12 16) NUREG 1021, Revision 10        


SIM JPM D       Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM D Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM D (Rev_011216)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training  


Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                           Page 2 of 13                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                                 Task No.:
- Control Room JPM D NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Reactor Startup with Ejected Control JPM No.:           2016 Systems - Control Rod                                                      Room JPM D (Alternate Path)
Reactor Startup with Ejected Control Rod JPM No.: 2016 Systems  
- Control Room JPM D (Alternate Path)
K/A  
K/A  


==Reference:==
==Reference:==
001 A1.06 (4.1/4.4)
001 A1.06 (4.1/4.4)
Examinee: NRC Examiner:
Examinee:                                                       NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                             Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:       X Classroom                 Simulator       X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* The plant is stabilized at 2% power.
: 1. Initial Conditions:
* The RCS is at normal operating temperature and pressure.
The plant is stabilized at 2% power
* A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
. The RCS is at normal operating temperature and pressure
* You are the OATC.
. A plant startup is in progress IAW GP
* The BOP is temporarily outside the Control Room.
-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.
Initiating Cue:             The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.
: 7. You are the OATC.
Task Standard:             The operator will start to raise reactor power to 3-5%. Then, the operator will manually trip the reactor, attempt to manually actuate Safety Injection and manually start SI Pumps in response to an ejected rod.
The BOP is temporarily outside the Control Room.
Required Materials:         None General  
Initiating Cue:
The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.
8 of GP-003. Task Standard:
The operator will start to raise reactor power to 3
-5%. Then, the operator will manually trip the reactor, attempt to manually actuate Safety Injection and manually start SI Pumps in response to an ejected rod. Required Materials:
None   General  


==References:==
==References:==
GP-003 (Normal Plant Startup From Hot Shutdown to Critical), Rev 105 2016 Systems - Control Room JPM D                                            NUREG 1021, Revision 10


GP-003 (Normal Plant Startup From Hot Shutdown to Critical), Rev 105 Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                     Page 3 of 13                     Form ES-C-1 Job Performance Measure Worksheet APP-004 (First Out Reactor Trips), Rev 18 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 AOP-001 (Malfunction of Reactor Control System), Rev 33 AOP-016 (Excessive Primary Plant Leakage), Rev 23 AOP-019 (Malfunction of RCS Pressure Control), Rev 20 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:               Handout 1: Section 8.4 of GP-003 marked up for this JPM to Step 8.4.7.
- Control Room JPM D NUREG 1021, Revision 10 APP-004 (First Out Reactor Trips), Rev 18 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 AOP-001 (Malfunction of Reactor Control System), Rev 33 AOP-016 (Excessive Primary Plant Leakage), Rev 23 AOP-019 (Malfunction of RCS Pressure Control), Rev 20 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45   Handouts: Handout 1: Section 8.4 of GP
Time Critical Task:     NO Validation Time:         5 minutes NOTE:                   This JPM should be pre-briefed in the Briefing Room.
-003 marked up for this JPM to Step 8.4.7. Time Critical Task:
Critical Step Justification Step 1       This step is critical because placing the Manual Rod Control Switch to the OUT position is necessary to raise and then stabilize power between 3-5%.
NO   Validation Time:
Step 2       This step is critical because pressing one of two Rx Trip pushbuttons is necessary to manually trip the reactor.
5 minutes   NOTE: This JPM should be pre
Step 8       This step is critical because pressing BOTH SI pushbuttons is necessary to manually attempt to actuate SI.
-briefed in the Briefing Room.
Alternate Path Critical Step Justification Step 9       This step is critical because placing the A and the C SI Pump Control Switches to START is necessary to manually start SI Pumps in response to an ejected rod.
Critical Step Justification Step 1 This step is critical because placing the Manual Rod Control Switch to the OUT position is necessary to raise and then stabilize power between 3
2016 Systems - Control Room JPM D                                      NUREG 1021, Revision 10
-5%. Step 2 This step is critical because pressing one of two Rx Trip pushbuttons is necessary to manually trip the reactor
. Step 8 This step is critical because pressing BOTH SI pushbuttons is necessary to manually attempt to actuate SI
. Alternate Path Critical Step Justification Step 9 This step is critical because placing the "A" and the "C" SI Pump Control Switches to START is necessary to manually start SI Pumps in response to an ejected rod


Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                 Page 4 of 13                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM D NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ D as follows:
: 1. Construct Scenario File 006_JPM_ D as follows:
I MF SIS01A, f:FAIL_TO_INITIATE , (SI Train "A" Fails to AUTO/MANUAL actuate) I MF SIS01B, f:FAIL_TO_INITIATE, (SI Train "A" Fails to AUTO/MANUAL actuate)
* IMF SIS01A, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
IMF RPS01A f:FAILURE_TO_OPEN, AUTO IMF RPS01B f:FAILURE_TO_OPEN, AUTO Event 1: $006_ROD_OUT_ARMED IMF CRF05A d:5 f:2000, H-8 (Ejected Control Rod) 2. Reset simulator to IC
* IMF SIS01B, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
-1 , 10-8amps IR and raise power to 2% and stabilize
* IMF RPS01A f:FAILURE_TO_OPEN, AUTO
. 3. Place in RUN, execute Scenario File 006_JPM_D and allow time to stabilize.
* IMF RPS01B f:FAILURE_TO_OPEN, AUTO
: 4. Ensure actions of GP-003 up to Step 8.4.7 are complete
* Event 1: $006_ROD_OUT_ARMED IMF CRF05A d:5 f:2000, H-8 (Ejected Control Rod)
. 5. Stabilize the plant
: 2. Reset simulator to IC-1, 10-8amps IR and raise power to 2% and stabilize.
.
: 3. Place in RUN, execute Scenario File 006_JPM_D and allow time to stabilize.
: 6. Freeze the Simulator. OR 1. Reset Simulator to Temporary Snap IC
: 4. Ensure actions of GP-003 up to Step 8.4.7 are complete.
-603 (August, 201 5). 2. Scenario File 006_JPM_ D
: 5. Stabilize the plant.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 6. Freeze the Simulator.
-411. 4. Place Simulator in Run when Operator assumes the watch.
OR
: 1. Reset Simulator to Temporary Snap IC-603 (August, 2015).
: 2. Scenario File 006_JPM_ D
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM D                                NUREG 1021, Revision 10


Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 13                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM D NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
STEP 1:       ADJUST control rods as necessary to achieve the following while             CRITICAL continuing with this procedure:                                               STEP RCS Tavg between 547&deg;F and 551&deg;F                                           ___ SAT Reactor Power 3% to less than or equal to 5%.
STEP 1: ADJUST control rods as necessary to achieve the following while continuing with this procedure:
(Step 8.4.8).
RCS Tavg between 547&deg;F and 551&deg;F Reactor Power 3% to less than or equal to 5%.
___ UNSAT STANDARD:       The operator places the Manual Rod Control Switch to the OUT position to raise reactor power between 3-5%, and Tavg between 547&deg;F and 551&deg;F.
(Step 8.4.8). STANDARD: The operator plac es the Manual Rod Control Switch to the OUT position to raise reactor power between 3-5%, and Tavg between 547&deg;F and 551&deg;F
The operator will observe that an event unrelated to the reactor startup is occurring.
. The operator will observe that an event unrelated to the reactor startup is occurring
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 An Ejected Rod will occur shortly after the rod withdrawal has commenced.
.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
An Ejected Rod will occur shortly after the rod withdrawal has commenced.
Shortly afterwards, the following indications will be available to the operator:
Shortly afterwards, the following indications will be available to the operator:
Several RTGB Annunciators alarm Rod Bottom light for Control Rod H
* Several RTGB Annunciators alarm
-8 is LIT SUR is positive and rising Neutron flux is rising RCS pressure is lowering Pzr level is lowering Charging Pump speed is rising
* Rod Bottom light for Control Rod H-8 is LIT
* SUR is positive and rising
* Neutron flux is rising
* RCS pressure is lowering
* Pzr level is lowering
* Charging Pump speed is rising COMMENTS:
2016 Systems - Control Room JPM D                                        NUREG 1021, Revision 10
 
Appendix C                                    Page 6 of 13                      Form ES-C-1 PERFORMANCE INFORMATION STEP 2:      Diagnose LOCA and manually trip Rx                                        CRITICAL STEP STANDARD:    The operator observes RTGB alarms and indications and manually trips the Rx by pressing one of two Rx Trip pushbuttons.                ___ SAT The operator proceeds to EOP-E-0.
___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:              The operator may address one or more APPs, enter AOP-001, AOP-016, or AOP-019.
The operator may manually trip the reactor based on Attachment 3, Control Band and Trip Limit Guidance, of OMM-022, Emergency Operating Procedures Users Guide.
Since the first four actions of EOP-E-0 are Immediate Actions, the operator will likely NOT address the procedure (EOP-E-0) until the Immediate Actions are complete.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM D                                    NUREG 1021, Revision 10


COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 6 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                               Page 7 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       CHECK Reactor Trip:
- Control Room JPM D NUREG 1021, Revision 10 STEP 2: Diagnose LOCA and manually trip Rx STANDARD: The operator observes RTGB alarms and indications and manually trips the Rx by pressing one of two Rx Trip pushbuttons
Reactor Trip AND Bypass Breakers  OPEN Rod position indicators  FULLY INSERTED Rod Bottom Lights  ILLUMINATED                                     ___ SAT Neutron Flux  LOWERING (EOP-E-0 Step 1)
. The operator proceeds to EOP
___ UNSAT STANDARD:     The operator observes parameters and determines that the Rx is tripped.
-E-0. EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 4:       CHECK Turbine Trip:
The operator may address one or more APP s , enter AOP-001, A OP-016, or AOP-019.      The operator may manually trip the reactor based on Attachment 3, Control Band and Trip Limit Guidance, of OMM-022, Emergency Operating Procedures User's Guide
Both Turbine Stop Valves  CLOSED All MSR Purge AND Shutoff Valves  CLOSED                           ___ SAT (EOP-E-0 Step 2)
.      Since the first four actions of EOP
STANDARD:     The operator observes parameters and determines that the Turbine   ___ UNSAT is tripped.
-E-0 are Immediate Actions, the operator will likely NOT address the procedure (EOP
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
-E-0) until the Immediate Actions are complete. BOOTH OPERATOR CUE: NONE  COMMENTS:
2016 Systems - Control Room JPM D                              NUREG 1021, Revision 10
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM D NUREG 1021, Revision 10 STEP 3: CHECK Reactor Trip:
Reactor Trip AND Bypass Breakers  OPEN Rod position indicators  FULLY INSERTED Rod Bottom Lights  ILLUMINATED Neutron Flux  LOWERING (EOP-E-0 Step 1)   STANDARD: The operator observes parameters and determines that the Rx is tripped. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT  STEP 4: CHECK Turbine Trip: Both Turbine Stop Valves  CLOSED All MSR Purge AND Shutoff Valves  CLOSED (EOP-E-0 Step 2)
STANDARD: The operator observes parameters and determines that the Turbine is tripped.


EXAMINER'S CUE:
Appendix C                                 Page 8 of 13                           Form ES-C-1 PERFORMANCE INFORMATION STEP 5:       CHECK Power To AC EMERGENCY BUSSES:
NONE  EXAMINER'S NOTE:
CHECK Bus E1 OR E2  AT LEAST ONE ENERGIZED CHECK Bus E1 AND E2  BOTH ENERGIZED (EOP-E-0 Step 3)                                                         ___ SAT STANDARD:     The operator observes E-1/E-2 bus voltage and determines that both E-1 and E-2 are energized.                                           ___ UNSAT EXAMINERS CUE:             NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
NONE  BOOTH OPERATOR CUE:
STEP 6:       CHECK SI Status:
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM D NUREG 1021, Revision 10 STEP 5: CHECK Power To AC EMERGENCY BUSSES:
CHECK Bus E1 OR E2  AT LEAST ONE ENERGIZED CHECK Bus E1 AND E2  BOTH ENERGIZED (EOP-E-0 Step 3)
STANDARD: The operator observes E-1/E-2 bus voltage and determines that both E-1 and E-2 are energized
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT  STEP 6: CHECK SI Status:
CHECK if SI is actuated:
CHECK if SI is actuated:
SI annunciators  ANY ILLUMINATED OR SI equipment  AUTO STARTED (EOP-E-0 Step 4/4.a)   STANDARD: The operator observes SI annunciators are LIT, and proceeds
SI annunciators  ANY ILLUMINATED                                   ___ SAT OR SI equipment  AUTO STARTED (EOP-E-0 Step 4/4.a)
. EXAMINER'S CUE:
___ UNSAT STANDARD:     The operator observes SI annunciators are LIT, and proceeds.
NONE EXAMINER'S NOTE:
EXAMINERS CUE:             NONE EXAMINERS NOTE:             If the SI annunciators are not lit, the operator will perform the step 4.a RNO (It is expected that the criteria to automatically actuate safety injection will either occur or be close to occurring during the performance of this step).
If the SI annunciators are not lit, the operator will perform the step 4.a RNO (It is expected that the criteria to automatically actuate safety injection will either occur or be close to occurring during the performance of this step).
SI equipment will NOT auto start.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM D                                    NUREG 1021, Revision 10


SI equipment will NOT auto start.
Appendix C                                   Page 9 of 13                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:     CHECK BOTH trains of SI actuated:
BOOTH OPERATOR CUE:
SI Pumps  TWO RUNNING RHR Pumps  BOTH RUNNING                                               ___ SAT (EOP-E-0 Step 4.b)
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STANDARD:     The operator observes the A and C SI Pumps Green status lights   ___ UNSAT are LIT, and Red status lights are EXTINGUISHED.
- Control Room JPM D NUREG 1021, Revision 10 STEP 7: CHECK BOTH trains of SI actuated:
The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED The operator proceeds to the RNO.
SI Pumps  TWO RUNNING RHR Pumps  BOTH RUNNING (EOP-E-0 Step 4.b)   STANDARD: The operator observes the "A" and "C" SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED
EXAMINERS CUE:                NONE EXAMINERS NOTE:                SI equipment will NOT auto start.
.
BOOTH OPERATOR CUE:            NONE COMMENTS:
The operator observes the "A" and "B" RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED The operator proceeds to the RNO.
2016 Systems - Control Room JPM D                                NUREG 1021, Revision 10


EXAMINER'S CUE:
Appendix C                                   Page 10 of 13                       Form ES-C-1 PERFORMANCE INFORMATION STEP 8:     Manually ACTUATE SI by depressing BOTH SI pushbuttons.
NONE  EXAMINER'S NOTE:
(EOP-E-0 Step 4.b RNO)                                                       CRITICAL STEP STANDARD:     The operator presses BOTH SI pushbuttons.                                 ___ SAT The operator observes the A and C SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
SI equipment will NOT auto start.
___ UNSAT The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
BOOTH OPERATOR CUE:
(Alternate Path).
NONE  COMMENTS:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               Upon completion of the EOP-E-0 Immediate Actions the operator may obtain EOP-E-0 and verify the Immediate Actions, BEFORE proceeding.
___ SAT    ___ UNSAT Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
If so, the operator will likely review the EOP-E-0 Foldout Page, as well.
- Control Room JPM D NUREG 1021, Revision 10 STEP 8: Manually ACTUATE SI by depressing BOTH SI pushbuttons.
BOOTH OPERATOR CUE:             NONE COMMENTS:
(EOP-E-0 Step 4.b RNO
2016 Systems - Control Room JPM D                                       NUREG 1021, Revision 10
)   STANDARD: The operator presses BOTH SI pushbuttons
. The operator observes the "A" and "C" SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
The operator observes the "A" and "B" RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.
(Alternate Path)
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
Upon completion of the EOP
-E-0 Immediate Actions the operator may obtain EOP
-E-0 and verify the Immediate Actions, BEFORE proceeding.
If so, the operator will likely review the EOP
-E-0 Foldout Page, as well.
BOOTH OPERATOR CUE:
NONE COMMENTS:         CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 11 of 13 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM D NUREG 1021, Revision 10 STEP 9: Manually start both SI Pumps.
(Step 5.3.1.c of OMM
-022)  STANDARD: The operator places the "A" SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
The operator places the "C" SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
This action may be taken at the time that the operator realizes that the manual SI actuation pushbuttons have failed to start the SI equipment using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure


of automatic systems to perform or respond correctly.)       If the operator addresses EOP
Appendix C                                    Page 11 of 13                    Form ES-C-1 PERFORMANCE INFORMATION STEP 9:      Manually start both SI Pumps.                                            CRITICAL (Step 5.3.1.c of OMM-022)                                                    STEP
-E-0 to verify the Immediate Actions upon completion of Step 4, and the SI Pumps have NOT been started, the operator will address Attachment 1 (With the BOP out of the Control Room) and manually start the SI Pumps (Step 1 and Step 1 RNO
___ SAT STANDARD:      The operator places the A SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
).
___ UNSAT The operator places the C SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.
BOOTH OPERATOR CUE:
EXAMINERS CUE:                NONE EXAMINERS NOTE:              This action may be taken at the time that the operator realizes that the manual SI actuation pushbuttons have failed to start the SI equipment using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.)
NONE COMMENTS:       CRITICAL STEP
If the operator addresses EOP-E-0 to verify the Immediate Actions upon completion of Step 4, and the SI Pumps have NOT been started, the operator will address Attachment 1 (With the BOP out of the Control Room) and manually start the SI Pumps (Step 1 and Step 1 RNO).
___ SAT    ___ UNSAT          Terminating Cue:
BOOTH OPERATOR CUE:           NONE COMMENTS:
Evaluation on this JPM is complete.
Terminating Cue:               Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM D                                    NUREG 1021, Revision 10


Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 12 of 13                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM D Examinees Name:
- Control Room JPM D NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM D   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 3,584: Line 2,671:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM D                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is stabilized at 2% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The RCS is at normal operating temperature and pressure.
The plant is stabilized at 2% power.
* A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
The RCS is at normal operating temperature and pressure. A plant startup is in progress IAW GP
* You are the OATC.
-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7. You are the OATC.
* The BOP is temporarily outside the Control Room.
The BOP is temporarily outside the Control Room.
INITIATING CUE:     The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.
 
NUREG 1021, Revision 10
INITIATING CUE:
The CRS has directed you to pull control rods to stabilize reactor power between 3
-5% by continuing with Step 8.4.8 of GP
-003.
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM E (Rev_011116) NUREG 1021, Revision 10


SIM JPM E     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM E Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM E (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 18 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 18                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- Control Room JPM E NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Transfer to Long Term Recirculation     JPM No.:     2016 Systems -
Transfer to Long Term Recirculation JPM No.: 2016 Systems  
Control Room JPM E (Alternate Path)
- Control Room JPM E (Alternate Path)
K/A  
K/A  


==Reference:==
==Reference:==
EPE 011 EA1.11 (4.2/4.2)
EPE 011 EA1.11 (4.2/4.2)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                       Actual Performance:       X Classroom                 Simulator       X   Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* A large break LOCA has occurred.
: 1. Initial Conditions:
* The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
A large break LOCA has occurred
* RHR Cold Leg Recirculation flow is 3000 gpm.
. The plant is currently on Cold Leg Recirculation IAW EOP
Initiating Cue:             The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.
-ES-1.3, Transfer to Cold Leg Recirculation
THIS IS A TIME CRITICAL JPM Task Standard:             The operator will align for Long Term Recirculation per EOP-ES-1.4, and align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.
. RHR Cold Leg Recirculation   Initiating Cue:
Required Materials:         None General  
The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation
. THIS IS A TIME CRITICAL JPM Task Standard:
The operator will align for Long Term Recirculation per EOP
-ES-1.4, and align only the B RHR Pump for operation when it is determined that SI
-863A has failed to OPEN
. Required Materials:
None   General  


==References:==
==References:==
EOP-ES-1.3 (Transfer to Cold Leg Recirculation), Rev 0 2016 Systems - Control Room JPM E                                          NUREG 1021, Revision 10


E OP-ES-1.3 (Transfer to Cold Leg Recirculation), Rev 0 Appendix C Page 3 of 18 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                     Page 3 of 18                       Form ES-C-1 Job Performance Measure Worksheet EOP-ES-1.4 (Transfer to Long Term Recirculation), Rev 0 OMM-22 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:             Handout 1: Blank Copy of EOP-ES-1.4.
- Control Room JPM E NUREG 1021, Revision 10 EOP-ES-1.4 (Transfer to Long Term Recirculation), Rev 0 OMM-22 (Emergency Operating Procedures User's Guide), Rev 45   Handouts: Handout 1: Blank Copy of EOP
Time Critical Task:   YES - Siemens fuel Analysis for LBLOCA, ESR 99- 00273 indicates that the operator must Restore Core cooling flow within 6 minutes when transferring to Piggy-Back Mode (Maximum of 6 minutes of no flow when transferring to the Piggy-Back Mode)
-ES-1.4. Time Critical Task:
Validation Time:       10 minutes Critical Step Justification Step 3       This step is critical because placing the A RHR Pump Control Switch to STOP is necessary to align for Long Term Recirculation per EOP-ES-1.4.
YES - Siemen's fuel Analysis for LBLOCA, ESR 99
Step 4       This step is critical because placing the RHR-759A and 759B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.
- 00273 indicates that the operator must Restore Core cooling flow within 6 minutes when transferring to Piggy
Step 5       This step is critical because placing the SI-863B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.
-Back Mode (Maximum of 6 minutes of no flow when transferring to the Piggy
Step 6       This step is critical because placing the SI-866A Control Switch to OPEN is OPEN is necessary to align for Long Term Recirculation per EOP-ES-1.4.
-Back Mode)
Step 7       This step is critical because placing the SI-870A and B Control Switches to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.
Validation Time:
Step 11       This step is critical because placing the A or C SI Pump Control Switch to START is necessary to align for Long Term Recirculation per EOP-ES-1.4.
1 0 minutes       Critical Step Justification Step 3 This step is critical because placing the A RHR Pump Control Switch to STOP is necessary to align for Long Term Recirculation per EOP
Alternate Path Critical Step Justification Step 10       This step is critical because placing the B RHR Pump Control Switch to START is necessary to align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.
-ES-1.4. Step 4 This step is critical because placing the RHR
2016 Systems - Control Room JPM E                                    NUREG 1021, Revision 10
-759A and 759B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 5 This step is critical because placing the SI
-863B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 6 This step is critical because placing the SI
-866A Control Switch to OPEN is OPEN is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 7 This step is critical because placing the SI
-870A and B Control Switches to CLOSE is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Step 11 This step is critical because placing the A or C SI Pump Control Switch to START is necessary to align for Long Term Recirculation per EOP
-ES-1.4. Alternate Path Critical Step Justification Step 10 This step is critical because placing the B RHR Pump Control Switch to START is necessary to align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN


Appendix C Page 4 of 18 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                 Page 4 of 18                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM E NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ E as follows:
: 1. Construct Scenario File 006_JPM_ E as follows:
IOR diSISAAI201 f:CLOSE (RHR Loop Recirc SI-863A fails to OPEN)
* IOR diSISAAI201 f:CLOSE (RHR Loop Recirc SI-863A fails to OPEN)
: 2. Reset simulator to IC
: 2. Reset simulator to IC-28, (Cold Leg Recirculation).
-28 , (Cold Leg Recirculation)
: 3. Place in RUN, execute Scenario File 006_JPM_E and allow time to stabilize.
.
: 4. Perform the following:
: 3. Place in RUN
* Stop A Primary Water Pump and place in AUTO
, execute Scenario File 006_JPM_E and allow time to stabilize
* CLOSE FCV-114A and place in AUTO
. 4. Perform the following:
* Place Controller FCV-114A in AUTO
Stop "A" Primary Water Pump and place in AUTO CLOSE FCV-114A and place in AUTO Place Controller FCV
: 5. Acknowledge alarms on RR-1 and APP-036.
-114A in AUTO
: 6. Freeze the Simulator.
: 5. Acknowledge alarms on RR
OR
-1 and APP-036. 6. Freeze the Simulator
: 1. Reset Simulator to Temporary Snap IC-604 (August, 2015).
. OR 1. Reset Simulator to Temporary Snap IC
: 2. Place Simulator in Run, acknowledge alarms on RR-1 and APP-036, and Freeze Simulator.
-604 (August, 201 5). 2. Place Simulator in Run, acknowledge alarms on RR
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
-1 and APP-036, and Freeze Simulator.
: 4. Place Simulator in Run when operator assumes the watch.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
2016 Systems - Control Room JPM E                              NUREG 1021, Revision 10
-411. 4. Place Simulator in Run when operator assumes the watch.


Appendix C Page 5 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 5 of 18                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM E NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
NOTE: FOLDOUT for EOPES1.4 is in effect.
NOTE: FOLDOUT for EOPES1.4 is in effect.
STEP 1: CHECK Condition Below  ANY PRESENT APP001D4, RHR PIT A HIHI LEVEL  ILLUMINATED OR APP001D5, RHR PIT B HIHI LEVEL  ILLUMINATED OR EITHER RHR Pit level indication  GREATER THAN 24 INCHES PERFORM the following:
STEP 1:       CHECK Condition Below  ANY PRESENT APP001D4, RHR PIT A HIHI LEVEL  ILLUMINATED OR                                                                   ___ SAT APP001D5, RHR PIT B HIHI LEVEL  ILLUMINATED OR EITHER RHR Pit level indication  GREATER THAN 24 INCHES
___ UNSAT PERFORM the following:
MONITOR RHR Pit indications.
MONITOR RHR Pit indications.
IF ANY of the RHR Pit level conditions noted occur, THEN GO TO EPP24, Isolation Of Leakage In The RHR Pump Pit.
IF ANY of the RHR Pit level conditions noted occur, THEN GO TO EPP24, Isolation Of Leakage In The RHR Pump Pit.
GO TO Step 3. (Step 1 and 1 RNO). STANDARD: The operator reads the Note, and proceeds.
GO TO Step 3.
(Step 1 and 1 RNO).
STANDARD:       The operator reads the Note, and proceeds.
The operator reviews the Foldout Page Criteria.
The operator reviews the Foldout Page Criteria.
The operator observes APP-001-D4 and D5 are extinguished, and that LI-615 A and B are both less than 24 inches; and determines that there is no RHR Pit leakage and proceeds to Step 3.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM E                                    NUREG 1021, Revision 10


The operator observes APP
Appendix C                                 Page 6 of 18                     Form ES-C-1 PERFORMANCE INFORMATION STEP 2:       DETERMINE Needed RHR Alignment:
-001-D4 and D5 are extinguished, and that LI-615 A and B are both less than 24 inches; and determines that there is no RHR Pit leakage and proceeds to Step 3
CHECK RHR System alignment  IN PIGGYBACK MODE
.
___ SAT OBSERVE the CAUTION prior to Step 5 AND GO TO Step 5.
EXAMINER'S CUE:
(Step 3 and 3 RNO.)
NONE  EXAMINER'S NOTE:
___ UNSAT STANDARD: The operator observes SI-863A and B Green status lights are LIT, and Red status lights are OFF (Or equivalent) and determines that RHR is NOT in PIGGY-BACK Mode and proceeds to the Caution prior to Step 5.
NONE  BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE  COMMENTS:              ___ SAT    ___ UNSAT Appendix C Page 6 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
CAUTION: Steps 5 through 8 must be performed without delay to minimize the time without flow through the core.
- Control Room JPM E NUREG 1021, Revision 10 STEP 2: DETERMINE Needed RHR Alignment:
2016 Systems - Control Room JPM E                                NUREG 1021, Revision 10
CHECK RHR System alignment  IN PIGGYBACK MODE OBSERVE the CAUTION prior to Step 5 AND GO TO Step 5.
(Step 3 and 3 RNO
.) STANDARD: The operator observes SI
-863A and B Green status lights are LIT, and Red status lights are OFF (Or equivalent) and determines that RHR is NOT in P I GG Y-BACK Mode and proceeds to the Caution prior to Step 5. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:  


___ SAT    ___ UNSAT   CAUTION: Steps 5 through 8 must be performed without delay to minimize the time without flow through the core.
Appendix C                                  Page 7 of 18                      Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 3:      ALIGN Equipment To Obtain The Following Conditions:                        STEP STOP ALL RHR Pumps (Step 5/5.a)
STANDARD:      The operator reads the Caution, and proceeds.                          ___ SAT The operator places the A RHR Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light   ___ UNSAT is OFF.
The operator observes the B RHR Pump Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:              NONE EXAMINERS NOTE:             The operator will likely read through Steps 5-8 ahead of time before performing actions.
APP-001-A7, RHR HX LO FLOW, is an expected alarm.
BOOTH OPERATOR CUE:          NONE COMMENTS:
TIME CRITICAL START TIME: ________
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


Appendix C Page 7 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 8 of 18                       Form ES-C-1 PERFORMANCE INFORMATION STEP 4:     ALIGN Equipment To Obtain The Following Conditions:                       CRITICAL CLOSE RHR HX Discharge Valves                                                STEP RHR759A RHR759B (Step 5/5.b)                                                             ___ SAT STANDARD:     The operator places the RHR-759A Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light
- Control Room JPM E NUREG 1021, Revision 10 STEP 3: ALIGN Equipment To Obtain The Following Conditions:
___ UNSAT is OFF.
STOP ALL RHR Pumps (Step 5/5.a) STANDARD: The operator reads the Caution, and proceeds.
The operator places the RHR-759B Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


The operator places the "A" RHR Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF. The operator observes the "B" RHR Pump Green status light is LIT and the Red status light is OFF
Appendix C                                       Page 9 of 18                       Form ES-C-1 PERFORMANCE INFORMATION STEP 5:         ALIGN Equipment To Obtain The Following Conditions:                       CRITICAL OPEN RHR Loop Recirc Valves                                                 STEP SI863A SI863B                                                                   ___ SAT (Step 5/5.c)
.
STANDARD:         The operator places the SI-863A Control Switch to OPEN and
EXAMINER'S CUE:
___ UNSAT observes that the Green status light remains LIT and the Red status light remains OFF (Alternate Path - mitigated in subsequent steps).
NONE EXAMINER'S NOTE:
The operator places the SI-863B Control Switch to OPEN and observes that the Red status light is LIT and the Green status light is OFF.
The operator will likely read through Steps 5-8 ahead of time before performing actions.
EXAMINERS CUE:                 If operator reports the failure of SI-863A to OPEN, acknowledge as the CRS.
APP-001-A7, RHR HX LO FLOW, is an expected alarm. BOOTH OPERATOR CUE:
EXAMINERS NOTE:                 The operator should not stop the procedure, the procedure is designed to subsequently mitigate the failure of SI-863A to OPEN.
NONE  COMMENTS:    TIME CRITICAL START TIME: ________
The operator may place the SI-863A Control Switch back to CLOSE.
CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 8 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
BOOTH OPERATOR CUE:              NONE COMMENTS:
- Control Room JPM E NUREG 1021, Revision 10 STEP 4: ALIGN Equipment To Obtain The Following Conditions:
CAUTION: Opening SI866A AND SI866B, Hot Leg Injection Valves, with only one SI pump running will result in SI Pump runout.
CLOSE RHR HX Discharge Valves RHR759A RHR759B (Step 5/5.b)  STANDARD: The operator places the RHR
2016 Systems - Control Room JPM E                                        NUREG 1021, Revision 10
-759A Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF. The operator places the RHR
-759B Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:
CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 9 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 STEP 5: ALIGN Equipment To Obtain The Following Conditions:
OPEN RHR Loop Recirc Valves SI863A SI863B (Step 5/5.c) STANDARD: The operator places the SI
-863A Control Switch to OPEN and observes that the Green status light remains LIT and the Red status light remains OFF (Alternate Path
- mitigated in subsequent steps). The operator places the SI
-863B Control Switch to OPEN and observes that the Red status light is LIT and the Green status light is OFF. EXAMINER'S CUE:
If operator reports the failure of SI
-863 A to OPEN, acknowledge as the CRS.
EXAMINER'S NOTE:
The operator should not stop the procedure, the procedure is designed to subsequently mitigate the failure of SI
-863A to OPEN.


The operator may place the SI
Appendix C                                Page 10 of 18                        Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      ALIGN For Hot Leg Recirculation:                                          CRITICAL OPEN SI866A, LOOP 3 HOT LEG INJ Valve                                      STEP (Step 6/6.a)
-863A Control Switch back to CLOSE.
STANDARD:      The operator reads the Caution, and proceeds.                          ___ SAT The operator places the key-operated SI-866A Control Switch to OPEN and observes that SI-866A Red status light is LIT and the          ___ UNSAT Green status light is OFF.
BOOTH OPERATOR CUE:
EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
NONE COMMENTS:      CRITICAL STEP ___ SAT   ___ UNSAT   CAUTION: Opening SI866A AND SI866B, Hot Leg Injection Valves, with only one SI pump running will result in SI Pump runout.
STEP 7:      ALIGN For Hot Leg Recirculation:                                          CRITICAL CLOSE BIT Outlet Valves:                                                    STEP SI870A SI870B (Step 6/6.b)                                                              ___ SAT STANDARD:      The operator places the SI-870A Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light
___ UNSAT is OFF.
The operator places the SI-870B Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:               NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


Appendix C Page 10 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 11 of 18                   Form ES-C-1 PERFORMANCE INFORMATION CAUTION: RHR759A AND RHR759B, RHR HX Discharge Valves, are closed. The RHR Pumps will run deadheaded AND are subject to damage UNTIL the SI pumps are started.
- Control Room JPM E NUREG 1021, Revision 10 STEP 6: ALIGN For Hot Leg Recirculation:
STEP 8:       ESTABLISH Hot Leg Recirculation Flow:
OPEN SI866A, LOOP 3 HOT LEG INJ Valve (Step 6/6.a) STANDARD: The operator reads the Caution, and proceeds.
CHECK RHR759A, RHR HX A DISCH Valve CLOSED                          ___ SAT (Step 7/7.a)
The operator places the key-operated SI-866A Control Switch to OPEN and observes that SI
STANDARD:       The operator reads the Caution, and proceeds.
-866A Red status light is LIT and the Green status light is OFF.
___ UNSAT The operator observes the RHR-759A Green status light is LIT, and Red status light is OFF.
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE EXAMINER'S NOTE:
STEP 9:       ESTABLISH Hot Leg Recirculation Flow:
NONE BOOTH OPERATOR CUE:
CHECK SI863A, RHR LOOP RECIRC Valve  OPEN (Step 7/7.b)
NONE COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 7: ALIGN For Hot Leg Recirculation:
___ SAT STANDARD:       The operator observes the SI-863A Green status light is LIT and determines that SI-863A is CLOSED (Alternate Path), and proceeds to Step 7.b RNO.
CLOSE BIT Outlet Valves:
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               The operator has previously attempted to OPEN this valve, and it failed to OPEN. This procedure will address the compensatory actions now.
SI870A SI870B (Step 6/6.b) STANDARD: The operator places the SI
BOOTH OPERATOR CUE:             NONE COMMENTS:
-870A Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF. The operator places the SI
2016 Systems - Control Room JPM E                                 NUREG 1021, Revision 10
-870B Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE COMMENTS:       CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 11 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM E NUREG 1021, Revision 10 CAUTION: RHR759A AND RHR759B, RHR HX Discharge Valves, are closed. The RHR Pumps will run deadheaded AND are subject to damage UNTIL the SI pumps are started.
STEP 8: ESTABLISH Hot Leg Recirculation Flow:
CHECK RHR759A, RHR HX A DISCH Valve  CLOSED (Step 7/7.a)  STANDARD: The operator reads the Caution, and proceeds.
The operator observes the RHR-759A Green status light is LIT, and Red status light is OFF.


EXAMINER'S CUE:
Appendix C                                 Page 12 of 18                       Form ES-C-1 PERFORMANCE INFORMATION STEP 10:     ESTABLISH Hot Leg Recirculation Flow:                                     CRITICAL PERFORM the following:                                                     STEP CLOSE RHR759B, RHR HX B DISCH Valve.
NONE  EXAMINER'S NOTE:
OPEN SI863B, RHR LOOP RECIRC Valve.                                     ___ SAT CLOSE SI863A, RHR LOOP RECIRC Valve.
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT    STEP 9: ESTABLISH Hot Leg Recirculation Flow:
CHECK SI863A, RHR LOOP RECIRC Valve  OPEN (Step 7/7.b)  STANDARD: The operator observes the SI
-863A Green status light is LIT and determines that SI
-863A is CLOSED (Alternate Path), and proceeds to Step 7.b RNO
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
The operator has previously attempted to OPEN this valve, and it failed to OPEN. This procedure will address the compensatory actions now.
BOOTH OPERATOR CUE:
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 12 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 STEP 10: ESTABLISH Hot Leg Recirculation Flow:
PERFORM the following:
CLOSE RHR759B, RHR HX B DISCH Valve.
OPEN SI863B, RHR LOOP RECIRC Valve.
CLOSE SI863A, RHR LOOP RECIRC Valve.
START RHR Pump B.
START RHR Pump B.
GO TO Step 8.
GO TO Step 8.
(Step 7/7.b RNO)  STANDARD: The operator observes the RHR-759B Green status light is LIT and the Red status light is OFF.
(Step 7/7.b RNO)                                                         ___ UNSAT STANDARD:      The operator observes the RHR-759B Green status light is LIT and the Red status light is OFF.
The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.
The operator places the SI-863A Control Switch in the CLOSE position and observes the Green status light is LIT and the Red status light is OFF.
The operator places the B RHR Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.
The operator proceeds to Step 8.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10
 
Appendix C                                    Page 13 of 18                Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 11:    START One SI Pump                                                        STEP (Step 8)
STANDARD:      The operator places the A or C SI Pump Control Switch to      ___ SAT START, and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
TIME CRITICAL STOP TIME: ________ (Less than 6 Minutes)
STEP 12:    CHECK Indicated Flow On The Appropriate Flow Meters:
PATH            FLOW METERS SI-866B          FI-940, SI Hot Leg Header Flow FI-933, SI Loop 2 Hot Leg Flow                    ___ SAT SI-866A          FI-940, SI Hot Leg Header Flow FI-932, SI Loop 3 Hot Leg Flow (Step 9)
___ UNSAT STANDARD:      The operator observes FI-940 and determines flow to be 640-680 gpm.
The operator observes FI-932 and determines flow to be 580-600 gpm.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM E                                NUREG 1021, Revision 10
 
Appendix C                                  Page 14 of 18                        Form ES-C-1 PERFORMANCE INFORMATION CAUTION: The operator should be sure that cavitation is taking place prior to transitioning to steps that attempt to mitigate screen blockage. The actions taken are beyond design basis AND should NOT be taken unless warranted. Stable indication on FI605 may also be used as an aid in determining if cavitation is present in subsequent steps when RHR759A OR RHR759B AND RHR 744A OR RHR744B are open.
STEP 13:        CHECK RHR Pump Discharge Pressure  STABLE PI602A PI602B                                                                    ___ SAT (Step 10)
STANDARD:        The operator reads the caution, and proceeds.                          ___ UNSAT The operator observes PI-602B to be 160 psig.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                NONE BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10
 
Appendix C                                  Page 15 of 18                      Form ES-C-1 PERFORMANCE INFORMATION STEP 14:    DETERMINE If Flow Should Be Established To Cold Legs as follows:
CHECK RCS pressure  LESS THAN 275 PSIG CHECK RHR Cold Leg Recirculation flow indicated in EOPES1.3,          ___ SAT Transfer To Cold Leg Recirculation CHECK CV Sump Screen status  HAS REMAINED CLEAR DURING RECIRCULATION
___ UNSAT CHECK ALL of the following AVAILABLE
* FI605, RHR TOTAL FLOW
* RHR759A AND RHR759B, RHR HX Discharge Valves
* SI863A AND SI863B, RHR LOOP RECIRC Valves
* RHR Pumps A AND B (Step 11a-d and 11.d RNO)
STANDARD:     The operator observes PR-444 (or equivalent) to be 5 psig.
The operator recalls that 3000 gpm of flow existed in the Cold Legs before this procedure started.
The operator observes RHR discharge pressure to be steady at 150 psig (or equivalent), and determines that no RHR Pump cavitation is occurring.
The operator observes 0 gpm on FI-605.
The operator observes the RHR-759A Green status light is LIT, and the Red status light is OFF.
The operator observes the RHR-759B Green status light is LIT, and the Red status light is OFF.
The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.
The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.
The operator places the SI
The operator observes the SI-863A Green status light is LIT and the Red status light is OFF.
-863A Control Switch in the CLOSE position and observes the Green status light is LIT and the Red status light is OFF.
The operator recognizes that SI-863A is NOT available, and proceeds to Step 16.
The operator places the "B" RHR Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF. The operator proceeds to Step 8.
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
EXAMINER'S CUE:
2016 Systems - Control Room JPM E                                   NUREG 1021, Revision 10
NONE EXAMINER'S NOTE:
 
NONE  BOOTH OPERATOR CUE:
Appendix C                                 Page 16 of 18                     Form ES-C-1 PERFORMANCE INFORMATION STEP 15:     CHECK Time Since Hot Leg Recirculation Established  GREATER THAN 16 HOURS WHEN 16 hours have elapsed, THEN GO TO Step 17.                       ___ SAT (Step 16 and 16 RNO)
NONE  COMMENTS:        CRITICAL STEP
STANDARD:     The operator recognizes that the procedure must be stopped for 16 hours, and reports that the procedure must be placed on hold.       ___ UNSAT EXAMINERS CUE:             Another operator will continue with this procedure EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 13 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Terminating Cue:             Evaluation on this JPM is complete.
- Control Room JPM E NUREG 1021, Revision 10 STEP 11: START One SI Pump (Step 8)  STANDARD: The operator places the "A" or "C" SI Pump Control Switch to START, and observes the Red status light is LIT and the Green status light is OFF
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        TIME CRITICAL STOP TIME: ________ (Less than 6 Minutes)
CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 12: CHECK Indicated Flow On The Appropriate Flow Meters:
PATH FLOW METERS SI-866B FI-940, SI Hot Leg Header Flow FI-933, SI Loop 2 Hot Leg Flow SI-866A FI-940, SI Hot Leg Header Flow FI-932, SI Loop 3 Hot Leg Flow (Step 9)  STANDARD: The operator observes FI
-940 and determines flow to be 6 4 0-680 gpm. The operator observes FI
-932 and determines flow to be 580-600 gpm. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 14 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 CAUTION: The operator should be sure that cavitation is taking place prior to transitioning to steps that attempt to mitigate screen blockage. The actions taken are beyond design basis AND should NOT be taken unless warranted. Stable indication on FI605 may also be used as an aid in determining if cavitation is present in subsequent steps when RHR759A OR RHR759B AND RHR744A OR RHR744B are open.
STEP 13: CHECK RHR Pump Discharge Pressure  STABLE  PI602A PI602B (Step 10)  STANDARD: The operator reads the caution, and proceeds.
The operator observes PI
-602B 60 psig. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT Appendix C Page 15 of 18 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM E NUREG 1021, Revision 10 STEP 14: DETERMINE If Flow Should Be Established To Cold Legs as follows:
CHECK RCS pressure  LESS THAN 275 PSIG CHECK RHR Cold Leg Recirculation flow indicated in EOPES1.3, Transfer To Cold Leg Recirculation CHECK CV Sump Screen status  HAS REMAINED CLEAR DURING RECIRCULATION CHECK ALL of the following  AVAILABLE  FI605, RHR TOTAL FLOW RHR759A AND RHR759B, RHR HX Discharge Valves SI863A AND SI863B, RHR LOOP RECIRC Valves RHR Pumps A AND B (Step 11a-d and 11.d RNO
)  STANDARD: The operator observes PR-444 (or equivalent) to be 5 psig.
The operator recalls that 3000 gpm of flow existed in the Cold Legs before this procedure started
. The operator observes RHR discharge pressure to be steady at 150 psig (or equivalent), and determines that no RHR Pump cavitation is occurring.
The operator observes 0 gpm on FI
-605. The operator observes the RHR
-759 A Green status light is LIT, and the Red status light is OFF.
The operator observes the RHR
-759B Green status light is LIT, and the Red status light is OFF.
The operator observes the SI
-863B Red status light is LIT and the Green status light is OFF.
The operator observes the SI
-863A Green status light is LIT and the Red status light is OFF.
The operator recognizes that SI
-863A is NOT available, and proceeds to Step 16
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 16 of 18 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM E NUREG 1021, Revision 10 STEP 15: CHECK Time Since Hot Leg Recirculation Established  GREATER THAN 16 HOURS WHEN 16 hours have elapsed, THEN GO TO Step 17.
(Step 16 and 16 RNO
STANDARD: The operator recognizes that the procedure must be stopped for 16 hours, and reports that the procedure must be placed on hold
. EXAMINER'S CUE:
Another operator will continue with this procedure EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:             ___ SAT    ___ UNSAT          Terminating Cue: Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM E                                  NUREG 1021, Revision 10


Appendix C Page 17 of 18 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 17 of 18                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM E Examinees Name:
- Control Room JPM E NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM E   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 3,857: Line 2,873:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM E                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A large break LOCA has occurred.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
A large break LOCA has occurred. The plant is currently on Cold Leg Recirculation IAW EOP
* RHR Cold Leg Recirculation flow is 3000 gpm.
-ES-1.3, Transfer to Cold Leg Recirculation.         INITIATING CUE:
INITIATING CUE:     The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.
The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation
THIS IS A TIME CRITICAL JPM NUREG 1021, Revision 10
. THIS IS A TIME CRITICAL JPM
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM F (Rev_011116) NUREG 1021, Revision 10        


SIM JPM F     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM F Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM F (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                           Page 2 of 15                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM F NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Fill a Safety Injection Accumulator       JPM No.:     2016 Systems - Control Room JPM F K/A  
Fill a Safety Injection Accumulator JPM No.: 2016 Systems  
- Control Room JPM F     K/A  


==Reference:==
==Reference:==
006 A4.02 (4.0/3.8)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing:
Simulated Performance:                                        Actual Performance:        X Classroom                Simulator        X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* The plant is at 100% power.
* SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
* You are the Licensed Dedicated Operator referred to in OP-202.
Initiating Cue:            The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.
Task Standard:              The operator will refill SI Accumulator C to reset the low level alarm without exceeding specified limits.
Required Materials:        None General


0 06 A 4.0 2 (4.0/3.8)    Examinee:  NRC Examiner:
==References:==
Facility Evaluator:
OP-202 (Safety Injection and Containment Vessel Spray System), Rev 98 APP-002 (Engineering Safeguards), Rev 70 2016 Systems - Control Room JPM F                                          NUREG 1021, Revision 10
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
The plant is at 100% power.
SI ACCUM C HI/LO LVL (APP
-002-E4) alarm has been received and actions have been reviewed by the RO
. You are the Licensed Dedicated Operator referred to in OP
-202. Initiating Cue:
The CRS has briefed and directed you to fill SI Accumulator "C" to reset the low level alarm IAW OP
-202, Section 5.2.1. Task Standard:
The operator will refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits.
Required Materials:
None  General


==References:==
Appendix C                                  Page 3 of 15                  Form ES-C-1 Job Performance Measure Worksheet Handouts:           Handout 1: OP-202, Section 5.2.1 marked up as follows:
Step 5.2.1.1.a - Initialed Step 5.2.1.1.b Bullet 1 - Initialed Step 5.2.1.1.b Bullet 2 - NAd Step 5.2.1.1.c - NAd Step 5.2.1.1.d - Initialed Step 5.2.1.1.e (1) and (2) - NAd Time Critical Task:  NO Validation Time:    8 minutes 2016 Systems - Control Room JPM F                              NUREG 1021, Revision 10


OP-202 (Safety Injection and Containment Vessel Spray System), Rev 9 8 APP-002 (Engineering Safeguards), Rev 70
Appendix C                                    Page 4 of 15                          Form ES-C-1 Job Performance Measure Worksheet Critical Step Justification Step 2      This step is critical because placing the SI-869 Normal/Defeat switch in the NORMAL position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Control power must be aligned to the valve to allow for RTGB operation).
Step 4      This step is critical because placing the SI-869 control switch to the OPEN position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Open valve to align flowpath to SI Accumulator).
Step 5      This step is critical because placing an SI Pump control switch to the START position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Provides adequate flow and pressure to fill the SI Accumulator).
Step 7      This step is critical because placing the SI-851C control switch to the OPEN position, and then closing it within limits is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (align fill path to appropriate accumulator and to secure filling at desired level).
Step 8     This step is critical because placing the operating SI Pump control switch to STOP and returning it to the MID position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (secure fill source and prevent operating on recirculation for an extended period).
Step 10    This step is critical because placing the SI-869 control switch to the CLOSED position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (realign SI-869 to its normal Mode 1 alignment).
Step 11    This step is critical because placing the SI-869 Normal/Defeat switch in the DEFEAT position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (properly align SI-869 Control Power Defeat Switch as required for Mode 1).
2016 Systems - Control Room JPM F                                      NUREG 1021, Revision 10


Appendix C Page 3 of 15 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
Appendix C                                   Page 5 of 15                 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM F NUREG 1021, Revision 10 Handouts: Handout 1:
: 1. Reset simulator to IC-5, 100% Power.
OP-202, Section 5.2.1 marked up as follows:
Step 5.2.1.1.a
- Initialed Step 5.2.1.1.b Bullet 1
- Initialed Step 5.2.1.1.b Bullet 2 - NA'd Step 5.2.1.1.c
- NA'd Step 5.2.1.1.d
- Initialed Step 5.2.1.1.e (1) and (2)
- NA'd  Time Critical Task:
NO  Validation Time:
8 minutes Appendix C Page 4 of 15 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 Critical Step Justification Step 2 This step is critical because placing the SI-869 Normal/Defeat switch in the NORMAL position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (Control power must be aligned to the valve to allow for RTGB operation)
. Step 4 This step is critical because placing the SI-869 control switch to the OPEN position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (Open valve to align flowpath to SI Accumulator)
. Step 5 This step is critical because placing an SI Pump control switch to the START position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (Provides adequate flow and pressure to fill the SI Accumulator)
. Step 7 This step is critical because placing the SI
-851C control switch to the OPEN position, and then closing it within limits is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (align fill path to appropriate accumulator and to secure filling at desired level)
. Step 8 This step is critical because placing the operating SI Pump control switch to STOP and returning it to the MID position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (secure fill source and prevent operating on recirculation for an extended period)
. Step 10 This step is critical because placing the SI
-869 control switch to the CLOSED position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (realign SI
-869 to its normal Mode 1 alignment)
. Step 11 This step is critical because placing the SI
-869 Normal/Defeat switch in the DEFEAT position is necessary to refill SI Accumulator "C" to reset the low level alarm without exceeding specified limits (properly align SI
-869 Control Power Defeat Switch as required for Mode 1)
.
Appendix C Page 5 of 15 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Reset simulator to IC
-5 , 100% Power.
: 2. Lower the C SI Accumulator Level as follows:
: 2. Lower the C SI Accumulator Level as follows:
OPEN SI-852C WHEN APP-002-B4, SI ACCUM C HI/LO LVL, is LIT, CLOSE SI
* OPEN SI-852C
-852C Check C SI Accumulator level at 64%
* WHEN APP-002-B4, SI ACCUM C HI/LO LVL, is LIT, CLOSE SI-852C
* Check C SI Accumulator level at 64%
: 3. Place in RUN and allow time to stabilize.
: 3. Place in RUN and allow time to stabilize.
: 4. Freeze the Simulator
: 4. Freeze the Simulator.
.
OR
OR 1. Reset Simulator to Temporary Snap IC
: 1. Reset Simulator to Temporary Snap IC-605 (August, 2015).
-605 (August, 201 5). 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
-411. 3. Place Simulator in Run when Operator assumes the watch.
: 3. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM F                              NUREG 1021, Revision 10
 
Appendix C                                    Page 6 of 15                      Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
START TIME:
STEP 1:          Check open SI-856A, SI PUMP RECIRC and SI-856B, SI PUMP RECIRC (Steps 5.2.1.2.a and b).
___ SAT STANDARD:        The operator observes SI-856A and B RED lights are LIT and the Green status lights are OFF.
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                The operator may use ERFIS to monitor SI Accumulator C level. (ERFIS: QP ACCUM C)
The Control Switches for these valves are located on the CV Sump Recirc Panel on the apron section of the RTGB below APP-002.
BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM F                                    NUREG 1021, Revision 10
 
Appendix C                                      Page 7 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 2:          ENSURE the Control Power Defeat switch for SI-869 is in the            CRITICAL NORMAL position (Step 5.2.1.c)                                            STEP STANDARD:        The operator places the SI-869 NORMAL/DEFEAT key switch in              ___ SAT the NORMAL position and observes the Amber status light is LIT.
EXAMINERS CUE:                  If the operator requests an AO check breaker status,    ___ UNSAT report that all requested breakers are open.
EXAMINERS NOTE:                Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
BOOTH OPERATOR CUE:              NONE COMMENTS:
NOTE Based upon the numerous indications available to the Dedicated Operator of an SI actuation at the RTGB and the immediate response to isolate the SI Accumulator flowpath, an LCO declaration for SI Pump OR SI Flowpath Operability is NOT required.
The following step is a continuous action step which shall be performed when the stated condition is met.
2016 Systems - Control Room JPM F                                      NUREG 1021, Revision 10
 
Appendix C                                  Page 8 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 3:      IF an SI actuation is received during filling, THEN IMMEDIATELY CLOSE the applicable SI Accumulator makeup valve AND PERFORM Step 5.2.1.2.m to restore the SI System lineup. (Step 5.2.1.d)                                                              ___ SAT STANDARD:    The operator reads the Notes, and proceeds.
___ UNSAT The operator reads step and acknowledges continuous actions step in the event of an SI actuation.
EXAMINERS CUE:                NONE EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:            NONE COMMENTS:
STEP 4:      Open SI-869, SI HOT LEG HDR. (Step 5.2.1.2.e)                          CRITICAL STEP STANDARD:    The operator places the SI-869 Control Switch in the OPEN position and observes the Red status light LIT and the Green status light is    ___ SAT OFF.
EXAMINERS CUE:              NONE
___ UNSAT EXAMINERS NOTE:              NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM F                                  NUREG 1021, Revision 10
 
Appendix C                                      Page 9 of 15                      Form ES-C-1 PERFORMANCE INFORMATION STEP 5:        Start an SI Pump. (Step 5.2.1.2.f)                                          CRITICAL STEP STANDARD:      The operator will make an announcement regarding the pump start.
___ SAT The operator places an SI Pump Control Switch in the START position and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT EXAMINERS CUE:                  NONE EXAMINERS NOTE:                  Starting the SI Pump will cause APP-002-C3, BIT HDR HI PRESS, to alarm (Expected). The operator may address the APP.
The announcement of the Pump start is NOT critical BOOTH OPERATOR CUE:              NONE COMMENTS:
NOTE: If the cooling unit for the train of the SI pump started is NOT operable, the opposite train unit can be started by placing its AUTO/RUN switch on the power supply breaker to RUN.
STEP 6:        ENSURE at least one SI Pump Area Cooling unit (HVH-6A OR HVH-6B OR both) is operating. (Step 5.2.1.2.g)
STANDARD:      The operator reads the Note, and proceeds.                                ___ SAT The operator observes the HVH-6A Red status light is LIT and the Green status light is OFF if the A SI Pump is started.
___ UNSAT The operator observes the HVH-6B Red status light is LIT and the Green status light is OFF if the C SI Pump is started.
EXAMINERS CUE:                  NONE EXAMINERS NOTE:                  The non-operating HVH Unit Green status light is LIT.
BOOTH OPERATOR CUE:              NONE COMMENTS:
2016 Systems - Control Room JPM F                                    NUREG 1021, Revision 10
 
Appendix C                                      Page 10 of 15                      Form ES-C-1 PERFORMANCE INFORMATION NOTE: The following are pressure and level limits/alarms for the SI Accumulators:
* High Pressure Alarm                    646 psig
* Normal Operating Pressure              630 psig
* High Level Alarm                        75 percent
* Low Level Alarm                        67 percent CAUTION Filling the SI Accumulators can result in rapid indicated level changes due to the narrow span (approx. 14 inches) associated with the SI Accumulator level instruments and should be closely monitored.
STEP 7:          IF SI Accumulator C is to be filled, THEN perform the following:        CRITICAL (Step 5.2.1.2.j)                                                            STEP
: 1)    Open SI-851C, MAKEUP.
: 2)    Monitor the level and pressure of SI Accumulator C.
: 3)    When desired level is obtained, then close SI-851C.                ___ SAT STANDARD:        The operator reads the Note and the Caution, and proceeds.
The operator places the SI-851C Control Switch to OPEN and              ___ UNSAT observes the Red status light is LIT and the Green status light is OFF.
The operator observes LI-928 and PI-929 and LI-930 and PI-931 during filling.
When the accumulator level is > 67% and < 75% and accumulator pressure is > 614 psig and < 646 psig, the operator places the SI-851C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:                    NONE EXAMINERS NOTE:                  APP-002-E4 will clear during the filling process.
It is acceptable if the C Accumulator Hi Level Annunciator (APP-002-E4) alarms during filling, as long as the TS LCO maximum level of 80.4% is NOT exceeded.
BOOTH OPERATOR CUE:                NONE COMMENTS:
2016 Systems - Control Room JPM F                                      NUREG 1021, Revision 10


Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                               Page 11 of 15                       Form ES-C-1 PERFORMANCE INFORMATION STEP 8:       Stop the operating SI Pump. (Step 5.2.1.2.k)                           CRITICAL STEP STANDARD:     The operator places the operating SI Pump Control Switch in the STOP position and observes the Green status light is LIT and the     ___ SAT Red status light is OFF.
- Control Room JPM F NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
EXAMINERS CUE:               NONE
)  Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
___ UNSAT EXAMINERS NOTE:             APP-002-C3 will clear when the SI Pump is stopped.
: 1. START TIME:
BOOTH OPERATOR CUE:           NONE COMMENTS:
STEP 1: Check open SI
STEP 9:       Verify both SI Pump Area Cooling units are OFF. (Step 5.2.1.2.l)
-856A, SI PUMP RECIRC and SI
: 1)   HVH-6A
-856B, SI PUMP RECIRC (Steps 5.2.1.2.a and b).
: 2)    HVH-6B
STANDARD: The operator observes SI-856A and B RED lights are LIT and the Green status lights are OFF
___ SAT STANDARD:     The operator observes the HVH-6A Green status light is LIT and the Red status light is OFF.
. EXAMINER'S CUE:
The operator observes the HVH-6B Green status light is LIT and the   ___ UNSAT Red status light is OFF.
NONE  EXAMINER'S NOTE:
EXAMINERS CUE:              NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
The operator may use ERFIS to monitor SI Accumulator "C" level. (ERFIS: QP ACCUM C)
2016 Systems - Control Room JPM F                                 NUREG 1021, Revision 10
The Control Switches for these valves are located on the CV Sump Recirc Panel on the apron section of the RTGB below APP
-002.
BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT
___ UNSAT Appendix C Page 7 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 2: ENSURE the Control Power Defeat switch for SI
-869 is in the NORMAL position (Step 5.2.1.c)   STANDARD: The operator places the SI-869 NORMAL/DEFEAT key switch in the NORMAL position and observes the Amber status light is LIT
. EXAMINER'S CUE:
If the operator requests an AO check breaker status, report that all requested breakers are open.
EXAMINER'S NOTE:
Key switch for SI
-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
BOOTH OPERATOR CUE:
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT  NOTE  Based upon the numerous indications available to the Dedicated Operator of an SI actuation at the RTGB and the immediate response to isolate the SI Accumulator flowpath, an LCO declaration for SI Pump OR SI Flowpath Operability is NOT required. The following step is a continuous action step which shall be performed when the stated condition is met.
Appendix C Page 8 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM F NUREG 1021, Revision 10 STEP 3: IF an SI actuation is received during filling, THEN IMMEDIATELY CLOSE the applicable SI Accumulator makeup valve AND PERFORM Step 5.2.1.2.m to restore the SI System lineup.  (Step 5.2.1.d)
STANDARD: The operator reads the Notes, and proceeds.


The operator reads step and acknowledges continuous actions step in the event of an SI actuation.
Appendix C                                    Page 12 of 15                        Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 10:         Close SI-869, SI HOT LEG HDR. (Step 5.2.1.2.m)                             STEP STANDARD:       The operator places the SI-869 Control Switch in the CLOSE position and observes the Green status light LIT and the Red status     ___ SAT light is OFF.
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE
NONE  EXAMINER'S NOTE:
___ UNSAT EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
NONE BOOTH OPERATOR CUE:
NOTE: In Mode 1, 2 OR 3 the Control Power Defeat switch for SI-869 should be in the DEFEAT position. In Mode 5 OR 6 the Control Power Defeat switch for SI-869 should be in the NORMAL position. In Mode 4 the position of the Control Power Defeat switch for SI-869 is determined by GP-002 OR GP-007.
NONE  COMMENTS:
2016 Systems - Control Room JPM F                                     NUREG 1021, Revision 10
___ SAT    ___ UNSAT  STEP 4: Open SI-869, SI HOT LEG HDR. (Step 5.2.1.2.e)   STANDARD: The operator places the SI
-869 Control Switch in the OPEN position and observes the Red status light LIT and the Green status light is OFF.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:   CRITICAL STEP
___ SAT    ___ UNSAT Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 5: Start an SI Pump. (Step 5.2.1.2.f)  STANDARD: The operator will make an announcement regarding the pump start.
The operator places an SI Pump Control Switch in the START position and observes the Red status light is LIT and the Green status light is OFF.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
Starting the SI Pump will cause APP
-002-C3, BIT HDR HI PRESS, to alarm (Expected). The operator may address the APP.
The announcement of the Pump start is NOT critical BOOTH OPERATOR CUE:
NONE  COMMENTS:    CRITICAL STEP
___ SAT    ___ UNSAT  NOTE: If the cooling unit for the train of the SI pump started is NOT operable, the opposite train unit can be started by placing its AUTO/RUN switch on the power supply breaker to RUN.
STEP 6: ENSURE at least one SI Pump Area Cooling unit (HVH
-6A OR HVH-6B OR both) is operating. (Step 5.2.1.2.g)  STANDARD: The operator reads the Note, and proceeds.
The operator observes the HVH-6A Red status light is LIT and the Green status light is OFF if the "A" SI Pump is started
. The operator observes the HVH-6B Red status light is LIT and the Green status light is OFF if the "C" SI Pump is started
. EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
The non-operating HVH Unit Green status light is LIT. BOOTH OPERATOR CUE:
NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 10 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM F NUREG 1021, Revision 10 NOTE:  The following are pressure and level limits/alarms for the SI Accumulators:
High Pressure Alarm                      646 psig Normal Operating Pressure            630 psig High Level Alarm 75 percent Low Level Alarm                              67 percent CAUTION Filling the SI Accumulators can result in rapid indicated level changes due to the narrow span (approx. 14 inches) associated with the SI Accumulator level instruments and should be closely monitored.
STEP 7: IF SI Accumulator "C" is to be filled, THEN perform the following:
(Step 5.2.1.2.j) 1) Open SI-851C, MAKEUP.
: 2) Monitor the level and pressure of SI Accumulator "C".
: 3) When desired level is obtained, then close SI
-851C. STANDARD: The operator reads the Note and the Caution, and proceeds.
The operator places the SI-851C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF. The operator observes LI
-928 and PI
-929 and LI
-930 and PI
-931 during filling.
When the accumulator level is
> 67% and < 75% and accumulator pressure is > 614 psig and < 646 psig, the operator places the SI-851C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
APP-00 2-E4 will clear during the filling process.
It is acceptable if the "C" Accumulator Hi Level Annunciator (APP
-002-E4) alarms during filling, as long as the TS LCO maximum level of 80.4% is NOT exceeded.


BOOTH OPERATOR CUE:
Appendix C                                 Page 13 of 15                     Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     ENSURE the Control Power Defeat switch for SI-869 in the position     CRITICAL determined by plant status. (Step 5.2.1.2.n)                             STEP STANDARD:     The operator reads the Note, and proceeds.
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 11 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
___ SAT The operator places the SI-869 NORMAL/DEFEAT key switch in the DEFEAT position and observes the Amber status light is OFF.
- Control Room JPM F NUREG 1021, Revision 10 STEP 8: Stop the operating SI Pump. (Step 5.2.1.2.k)  STANDARD: The operator places the operating SI Pump Control Switch in the STOP position and observes the Green status light is LIT and the Red status light is OFF.
EXAMINERS CUE:             NA                                                     ___ UNSAT EXAMINERS NOTE:             Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
EXAMINER'S CUE:
BOOTH OPERATOR CUE:         NONE COMMENTS:
NONE EXAMINER'S NOTE:
Terminating Cue:           Evaluation on this JPM is complete.
APP-002-C3 will clear when the SI Pump is stopped. BOOTH OPERATOR CUE:
NONE  COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT    STEP 9: Verify both SI Pump Area Cooling units are OFF. (Step 5.2.1.2.l) 1) HVH-6A 2) HVH-6B  STANDARD: The operator observes the HVH-6A Green status light is LIT and the Red status light is OFF
.
The operator observes the HVH-6B Green status light is LIT and the Red status light is OFF
. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE  BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 12 of 15 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 10:  Close SI-869, SI HOT LEG HDR. (Step 5.2.1.2.m)  STANDARD: The operator places the SI
-869 Control Switch in the CLOSE position and observes the Green status light LIT and the Red status light is OFF.
EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE  COMMENTS:          CRITICAL STEP
___ SAT    ___ UNSAT  NOTE:  In Mode 1, 2 OR 3 the Control Power Defeat switch for SI
-869 should be in the DEFEAT position. In Mode 5 OR 6 the Control Power Defeat switch for SI
-869 should be in the NORMAL position. In Mode 4 the position of the Control Power Defeat switch for SI
-869 is determined by GP-002 OR GP-007.
Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM F NUREG 1021, Revision 10 STEP 11: ENSURE the Control Power Defeat switch for SI
-869 in the position determined by plant status. (Step 5.2.1.2.n)   STANDARD: The operator reads the Note, and proceeds.
The operator places the SI-869 NORMAL/DEFEAT key switch in the DEFEAT position and observes the Amber status light is OFF
. EXAMINER'S CUE:
NA EXAMINER'S NOTE:
Key switch for SI
-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.
BOOTH OPERATOR CUE: NONE COMMENTS:         CRITICAL STEP
___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM F                                  NUREG 1021, Revision 10


Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 14 of 15                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM F Examinees Name:
- Control Room JPM F NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM F   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 4,073: Line 3,022:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM F                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
The plant is at 100% power.
* You are the Licensed Dedicated Operator referred to in OP-202.
SI ACCUM C HI/LO LVL (APP
INITIATING CUE:     The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.
-002-E4) alarm has been received and actions have been reviewed by the RO.
NUREG 1021, Revision 10
You are the Licensed Dedicated Operator referred to in OP
-202. INITIATING CUE:
The CRS has briefed and directed you to fill SI Accumulator "C" to reset the low level alarm IAW OP
-202, Section 5.2.1.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM G (Rev_011116) NUREG 1021, Revision 10


SIM JPM G     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM G Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM G (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 10                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM G NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Remove Source Range Channel N-           JPM No.:     2016 Systems - Control 31 From Service                                        Room JPM G K/A  
Remove Source Range Channel N
-31 From Service JPM No.: 2016 Systems  
- Control Room JPM G     K/A  


==Reference:==
==Reference:==
015 A4.03 (3.8/3.9)
015 A4.03 (3.8/3.9)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:                                         Actual Performance:     X Classroom               Simulator         X     Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Actual Performance:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
X Classroom Simulator X Plant   READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Initial Conditions:
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
* A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
: 1. Initial Conditions:
* SR Channel N-31 has just failed low.
A plant startup is in progress in accordance with GP
-003, Normal Plant Startup From Hot Shutdown to Critical
. SR Channel N
-31 has just failed low.
Initiating Cue:
Initiating Cue:
The CRS has directed you to remove SR Channel N
* The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
-31 from service IAW OWP-011 , Nuclear Instrumentation
* The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.
. The latest Revision of OWP
Task Standard:             The operator will remove SR Channel N-31 from service IAW NI-5 of OWP-011.
-011 has been verified to be Rev 24, and the associated Work Request is 16
Required Materials:         None General  
-02. Task Standard:
The operator will remove SR Channel N
-31 from service IAW NI-5 of OWP-011. Required Materials:
None   General  


==References:==
==References:==
OWP-011 (Nuclear Instrumentation), Rev 24 GP-003, Normal Plant Startup From Hot Shutdown to Critical, Rev 105 2016 Systems - Control Room JPM G                                          NUREG 1021, Revision 10


OWP-011 (Nuclear Instrumentation), Rev 2 4  GP-003, Normal Plant Startup From Hot Shutdown to Critical, Rev 105
Appendix C                                      Page 3 of 10                      Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Blank Copy of OWP-11.
Time Critical Task:    NO Validation Time:      7 minutes Critical Step Justification Step 2        This step is critical because removing NI-31 from ERFIS Scan is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.
Step 4        This step is critical because placing the Start Up Rate Channel Select Switch to the N32, N35 or N36 is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.
Step 5        This step is critical because placing the NI-31 Level Trip Bypass Switch to the BYPASS position is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.
2016 Systems - Control Room JPM G                                      NUREG 1021, Revision 10


Appendix C Page 3 of 10 Form ES-C-1  Job Performance Measure Worksheet 2016 Systems
Appendix C                                   Page 4 of 10                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
- Control Room JPM G NUREG 1021, Revision 10 Handouts: Handout 1: Blank Copy of OWP
: 1. Reset simulator to IC-8, (47.25 hours tripped, Critical at 48 hours).
-11. Time Critical Task:
: 2. Place in RUN and allow time to stabilize.
NO  Validation Time:
7 minutes      Critical Step Justification Step 2 This step is critical because removing NI
-31 from ERFIS Scan is necessary to remove SR Channel N
-31 from service IAW NI-5 of OWP-011. Step 4 This step is critical because placing the Start Up Rate Channel Select Switch to the N32, N35 or N36 is necessary to remove SR Channel N
-31 from service IAW NI-5 of OWP-011. Step 5 This step is critical because placing the NI
-31 Level Trip Bypass Switch to the BYPASS position is necessary to remove SR Channel N
-31 from service IAW NI-5 of OWP-011.
Appendix C Page 4 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM G NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Reset simulator to IC
-8 , (47.25 hours tripped, Critical at 48 hours
).
: 2. Place in RUN and allow time to stabilize
.
: 3. Perform the following:
: 3. Perform the following:
Rod Bank Select Switch to SBB Withdrawal SBB rods to 225 Steps Rod Bank Select Switch to M Withdrawal CBA rods to 22 Steps Place Audio Count Rate Selector in the N31 position Place the Startup Rate Channel Select Switch in the N31 position
* Rod Bank Select Switch to SBB
: 4. Insert Malfunction NIS0 1A , Final: 1 (SR N-31 fails LOW
* Withdrawal SBB rods to 225 Steps
5. Acknowledge alarms and stabilize the plant
* Rod Bank Select Switch to M
. 6. Freeze the Simulator
* Withdrawal CBA rods to 22 Steps
. OR 1. Reset Simulator to Temporary Snap IC
* Place Audio Count Rate Selector in the N31 position
-606 (August, 201 5). 2. Place Simulator in Run when Operator assumes the watch.
* Place the Startup Rate Channel Select Switch in the N31 position
: 4. Insert Malfunction NIS01A, Final: 1 (SR N-31 fails LOW)
: 5. Acknowledge alarms and stabilize the plant.
: 6. Freeze the Simulator.
OR
: 1. Reset Simulator to Temporary Snap IC-606 (August, 2015).
: 2. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM G                                    NUREG 1021, Revision 10
 
Appendix C                                    Page 5 of 10                          Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
START TIME:
STEP 1:        Obtain and review the procedure.
(OWP-011, NI-5, Steps 1-7).
___ SAT STANDARD:        The operator reviews Handout 1 and identifies that NI-5 must be addressed.
The operator verifies that Revision 24 is the latest revision (Initial
___ UNSAT Cue), and prints their name, signs and dates Step 1.
Operator reviews Steps 2-7.
EXAMINERS CUE:                NONE EXAMINERS NOTE:                The operator may use Green Dots to flag the expected annunciators.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM G                                        NUREG 1021, Revision 10


Appendix C Page 5 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     Complete Step 8:                                                         CRITICAL REMOVE NI-31 from ERFIS SCAN: NIN0031A.                                     STEP (NI-5 Valve, Breaker, Switch Lineup).
- Control Room JPM G NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
___ SAT STANDARD:     The operator selects F3 on ERFIS (Master Menu)
)  Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. START TIME:
STEP 1: Obtain and review the procedure
.    (OWP-011, NI-5, Step s 1-7). STANDARD: The operator reviews Handout 1 and identifies that NI
-5 must be addressed.
The operator verifies that Revision 24 is the latest revision (Initial Cue), and prints their name, signs and dates Step 1. Operator reviews Steps 2
-7. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
The operator may use Green Dots to flag the expected annunciators.
BOOTH OPERATOR CUE:
NONE  COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM G NUREG 1021, Revision 10 STEP 2: Complete Step 8:
REMOVE NI-31 from ERFIS SCAN: NIN0031A.
(NI-5 Valve, Breaker, Switch Lineup
). STANDARD: The operator selects F3 on ERFIS (Master Menu)
The operator selects ADMIN (Administrative Functions Menu)
The operator selects ADMIN (Administrative Functions Menu)
The operator selects DR (Del/Res Point From/To S can or Alarm)
___ UNSAT The operator selects DR (Del/Res Point From/To Scan or Alarm)
 
The operator depresses the DELETE SCAN pushbutton The operator enters Point I.D. NIN0031A EXAMINERS CUE:               NONE EXAMINERS NOTE:             This can be checked on ERFIS as follows:
The operator depresses the DELETE SCAN pushbutton The operator enters Point I.D. NIN0031A EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This can be checked on ERFIS as follows:
Select F3 (Master Menu)
Select F3 (Master Menu)
Select REAL (Real Time Data Menu)
Select REAL (Real Time Data Menu)
Select DBO (Point Information/Value Display)
Select DBO (Point Information/Value Display)
Enter NNI0031A Observe QUALITY to be DEL
Enter NNI0031A Observe QUALITY to be DEL BOOTH OPERATOR CUE:           NONE COMMENTS:
 
STEP 3:     Complete Step 8:
BOOTH OPERATOR CUE:
AUDIO COUNT RATE CHANNEL - CHANNEL SELECTOR Switch (NI-5 Valve, Breaker, Switch Lineup).
NONE COMMENTS:     CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 3: Complete Step 8:
___ SAT STANDARD:     The operator pulls and rotates the Audio Count Rate Channel Selector Switch counter-clockwise to the N32 position, and initials the Selected to SR 32 block on the NI-5 Valve, Breaker, Switch Lineup.
AUDIO COUNT RATE CHANNEL  
___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:             This switch is on the Audio Count Rate Drawer BOOTH OPERATOR CUE:           NONE COMMENTS:
- CHANNE L SELECTOR Switch (NI-5 Valve, Breaker, Switch Lineup
2016 Systems - Control Room JPM G                                  NUREG 1021, Revision 10
). STANDARD: The operator pulls and rotates the Audio Count Rate Channel Selector Switch counter-clockwise to the N32 position, and initials the Selected to SR 32 block on the NI-5 Valve, Breaker, Switch Lineup. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
This switch is on the Audio Count Rate Drawer BOOTH OPERATOR CUE:
NONE COMMENTS:  


___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 7 of 10                   Form ES-C-1 PERFORMANCE INFORMATION STEP 4:     Complete Step 8:                                                         CRITICAL START UP RATE CHANNEL SELECT Switch
- Control Room JPM G NUREG 1021, Revision 10 STEP 4: Complete Step 8:
* STEP (NI-5 Valve, Breaker, Switch Lineup).
START UP RATE CHANNEL SELECT Switch *
STANDARD:     The operator places the Start Up Rate Channel Select Switch to the
(NI-5 Valve, Breaker, Switch Lineup
___ SAT N32; records the selected instrument in the NI block position, and initials the NI-5 Valve, Breaker, Switch Lineup.
). STANDARD: The operator places the Start Up Rate Channel Select Switch to the N32; records the selected instrument in the NI block position, and initials the NI
EXAMINERS CUE:                 NONE
-5 Valve, Breaker, Switch Lineup.
___ UNSAT EXAMINERS NOTE:               This switch is on the Comparator and Rate Drawer BOOTH OPERATOR CUE:            NONE COMMENTS:
EXAMINER'S CUE:
STEP 5:      Complete Step 8:                                                        CRITICAL LEVEL TRIP Switch                                                          STEP (NI-5 Valve, Breaker, Switch Lineup).
NONE  EXAMINER'S NOTE:
___ SAT STANDARD:      The operator places the NI-31 Level Trip Bypass Switch to the BYPASS position, and initials the NI-5 Valve, Breaker, Switch Lineup.
This switch is on the Comparator and Rate Drawer
___ UNSAT EXAMINERS CUE:                NONE EXAMINERS NOTE:                The operator will acknowledge APP-005-D4, NIS TRIP/DROP ROD BYPASS, as an expected alarm.
BOOTH OPERATOR CUE:            NONE COMMENTS:
2016 Systems - Control Room JPM G                                  NUREG 1021, Revision 10


BOOTH OPERATOR CUE:
Appendix C                                     Page 8 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 6:     Complete Step 8:
NONE  COMMENTS:
NIS TRIP BYPASS NI-31 Status Light (NI-5 Valve, Breaker, Switch Lineup).
CRITICAL STEP
___ SAT STANDARD:     The operator observes the NI-31 LEVEL TRIP BYPASS status light is LIT and initials the NI-5 Valve, Breaker, Switch Lineup.
___ SAT    ___ UNSAT  STEP 5: Complete Step 8:
EXAMINERS CUE:                 NONE
LEVEL TRIP Switch (NI-5 Valve, Breaker, Switch Lineup
___ UNSAT EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
). STANDARD: The operator places the NI
STEP 7:     Complete Step 8:
-31 Level Trip Bypass Switch to the BYPASS position, and initials the NI
HIGH FLUX AT SHUTDOWN Switch (NI-5 Valve, Breaker, Switch Lineup).
-5 Valve, Breaker, Switch Lineup. EXAMINER'S CUE:
___ SAT STANDARD:     The operator places the NI-High Flux At Shutdown Switch to the BLOCK position, and initials the NI-5 Valve, Breaker, Switch Lineup.
NONE  EXAMINER'S NOTE:
The operator signs and dates Step 8 of NI-5.
The operator will acknowledge APP
___ UNSAT EXAMINERS CUE:                 NONE EXAMINERS NOTE:               The operator will acknowledge APP-005-B1, HI FLUX AT SHUTDOWN ALARM BLOCK, as an expected alarm.
-005-D4, NIS TRIP/DROP ROD BYPASS, as an expected alarm.
BOOTH OPERATOR CUE:             NONE COMMENTS:
BOOTH OPERATOR CUE:
Terminating Cue:               Evaluation on this JPM is complete.
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM G NUREG 1021, Revision 10 STEP 6: Complete Step 8:
NIS TRIP BYPASS NI
-31 Status Light (NI-5 Valve, Breaker, Switch Lineup
). STANDARD: The operator observes the NI
-31 LEVEL TRIP BYPASS status light is LIT and initials the NI-5 Valve, Breaker, Switch Lineup.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT  STEP 7: Complete Step 8:
HIGH FLUX AT SHUTDOWN Switch (NI-5 Valve, Breaker, Switch Lineup
). STANDARD: The operator places the NI
-High Flux At Shutdown Switch to the BLOCK position, and initials the NI
-5 Valve, Breaker, Switch Lineup.
The operator signs and dates Step 8 of NI
-5. EXAMINER'S CUE:
NONE EXAMINER'S NOTE:
The operator will acknowledge APP
-005-B1, HI FLUX AT SHUTDOWN ALARM BLOCK, as an expected alarm.
BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT        Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM G                                    NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 9 of 10                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM G Examinees Name:
- Control Room JPM G NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM G   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 4,250: Line 3,144:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM G                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* SR Channel N-31 has just failed low.
A plant startup is in progress in accordance with GP
-003, Normal Plant Startup From Hot Shutdown to Critical.
SR Channel N
-31 has just failed low.
INITIATING CUE:
INITIATING CUE:
The CRS has directed you to remove SR Channel N
* The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
-31 from service IAW OWP
* The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.
-011 , Nuclear Instrumentation
NUREG 1021, Revision 10
. The latest Revision of OWP
-011 has been verified to be Rev 24, and the associated Work Request is 16
-02.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- Control Room JPM H (Rev_011116) NUREG 1021, Revision 10


SIM JPM H     Developed By:
Appendix C                        Job Performance Measure            Form ES-C-1 Worksheet SIM JPM H Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:       ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - Control Room JPM H (Rev_011116)        NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 16 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 16                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- Control Room JPM H NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Start a Reactor Coolant Pump             JPM No.:     2016 Systems - Control Room JPM H K/A  
Start a Reactor Coolant Pump JPM No.: 2016 Systems  
- Control Room JPM H     K/A  


==Reference:==
==Reference:==
003 A4.03 (2.8/2.5)
Examinee:                                                      NRC Examiner:
Facility Evaluator:                                            Date:
Method of testing:
Simulated Performance:                                        Actual Performance:      X Classroom                  Simulator      X    Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Initial Conditions:
* A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
* The A RCP is running.
* It is intended to start the B RCP next.
* Section 8.1 of OP-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
* It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.
Initiating Cue:            The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.
Task Standard:              The operator will start the B RCP IAW OP-101.
Required Materials:        None 2016 Systems - Control Room JPM H                                          NUREG 1021, Revision 10


003 A4.03 (2.8/2.5)
Appendix C                                     Page 3 of 16                         Form ES-C-1 Job Performance Measure Worksheet General  
Examinee:  NRC Examiner:
Facility Evaluator:
Date:  Method of testing:
Simulated Performance:
Actual Performance:
X  Classroom  Simulator X Plant  READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. Initial Conditions:
A plant startup is in progress in accordance with GP
-002, Cold Shutdown to Hot Sub
-Critical at No
-Load Tavg. The "A" RCP is running
. It is intended to start the "B" RCP next.
Section 8.1 of OP
-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP
-101, and an AO is standing by to assist in this process.
Initiating Cue:
The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP
-101. Task Standard:
The operator will start the B RCP IAW OP
-101. Required Materials:
None Appendix C Page 3 of 16 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM H NUREG 1021, Revision 10 General  


==References:==
==References:==
OP-101 (Reactor Coolant System and Reactor Coolant Pump Startup and Operation), Rev 74 AD-OP-ALL-1000 (Conduct of Operations) Rev 4 AOP-018 (Reactor Coolant Pump Abnormal Conditions), Rev 31 APP-001 (Miscellaneous NSSS), Rev 60 Technical Specification LCO 3.3.5 (Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation), Amendment 176 Handouts:              Handout 1: Section 8.1 of OP-101 marked up through Step 8.1.1.2.y for this JPM.
Time Critical Task:    NO Validation Time:        10 minutes NOTE:                  This JPM should be pre-briefed in the Briefing Room.
Critical Step Justification Step 2        This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.aa.1&3 is necessary to start the B RCP IAW OP-101.
Step 3        This step is critical because placing the Bearing Lift Pump in the START position, and observing that the LIFT PRESSURE status light is LIT is necessary to start the B RCP IAW OP-101.
Step 6        This step is critical because after 2 minutes with the Bearing Oil Lift Pump running, placing the B RCP Control Switch to the START position is necessary to start the B RCP IAW OP-101.
Step 8        This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.gg.1-6 is necessary to start the B RCP IAW OP-101.
Step 10      This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.ii.1-6. is necessary to start the B RCP IAW OP-101.
2016 Systems - Control Room JPM H                                      NUREG 1021, Revision 10


OP-101 (Reactor Coolant System and Reactor Coolant Pump Startup and Operation), Rev 74  AD-OP-ALL-1000 (Conduct of Operations) Rev 4 AOP-018 (Reactor Coolant Pump Abnormal Conditions), Rev 31 APP-001 (Miscellaneous NSSS), Rev 60  Technical Specification LCO 3.3.5 (Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation), Amendment 176 Handouts: Handout 1: Section 8.1 of OP
Appendix C                                   Page 4 of 16                     Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES
-101 marked up through Step 8.1.1.2.y for this JPM. Time Critical Task:
NO  Validation Time:
1 0 minutes  NOTE: This JPM should be pre
-briefed in the Briefing Room.
Critical Step Justification Step 2 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.aa.1&3 is necessary to start the B RCP IAW OP
-101. Step 3 This step is critical because placing the Bearing Lift Pump in the START position, and observing that the LIFT PRESSURE status light is LIT is necessary to start the B RCP IAW OP
-101. Step 6 This step is critical because after 2 minutes with the Bearing Oil Lift Pump running, placing the B RCP Control Switch to the START position is necessary to start the B RCP IAW OP
-101. Step 8 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.gg.1
-6 is necessary to start the B RCP IAW OP
-101. Step 10 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.ii.1
-6. is necessary to start the B RCP IAW OP
-101.
Appendix C Page 4 of 16 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
- Control Room JPM H NUREG 1021, Revision 10 SIMULATOR OPERATIONAL GUIDELINES
: 1. Construct Scenario File 006_JPM_ H as follows:
: 1. Construct Scenario File 006_JPM_ H as follows:
IRF EPSL007 f:DEFEAT IRF EPSL008 f:DEFEAT IRF EPSL007 f:NORMAL IRF EPSL008 f:NORMAL
* IRF EPSL007 f:DEFEAT
: 2. Reset simulator to IC
* IRF EPSL008 f:DEFEAT
-35, 0% Power, Mode 3 at NOP/NOT
* IRF EPSL007 f:NORMAL
. 3. Place in RUN execute Scenario File 006_JPM_H, and allow time to stabilize
* IRF EPSL008 f:NORMAL
.
: 2. Reset simulator to IC-35, 0% Power, Mode 3 at NOP/NOT.
: 4. Place PCV-455A in manual and close "B" Loop Spray Valve (PCV-455A). 5. Perform the actions of Section 8.1.1 of OP
: 3. Place in RUN execute Scenario File 006_JPM_H, and allow time to stabilize.
-101 up to Step 8.1.1.2.y. 6. Stabilize the plant
: 4. Place PCV-455A in manual and close "B" Loop Spray Valve (PCV-455A).
.
: 5. Perform the actions of Section 8.1.1 of OP-101 up to Step 8.1.1.2.y.
: 7. Freeze the Simulator
: 6. Stabilize the plant.
.
: 7. Freeze the Simulator.
OR 1. Reset Simulator to Temporary Snap IC
OR
-607 (August, 201 5). 2. Open Scenario File 006_JPM_H.
: 1. Reset Simulator to Temporary Snap IC-607 (August, 2015).
NOTE:   Booth Instructor will need to operate Event s 1-4 when contacted by the operator at JPM Steps 2 , 8 & 10. 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP
: 2. Open Scenario File 006_JPM_H.
-411. 4. Place Simulator in Run when Operator assumes the watch.
NOTE:         Booth Instructor will need to operate Events 1-4 when contacted by the operator at JPM Steps 2, 8 & 10.
: 3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
: 4. Place Simulator in Run when Operator assumes the watch.
2016 Systems - Control Room JPM H                                  NUREG 1021, Revision 10


Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 5 of 16                     Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- Control Room JPM H NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
START TIME:
: 1. START TIME:
NOTES ITS LCO 3.3.5 allows bypassing Degraded Grid Protection when the Unit is NOT in Mode 1.
NOTES ITS LCO 3.3.5 allows bypassing Degraded Grid Protection when the Unit is NOT in Mode 1. Conservative operating principles have determined that bypassing the Degraded Grid Protection will only be permitted when the Unit is NOT in Mode 1 OR Mode 2. (NCR 151422)
Conservative operating principles have determined that bypassing the Degraded Grid Protection will only be permitted when the Unit is NOT in Mode 1 OR Mode 2. (NCR 151422)
Degraded Grid Voltage Protection is limited to one hour in the DEFEAT position before it shall be returned to NORMAL. (NCR 151422)
Degraded Grid Voltage Protection is limited to one hour in the DEFEAT position before it shall be returned to NORMAL. (NCR 151422)
STEP 1: IF required, THEN ENTER LCO 3.3.5 Action Statement due to bypassing Degraded Grid Protection, AND RECORD time. (Step 8.1.1.2.z). STANDARD: The operator reads the Note, and proceeds.
STEP 1:           IF required, THEN ENTER LCO 3.3.5 Action Statement due to bypassing Degraded Grid Protection, AND RECORD time.
 
(Step 8.1.1.2.z).                                                     ___ SAT STANDARD:         The operator reads the Note, and proceeds.
The operator records the time in the block provided
___ UNSAT The operator records the time in the block provided.
.
The operator informs the CRS that LCO 3.3.5 may need to be entered.
The operator informs the CRS that LCO 3.3.5 may need to be entered. EXAMINER'S CUE:
EXAMINERS CUE:                 As the CRS, acknowledge report.
As the CRS, acknowledge report.
EXAMINERS NOTE:                 NONE BOOTH OPERATOR CUE:             NONE COMMENTS:
EXAMINER'S NOTE:
2016 Systems - Control Room JPM H                                 NUREG 1021, Revision 10
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:      ___ SAT    ___ UNSAT Appendix C Page 6 of 16 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- Control Room JPM H NUREG 1021, Revision 10 STEP 2: IF degraded grid protection is in service, THEN DEFEAT the degraded grid voltage protection as follows:
On the front of Bus E
-1, Cubicle 18A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position.
CHECK annunciator APP
-010-F5, DEGRADED GRID E
-1 PROT BYPD, is ILLUMINATED.
On the front of Bus E
-2, Cubicle 28A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position.
CHECK annunciator APP
-010-F6, DEGRADED GRID E
-2 PROT BYPD, is ILLUMINATED.
(Step 8.1.1.2.aa
). STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.aa.1&3
. The operator observes APP-010-F5, DEGRADED GRID E
-1 PROT BYPD, is LIT and is an expected alarm.
 
The operator observes APP-010-F 6, DEGRADED GRID E
-2 PROT BYPD, is LIT and is an expected alarm.
EXAMINER'S CUE:
NONE  EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
When directed, defeat Degraded Grid Protection on Bus E-1 RFI  EPS L007, and report back as AO that Steps 8.1.1.2.aa.1 ha s been completed When directed, defeat Degraded Grid Protection on Bus E-2 RFI EPS L 008, and report back as AO that Steps 8.1.1.2.aa.3 has been completed COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT  NOTE: Several starts / stops of the Bearing Oil Lift Pump may be required to prime the pump in a Motor where the Upper Reservoir has been drained and refilled.
 
Appendix C Page 7 of 16 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- Control Room JPM H NUREG 1021, Revision 10 STEP 3: START the BRG LIFT PUMP AND CHECK the LIFT PRESSURE light ILLUMINATES.
(Step 8.1.1.2.bb). STANDARD: The operator reads the Note, and proceeds.
The operator places the Bearing Lift Pump "B" Control Switch in the START position, and observes the Red status light is LIT and the Green status light is OFF
.
The operator observes that that the LIFT PRESSURE status light is LI T. EXAMINER'S CUE:
If the operator addresses the CRS/SM about AOP
-018 because of APP
-001-E2, as the SM indicate that the performance of the procedure can be deferred.
EXAMINER'S NOTE:
APP-001-E2, RCP #1 SEAL LEAKOFF LO FLOW, alarms when the Bearing Oil Lift Pump is started. This is because the pump start causes the "B" RCP shaft to be lifted affecting the #1 Seal on the "B" RCP, which will affect the #1 Seal Leakoff flows on the other RCPs. The operator may address the APP, and may address AOP
-018, Reactor Coolant Pump Abnormal Conditions. If so, a NOTE on the Entry Conditions to AOP-018 states that "IF RCP#1 Seal Leakoff flow is below 1 gpm due to plant conditions known to affect


leakoff flow, the SM may defer procedure entry provided the #1 Seal Leakoff flow remains above 0.8 gpm."  BOOTH OPERATOR CUE:
Appendix C                                     Page 6 of 16                       Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 2:      IF degraded grid protection is in service, THEN DEFEAT the                  STEP degraded grid voltage protection as follows:
NONE  COMMENTS:      CRITICAL STEP
* On the front of Bus E-1, Cubicle 18A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position.                                                      ___ SAT
___ SAT    ___ UNSAT Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
* CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is ILLUMINATED.
- Control Room JPM H NUREG 1021, Revision 10 STEP 4: IF RCP Oil Reservoir level annunciator is NOT EXTINGUISHED, THEN REFER to the appropriate Annunciator Procedure.
* On the front of Bus E-2, Cubicle 28A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the                 ___ UNSAT DEFEAT position.
(Step 8.1.1.2.cc
* CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is ILLUMINATED.
). STANDARD: The operator observes that APP
(Step 8.1.1.2.aa).
-001-E8, RCP B OIL RESERV HI/LO LVL, is EXTINGUISHED
STANDARD:       The operator contacts AO and directs performance of Step 8.1.1.2.aa.1&3.
. EXAMINER'S CUE:
The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is LIT and is an expected alarm.
NONE   EXAMINER'S NOTE:
The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is LIT and is an expected alarm.
NONE BOOTH OPERATOR CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           When directed, defeat Degraded Grid Protection on Bus E-1 RFI EPSL007, and report back as AO that Steps 8.1.1.2.aa.1 has been completed When directed, defeat Degraded Grid Protection on Bus E-2 RFI EPSL008, and report back as AO that Steps 8.1.1.2.aa.3 has been completed COMMENTS:
NONE  COMMENTS:        ___ SAT    ___ UNSAT  STEP 5: NOTIFY RC that RCP's are to be started AND to monitor for changing radiological conditions.
NOTE: Several starts / stops of the Bearing Oil Lift Pump may be required to prime the pump in a Motor where the Upper Reservoir has been drained and refilled.
(Step 8.1.1.2.dd). STANDARD: The operator contacts RC and makes notification
2016 Systems - Control Room JPM H                                  NUREG 1021, Revision 10
. EXAMINER'S CUE:
As RC Supervisor, Acknowledge


EXAMINER'S NOTE:
Appendix C                                    Page 7 of 16                    Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       START the BRG LIFT PUMP AND CHECK the LIFT PRESSURE                    CRITICAL light ILLUMINATES.                                                        STEP (Step 8.1.1.2.bb).
NONE  BOOTH OPERATOR CUE:
___ SAT STANDARD:     The operator reads the Note, and proceeds.
NONE  COMMENTS:
The operator places the Bearing Lift Pump B Control Switch in the START position, and observes the Red status light is LIT and the
___ SAT    ___ UNSAT   CAUTION: Only one Reactor Coolant Pump is to be started at a time.
___ UNSAT Green status light is OFF.
The operator observes that that the LIFT PRESSURE status light is LIT.
EXAMINERS CUE:             If the operator addresses the CRS/SM about AOP-018 because of APP-001-E2, as the SM indicate that the performance of the procedure can be deferred.
EXAMINERS NOTE:            APP-001-E2, RCP #1 SEAL LEAKOFF LO FLOW, alarms when the Bearing Oil Lift Pump is started.
This is because the pump start causes the B RCP shaft to be lifted affecting the #1 Seal on the B RCP, which will affect the #1 Seal Leakoff flows on the other RCPs.
The operator may address the APP, and may address AOP-018, Reactor Coolant Pump Abnormal Conditions. If so, a NOTE on the Entry Conditions to AOP-018 states that IF RCP#1 Seal Leakoff flow is below 1 gpm due to plant conditions known to affect leakoff flow, the SM may defer procedure entry provided the #1 Seal Leakoff flow remains above 0.8 gpm.
BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10


Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 8 of 16                 Form ES-C-1 PERFORMANCE INFORMATION STEP 4:       IF RCP Oil Reservoir level annunciator is NOT EXTINGUISHED, THEN REFER to the appropriate Annunciator Procedure.
- Control Room JPM H NUREG 1021, Revision 10 STEP 6: WHEN the Brg Lift Pump has operated for a minimum of 2 minutes, THEN START the Reactor Coolant Pump.
(Step 8.1.1.2.cc).
(Step 8.1.1.2.ee). STANDARD: The operator reads the Caution, and proceeds.
___ SAT STANDARD:     The operator observes that APP-001-E8, RCP B OIL RESERV HI/LO LVL, is EXTINGUISHED.
The operator will make a plant announcement prior to starting the RCP. After 2 minutes with the Bearing Oil Lift Pump running, the operator places the B RCP Control Switch to the START position, and observes the Red status light is LIT and the Green status light is OFF.
___ UNSAT EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
The operator will observe FI
STEP 5:      NOTIFY RC that RCPs are to be started AND to monitor for changing radiological conditions.
-424 at 118%.
(Step 8.1.1.2.dd).                                                ___ SAT STANDARD:    The operator contacts RC and makes notification.
(Not Critical)
___ UNSAT EXAMINERS CUE:              As RC Supervisor, Acknowledge EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
The operator will observe FI
CAUTION: Only one Reactor Coolant Pump is to be started at a time.
-425 at 118%.
2016 Systems - Control Room JPM H                              NUREG 1021, Revision 10
(Not Critical)
The operator will observe FI
-426 at 117%.
(Not Critical)


The operator will observe "B" RCP #1 Seal Leakoff on FR
Appendix C                                  Page 9 of 16                        Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      WHEN the Brg Lift Pump has operated for a minimum of 2 minutes,          CRITICAL THEN START the Reactor Coolant Pump.                                      STEP (Step 8.1.1.2.ee).
-154B to be 1.24 gpm.
___ SAT STANDARD:    The operator reads the Caution, and proceeds.
The operator will make a plant announcement prior to starting the RCP.
___ UNSAT After 2 minutes with the Bearing Oil Lift Pump running, the operator places the B RCP Control Switch to the START position, and observes the Red status light is LIT and the Green status light is OFF.
The operator will observe FI-424 at 118%. (Not Critical)
The operator will observe FI-425 at 118%. (Not Critical)
The operator will observe FI-426 at 117%. (Not Critical)
The operator will observe B RCP #1 Seal Leakoff on FR-154B to be 1.24 gpm. (Not Critical)
The operator will observe RCS pressure on PR-444 to be 360 psig.
(Not Critical)
(Not Critical)
EXAMINERS CUE:              NONE EXAMINERS NOTE:            NONE BOOTH OPERATOR CUE:          NONE COMMENTS:
2016 Systems - Control Room JPM H                                  NUREG 1021, Revision 10


The operator will observe RCS pressure on PR
Appendix C                                     Page 10 of 16                     Form ES-C-1 PERFORMANCE INFORMATION STEP 7:           WHEN a minimum of 50 seconds has elapsed since the Reactor Coolant Pump was started, THEN STOP the BRG LIFT PUMP.
-  (Not Critical)
(Step 8.1.1.2.ff).
EXAMINER'S CUE:
___ SAT STANDARD:         After a minimum of 50 seconds with the B RCP Running, the operator places the Bearing Oil Lift Pump Control Switch to the STOP position, and observes the Green status light is LIT and the
NONE EXAMINER'S NOTE:
___ UNSAT Red status light is OFF.
NONE  BOOTH OPERATOR CUE:
The operator observes that that the LIFT PRESSURE status light is OFF.
NONE  COMMENTS:      CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
EXAMINERS CUE:                   NONE EXAMINERS NOTE:                   NONE BOOTH OPERATOR CUE:               NONE COMMENTS:
- Control Room JPM H NUREG 1021, Revision 10 STEP 7: WHEN a minimum of 50 seconds has elapsed since the Reactor Coolant Pump was started, THEN STOP the BRG LIFT PUMP.
CAUTION: Do NOT Restore the Degraded Grid Voltage Protection to NORMAL until the Amber indicating light is Extinguished.
(Step 8.1.1.2.ff). STANDARD: After a minimum of 50 seconds with the B RCP Running, the operator places the Bearing Oil Lift Pump Control Switch to the STOP position, and observes the Green status light is LIT and the Red status light is OFF
. The operator observes that that the LIFT PRESSURE status light is OFF. EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:         ___ SAT    ___ UNSAT  CAUTION: Do NOT Restore the Degraded Grid Voltage Protection to NORMAL until the Amber indicating light is Extinguished.
NOTE: The Degraded Grid Voltage keylock keys can NOT be removed from switches unless positioned to NORMAL.
NOTE: The Degraded Grid Voltage keylock keys can NOT be removed from switches unless positioned to NORMAL.
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10


Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 11 of 16                         Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 8:     IF E-1 Degraded Grid Voltage Protection is to be returned to                   STEP NORMAL, THEN RESTORE as follows:
- Control Room JPM H NUREG 1021, Revision 10 STEP 8: IF E-1 Degraded Grid Voltage Protection is to be returned to NORMAL, THEN RESTORE as follows:
* Momentarily DEPRESS the amber E-1 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.                     ___ SAT
Momentarily DEPRESS the amber E
* CHECK the amber E-1 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
-1 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.
* PLACE E-1 DEGRADED GRID VOLTAGE key switch to NORMAL.                                                                 ___ UNSAT
CHECK the amber E
* REMOVE key.
-1 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
* IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.3, E-1 Defeat Switch Contact Position Verification.
PLACE E-1 DEGRADED GRID VOLTAGE key switch to NORMAL. REMOVE key. IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.3, E
* ENSURE Relay 27 contacts are RESET by performing the following:
-1 Defeat Switch Contact Position Verification.
ENSURE Relay 27 contacts are RESET by performing the following:
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVA-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVA-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVB-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVB-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVC-1 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for Relay 27/DVC-1 AND CHECK that the target flag indicates black.
CHECK annunciator APP
* CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.
-010-F5, DEGRADED GRID E
(Step 8.1.1.2.gg.1-7).
-1 PROT BYPD, is EXTINGUISHED.
STANDARD:     The operator reads the Caution and Note, and proceeds.
(Step 8.1.1.2.gg.1-7). STANDARD: The operator reads the Caution and Note, and proceeds.
The operator contacts AO and directs performance of Step 8.1.1.2.gg.1-6.
The operator contacts AO and directs performance of Step 8.1.1.2.gg.1
The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.
-6. The operator observes APP-010-F5, DEGRADED GRID E
EXAMINERS CUE:               If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.
-1 PROT BYPD, is EXTINGUISHED
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           When directed, return Degraded Grid Protection on Bus E-1 to normal RFI EPSL007, and report back as AO that Steps 8.1.1.2.gg.1-6 have been completed COMMENTS:
. EXAMINER'S CUE:
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10
If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the "C" RCP is started, direct the operator to continue with the procedure as written.
 
EXAMINER'S NOTE:
Appendix C                                 Page 12 of 16                 Form ES-C-1 PERFORMANCE INFORMATION STEP 9:       IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time.
NONE BOOTH OPERATOR CUE:
(Step 8.1.1.2.hh).                                               ___ SAT STANDARD:     The operator records the time in the block provided.
When directed, return Degraded Grid Protection on Bus E-1 to normal RFI EPS L 007, and report back as AO that Steps 8.1.1.2.gg.1
___ UNSAT EXAMINERS CUE:             NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:         NONE COMMENTS:
-6 have been completed COMMENTS:   CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
2016 Systems - Control Room JPM H                              NUREG 1021, Revision 10
- Control Room JPM H NUREG 1021, Revision 10 STEP 9: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time. (Step 8.1.1.2.hh). STANDARD: The operator records the time in the block provided
 
. EXAMINER'S CUE:
Appendix C                                   Page 13 of 16                         Form ES-C-1 PERFORMANCE INFORMATION STEP 10:     IF E-2 Degraded Grid Voltage Protection is to be returned to                 CRITICAL NORMAL, THEN RESTORE as follows:                                               STEP
NONE   EXAMINER'S NOTE:
* Momentarily DEPRESS the amber E-2 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.                     ___ SAT
NONE BOOTH OPERATOR CUE:
* CHECK the amber E-2 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
NONE COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
* PLACE E-2 DEGRADED GRID VOLTAGE key switch to NORMAL.                                                                 ___ UNSAT
- Control Room JPM H NUREG 1021, Revision 10 STEP 1 0: IF E-2 Degraded Grid Voltage Protection is to be returned to NORMAL, THEN RESTORE as follows:
* REMOVE key.
Momentarily DEPRESS the amber E
* IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.4, E-2 Defeat Switch Contact Position Verification.
-2 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES.
* ENSURE relay 27 contacts are RESET by performing the following:
CHECK the amber E
-2 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED. PLACE E-2 DEGRADED GRID VOLTAGE key switch to NORMAL. REMOVE key. IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.4, E
-2 Defeat Switch Contact Position Verification.
ENSURE relay 27 contacts are RESET by performing the following:
o DEPRESS the TARGET RESET pushbutton for relay 27/DVA-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVA-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVB-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVB-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVC-2 AND CHECK that the target flag indicates black.
o DEPRESS the TARGET RESET pushbutton for relay 27/DVC-2 AND CHECK that the target flag indicates black.
CHECK annunciator APP
* CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.
-010-F6, DEGRADED GRID E
(Step 8.1.1.2.ii).
-2 PROT BYPD, is EXTINGUISHED.
STANDARD:     The operator contacts AO and directs performance of Step 8.1.1.2.ii.1-6.
(Step 8.1.1.2.ii). STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.ii.1
The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.
-6. The operator observes APP-010-F 6, DEGRADED GRID E
EXAMINERS CUE:               If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.
-2 PROT BYPD, is EXTINGUISHED
EXAMINERS NOTE:               NONE BOOTH OPERATOR CUE:           When directed, return Degraded Grid Protection on Bus E-2 to normal RFI EPSL008, and report back as AO that Steps 8.1.1.2.ii.1-6 have been completed COMMENTS:
. EXAMINER'S CUE:
2016 Systems - Control Room JPM H                                    NUREG 1021, Revision 10
If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the "C" RCP is started, direct the operator to continue with the procedure as written.
 
EXAMINER'S NOTE:
Appendix C                                 Page 14 of 16                   Form ES-C-1 PERFORMANCE INFORMATION STEP 11:     IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time.                               ___ SAT (Step 8.1.1.2.jj).
NONE BOOTH OPERATOR CUE:
STANDARD:     The operator records the time in the block provided.
When directed, return Degraded Grid Protection on Bus E-2 to normal RFI EPS L 008, and report back as AO that Steps 8.1.1.2.ii.1
___ UNSAT The operator informs the CRS that the LCO 3.3.5 Action Statement may be able to be exited.
-6 have been completed COMMENTS:     CRITICAL STEP
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE BOOTH OPERATOR CUE:           NONE COMMENTS:
___ SAT    ___ UNSAT Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Terminating Cue:             Evaluation on this JPM is complete.
- Control Room JPM H NUREG 1021, Revision 10 STEP 1 1: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time. (Step 8.1.1.2.jj). STANDARD: The operator records the time in the block provided
. The operator informs the CRS that the LCO 3.3.5 Action Statement may be able to be exited.
EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE BOOTH OPERATOR CUE:
NONE COMMENTS:           ___ SAT    ___ UNSAT          Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - Control Room JPM H                              NUREG 1021, Revision 10


Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 15 of 16                 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM H Examinees Name:
- Control Room JPM H NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - Control Room JPM H   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 4,518: Line 3,340:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                    Date:
2016 Systems - Control Room JPM H                          NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                               Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The A RCP is running.
A plant startup is in progress in accordance with GP
* It is intended to start the B RCP next.
-002, Cold Shutdown to Hot Sub
* Section 8.1 of OP-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
-Critical at No
* It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.
-Load Tavg. The "A" RCP is running. It is intended to start the "B" RCP next.
INITIATING CUE:     The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.
Section 8.1 of OP
NUREG 1021, Revision 10
-101, Reactor Coolant System and Reactor Coolant Pump Startup and Operation, has been completed through Step 8.1.1.2.y in preparation for starting the Reactor Coolant Pump.
It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.     INITIATING CUE:
The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP
-101.
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- In-Plant JPM I (Rev_011116) NUREG 1021, Revision 10


In-Plant JPM I     Developed By:
Appendix C                          Job Performance Measure            Form ES-C-1 Worksheet In-Plant JPM I Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:         ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - In-Plant JPM I (Rev_011116)              NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 11                         Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- In-Plant JPM I NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Locally Establish AFW Flow from         JPM No.:   2016 Systems - In-the SDAFW Pump and Control S/G                      Plant JPM I Levels and Pressures K/A  
Locally Establish AFW Flow from the SDAFW Pump and Control S/G Levels and Pressures JPM No.: 2016 Systems  
- In-Plant JPM I K/A  


==Reference:==
==Reference:==
EPE 055 EA2.01 (3.4/3.7)
EPE 055 EA2.01 (3.4/3.7)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:           X                           Actual Performance:
X Actual Performance:
Classroom               Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
Initial Conditions:
: 1. Initial Conditions:
* The Plant has experienced a loss of onsite and offsite power.
The Plant has experienced a loss of onsite and offsite power
* EOP-ECA-0.0, Loss of All AC Power, has been implemented.
. EOP-ECA-0.0, Loss of All AC Power, has been implemented
* Wide range levels in all three SGs are 55%.
. Wide range levels in all three SGs are 55%.
* Steam Generator pressures are 1075 psig
Steam Generator pressures are 1075 psig The SDAFW Pump has just been started
* The SDAFW Pump has just been started.
. Initiating Cue:
Initiating Cue:             The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.
The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0. Task Standard:
Task Standard:             The operator will control AFW flow to the Steam Generators and align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
The operator will control AFW flow to the Steam Generators and align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
Required Materials:         PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
-ECA-0.0. Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
General  
General  


==References:==
==References:==
EOP-ECA-0.0 (Loss of All AC Power), Rev 4 2016 Systems - In-Plant JPM I                                              NUREG 1021, Revision 10
Appendix C                                      Page 3 of 11                        Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts:              Handout 1: Blank copy of Attachment 4 of EOP-ECA-0.0.
Time Critical Task:    NO Validation Time:      7 minutes Critical Step Justification Step 1        This step is critical because throttling the SDAFW Pump Discharge Valves is necessary to control AFW flow to the Steam Generators IAW Attachment 4 of EOP-ECA-0.0.
Step 3        This step is critical because closing IA-297 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 4        This step is critical because opening SDN-13 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 5        This step is critical because closing SDN-29 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 6        This step is critical because opening SDN-28 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
Step 7        This step is critical because opening IA-423 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.
2016 Systems - In-Plant JPM I                                        NUREG 1021, Revision 10


E OP-ECA-0.0 (Loss of All AC Power), Rev 4 Appendix C Page 3 of 11 Form ES-C-1  Job Performance Measure Worksheet  2016 Systems
Appendix C                                       Page 4 of 11                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- In-Plant JPM I NUREG 1021, Revision 10 OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45  Handouts: Handout 1: Blank copy of Attachment 4 of EOP
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
-ECA-0.0. Time Critical Task:
START TIME:
NO  Validation Time:
NOTE Flashlights AND ANY handtools needed are located with AOP/EOP/DSP Tool Kits.
7 minutes      Critical Step Justification Step 1 This step is critical because throttling the SDAFW Pump Discharge Valves is necessary to control AFW flow to the Steam Generators IAW Attachment 4 of EOP-ECA-0.0. Step 3 This step is critical because closing IA
-297 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0. Step 4 This step is critical because opening SDN
-13 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0. Step 5 This step is critical because closing SDN
-29 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0. Step 6 This step is critical because opening SDN
-28 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0. Step 7 This step is critical because opening IA
-423 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP
-ECA-0.0.
Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM I NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. START TIME:
NOTE Flashlights AND ANY handtools needed are located with AOP/EOP/DSP Tool Kits.
The S/G Wide Range level indicators LI607A2, LI607B2, AND LI607C2 located in the Secondary Control Panel are powered from PP50 AND should always be available. These channels are credited in the SBO Coping Analysis.
The S/G Wide Range level indicators LI607A2, LI607B2, AND LI607C2 located in the Secondary Control Panel are powered from PP50 AND should always be available. These channels are credited in the SBO Coping Analysis.
STEP 1: Locally THROTTLE The Steam Driven AFW Pump Discharge Valve(s) At The Secondary Control Panel Area To Maintain S/G WR Levels Between 60% AND 67%
CRITICAL STEP 1:         Locally THROTTLE The Steam Driven AFW Pump Discharge                         STEP Valve(s) At The Secondary Control Panel Area To Maintain S/G WR Levels Between 60% AND 67%.
. AFWV214A  S/G A AFWV214B  S/G B AFWV214C  S/G C (Step 1) STANDARD: The operator reads the Notes, and proceeds.
* AFWV214A  S/G A                                                       ___ SAT
* AFWV214B  S/G B
* AFWV214C  S/G C (Step 1)                                                                   ___ UNSAT STANDARD:         The operator reads the Notes, and proceeds.
The operator depresses the AFWV214A, 14B and 14C de-clutch lever and rotates handwheel counterclockwise to increase feedwater flow or clockwise to decrease feedwater flow.
The operator depresses the AFWV214A, 14B and 14C de-clutch lever and rotates handwheel counterclockwise to increase feedwater flow or clockwise to decrease feedwater flow.
AS-FOUND: All three valves are CLOSED (Stems fully inserted)
AS-FOUND:               All three valves are CLOSED (Stems fully inserted)
EXAMINER'S CUE:
EXAMINERS CUE:                   After locating and describing how the three valves are operated, indicate that each valve has been De-Clutched and the handwheel rotated as needed to adjust feedwater flow When appropriate, indicate that each SG WR level is 64% and stable If the operator elects to OPEN the motor breakers for these valves, indicate that another operator will perform this action EXAMINERS NOTE:                  The operator may request that a second operator observe SG WR levels while the remainder of the Attachment is completed COMMENTS:
After locating and describing how the three valves are operated, indicate that each valve has been De
2016 Systems - In-Plant JPM I                                          NUREG 1021, Revision 10
-Clutched and the handwheel rotated as needed to adjust feedwater flow
 
Appendix C                                  Page 5 of 11                        Form ES-C-1 PERFORMANCE INFORMATION STEP 2:      OBSERVE NOTE Prior To Step 10 AND GO TO Step 10 (Step 2)
___ SAT STANDARD: The operator proceeds to Step 10.
___ UNSAT AS-FOUND:            NA EXAMINERS CUE:              NONE EXAMINERS NOTE:              NONE COMMENTS:
NOTE IA297 is located at the southeast corner of the Pipe Jungle at an elevation between the feed AND steam lines.
CRITICAL STEP 3:      CLOSE IA297, HDR STOP TO PORV STATION & MSIVS                                STEP (Step 10)
STANDARD:      The operator reads the Note, and proceeds.
___ SAT The operator rotates the IA-297 handwheel in the clockwise direction.
___ UNSAT AS-FOUND:            OPEN (Stem Fully Withdrawn)
EXAMINERS CUE:              The IA-297 handwheel will no longer turn in the clockwise direction and the stem is inserted EXAMINERS NOTE:              Located at the SE corner of Pipe Jungle between the Feed & Steam lines elevation IA-297 is located in the overhead under a catwalk and the operator must climb an installed ladder, or proceed up the stairs to the top floor of the Turbine Building. However, the valve can be seen from below or above, and discussion of operation can take place from one of these two locations COMMENTS:
2016 Systems - In-Plant JPM I                                          NUREG 1021, Revision 10


When appropriate, indicate that each SG WR level is 64% and stable If the operator elects to OPEN the motor breakers for these valves, indicate that another operator will perform this action EXAMINER'S NOTE:
Appendix C                                   Page 6 of 11                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN13 is located at the Steam Dump Nitrogen Accumulator.
The operator may request that a second operator observe SG WR levels while the remainder of the Attachment is completed COMMENTS:  CRITICAL STEP  ___ SAT    ___ UNSAT Appendix C Page 5 of 11 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
STEP 4:     OPEN SDN13, NITROGEN BACK UP SUPPLY                                   CRITICAL (Step 11)                                                                 STEP STANDARD:     The operator reads the Note, and proceeds.
- In-Plant JPM I NUREG 1021, Revision 10 STEP 2: OBSERVE NOTE Prior To Step 10 AND GO TO Step 10 (Step 2)  STANDARD: The operator proceeds to Step 10
___ SAT The operator rotates the SDN-13 handwheel in the counter-clockwise direction.
. AS-FOUND: NA  EXAMINER'S CUE:
___ UNSAT AS-FOUND:           CLOSED (Stem Fully Inserted)
NONE  EXAMINER'S NOTE:
EXAMINERS CUE:               The SDN-13 handwheel will no longer turn in the clockwise direction and the stem is inserted.
NONE  COMMENTS:      ___ SAT    ___ UNSAT  NOTE IA297 is located at the southeast corner of the Pipe Jungle at an elevation between the feed AND steam lines.
EXAMINERS NOTE:             Located at the Steam Dump Nitrogen Accumulator COMMENTS:
STEP 3: CLOSE IA297, HDR STOP TO PORV STATION & MSIVS (Step 10)  STANDARD: The operator reads the Note, and proceeds.
2016 Systems - In-Plant JPM I                                      NUREG 1021, Revision 10
The operator rotates the IA
-297 handwheel in the clockwise direction. AS-FOUND: OPEN (Stem Fully Withdrawn)  EXAMINER'S CUE:
The IA-297 handwheel will no longer turn in the clockwise direction and the stem is inserted  EXAMINER'S NOTE:
Located at the SE corner of Pipe Jungle between the Feed & Steam lines elevation IA-297 is located in the overhead under a catwalk and the operator must climb an installed ladder, or proceed up the stairs to the top floor of the Turbine Building. However, the valve can be seen from below or above, and discussion of operation can take place from one of these two locations COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: SDN13 is located at the Steam Dump Nitrogen Accumulator.
STEP 4: OPEN SDN13, NITROGEN BACK UP SUPPLY (Step 11) STANDARD: The operator reads the Note, and proceeds.
The operator rotates the SDN
-13 handwheel in the counter
-clockwise direction
. AS-FOUND: CLOSED (Stem Fully Inserted) EXAMINER'S CUE:
The SDN-13 handwheel will no longer turn in the clockwise direction and the stem is inserted. EXAMINER'S NOTE:
Located at the Steam Dump Nitrogen Accumulator COMMENTS:  


CRITICAL STEP
Appendix C                                   Page 7 of 11                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN28 AND SDN29 are located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.
___ SAT    ___ UNSAT Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
STEP 5:     UNLOCK AND CLOSE SDN29, STEAM LINE PORV NITROGEN                       CRITICAL B/U TO IA TELLTALE DRAIN                                                 STEP (Step 12)
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: SDN28 AND SDN29 are located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.
___ SAT STANDARD:     The operator reads the Note, and proceeds.
STEP 5: UNLOCK AND CLOSE SDN29, STEAM LINE PORV NITROGEN B/U TO IA TELLTALE DRAIN (Step 12) STANDARD: The operator reads the Note, and proceeds.
The operator unlocks and rotates the SDN-29 handwheel in the         ___ UNSAT clockwise direction.
The operator unlocks and rotates the SDN
AS-FOUND:           Locked OPEN (Stem Fully Withdrawn)
-29 handwheel in the clockwise direction
EXAMINERS CUE:               The SDN-29 handwheel will no longer turn in the clockwise direction and the stem is inserted.
. AS-FOUND: Locked OPEN (Stem Fully Withdrawn) EXAMINER'S CUE:
EXAMINERS NOTE:             Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:
The SDN-29 handwheel will no longer turn in the clockwise direction and the stem is inserted. EXAMINER'S NOTE:
STEP 6:      UNLOCK AND OPEN SDN28, NITROGEN BACKUP TO STEAM                        CRITICAL LINE PORVS                                                                STEP (Step 13)
Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck
STANDARD:      The operator unlocks and rotates the SDN-28 handwheel in the        ___ SAT counter-clockwise direction.
AS-FOUND:          Locked CLOSED (Stem Fully Inserted)                            ___ UNSAT EXAMINERS CUE:              The SDN-28 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.
EXAMINERS NOTE:              Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:
2016 Systems - In-Plant JPM I                                      NUREG 1021, Revision 10


COMMENTS:
Appendix C                                  Page 8 of 11                      Form ES-C-1 PERFORMANCE INFORMATION NOTE: IA423 is located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.
CRITICAL STEP ___ SAT    ___ UNSAT  STEP 6: UNLOCK AND OPEN SDN28, NITROGEN BACKUP TO STEAM LINE PORVS (Step 13) STANDARD: The operator unlocks and rotates the SDN
STEP 7:     UNLOCK AND OPEN IA423, NITROGEN TO STEAM LINE PORVS                     CRITICAL (Step 14)                                                                   STEP STANDARD:     The operator reads the Note, and proceeds.
-28 handwheel in the counter-clockwise direction
___ SAT The operator unlocks and rotates the IA-423 handwheel in the counter-clockwise direction.
. AS-FOUND: Locked CLOSED (Stem Fully Inserted) EXAMINER'S CUE:
___ UNSAT AS-FOUND:             Locked CLOSED (Stem Fully Inserted)
The SDN-28 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn. EXAMINER'S NOTE:
EXAMINERS CUE:               The IA-423 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.
Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:       CRITICAL STEP   ___ SAT   ___ UNSAT Appendix C Page 8 of 11 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
EXAMINERS NOTE:             Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: IA423 is located at the southeast corner of the Pipe Jungle on the Mezzanine Deck. STEP 7: UNLOCK AND OPEN IA423, NITROGEN TO STEAM LINE PORVS (Step 14)  STANDARD: The operator reads the Note, and proceeds.
STEP 8:      NOTIFY The Control Room Of The Following:
* S/G level is under control locally                                    ___ SAT
* The S/G Steam Line PORVs have N2 supplied for motive air (Step 15/15.a and b)
STANDARD:      The operator contacts the Control Room and makes the                  ___ UNSAT notifications.
AS-FOUND:            NA EXAMINERS CUE:              As the CRS, acknowledge EXAMINERS NOTE:              NONE COMMENTS:
2016 Systems - In-Plant JPM I                                       NUREG 1021, Revision 10


The operator unlocks and rotates the IA
Appendix C                                   Page 9 of 11                     Form ES-C-1 PERFORMANCE INFORMATION NOTE: When MCC5 is energized, the Control Room will feed S/G A AND S/G C.
-423 handwheel in the counter-clockwise direction
STEP 9:     WHEN Notified From The Control Room, THEN FEED S/G B To 67%
. AS-FOUND: Locked CLOSED (Stem Fully Inserted)
S/G Wide Range Level AND SECURE Feeding (Step 16)
EXAMINER'S CUE:
___ SAT STANDARD:     The operator reads the Note, and proceeds.
The IA-423 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn. EXAMINER'S NOTE:
The operator recognizes that this is a Continuous Action Step, and   ___ UNSAT reports that the Attachment is complete.
Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:        CRITICAL STEP  ___ SAT    ___ UNSAT  STEP 8: NOTIFY The Control Room Of The Following:
AS-FOUND:           NA EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
S/G level is under control locally The S/G Steam Line PORVs have N2 supplied for motive air (Step 15/15.a and b
Terminating Cue:               Evaluation on this JPM is complete.
)  STANDARD: The operator contacts the Control Room and makes the notifications
. AS-FOUND: NA  EXAMINER'S CUE:
As the CRS, acknowledge EXAMINER'S NOTE:
NONE  COMMENTS:        ___ SAT    ___ UNSAT Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM I NUREG 1021, Revision 10 NOTE: When MCC5 is energized, the Control Room will feed S/G A AND S/G C.
STEP 9: WHEN Notified From The Control Room, THEN FEED S/G B To 67% S/G Wide Range Level AND SECURE Feeding (Step 16) STANDARD: The operator reads the Note, and proceeds.
The operator recognizes that this is a Continuous Action Step, and reports that the Attachment is complete
. AS-FOUND: NA EXAMINER'S CUE:
NONE   EXAMINER'S NOTE:
NONE   COMMENTS:           ___ SAT    ___ UNSAT            Terminating Cue:
Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - In-Plant JPM I                                      NUREG 1021, Revision 10


Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 10 of 11                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   2016 Systems - In-Plant JPM I Examinees Name:
- In-Plant JPM I NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - In-Plant JPM I Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 4,668: Line 3,466:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                      Date:
2016 Systems - In-Plant JPM I                                NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The Plant has experienced a loss of onsite and offsite power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* EOP-ECA-0.0, Loss of All AC Power, has been implemented.
The Plant has experienced a loss of onsite and offsite power.
* Wide range levels in all three SGs are 55%.
EOP-ECA-0.0, Loss of All AC Power, has been implemented.
* Steam Generator pressures are 1075 psig
Wide range levels in all three SGs are 55%.
* The SDAFW Pump has just been started.
Steam Generator pressures are 1075 psig The SDAFW Pump has just been started
INITIATING CUE:     The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.
.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
INITIATING CUE:
NUREG 1021, Revision 10
The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0. NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- In-Plant JPM J (Rev_011116) NUREG 1021, Revision 10


In-Plant JPM J     Developed By:
Appendix C                          Job Performance Measure            Form ES-C-1 Worksheet In-Plant JPM J Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:         ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - In-Plant JPM J (Rev_011116)              NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 10                       Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                             Task No.:
- In-Plant JPM J NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Respond to a Loss of Instrument Air     JPM No.:   2016 Systems - In-Plant JPM J K/A  
Respond to a Loss of Instrument Air JPM No.: 2016 Systems  
- In-Plant JPM J     K/A  


==Reference:==
==Reference:==
 
065 AA1.04 (3.5.3.4)
0 65 A A1.0 4 (3.5.3.4)   Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:           X                           Actual Performance:
X Actual Performance:
Classroom               Simulator             Plant       X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout
Initial Conditions:
: 1. Initial Conditions:
* IA Header Pressure is 75 PSIG and lowering.
IA Header Pressure is 75 PSIG and lowering.
* AOP-017, Loss Of Instrument Air, has been entered.
AOP-017, Loss Of Instrument Air, has been entered.
* The Station Air Compressor is under clearance and disassembled
The Station Air Compressor is under clearance and disassembled The Station Air Receiver is depressurized and vented.
* The Station Air Receiver is depressurized and vented.
Initiating Cue:
Initiating Cue:
The CRS has directed you to perform AOP
* The CRS has directed you to perform AOP-017 Step 8.
-017 Step 8
* The Outside AO is standing by to assist as needed.
. The Outside AO is standing by to assist as needed.
Task Standard:             The operator will start IA Compressors A and B and align their discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.
Task Standard:
Required Materials:         PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
The operator will start IA Compressors "A" and "B" and align their discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP
-017. Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
General  
General  


==References:==
==References:==
AOP-017 (Loss of Instrument Air), Rev 43 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 2016 Systems - In-Plant JPM J                                              NUREG 1021, Revision 10
Appendix C                                      Page 3 of 10                      Form ES-C-1 Job Performance Measure Worksheet Handouts:              Handout 1: Blank Copy of AOP-017.
Time Critical Task:    NO Validation Time:        14 minutes Critical Step Justification Step 6        This step is critical because placing the IA Compressor A & B Control Switches in MANUAL is necessary to start IA Compressors A and B in accordance with Step 8 of AOP-017.
Step 8        This step is critical because rotating the IA3665 handwheel in the counter-clockwise direction is necessary to align the IA Compressors A and B discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.
2016 Systems - In-Plant JPM J                                        NUREG 1021, Revision 10


AOP-01 7 (Loss of Instrument Air), Rev 43  OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45 Appendix C Page 3 of 10 Form ES-C-1  Job Performance Measure Worksheet  2016 Systems
Appendix C                                   Page 4 of 10                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- In-Plant JPM J NUREG 1021, Revision 10 Handouts: Handout 1: Blank Copy of AOP-01 7. Time Critical Task:
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.
NO  Validation Time:
START TIME:
14 minutes      Critical Step Justification Step 6 This step is critical because placing the IA Compressor A & B Control Switches in MANUAL is necessary to start IA Compressors "A" and "B" in accordance with Step 8 of AOP
NOTE IA3821 is located on IA Dryer D.
-017. Step 8 This step is critical because rotating the IA3665 handwheel in the counter-clockwise direction is necessary to align the IA Compressors "A" and "B" discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.
Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM J NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout
: 1. START TIME:
NOTE IA3821 is located on IA Dryer D.
Operator Aid 97OP35 to supply Station Air to Instrument Air is located in the Aux Bldg hallway on the Station Air Receiver.
Operator Aid 97OP35 to supply Station Air to Instrument Air is located in the Aux Bldg hallway on the Station Air Receiver.
STEP 1: DISPATCH Operator(s) To Perform The Following:
STEP 1:         DISPATCH Operator(s) To Perform The Following:
CHECK Station Air Compressor Available For Service:
CHECK Station Air Compressor Available For Service:
SA1, STATION AIR TO RECEIVER  OPEN AND Station Air Compressor Function Switch  ON (Step 8/8.a
SA1, STATION AIR TO RECEIVER  OPEN                                     ___ SAT AND Station Air Compressor Function Switch  ON (Step 8/8.a)
STANDARD: The operator reads the Notes, and proceeds.
___ UNSAT STANDARD:         The operator reads the Notes, and proceeds.
The operator recognizes that SA
The operator recognizes that SA-1 is OOS and proceeds to the RNO.
-1 is OOS and proceeds to the RNO. AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
AS FOUND:               SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
EXAMINER'S CUE:
EXAMINERS CUE:                 NONE EXAMINERS NOTE:                 NONE COMMENTS:
NONE   EXAMINER'S NOTE:
2016 Systems - In-Plant JPM J                                      NUREG 1021, Revision 10
NONE COMMENTS:
 
___ SAT    ___ UNSAT Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 2:     OPEN SA1 AND PLACE the Station Air Compressor Function switch to ON.
- In-Plant JPM J NUREG 1021, Revision 10 STEP 2: OPEN SA1 AND PLACE the Station Air Compressor Function switch to ON. IF the Station Air Compressor is still NOT available for service, THEN GO TO Step 8.d.
IF the Station Air Compressor is still NOT available for service, THEN   ___ SAT GO TO Step 8.d.
(Step 8.a RNO) STANDARD: The operator recognizes that SA
(Step 8.a RNO)
-1 cannot be opened nor can the SAC Function Switch be placed to ON, and proceeds to Step 8.d
___ UNSAT STANDARD:     The operator recognizes that SA-1 cannot be opened nor can the SAC Function Switch be placed to ON, and proceeds to Step 8.d.
. AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
AS FOUND:           SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)
EXAMINER'S CUE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
NONE   EXAMINER'S NOTE:
STEP 3:     CHECK IA18, AIR DRYER "A" & "B" BYPASS  OPEN (Step 8.d)
NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 3: CHECK IA18, AIR DRYER "A" & "B" BYPASS  OPEN (Step 8.d) STANDARD: The operator observes IA
STANDARD:     The operator observes IA-18, and (After Cue) proceeds to the Step       ___ SAT 8.d RNO.
-18, and (After Cue) proceeds to the Step 8.d RNO. AS FOUND: IA-18 stem is fully inserted (Cue as needed)
AS FOUND:           IA-18 stem is fully inserted (Cue as needed)                     ___ UNSAT EXAMINERS CUE:               NONE EXAMINERS NOTE:               NONE COMMENTS:
EXAMINER'S CUE:
2016 Systems - In-Plant JPM J                                        NUREG 1021, Revision 10
NONE   EXAMINER'S NOTE:
 
NONE   COMMENTS:         ___ SAT    ___ UNSAT Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 6 of 10                     Form ES-C-1 PERFORMANCE INFORMATION STEP 4:     OPEN IA18, AIR DRYER "A" & "B" BYPASS.
- In-Plant JPM J NUREG 1021, Revision 10 STEP 4: OPEN IA18, AIR DRYER "A" & "B" BYPASS.
(Step 8.d RNO)
(Step 8.d RNO) STANDARD: The operator rotates the IA
___ SAT STANDARD:     The operator rotates the IA-18 handwheel in the counter-clockwise direction.
-18 handwheel in the counter
___ UNSAT AS FOUND:           IA-18 stem is fully inserted (Cue as needed)
-clockwise direction. AS FOUND: IA-18 stem is fully inserted (Cue as needed)
EXAMINERS CUE:               After locating and describing how the valve would be opened, indicate that the stem is fully withdrawn.
EXAMINER'S CUE:
EXAMINERS NOTE:             NONE COMMENTS:
After locating and describing how the valve would be opened, indicate that the stem is fully withdrawn.
STEP 5:     CHECK the following Compressors  RUNNING
EXAMINER'S NOTE:
* INST AIR COMP A
NONE   COMMENTS:         ___ SAT    ___ UNSAT  STEP 5: CHECK the following Compressors  RUNNING INST AIR COMP A INST AIR COMP B (Step 8.e) STANDARD: The operator observes the IA Compressor A Control Switch
* INST AIR COMP B                                                   ___ SAT (Step 8.e)
. The operator observes the IA Compressor B Control Switch
STANDARD:     The operator observes the IA Compressor A Control Switch.
. AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
___ UNSAT The operator observes the IA Compressor B Control Switch.
EXAMINER'S CUE:
AS FOUND:           Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
NONE EXAMINER'S NOTE:
EXAMINERS CUE:               NONE EXAMINERS NOTE:             NONE COMMENTS:
NONE   COMMENTS:       ___ SAT    ___ UNSAT Appendix C Page 7 of 10 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
2016 Systems - In-Plant JPM J                                         NUREG 1021, Revision 10
- In-Plant JPM J NUREG 1021, Revision 10 STEP 6: START the following compressors:
INST AIR COMP A INST AIR COMP B (Step 8.e RNO)  STANDARD: The operator places the IA Compressor A Control Switch in MANUAL. The operator places the IA Compressor B Control Switch in MANUAL. AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
EXAMINER'S CUE:
After the IA Compressor Control Switches are placed in MANUAL indicate that the motor starts and the compressor is running EXAMINER'S NOTE:
NONE COMMENTS:
CRITICAL STEP
___ SAT    ___ UNSAT  STEP 7: CHECK FCV1740, AIR DRYER HIGH DP FLOW CONTROL valve  OPEN  (Step 8.f)  STANDARD: The operator observes FCV
-1740. AS FOUND: CLOSED (Cue as needed)


EXAMINER'S CUE:
Appendix C                                   Page 7 of 10                         Form ES-C-1 PERFORMANCE INFORMATION STEP 6:      START the following compressors:                                           CRITICAL
After locating and describing how the valve would be verified opened indicate the position indicator is down indicating closed.
* INST AIR COMP A                                                         STEP
EXAMINER'S NOTE:
* INST AIR COMP B (Step 8.e RNO)
NONE  COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
___ SAT STANDARD:     The operator places the IA Compressor A Control Switch in MANUAL.
- In-Plant JPM J NUREG 1021, Revision 10 STEP 8: OPEN IA3665, AIR DRYER "A" & "B" BYPASS.
___ UNSAT The operator places the IA Compressor B Control Switch in MANUAL.
(Step 8.f RNO) STANDARD: The operator rotates the IA3665 handwheel in the counter
AS FOUND:           Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)
-clockwise direction
EXAMINERS CUE:             After the IA Compressor Control Switches are placed in MANUAL indicate that the motor starts and the compressor is running EXAMINERS NOTE:             NONE COMMENTS:
. AS FOUND: CLOSED (Cue as needed)
STEP 7:     CHECK FCV1740, AIR DRYER HIGH DP FLOW CONTROL valve OPEN (Step 8.f)
EXAMINER'S CUE:
___ SAT STANDARD:     The operator observes FCV-1740.
After locating and describing how the valve would be opened indicate the valve has been rotated fully counter-clockwise (stem fully withdrawn)
AS FOUND:           CLOSED (Cue as needed)                                              ___ UNSAT EXAMINERS CUE:             After locating and describing how the valve would be verified opened indicate the position indicator is down indicating closed.
EXAMINER'S NOTE:
EXAMINERS NOTE:            NONE COMMENTS:
NONE   COMMENTS:       CRITICAL STEP  ___ SAT
2016 Systems - In-Plant JPM J                                      NUREG 1021, Revision 10
___ UNSAT    STEP 9: OPEN IA3821, INSTRUMENT AIR DRYER "D" BYPASS (Step 8.g) STANDARD: The operator contacts the Outside AO and directs that IA
-3821 be OPENED. AS FOUND: NA  EXAMINER'S CUE:
As the Outside AO, indicate that IA
-3821 is OPEN.
If the operator starts to proceed to IA
-3821 (In Turbine Building), rather than call the Outside AO to re
-position this valve, indicate that another operator will perform this action and terminate the JPM.


EXAMINER'S NOTE: IA-3821 is located on the "D" IA dryer.
Appendix C                                    Page 8 of 10                          Form ES-C-1 PERFORMANCE INFORMATION STEP 8:      OPEN IA3665, AIR DRYER "A" & "B" BYPASS.                                      CRITICAL (Step 8.f RNO)                                                                  STEP STANDARD:      The operator rotates the IA3665 handwheel in the counter-                  ___ SAT clockwise direction.
COMMENTS:         ___ SAT
AS FOUND:          CLOSED (Cue as needed)                                                ___ UNSAT EXAMINERS CUE:              After locating and describing how the valve would be opened indicate the valve has been rotated fully counter-clockwise (stem fully withdrawn)
___ UNSAT            Terminating Cue:
EXAMINERS NOTE:             NONE COMMENTS:
Evaluation on this JPM is complete.
STEP 9:      OPEN IA3821, INSTRUMENT AIR DRYER "D" BYPASS (Step 8.g)
STANDARD:      The operator contacts the Outside AO and directs that IA-3821 be OPENED.                                                                    ___ SAT AS FOUND:          NA
___ UNSAT EXAMINERS CUE:              As the Outside AO, indicate that IA-3821 is OPEN.
If the operator starts to proceed to IA-3821 (In Turbine Building), rather than call the Outside AO to re-position this valve, indicate that another operator will perform this action and terminate the JPM.
EXAMINERS NOTE:              IA-3821 is located on the D IA dryer.
COMMENTS:
Terminating Cue:               Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - In-Plant JPM J                                          NUREG 1021, Revision 10


Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                               Page 9 of 10                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   2016 Systems - In-Plant JPM J Examinees Name:
- In-Plant JPM J NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - In-Plant JPM J   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 4,812: Line 3,587:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                      Date:
2016 Systems - In-Plant JPM J                                NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* IA Header Pressure is 75 PSIG and lowering.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* AOP-017, Loss Of Instrument Air, has been entered.
IA Header Pressure is 75 PSIG and lowering.
* The Station Air Compressor is under clearance and disassembled
AOP-017, Loss Of Instrument Air, has been entered.
* The Station Air Receiver is depressurized and vented.
The Station Air Compressor is under clearance and disassembled The Station Air Receiver is depressurized and vented.
INITIATING CUE:
INITIATING CUE:
The CRS has directed you to perform AOP
* The CRS has directed you to perform AOP-017 Step 8.
-017 Step 8
* The Outside AO is standing by to assist as needed.
. The Outside AO is standing by to assist as needed.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
NUREG 1021, Revision 10
 
Appendix C Job Performance Measure Form ES-C-1  Worksheet  2016 Systems
- In-Plant JPM K (Rev_01 11 16) NUREG 1021, Revision 10


In-Plant JPM K     Developed By:
Appendix C                          Job Performance Measure            Form ES-C-1 Worksheet In-Plant JPM K Developed By:       ______________________________         Date: ___________
______________________________
Instructor/Developer Concurred By:       ______________________________         Date: ___________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:         ______________________________         Date: ___________
Instructor/Developer Concurred By:
Superintendent/Supervisor Training 2016 Systems - In-Plant JPM K (Rev_011116)              NUREG 1021, Revision 10
______________________________
Date: ___________
Line Superintendent/Supervisor SRO Approved By:
______________________________
Date: ___________
Superintendent/Supervisor Training    


Appendix C Page 2 of 14 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                         Page 2 of 14                           Form ES-C-1 Job Performance Measure Worksheet Facility:               HB Robinson                               Task No.:
- In-Plant JPM K NUREG 1021, Revision 10 Facility: HB Robinson Task No.:     Task Title:
Task Title:             Loss of North SW Header in the           JPM No.:       2016 Systems - In-Auxiliary Building                                      Plant JPM K K/A  
Loss of North SW Header in the Auxiliary Building JPM No.: 2016 Systems  
- In-Plant JPM K     K/A  


==Reference:==
==Reference:==
APE 062 AA2.01 (2.9/3.5)
APE 062 AA2.01 (2.9/3.5)
Examinee: NRC Examiner:
Examinee:                                                     NRC Examiner:
Facility Evaluator:
Facility Evaluator:                                           Date:
Date: Method of testing:
Method of testing:
Simulated Performance:
Simulated Performance:           X                           Actual Performance:
X Actual Performance:
Classroom                 Simulator             Plant         X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. Initial Conditions:
Initial Conditions:
The plant is at 100% power
* The plant is at 100% power.
. The North SW header has ruptured inside the Auxiliary Building
* The North SW header has ruptured inside the Auxiliary Building.
. The Control Room has implemented AOP
* The Control Room has implemented AOP-022 (Loss of Service Water) for a leak in the North header.
-022 (Loss of Service Water) for a leak in the North header.
Initiating Cue:             The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.
Initiating Cue:
Task Standard:             The operator will isolate the intact SW header from the ruptured header, isolate the leak, and align cooling water to critical loads IAW Attachment 6 of AOP-022.
The CRS has directed you to isolate the leak IAW Attachment 6 of AOP
Required Materials:         PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
-022. Task Standard:
Flashlight Magnifying Glass General  
The operator will isolate the intact SW header from the ruptured header, isolate the leak, and align cooling water to critical loads IAW Attachment 6 of A O P-022. Required Materials:
PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)
Flashlight Magnifying Glass General  


==References:==
==References:==
AOP-022 (Loss of Service Water), Rev 35 2016 Systems - In-Plant JPM K                                              NUREG 1021, Revision 10
Appendix C                                      Page 3 of 14                        Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Plant Drawing G-190199 (Service & Cooling Water Flow Diagram) Rev 72 Figure 9.2.1-1, Flow Diagram Service and Cooling Water, Rev 26 Handouts:                Handout 1: Blank Copy of Attachment 6 of AOP-022.
Handout 2: Figure 9.2.1-1, Flow Diagram Service and Cooling Water, with the leak location marked.
Time Critical Task:      NO Validation Time:        14 minutes Critical Step Justification Step 1        This step is critical because closing either SW-18 or SW-19 is necessary to isolate the ruptured header from intact header.
Step 2        This step is critical because closing SW-740 and SW-102 is necessary to isolate the ruptured header from intact header.
Step 4        This step is critical because placing Instrument Air Compressor B in OFF is necessary to prevent damage to the compressor.
Step 7        This step is critical because cross-connecting the Booster Pump Suction is necessary to isolate the leak and align cooling water to critical loads (SW-25 must be closed to prevent reinitiating the leak, SW-26 and SW-27 must be opened to supply cooling water to vital equipment, SW-503 must be closed to prevent reinitiating the leak and SW-200A must be opened to provide emergency make up to the IVSW Tank).
Step 9        This step is critical because Closing SW-53 and Opening SW-83 is necessary to align cooling water to critical loads (EDGs).
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10


AOP-022 (Loss of Service Water), Rev 35 Appendix C Page 3 of 14 Form ES-C-1 Job Performance Measure Worksheet 2016 Systems
Appendix C                                     Page 4 of 14                       Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)
- In-Plant JPM K NUREG 1021, Revision 10 OMM-0 22 (Emergency Operating Procedures User's Guide), Rev 45  Plant Drawing G-190199 (Service & Cooling Water Flow Diagram)
Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.
Rev 72  Figure 9.2.1
START TIME:
-1, Flow Diagram Service and Cooling Water, Rev 26 Handouts: Handout 1: Blank Copy of Attachment 6 of AOP-022. Handout 2: Figure 9.2.1
CAUTION Electrically rated boots and gloves must be worn in the Auxiliary Building where flooding is in progress.
-1, Flow Diagram Service and Cooling Water , with the leak location marked
NOTE Dielectric rubber boots and low voltage electrical gloves are available in the AOP/DSP/EOP Equipment storage Locker inside the Auxiliary Building.
. Time Critical Task:
STEP 1:          Close One Of The Following Valves In The Auxiliary Building              CRITICAL Hallway :                                                                    STEP
NO  Validation Time:
* SW-18, North & South Supply HDR X-Conn (Chain Operated)
14 minutes      Critical Step Justification Step 1 This step is critical because closing either SW-18 or SW-19 is necessary to isolate the ruptured header from intact header
OR
. Step 2 This step is critical because closing SW
* SW-19, North & South Supply HDR X-Conn (Chain Operated)
-740 and SW
(Step 1)
-102 is necessary to isolate the ruptured header from intact header
___ SAT STANDARD:        The operator pulls either the SW-18 or SW-19 chain operator to rotate valve handwheel in the clockwise direction, and observes the area for water.
. Step 4 This step is critical because placing Instrument Air Compressor "B" in OFF is necessary to prevent damage to the compressor
___ UNSAT AS FOUND:        Both Valves Are Open EXAMINERS CUE:                  The operator reads the Caution and Note, and proceeds.
. Step 7 This step is critical because cross-connecting the Booster Pump Suction is necessary to isolate the leak and align cooling water to critical loads (SW-25 must be closed to prevent reinitiating the leak , SW-26 and SW-27 must be opened to supply cooling water to vital equipment , SW-503 must be closed to prevent reinitiating the leak and SW
After locating and describing how either valve would be closed then indicate the selected valve has been rotated full clockwise and the pointer indicates Closed.
-200A must be opened to provide emergency make up to the IVSW Tank
IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
). Step 9 This step is critical because Closing SW-53 and Opening SW-83 is necessary to align cooling water to critical loads (EDGs). 
EXAMINERS NOTE:                  The valve handwheels face opposite directions.
Ensure operator turns the selected handwheel via the chain in the proper direction.
COMMENTS:
2016 Systems - In-Plant JPM K                                          NUREG 1021, Revision 10


Appendix C Page 4 of 14 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
Appendix C                                     Page 5 of 14                       Form ES-C-1 PERFORMANCE INFORMATION NOTE SW-102 is located overhead East of CCW Pump B on top of horizontal header supported by adjustable pipe support.
- In-Plant JPM K NUREG 1021, Revision 10 (Critical Steps are identified as such in right-hand column
STEP 2:       Close The Following Valves In The CCW Pump Room:                           CRITICAL STEP
)  Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout s 1-2. START TIME:
* SW-740, CCW Heat Exchanger "B" Return
CAUTION Electrically rated boots and gloves must be worn in the Auxiliary Building where flooding is in progress. NOTE Dielectric rubber boots and low voltage electrical gloves are available in the AOP/DSP/EOP Equipment storage Locker inside the Auxiliary Building.
* SW-102, HVH-7B Supply (Step 2)
STEP 1: Close One Of The Following Valves In The Auxiliary Building Hallway :  SW-18, North & South Supply HDR X
STANDARD:       The operator reads the Note, and proceeds.                               ___ SAT The operator rotates the SW-740 and SW-102 handwheels in the clockwise direction.
-Conn (Chain Operated)
___ UNSAT AS FOUND:       Both Valves Open (SW-740 Pointer Indicates POS 1 And SW-102 Stem Is Fully Withdrawn).
OR  SW-19, North & South Supply HDR X
EXAMINERS CUE:                   After locating and describing how both valves would be closed, indicate the valves have been rotated full clockwise, the SW-740 pointer indicates Closed and the SW-102 stem is fully inserted.
-Conn (Chain Operated)
EXAMINERS NOTE:                 SW-102 is located overhead east of CCW Pump B on top of horizontal header supported by adjustable pipe support.
(Step 1)  STANDARD: The operator pulls either the SW-18 or SW-19 chain operator to rotate valve handwheel in the clockwise direction, and observes the area for water
. AS FOUND: Both Valves Are Open EXAMINER'S CUE:
The operator reads the Caution and Note, and proceeds. After locating and describing how either valve would be closed then indicate the selected valve has been rotated full clockwise and the pointer indicates "Closed".
IF asked i f any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
EXAMINER'S NOTE:
The valve handwheels face opposite directions. Ensure operator turns the selected handwheel via the chain in the proper direction.
COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 5 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM K NUREG 1021, Revision 10 NOTE SW-102 is located overhead East of CCW Pump B on top of horizontal header supported by adjustable pipe support.
STEP 2: Close The Following Valves In The CCW Pump Room:
SW-740, CCW Heat Exchanger "B" Return SW-102, HVH-7B Supply (Step 2) STANDARD: The operator reads the Note, and proceeds.
The operator rotates the SW-740 and SW
-102 handwheels in the clockwise direction.
AS FOUND: Both Valves Open (SW
-740 Pointer Indicates "POS 1" And SW-102 Stem Is Fully Withdrawn).
EXAMINER'S CUE:
After locating and describing how both valves would be closed, indicate the valves have been rotated full clockwise, the SW
-740 pointer indicates "Closed" and the SW
-102 stem is fully inserted.
EXAMINER'S NOTE:
SW-102 is located overhead east of CCW Pump "B" on top of horizontal header supported by adjustable pipe support.
SW-102 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
SW-102 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
COMMENTS:
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10


COMMENTS:    CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 6 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                   Page 6 of 14                   Form ES-C-1 PERFORMANCE INFORMATION STEP 3:       Notify Control Room Personnel That Steps 1 And 2 of Attachment 6 Are Complete (Step 3)                                                             ___ SAT STANDARD:     The operator contacts the Control Room and reports Steps 1 and 2 of Attachment 6 are complete.
- In-Plant JPM K NUREG 1021, Revision 10 STEP 3: Notify Control Room Personnel That Steps 1 And 2 of Attachment 6 Are Complete (Step 3) STANDARD: The operator contacts the Control Room and reports Steps 1 and 2 of Attachment 6 are complete.
___ UNSAT AS FOUND:     NONE EXAMINERS CUE:               When contacted, as CRS then acknowledge the report from the operator EXAMINERS NOTE:               NONE COMMENTS:
AS FOUND: NONE EXAMINER'S CUE:
STEP 4:       Place Instrument Air Compressor B Control Switch In The OFF           CRITICAL Position                                                                 STEP (Step 4)
When contacted, as CRS then acknowledge the report from the operator EXAMINER'S NOTE:
STANDARD:     The operator places the Instrument Air Compressor B Control Switch in OFF position
NONE COMMENTS:
___ SAT AS FOUND:     IA Compressor B Control Switch is in AUTO EXAMINERS CUE:               After locating and describing how the B IA compressor would be placed in OFF indicate the   ___ UNSAT Control Switch has been rotated to the middle position OFF.
___ SAT    ___ UNSAT  STEP 4: Place Instrument Air Compressor B Control Switch In The OFF Position (Step 4) STANDARD: The operator places the Instrument Air Compressor "B" Control Switch in OFF position AS FOUND: IA Compressor B Control Switch is in AUTO EXAMINER'S CUE:
EXAMINERS NOTE:               NONE COMMENTS:
After locating and describing how the "B" IA compressor would be placed in "OFF" indicate the Control Switch has been rotated to the middle position "OFF".
2016 Systems - In-Plant JPM K                                     NUREG 1021, Revision 10
EXAMINER'S NOTE:
NONE COMMENTS:       CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 7 of 14 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems
- In-Plant JPM K NUREG 1021, Revision 10 CAUTION  Subsequent actions to cross
-connect cooling water to plant components should not be performed if the leak will be reinitiated.
NOTE  SW-53, North Supply HDR To "B" TRN Components In Aux Bldg, is located in Auxiliary Building hallway, midway between Instrument Air Dryers A and B, above third cable tray.
STEP 5: Check leak location
- Downstream of SW
-53. (Step 5)  STANDARD: The operator reads the caution and Note, and proceeds.
The operator uses the SW flow diagram marked with the leak location (Handout 2), and observes the area for water and determines leak is NOT Downstream of SW
-53; and goes to step 5 RNO which directs the operator to Step 9  AS FOUND: NONE  EXAMINER'S CUE:
IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
EXAMINER'S NOTE:
NONE COMMENTS:          ___ SAT    ___ UNSAT Appendix C Page 8 of 14 Form ES-C-1  PERFORMANCE INFORMATION 2016 Systems  
- In-Plant JPM K NUREG 1021, Revision 10 STEP 6:  Check Leak Location
- Upstream of SW
-25, North HDR Supply To SW Booster Pump (Step 9)  STANDARD: The operator determines the leak is upstream of SW
-25. AS FOUND: NONE EXAMINER'S CUE:
IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.


EXAMINER'S NOTE:
Appendix C                                    Page 7 of 14                      Form ES-C-1 PERFORMANCE INFORMATION CAUTION Subsequent actions to cross-connect cooling water to plant components should not be performed if the leak will be reinitiated.
NONE  COMMENTS:        ___ SAT    ___ UNSAT  NOTE   SW Booster Pump B may be operated as required after the suction path is established from the South Service Water Header.
NOTE SW-53, North Supply HDR To "B" TRN Components In Aux Bldg, is located in Auxiliary Building hallway, midway between Instrument Air Dryers A and B, above third cable tray.
Closing SW
STEP 5:          Check leak location - Downstream of SW-53.
-503, SW Pump Supply To IVSW Tank, also isolates SW to the Penetration Coolers.
(Step 5)
STANDARD:        The operator reads the caution and Note, and proceeds.
The operator uses the SW flow diagram marked with the leak            ___ SAT location (Handout 2), and observes the area for water and determines leak is NOT Downstream of SW-53; and goes to step 5 RNO which directs the operator to Step 9
___ UNSAT AS FOUND:              NONE EXAMINERS CUE:                  IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
EXAMINERS NOTE:                  NONE COMMENTS:
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10


Appendix C Page 9 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 8 of 14                       Form ES-C-1 PERFORMANCE INFORMATION STEP 6:       Check Leak Location - Upstream of SW-25, North HDR Supply To SW Booster Pump (Step 9)
- In-Plant JPM K NUREG 1021, Revision 10 STEP 7: Cross-Connect SW Booster Pump Suction Supply As Follows:
___ SAT STANDARD:     The operator determines the leak is upstream of SW-25.
: a. Close SW-25, North HDR Supply To SW Booster Pumps
AS FOUND:      NONE
: b. Open SW-26, SW Booster Pump Suction Cross
___ UNSAT EXAMINERS CUE:                IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.
-Connect c. Open SW-27, SW Booster Pump Suction Cross
EXAMINERS NOTE:              NONE COMMENTS:
-Connect d. Close SW-503, SW Pump Supply To IVSW Tank
NOTE
: e. Open SW-200A, SWBP "A" TO IVSW Tank Supply (Step 10)  STANDARD: The operator reads the Notes, and proceeds.
* SW Booster Pump B may be operated as required after the suction path is established from the South Service Water Header.
The operator rotates the T-handle locking device counter
* Closing SW-503, SW Pump Supply To IVSW Tank, also isolates SW to the Penetration Coolers.
-clockwise on SW-25, and rotates the handwheel clockwise.
2016 Systems - In-Plant JPM K                                      NUREG 1021, Revision 10
The operator rotates the T-handle locking device counter
-clockwise on SW-26, and rotates the handwheel counter
-clockwise.


The operator rotates the T-handle locking device counter
Appendix C                                  Page 9 of 14                      Form ES-C-1 PERFORMANCE INFORMATION STEP 7:      Cross-Connect SW Booster Pump Suction Supply As Follows:                CRITICAL
-clockwise on SW-27, and rotates the handwheel counter
: a. Close SW-25, North HDR Supply To SW Booster Pumps                      STEP
-clockwise.
: b. Open SW-26, SW Booster Pump Suction Cross-Connect
: c. Open SW-27, SW Booster Pump Suction Cross-Connect
: d. Close SW-503, SW Pump Supply To IVSW Tank
: e. Open SW-200A, SWBP "A" TO IVSW Tank Supply (Step 10)                                                          ___ SAT STANDARD:    The operator reads the Notes, and proceeds.
___ UNSAT The operator rotates the T-handle locking device counter-clockwise on SW-25, and rotates the handwheel clockwise.
The operator rotates the T-handle locking device counter-clockwise on SW-26, and rotates the handwheel counter-clockwise.
The operator rotates the T-handle locking device counter-clockwise on SW-27, and rotates the handwheel counter-clockwise.
The operator rotates the SW-503 handwheel clockwise.
The operator rotates the SW-503 handwheel clockwise.
The operator rotates the SW-200A handwheel counter
The operator rotates the SW-200A handwheel counter-clockwise.
-clockwise.
AS FOUND:     SW-25 & SW-503, OPEN SW-26, SW-27 & SW-200A, CLOSED EXAMINERS CUE:               After locating and describing how each valve would be operated then indicate the selected valve has been rotated full counter-clockwise and the stem is fully withdrawn for the OPEN valves and rotated full clockwise with the stem fully inserted for the CLOSED valves SW-26 and 200A is located above the A SW Booster Pump.
AS FOUND: SW-25 & SW-503 , OPEN SW-26, SW-27 & SW-200A , CLOSED EXAMINER'S CUE:
SW-503 is located above the vent duct above the B SW Booster Pump, and requires a ladder.
After locating and describing how each valve would be operated then indicate the selected valve has been rotated full counter-clockwise and the stem is fully withdrawn for the "OPEN" valves and rotated full clockwise with the stem fully inserted for the "CLOSED" valves SW-26 and 200A is located above the A SW Booster Pump. SW-503 is located above the vent duct above the B SW Booster Pump, and requires a ladder.
EXAMINERS NOTE:             NONE COMMENTS:
EXAMINER'S NOTE:
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10
NONE COMMENTS:   CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 10 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
 
- In-Plant JPM K NUREG 1021, Revision 10 STEP 8: Notify Control Room Personnel That Step 10 Is Complete And SW Has Been Cross
Appendix C                                   Page 10 of 14                   Form ES-C-1 PERFORMANCE INFORMATION STEP 8:         Notify Control Room Personnel That Step 10 Is Complete And SW Has Been Cross-Connected To Supply SW Booster Pump B (Step 11)
-Connected To Supply SW Booster Pump B (Step 11)   STANDARD: The operator contacts the Control Room and reports SW has been cross-connected to supply SW Booster Pump "B".
___ SAT STANDARD:       The operator contacts the Control Room and reports SW has been cross-connected to supply SW Booster Pump B.
AS FOUND: NONE EXAMINER'S CUE:
___ UNSAT AS FOUND:       NONE EXAMINERS CUE:                   When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE:                   NONE COMMENTS:
When contacted, as CRS acknowledge the report from the operator EXAMINER'S NOTE:
NOTE
NONE COMMENTS:           ___ SAT    ___ UNSAT  NOTE   SW-83, Diesel Supply Cross
* SW-83, Diesel Supply Cross-Connect, is located at the North end of Emergency Diesel Generator A.
-Connect, is located at the North end of Emergency Diesel Generator A. Cross-connecting Service Water to the Emergency Diesel Generators will also cross
* Cross-connecting Service Water to the Emergency Diesel Generators will also cross-connect Service Water to HVH-6B, HVH-8B, and Instrument Air Compressor B.
-connect Service Water to HVH
* A ladder is required for access to SW-53, North Supply HDR To "B" TRN Components In Aux BLDG.
-6B, HVH-8B, and Instrument Air Compressor B. A ladder is required for access to SW
2016 Systems - In-Plant JPM K                                    NUREG 1021, Revision 10
-53, North Supply HDR To "B" TRN Components In Aux BLDG.
 
Appendix C Page 11 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
Appendix C                                 Page 11 of 14                         Form ES-C-1 PERFORMANCE INFORMATION STEP 9:       Cross-Connect Service Water Supply To EDGs AS Follows:                   CRITICAL STEP
- In-Plant JPM K NUREG 1021, Revision 10 STEP 9: Cross-Connect Service Water Supply To EDGs AS Follows:
: a. Close SW-53
: a. Close SW-53 b. Open SW-83 (Step 12) STANDARD: The operator reads the Notes, and proceeds.
: b. Open SW-83 (Step 12)
The operator rotates the SW-53 handwheel in the clockwise direction.
STANDARD:     The operator reads the Notes, and proceeds.                             ___ SAT The operator rotates the SW-53 handwheel in the clockwise direction.
The operator rotates the SW-8 3 handwheel in the counter
___ UNSAT The operator rotates the SW-83 handwheel in the counter-clockwise direction.
-clockwise direction.
AS FOUND:     SW-53 is OPEN, SW-83 is CLOSED EXAMINERS CUE:               After locating and describing how each valve would be operated indicate that the SW-53 handwheel has been rotated full clockwise and the stem is fully inserted, and that the SW-83 handwheel has been rotated full counter-clockwise with the stem fully withdrawn.
AS FOUND: SW-53 is OPEN, SW-83 is CLOSED EXAMINER'S CUE:
EXAMINERS NOTE:             SW-53 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
After locating and describing how each valve would be operated indicate that the SW
There is a label identifying the location of SW-53 on the vent duct above the walkway between the IA Dryers A and B.
-53 handwheel has been rotated full clockwise and the stem is fully inserted, and that the SW
-83 handwheel has been rotated full counter
-clockwise with the stem fully withdrawn.
EXAMINER'S NOTE:
SW-53 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.
There is a label identifying the location of SW
-53 on the vent duct above the walkway between the IA Dryers A and B.
SW-83 is located in the A EDG Vault Room. This room requires Control Room/WCCS permission to enter the room. The examiner will either need to get permission to enter, or open the door and observe the valve without entering the room (The valve can be seen from the open doorway).
SW-83 is located in the A EDG Vault Room. This room requires Control Room/WCCS permission to enter the room. The examiner will either need to get permission to enter, or open the door and observe the valve without entering the room (The valve can be seen from the open doorway).
COMMENTS:   CRITICAL STEP    ___ SAT    ___ UNSAT Appendix C Page 12 of 14 Form ES-C-1 PERFORMANCE INFORMATION 2016 Systems
COMMENTS:
- In-Plant JPM K NUREG 1021, Revision 10 STEP 10: Notify Control Room Personnel That SW Has Been Cross
2016 Systems - In-Plant JPM K                                        NUREG 1021, Revision 10
-Connected To Supply The Following Equipment:
 
EDG B Instrument Air Compressor B HVH-6B HVH-8B (Step 13) STANDARD: The operator contacts the Control Room and reports that SW has been cross
Appendix C                                 Page 12 of 14                     Form ES-C-1 PERFORMANCE INFORMATION STEP 10:     Notify Control Room Personnel That SW Has Been Cross-Connected To Supply The Following Equipment:
-connected to supply the above equipment AS FOUND: NONE EXAMINER'S CUE:
* EDG B
When contacted, as CRS acknowledge the report from the operator EXAMINER'S NOTE: NONE COMMENTS:       ___ SAT    ___ UNSAT  STEP 11: Notify Control Room Personnel That Attachment 6 Is Complete (Step 14) STANDARD: The operator contacts the control room and reports that Attachment 6 is complete AS FOUND: NONE EXAMINER'S CUE: When contacted, as CRS acknowledge that Attachment 6 is complete EXAMINER'S NOTE:
* Instrument Air Compressor B                                         ___ SAT
NONE COMMENTS:       ___ SAT    ___ UNSAT          Terminating Cue:
* HVH-6B
Evaluation on this JPM is complete.
* HVH-8B (Step 13)
___ UNSAT STANDARD:     The operator contacts the Control Room and reports that SW has been cross-connected to supply the above equipment AS FOUND:     NONE EXAMINERS CUE:                 When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE:               NONE COMMENTS:
STEP 11:       Notify Control Room Personnel That Attachment 6 Is Complete (Step 14)
STANDARD:     The operator contacts the control room and reports that Attachment   ___ SAT 6 is complete AS FOUND:     NONE
___ UNSAT EXAMINERS CUE:                 When contacted, as CRS acknowledge that Attachment 6 is complete EXAMINERS NOTE:               NONE COMMENTS:
Terminating Cue:               Evaluation on this JPM is complete.
STOP TIME:
STOP TIME:
2016 Systems - In-Plant JPM K                                      NUREG 1021, Revision 10


Appendix C Page 13 of 14 Form ES-C-1 VERIFICATION OF COMPLETION 2016 Systems
Appendix C                             Page 13 of 14                   Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.:   2016 Systems - In-Plant JPM K Examinees Name:
- In-Plant JPM K NUREG 1021, Revision 10 Job Performance Measure No.:
20 1 6 Systems - In-Plant JPM K   Examinee's Name:
Date Performed:
Date Performed:
Facility Evaluator:
Facility Evaluator:
Line 5,010: Line 3,753:
Time to Complete:
Time to Complete:
Question Documentation:
Question Documentation:
Result:                      SAT              UNSAT Examiners Signature:                                      Date:
2016 Systems - In-Plant JPM K                                NUREG 1021, Revision 10


Result:  SAT  UNSAT    Examiner's Signature:
Appendix C                                                             Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:
Date:
* The plant is at 100% power.
Appendix C Form ES-C-1 JPM CUE SHEET NUREG 1021, Revision 10 INITIAL CONDITIONS:
* The North SW header has ruptured inside the Auxiliary Building.
The plant is at 100% power.
* The Control Room has implemented AOP-022 (Loss of Service Water) for a leak in the North header.
The North SW header has ruptured inside the Auxiliary Building.
INITIATING CUE:     The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.
The Control Room has implemented AOP
NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.
-022 (Loss of Service Water) for a leak in the North header.
NUREG 1021, Revision 10}}
 
INITIATING CUE:
The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022. NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.}}

Revision as of 19:45, 30 October 2019

(11) Robinson 2016-301 Final Simulator and in Plant JPMs
ML16125A066
Person / Time
Site: Robinson 
Issue date: 04/27/2016
From:
Division of Reactor Safety II
To:
Duke Energy Progress
References
50-261/OL-16-301
Download: ML16125A066 (159)


Text

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM A Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM A (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 22 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Operation With High Switchyard JPM No.: 2016 Systems - Control Voltage Room JPM A (Alternate Path)

K/A

Reference:

062 A2.08 (2.7/3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Plant is at 100% power.
  • Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
  • You are the BOP.
  • D IAC is in service with A and B IACs in AUTO.
  • The DSDG is secured and aligned for AUTO.
  • The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.

Initiating Cue: The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 3 of 22 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3) in an effort to lower Switchyard Voltage; and when Breaker 50/20 fails to automatically OPEN, the operator will manually open it per AOP-31. Ultimately, the voltage on 480V Bus E-2 will be lowered to less than 502 volts.

Required Materials: None General

References:

AOP-031 (Operation with High Switchyard Voltage), Rev 15 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Control Room Copy of AOP-031 marked up for this JPM to Step 21.

Time Critical Task: NO Validation Time: 11 minutes Critical Step Justification Step 21 This step is critical because inserting the synchroscope key into 4 KV TIES Synchroscope Key Switch is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).

Step 22 This step is critical because placing the Synchroscope Switch to the BUS 3 & 4 position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).

Step 24 This step is critical because momentarily placing the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).

Alternate Path Critical Step Justification Step 27 This step is critical because depressing the THINK pushbutton and placing the control switch for BKR 52/20 to the OPEN (TRIP) position is necessary to manually open Breaker 52/20.

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 4 of 22 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ A as follows:
  • ICO V4160B4BRK20 f:TRIP_FAIL, (Breaker 52/20 Fails to Auto OPEN)
  • IMF EPS09 f:239.25, (Overvoltage on Bus E-2; > 506 Volts, due to High Switchyard Voltage)
  • (Conditional) $006_52_20_TRIP DCO V4160B4BRK20 (Remove Breaker 52/20 failure on Control Switch to TRIP)
2. Reset simulator to IC-5, 100% Power.
3. Place in RUN and allow time to stabilize.
4. Execute Scenario File 006_JPM_ A
5. Ensure that the following components are aligned:
  • C Charging Pump is RUNNING
  • HVH-3 and HVH-4 are RUNNING
  • HVA-1B is RUNNING
  • HVH-5B is OFF
  • HVE-2B is OFF
6. Call up QP E1E2 at the BOP Desk.
7. Perform the actions of AOP-31 up to Step 21.
8. Stabilize the plant.
9. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-600 (July, 2015).
2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
3. Call up QP E1E2 at the BOP Desk.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 5 of 22 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Check Emergency Bus E-2 Voltage - Greater than 505 Volts (Step 21).

___ SAT STANDARD: The operator observes ERFIS (QP E1E2) and recognizes that Bus E-2 Voltage is approximately 506.5 volts.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: Transferring the following safety related components will cause voltage to rise. This step is designed to protect components.

STEP 2: Check Instrument Air as follows:

a. Check Instrument Air Compressor B - Running in Manual

___ SAT (Step 22.a.)

RNO: Go to Step 23

___ UNSAT STANDARD: The operator reads the Note, and proceeds.

The operator recognizes that Instrument Air Compressor B is in AUTO as stated in the Initial Cue. The operator addresses the RNO.

EXAMINERS CUE: If the operator requests status of IAC B, remind the operator that the Cue sheet stated that IACs A and B were in AUTO.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the AO, as the AO, report that IAC A and B are in AUTO.

COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 6 of 22 Form ES-C-1 PERFORMANCE INFORMATION NOTE: For conditions where it may not be possible to reduce emergency bus voltages below 505 volts AND running of the EDG is required to ensure that the EDG is operable, testing of the EDG may be performed with concurrence from the system engineer if the system engineer determines that such testing does not constitute a long term degradation risk.

STEP 3: Check EDG B Status as Follows:

a. Check Main Generator - ON LINE (Step 23.a.)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that

___ UNSAT the Main Generator is ON Line.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: Check EDG B Status as Follows:

b. Check EMERGENCY DIESEL GENERATOR B - RUNNING (Step 23.b.)

___ SAT STANDARD: The operator observes the B EDG Green OFF status light is LIT and concludes that the B EDG is NOT running.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 7 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Check EDG B Status as Follows:

b. RNO: Postpone EDG B testing while in the AOP. Go to Step
24. Check EMERGENCY DIESEL GENERATOR B - RUNNING ___ SAT (Step 23.b. RNO)

STANDARD: The operator proceeds to Step 24. ___ UNSAT EXAMINERS CUE: If the operator informs the CRS to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the System Engineer to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the System Engineer.

COMMENTS:

STEP 6: Log the Time That Any of the Following Equipment Is OR Was Running Above 505 Volts.

  • INSTRUMENT AIR COMPRESSOR B
  • EDG B PRE-LUBE OIL PUMP ___ SAT
  • Fuel Oil Transfer Pump B (Step 24)

STANDARD: The operator recognizes that NONE of these components are ___ UNSAT running.

EXAMINERS CUE: Inform operator that another operator will track the run times.

EXAMINERS NOTE: The B IAC is in AUTO and the B EDG is NOT RUNNING.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 8 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Check Load On Emergency Bus E HAS BEEN RAISED USING STEP 18.

(Step 25)

Go to Step 27 ___ SAT (Step 25 RNO)

STANDARD: The operator recognizes that load on Emergency Bus E-1 has NOT been raised based on information given in the Initial Cue. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This would have been completed in Step 18 of AOP-031, which was bypassed.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 8: Raise Load On Emergency BUS E-2 As Follows:

a. Check Charging Pump C - Running

___ SAT (Step 27.a)

STANDARD: The operator observes the C Charging Pump Red status light is LIT and the Green status light is OFF (Or equivalent) and concludes ___ UNSAT that Charging Pump C is running.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 9 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Raise Load On Emergency BUS E-2 As Follows:

b. Verify CV RECIRC FANS - RUNNING

- HVH-3

___ SAT

- HVH-4 (Step 27.b)

___ UNSAT STANDARD: The operator observes the HVH-3 Red ON status light is LIT and concludes that HVH-3 is running.

The operator observes the HVH-4 Red ON status light is LIT and concludes that HVH-4 is running.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 10: Check CONT RM AIR HANDLING HVA-1B - RUNNING (Step 27.c)

___ SAT STANDARD: The operator observes the HVA-1B Red ON status light is LIT and concludes that HVH-1B is running.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 10 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: Check CRDM COOLING FAN, HVH-5B - RUNNING (Step 27.d)

___ SAT STANDARD: The operator observes the HVH-5B Green OFF status light is LIT and concludes that HVH-5B is NOT RUNNING, and proceeds to the RNO. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 12: Transfer CRDM COOLING FANS as follows:

1. Start HVH-5B
2. Stop HVH-5A (Step 27.d RNO)

___ SAT STANDARD: The operator places the HVH-5B control switch to START and observes the Red status light is LIT and the Green status light is OFF.

___ UNSAT The operator places the HVH-5A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: E-2 Voltage should lower to approx. 506.3 Volts.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 11 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 13: Check AUX BLDG EXH FAN, HVE-2B - RUNNING (Step 27.e)

___ SAT STANDARD: The operator observes the HVE-2B Green OFF status light is LIT and concludes that HVE-2B is NOT running, and proceeds to the RNO.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 14: Transfer AUX BLDG EXH FANs as follows:

1) Start HVE-2B
2) Stop HVE-2A (Step 27.e RNO)

___ SAT STANDARD: The operator places the HVE-2B control switch to START and observes the Red status light is LIT and the Green status light is ___ UNSAT OFF.

The operator places the HVE-2A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: E-2 Voltage should lower to approx. 506.2 Volts.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 12 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 15: Check RHR - IN SERVICE.

(Step 27. f)

___ SAT STANDARD: The operator recognizes that the plant is in Mode 1 and determines that RHR is NOT is IN SERVICE. The operator addresses the RNO and proceeds to Step 28.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 16: Check Emergency BUS E-2 Voltage - GREATER THAN 505 VOLTS (Step 28)

___ SAT STANDARD: The operator observes Bus E-2 Voltage on ERFIS to be greater than 505 Volts (506.2 volts).

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 13 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 17: Check DSDG Status As Follows:

a. Check Main Generator - ON LINE (Step 29.a)

___ SAT STANDARD: The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 18: Check DSDG Status As Follows:

b. Check DSDG - RUNNING (Step 29.b)

___ SAT STANDARD: The operator recognizes that DSDG is secured and aligned for AUTO as stated in the Initial Cue. The operator addresses the ___ UNSAT RNO.

EXAMINERS CUE: If the operator requests status of the DSDG, remind the operator that the Cue sheet stated that the DSDG was secured and aligned for AUTO.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the AO, as the AO, report that the DSDG is secured and aligned for AUTO.

COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 14 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 19: Check DSDG Status As Follows:

b. RNO: Postpone DSDG testing while in this AOP. Go to Step 30.

(Step 29.b RNO)

___ SAT STANDARD: The operator proceeds to step 30.

___ UNSAT EXAMINERS CUE: If operator informs the CRS to postpone DSDG testing while in this procedure, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the System Engineer to postpone DSDG testing while in this procedure, acknowledge as the System Engineer.

COMMENTS:

STEP 20: Check 4KV BUS 3-4 TIE, BKR 52 OPEN (Step 30)

___ SAT STANDARD: The operator observes 4KV BUS 3-4 TIE, BKR 52-19 Green status light is LIT and Red status light is OFF, and determines that BKR 52-19 IS OPEN. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52-19 indicates OPEN (TRIP) by GREEN light lit.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 15 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 21: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

a. Insert the Synchroscope Key into 4 KV TIES Synchroscope Key Switch

___ SAT (Step 31.a)

STANDARD: The operator inserts the synchroscope key into 4 KV TIES ___ UNSAT Synchroscope Key Switch.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 22: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

b. Place the Synchroscope Switch to the BUS 3 & 4 position (Step 31.b) ___ SAT STANDARD: The operator rotates the Synchroscope Switch clockwise to the BUS 3 & 4 position. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 16 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 23: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:

___ SAT

c. Verify the Synchroscope comes to approximately the 12 oclock position.

(Step 31.c)

___ UNSAT STANDARD: The operator observes that the Synchroscope is pointing to the 12 oclock position.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 24: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

d. Momentarily place the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position.

___ SAT (Step 31.d)

STANDARD: The operator momentarily places the control switch for BKR 52/19 ___ UNSAT to the CLOSE position.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 17 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 25: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:

___ SAT

e. Check BKR 52/19 - CLOSED (Step 31.e)

___ UNSAT STANDARD: The operator observes that the BKR 52/19 Red status light is LIT and the Green status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52-19 indicates CLOSED with RED light lit.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 26: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:

___ SAT

f. Check UNIT AUX TO 4 KV BUS 4 BKR, 52/20 - OPEN (Step 31.f)

___ UNSAT STANDARD: The operator observes that the BKR 52/20 Red status light has remained LIT and the Green status light has remained OFF; and concludes that BKR 52/20 has remained in the CLOSED position (Alternate Path). The operator will address the RNO.

EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52/20 indicates CLOSED with RED light lit.

BKR 52/20 should have automatically opened when BKR 52/19 was CLOSED (A failure has prevented it from doing so).

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 18 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 27: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

f. RNO: Perform the following
  • Simultaneously depress the THINK pushbutton AND ___ SAT place the control switch for BKR 52/20 to the OPEN position.

(Step 31.f RNO)

___ UNSAT STANDARD: The operator simultaneously depresses the THINK pushbutton and places the control switch for BKR 52/20 to the OPEN (TRIP) position, and observes that the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52/20 indicates OPEN (TRIP) with GREEN light lit. When this occurs Bus E-2 voltage will drop to 484.8 volts.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 19 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 28: Place the 4 KV TIES Synchroscope Key Switch to the mid position.

(Step 31.g)

STANDARD: The operator rotates the Synchroscope Switch counter-clockwise to

___ SAT the mid position.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 29: Check the following:

  • Emergency BUS E-1 Voltage - LESS THAN 505 VOLTS AND
  • Emergency BUS E-2 Voltage - LESS THAN 505 VOLTS (Step 32) ___ SAT STANDARD: The operator observes that Bus E-1 voltage is 488.9 volts.

___ UNSAT The operator observes that Bus E-2 voltage is 484.8 volts.

EXAMINERS CUE: When operator identifies that BOTH Bus E-1 and E-2 are less than 505 VOLTS inform the operator that this completes the JPM.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 20 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 30: Check Voltage as Follows: (Continuous Action Step)

  • APP-036-E3, SUT PRI OVER/UNDER VOLTAGE -

EXTINGUISHED AND

  • WEST 115KV BUS VOLTAGE - LESS THAN 119 KV ___ SAT AND
  • Emergency BUS E-1 Voltage - LESS THAN 502 VOLTS AND ___ UNSAT
  • Emergency BUS E-2 Voltage - LESS THAN 502 VOLTS (Step 33)

STANDARD: The operator observes that APP-036-E3 is DARK.

The operator observes that WEST 115KV BUS VOLTAGE is 18.8 KV.

The operator observes that Bus E-1 voltage is 488.9 volts.

The operator observes that Bus E-2 voltage is 484.8 volts.

EXAMINERS CUE: When operator identifies that BOTH Bus E-1 and E-2 are less than 502 VOLTS inform the operator that this completes the JPM.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 21 of 22 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM A Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • Plant is at 100% power.
  • Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
  • You are the BOP.
  • D IAC is in service with A and B IACs in AUTO.
  • The DSDG is secured and aligned for AUTO.
  • The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.

INITIATING CUE: The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM B Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM B (Rev_011216) NUREG 1021, Revision 10

Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Transfer From the FRV Bypass JPM No.: 2016 Systems - Control Valves to the FRVs Room JPM B (Alternate Path)

K/A

Reference:

059 A4.08 (3.2/2.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress with reactor power approximately 19%.
  • A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
  • The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
  • The Turbine is at 1800 RPM (Not synched to the Grid).
  • You are the operator assigned to control S/G water level.
  • Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.

Initiating Cue: The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.

Task Standard: The operator will place the C Feed Reg Valve in AUTO, and then take manual control of the B Feed Reg Valve and stabilize the B S/G level when it is determined that the B Feed Reg Valve has failed to control the B S/G level in AUTO.

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet Required Materials: None General

References:

GP-005 (Power Operation), Rev 128 AOP-010 (Main Feedwater/Condensate Malfunction), Rev 33 Handouts: Handout 1: Section 6.4 of GP-005 marked up for this JPM through Step 6.12.d for A and B FRVs.

Handout 2: Blank copy of AOP-010 Time Critical Task: NO Validation Time: 12 minutes NOTE: This JPM should be pre-briefed in the Briefing Room.

Critical Step Justification Step 2 This step is critical because adjusting the output of the FCV-499 controller is necessary to place the C Feed Reg Valve in AUTO.

Step 3 This step is critical because depressing the AUTO pushbutton on the FCV-498 controller is necessary to place the C Feed Reg Valve in AUTO.

Step 4 This step is critical because rotating the FCV-499 controller adjust knob counter-clockwise until the controller is at 0% is necessary to place the C Feed Reg Valve in AUTO.

Alternate Path Critical Step Justification Step 5 or 7 This step is critical because placing the FCV-488 controller in MANUAL and stabilizing the B S/G level is necessary to take manual control of the B Feed Reg Valve and stabilize the B S/G level.

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-3, 16% Power, Turbine Ready for Synch
2. Place in RUN.
3. Perform the following:
  • Adjust FRV Bypasses to 60-90% OPEN.
  • Override CLOSED FCV-1446 (1CFW094 f:normal)
4. Ensure the following:
  • Rx power is between 17-20%
  • Tavg is between 551-555°F
  • The C FRV Bypass Valve OPEN with 60-90% output demand
  • The C S/G level is within 2-4% of programmed level (39%)
  • The A and B FRV Controllers are in AUTO
  • The C FRV Controller is in MANUAL
  • FCV-1446 indicates SHUT
5. Insert $006_FRV_BYPASS IMF CFW17B d:5 r:90 f:0 (5 seconds after FCV-499 (C Feed Reg Bypass Valve) OPEN indication extinguishes)
6. Identify APP-003-D4, TAVE/TREF DEV, and an expected alarm (Green Dot)
7. Place Green Dots on all other LIT annunciators (Expected alarms)
8. Acknowledge alarms and stabilize plant.
9. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-601 (January, 2016).
2. Open Scenario File 006_JPM_B.
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE Section 6.4 Step 12 is a continuous action step that should be performed whenever plant conditions require Feedwater flow through the FRVs and conditions are suitable or automatic S/G water level control.

Feedwater Regulating Valves should be transferred to automatic control one at a time.

FCV-1446 (Condensate Recirc) is controlled by FS-1446 (Cond Pmp Recirc VLV Flow Switch). FS-1446 is set to open FCV-1446 at a flow of 1050 gpm with the valve closing at a Condensate System flow of 4200 gpm flow through the GS Condenser and SGBD Heat Exchangers.

The Push Button to reset FS-1446 is located in the same enclosure as FS-1446 which is located approximately 15 feet northwest of FCV-1446 on a concrete column.

STEP 1: WHEN Reactor Power is 15% to 20%, OR the Feedwater Regulating Bypass Valves are 60% to 90% demand signal, THEN shift each Feedwater Regulating Valve to AUTO as follows: ___ SAT

  • IF FCV-1446 (Condenser Recirc) does NOT indicate SHUT, THEN.

(Step 12/12.a).

___ UNSAT STANDARD: The operator reads the Notes, and proceeds.

The operator observes reactor power on NR-45 (or equivalent) to be 18%, and proceeds.

The operator observes that FCV-499 Controller output to be between 60-90%, and proceeds.

The operator observes the FCV-1446 Green status light is LIT and Red status light is OFF, and recognizes that this Step is NOT Applicable, and proceeds.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION NOTE With the Turbine not yet loaded, S/G Program Level will be approximately 39% based on First Stage Pressure.

STEP 2: Ensure Feed Flow is trending with Steam Flow and S/G Levels are CRITICAL within 1% of program level. STEP (Step 12.b).

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator observes C S/G Feed Flow is trending with Steam Flow, and that C S/G level is NOT within 1% of programmed level. ___ UNSAT The operator adjusts the output of the FCV-499 controller as needed to adjust the feed flow trend and/or C S/G level within 1% of programmed level.

EXAMINERS CUE: APP-003-D4, which is an expected alarm, may alarm during this time. If so, state that the OATC will address this alarm.

It may be necessary to provide this cue throughout the JPM.

EXAMINERS NOTE: S/G programmed level is 39%.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Depress the Auto pushbutton on the FRV controller. CRITICAL (Step 12.c) STEP STANDARD: The operator observes that C S/G level is within 1% of programmed level. ___ SAT The operator depresses the AUTO pushbutton on the FCV-498 controller, and observes the White AUTO light is LIT. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 4: IF ANY Feedwater Regulating Bypass Valve is NOT closed, THEN STEP slowly close it (Step 12.c.1)

___ SAT STANDARD: The operator observes FCV-499 to be OPEN, and rotates the controller adjust knob counter-clockwise, and observes the controller output move toward 0%.

___ UNSAT The operator observes the FCV-498 Red and Green status light is LIT, and the controller output start to rise from 0%.

EXAMINERS CUE: S/G level may drop as much as 5% while the FRV adjusts automatically, and this may result in an APP-006 deviation alarm (This is normal and expected).

However, the operator may take action per AOP-010, and place the FRV controller in MANUAL.

If so, when the C S/G level is under the operators control, report as I&C that troubleshooting has been conducted (Using time compression), and it has been determined that the FCV-498 controller is operating properly.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Ensure each FRV in AUTO is maintaining programmed S/G level. CRITICAL (Step 12.d) STEP STANDARD: The operator observes that C S/G level is stabilized and concludes that the C FRV (FCV-498) is maintaining programmed S/G level in ___ SAT AUTO.

The operator observes one or more of the following:

  • B Feed flow as indicated on FR-488 starts to lower ___ UNSAT
  • B S/G level as indicated on FR-488 starts to lower
  • FCV-488 controller output starts to lower
  • FCV-488 Green status light is LIT, Red status light is OFF
  • APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL (Alternate Path)

The operator depresses the MANUAL pushbutton on the FCV-488 controller, and observes the White AUTO light is Extinguished; and the B S/G is stabilized (i.e. under the operator control). (If so, Terminate JPM)

OR The operator addresses AOP-010. (If so, continue to subsequent Steps)

EXAMINERS CUE: If the operator addresses AOP-010, provide the operator with a copy of Handout 2, and continue.

EXAMINERS NOTE: 5 seconds after the C FRBV is closed the B FRV controller will fail causing FCV-488 to CLOSE.

The operator is expected to take manual control of FCV-488 using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.); or by entering AOP-010. If the operator addresses AOP-010, continue.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: CHECK FRVs OPERATING PROPERLY (MANUAL OR AUTO):

FCV478 FCV488 FCV498 ___ SAT (AOP-010 Step 1)

___ UNSAT STANDARD: The operator observes one or more of the following:

  • B Feed flow as indicated on FR-488 starts to lower
  • B S/G level as indicated on FR-488 starts to lower
  • FCV-488 controller output starts to lower
  • FCV-488 Green status light is LIT, Red status light is OFF
  • APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL The operator proceeds to Step 1 RNO.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 7: PERFORM the following: CRITICAL ENSURE FRV for affected S/G(s) in manual control. STEP ATTEMPT to stabilize S/G level using FRV and/or FRV Bypass Valves by matching steam flow with feed flow.

STOP any load change in progress.

If unable to control S/G level, THEN TRIP the reactor and GO TO ___ SAT EOPE0, Reactor Trip Or Safety Injection.

(AOP-010 Step 1 RNO)

___ UNSAT STANDARD: The operator places FCV-498 controller in MANUAL and stabilizes the B S/G level.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: CHECK Reactor Trip Setpoint BEING APPROACHED (AOP-010 Step 2)

___ SAT STANDARD: The operator observes that the B S/G level is stabilized.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 9: IF a reactor trip setpoint is approached, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.

GO TO Step 4. ___ SAT (AOP-010 Step 2 RNO)

STANDARD: The operator observes that the B S/G level is stabilized. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM B Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress with reactor power approximately 19%.
  • A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
  • The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
  • The Turbine is at 1800 RPM (Not synched to the Grid).
  • You are the operator assigned to control S/G water level.
  • Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.

INITIATING CUE: The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM C Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM C (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 17 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Restore PRT to Normal Operating JPM No.: 2016 Systems - Control Conditions Room JPM C (Alternate Path)

K/A

Reference:

007 A1.01 (2.9/3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.

Initial Conditions:

  • The plant is at 100% power.
  • APP-003-D3, PRT HI/LO LEVEL, has alarmed.
  • The cause of the low level is known leakage from the PRT to the RCDT.
  • PRT level is stable at 67%.

Initiating Cue:

  • The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
  • All of the prerequisites of Section 4.0 are complete.

Task Standard: The operator will refill the PRT in accordance with Section 8.2.2 of OP-103; and then diagnose and relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.

Required Materials: None General

References:

OP-103 (Pressurizer Relief Tank Control System), Rev 21 2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 3 of 17 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of OP-103 Time Critical Task: NO Validation Time: 10 minutes NOTE: This JPM should be pre-briefed in the briefing room.

Critical Step Justification Step 2 This step is critical because placing a PW Pump control switch to START is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 3 This step is critical because placing the RC-519C control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 4 This step is critical because placing the RC-519A and B control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 9 This step is critical because placing the RC-519A and B control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 10 This step is critical because placing the RC-519C control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Alternate Path Critical Step Justification Step 15 This step is critical because cycling RC-519C open and closed is necessary to relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 4 of 17 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ C as follows:
  • IOR doRCSAAO212d e:006_RC_519AB_OPEN f:ON (Over-Ride RC-519B to OPEN when Switch taken to OPEN)
  • IOR do CNMAOO086J e:006_519AB_OPEN f:OFF (Over-Ride RC-519A/B CIV Indication to OFF)

To be inserted after RC-519C is CLOSED during Initial Fill of PRT (JPM Step 12)

  • $006_RC_519C_OPEN DOR doRCSAAO212D (Removes Over-Ride for RC-519B when RC-519C is OPEN)
  • $600_RC_519C_OPEN DOR doCNMAOO086J (Removes Over-Ride on RC-519A/B CIV Indication)
2. Reset simulator to IC-5, 100% Power.
3. Place in RUN, execute Scenario File 006_JPM_C and allow time to stabilize.
4. Drain PRT to 67% (Open RC-523 until PRT level 67% and Close RC-523.
5. Verify PRT conditions as follows: 103°F temperature, 67% level and 3 psig pressure.
6. Stabilize the plant.
7. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-602 (July, 2015).
2. Scenario File 006_JPM_ C NOTE: Booth Instructor verify that two additional overrides are available to be inserted at Step 11 of this JPM.
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.

START TIME:

NOTE:

PRT temperatures of greater than 120°F should be reduced by alternately adding Primary Water to the PRT and draining the PRT. (SER 93-007)

Maximum cooling effect can be achieved by leaving the added Primary Water in the PRT for at least 10 minutes prior to draining. (SER 93-007)

STEP 1: Verify the following initial conditions are satisfied:

a. All prerequisites of Section 4.0 are complete
b. Pressurizer Relief Tank level is less than 80%. ___ SAT
c. Draining the PRT is NOT in progress.

(Step 8.2.2.1)

STANDARD: The operator reads the Notes, and proceeds. ___ UNSAT The operator Verifies all initial conditions satisfied (Initial Cue).

EXAMINERS CUE: If asked, section 4.0 prerequisites are complete.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION CAUTION Operating two Primary Water Pumps can cause inadvertent filling of the RCS if the RCS is depressurized and vented through a PORV when two Primary Water Pumps are operating. Water may makeup to the RCS via the PRT spargers if the PRT is filled faster than it can vent.

STEP 2: Verify a Primary Water Pump is OPERATING. CRITICAL (Step 8.2.2.2) STEP STANDARD: The operator reads the Caution, and proceeds.

___ SAT The operator observes the A and B Primary Water Pump Green status lights are LIT and the Red status lights are OFF, and determines that neither PW Pump is RUNNING.

___ UNSAT The operator places the A Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.

OR The operator places the B Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: The A Primary Water Pump is in AUTO, set-up for Auto Makeup.

The operator may start either the A or the B Primary Water Pump.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Open RC-519C, PW TO PRT ISO CRITICAL (Step 8.2.2.3) STEP STANDARD: The operator places the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF. ___ SAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE ___ UNSAT BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: Open RC-519A & B, PW TO CV ISO CRITICAL (Step 8.2.2.4) STEP STANDARD: The operator places and HOLDS the RC-519A & B Control Switch to OPEN and observes the Red status lights are LIT and the Green status ___ SAT lights are OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 8 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Monitor PRT for rising level (Step 8.2.2.5)

STANDARD: The operator observes rising PRT level on LI-470 or ERFIS. ___ SAT EXAMINERS CUE: NONE EXAMINERS NOTE: The normal PRT Level band is 70-80%. ___ UNSAT It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 6: IF the expected rise in level does NOT occur, THEN stop filling AND investigate.

(Step 8.2.2.6)

___ SAT STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: The normal PRT Level band is 70-80%.

It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 9 of 17 Form ES-C-1 PERFORMANCE INFORMATION NOTE: Increasing PRT level will cause PRT pressure to rise, possibly to the high pressure alarm setpoint of 5 psig.

STEP 7: Recognize/report PRT Hi Pressure alarm (APP-003 C3) received.

Monitors PRT pressure and reports value and that it is an expected alarm due to filling ___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator checks PRT pressure >5 psig due to filling, informs the ___ UNSAT CRS it is an expected alarm EXAMINERS CUE: As CRS, acknowledge report EXAMINERS NOTE: This is an expected alarm as the procedure note states. It is not expected that the operator will address the alarm and/or condition until after filling is completed. If the operator does address this alarm, if it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: WHEN PRT level is between 70% and 80%, THEN perform the following:

a. Stop the Primary Water Pump
b. Verify one Primary Water pump is in AUTO. ___ SAT (Step 8.2.2.7a&b)

STANDARD: If the A Primary Water Pump was previously started, the operator places the A Primary Water Pump Control Switch to STOP and ___ UNSAT observes the Green status light is LIT and the Red status light is OFF.

The operator places the A Primary Water Pump Control Switch to AUTO.

OR If the B Primary Water Pump was previously started, the operator places the B Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Close RC-519A & B CRITICAL (Step 8.2.2.7c) STEP STANDARD: The operator places and holds the RC-519A & B Control Switch to CLOSE and observes the RC-519A Green status light is LIT and the ___ SAT Red status light is OFF.

The operator observes that the RC-519B Red and Green status lights are LIT (Alternate Path - Mitigated in a later Step). ___ UNSAT The operator reports to the CRS that RC-519B has not fully CLOSED.

EXAMINERS CUE: As CRS, acknowledge report If a request is made to cycle RC-519A & B to attempt to verify RC-519B operation, as CRS then respond no do not cycle the valve EXAMINERS NOTE: A single Control Switch controls both valves BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 10: Close RC-519C CRITICAL (Step 8.2.2.7d) STEP STANDARD: The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF. ___ SAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE ___ UNSAT BOOTH OPERATOR CUE: Insert the last two commands IAW 006_JPM_C File to remove over-rides once RC-519C is closed.

COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 12 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: IF PRT level is greater than or equal to 83% OR PRT temperature is greater than 120°F, THEN lower the PRT level in accordance with the appropriate Section of this procedure, Draining the PRT When Pressurizer Temperature is Greater Than Or Equal to 200°F OR ___ SAT Draining the PRT When Pressurizer Temperature is Less Than 200°F. (Step 8.2.2.8)

STANDARD: The operator observes PRT level on LI-470 (or ERFIS) is <83% and ___ UNSAT PRT temperature on TI-471 (or ERFIS) is <120°F EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 12: IF RC-519A or RC-519B do NOT fully close, THEN relieve the hydraulic lock in accordance with the Relieving Hydraulic Lock on RC-519A AND RC-519B Section of this procedure (Alternate Path - RC-519B Hydraulic Lock has previously occurred and is Mitigated Here). ___ SAT (Step 8.2.2.9)

STANDARD: The operator reviews the OP-103 Table Of Contents and determines that Section 8.4.1 is required, and proceeds to this section. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: If the operator addresses APP-003-C3 prior to addressing the hydraulic lock, when it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORMATION NOTE: The RCS System Engineer WILL need to be NOTIFIED WHEN the following section is PERFORMED to relieve hydraulic lock on RC-519A AND RC-519B for Engineering Trending Purposes.

STEP 13: Relieving Hydraulic Lock on RC-519A AND RC-519B:

Verify the following initial conditions are satisfied:

a. RC-519A & B, PW TO CV ISO, control switch is in the CLOSE position and one OR both valves indicate in mid position. ___ SAT (Step 8.4.1.a)

STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator observes the RC-519A Green status light is LIT and the Red status light is OFF.

The operator observes the RC-519B Red and Green status lights are LIT.

EXAMINERS CUE: If the operator notifies the CRS or the System Engineer, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 14: Verify the Post Accident Sampling System is NOT in operation.

(Step 8.4.1.b)

STANDARD: Operator verifies PASS is not operating ___ SAT EXAMINERS CUE: If asked about the status of this system, ask the operator what they would expect the status to be in the current plant condition. THEN, indicate that the ___ UNSAT system is as expected.

EXAMINERS NOTE: The PASS is ONLY operated under accident conditions, which do NOT exist.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 15: IF RC-519B is indicating in mid position, THEN cycle RC-519C, PW CRITICAL TO PRT ISO STEP (Step 8.4.2)

STANDARD: The operator places the RC-519C Control Switch to OPEN and ___ SAT observes the Red status light is LIT and the Green status light is OFF.

The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF. ___ UNSAT The operator observes the RC-519B Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: If the operator informs the CRS of the valve position change, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 16: IF RC-519A is indicating in mid position, THEN perform the following:

a. Verify neither Primary Water Pump is OPERATING.
b. Close breaker 15 on Power Panel 27.
c. Open HCV-4176, CDT ISOLATION. ___ SAT
d. Open HCV-4174, PZR RELIEF TANK ISOLATION.
e. Close HCV-4176, CDT ISOLATION.
f. Close HCV-4174, PZR RELIEF TANK ISOLATION.
g. Open breaker 15 on Power Panel 27. ___ UNSAT (Step 8.4.1.3)

STANDARD: The operator recognizes the sub-steps under Section 8.4.1.3 are not applicable and annotates the steps with N/A EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: Power Panel 27 is located on the west side of the PASS panel.

STEP 17: IF RC-519A OR RC-519B is still indicating mid position, THEN declare the valve out of service AND refer to ITS LCO 3.6.3.

(Step 8.4.1.4)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator recognizes this step is N/A and marks it N/A

___ UNSAT EXAMINERS CUE: Inform the operator you will have another operator restore PRT pressure to normal EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM C Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100% power.
  • APP-003-D3, PRT HI/LO LEVEL, has alarmed.
  • The cause of the low level is known leakage from the PRT to the RCDT.
  • PRT level is stable at 67%.

INITIATING CUE:

  • The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
  • All of the prerequisites of Section 4.0 are complete.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM D Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM D (Rev_011216) NUREG 1021, Revision 10

Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Reactor Startup with Ejected Control JPM No.: 2016 Systems - Control Rod Room JPM D (Alternate Path)

K/A

Reference:

001 A1.06 (4.1/4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is stabilized at 2% power.
  • The RCS is at normal operating temperature and pressure.
  • A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
  • You are the OATC.
  • The BOP is temporarily outside the Control Room.

Initiating Cue: The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.

Task Standard: The operator will start to raise reactor power to 3-5%. Then, the operator will manually trip the reactor, attempt to manually actuate Safety Injection and manually start SI Pumps in response to an ejected rod.

Required Materials: None General

References:

GP-003 (Normal Plant Startup From Hot Shutdown to Critical), Rev 105 2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet APP-004 (First Out Reactor Trips), Rev 18 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 AOP-001 (Malfunction of Reactor Control System), Rev 33 AOP-016 (Excessive Primary Plant Leakage), Rev 23 AOP-019 (Malfunction of RCS Pressure Control), Rev 20 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Section 8.4 of GP-003 marked up for this JPM to Step 8.4.7.

Time Critical Task: NO Validation Time: 5 minutes NOTE: This JPM should be pre-briefed in the Briefing Room.

Critical Step Justification Step 1 This step is critical because placing the Manual Rod Control Switch to the OUT position is necessary to raise and then stabilize power between 3-5%.

Step 2 This step is critical because pressing one of two Rx Trip pushbuttons is necessary to manually trip the reactor.

Step 8 This step is critical because pressing BOTH SI pushbuttons is necessary to manually attempt to actuate SI.

Alternate Path Critical Step Justification Step 9 This step is critical because placing the A and the C SI Pump Control Switches to START is necessary to manually start SI Pumps in response to an ejected rod.

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ D as follows:
  • IMF SIS01A, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
  • IMF SIS01B, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
  • IMF RPS01A f:FAILURE_TO_OPEN, AUTO
  • IMF RPS01B f:FAILURE_TO_OPEN, AUTO
  • Event 1: $006_ROD_OUT_ARMED IMF CRF05A d:5 f:2000, H-8 (Ejected Control Rod)
2. Reset simulator to IC-1, 10-8amps IR and raise power to 2% and stabilize.
3. Place in RUN, execute Scenario File 006_JPM_D and allow time to stabilize.
4. Ensure actions of GP-003 up to Step 8.4.7 are complete.
5. Stabilize the plant.
6. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-603 (August, 2015).
2. Scenario File 006_JPM_ D
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: ADJUST control rods as necessary to achieve the following while CRITICAL continuing with this procedure: STEP RCS Tavg between 547°F and 551°F ___ SAT Reactor Power 3% to less than or equal to 5%.

(Step 8.4.8).

___ UNSAT STANDARD: The operator places the Manual Rod Control Switch to the OUT position to raise reactor power between 3-5%, and Tavg between 547°F and 551°F.

The operator will observe that an event unrelated to the reactor startup is occurring.

EXAMINERS CUE: NONE EXAMINERS NOTE: An Ejected Rod will occur shortly after the rod withdrawal has commenced.

Shortly afterwards, the following indications will be available to the operator:

  • SUR is positive and rising
  • Neutron flux is rising
  • RCS pressure is lowering
  • Pzr level is lowering
  • Charging Pump speed is rising COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Diagnose LOCA and manually trip Rx CRITICAL STEP STANDARD: The operator observes RTGB alarms and indications and manually trips the Rx by pressing one of two Rx Trip pushbuttons. ___ SAT The operator proceeds to EOP-E-0.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator may address one or more APPs, enter AOP-001, AOP-016, or AOP-019.

The operator may manually trip the reactor based on Attachment 3, Control Band and Trip Limit Guidance, of OMM-022, Emergency Operating Procedures Users Guide.

Since the first four actions of EOP-E-0 are Immediate Actions, the operator will likely NOT address the procedure (EOP-E-0) until the Immediate Actions are complete.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: CHECK Reactor Trip:

Reactor Trip AND Bypass Breakers OPEN Rod position indicators FULLY INSERTED Rod Bottom Lights ILLUMINATED ___ SAT Neutron Flux LOWERING (EOP-E-0 Step 1)

___ UNSAT STANDARD: The operator observes parameters and determines that the Rx is tripped.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: CHECK Turbine Trip:

Both Turbine Stop Valves CLOSED All MSR Purge AND Shutoff Valves CLOSED ___ SAT (EOP-E-0 Step 2)

STANDARD: The operator observes parameters and determines that the Turbine ___ UNSAT is tripped.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: CHECK Power To AC EMERGENCY BUSSES:

CHECK Bus E1 OR E2 AT LEAST ONE ENERGIZED CHECK Bus E1 AND E2 BOTH ENERGIZED (EOP-E-0 Step 3) ___ SAT STANDARD: The operator observes E-1/E-2 bus voltage and determines that both E-1 and E-2 are energized. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 6: CHECK SI Status:

CHECK if SI is actuated:

SI annunciators ANY ILLUMINATED ___ SAT OR SI equipment AUTO STARTED (EOP-E-0 Step 4/4.a)

___ UNSAT STANDARD: The operator observes SI annunciators are LIT, and proceeds.

EXAMINERS CUE: NONE EXAMINERS NOTE: If the SI annunciators are not lit, the operator will perform the step 4.a RNO (It is expected that the criteria to automatically actuate safety injection will either occur or be close to occurring during the performance of this step).

SI equipment will NOT auto start.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: CHECK BOTH trains of SI actuated:

SI Pumps TWO RUNNING RHR Pumps BOTH RUNNING ___ SAT (EOP-E-0 Step 4.b)

STANDARD: The operator observes the A and C SI Pumps Green status lights ___ UNSAT are LIT, and Red status lights are EXTINGUISHED.

The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED The operator proceeds to the RNO.

EXAMINERS CUE: NONE EXAMINERS NOTE: SI equipment will NOT auto start.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: Manually ACTUATE SI by depressing BOTH SI pushbuttons.

(EOP-E-0 Step 4.b RNO) CRITICAL STEP STANDARD: The operator presses BOTH SI pushbuttons. ___ SAT The operator observes the A and C SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.

___ UNSAT The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.

(Alternate Path).

EXAMINERS CUE: NONE EXAMINERS NOTE: Upon completion of the EOP-E-0 Immediate Actions the operator may obtain EOP-E-0 and verify the Immediate Actions, BEFORE proceeding.

If so, the operator will likely review the EOP-E-0 Foldout Page, as well.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Manually start both SI Pumps. CRITICAL (Step 5.3.1.c of OMM-022) STEP

___ SAT STANDARD: The operator places the A SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.

___ UNSAT The operator places the C SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.

EXAMINERS CUE: NONE EXAMINERS NOTE: This action may be taken at the time that the operator realizes that the manual SI actuation pushbuttons have failed to start the SI equipment using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.)

If the operator addresses EOP-E-0 to verify the Immediate Actions upon completion of Step 4, and the SI Pumps have NOT been started, the operator will address Attachment 1 (With the BOP out of the Control Room) and manually start the SI Pumps (Step 1 and Step 1 RNO).

BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM D Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is stabilized at 2% power.
  • The RCS is at normal operating temperature and pressure.
  • A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
  • You are the OATC.
  • The BOP is temporarily outside the Control Room.

INITIATING CUE: The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM E Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM E (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 18 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Transfer to Long Term Recirculation JPM No.: 2016 Systems -

Control Room JPM E (Alternate Path)

K/A

Reference:

EPE 011 EA1.11 (4.2/4.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A large break LOCA has occurred.
  • The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
  • RHR Cold Leg Recirculation flow is 3000 gpm.

Initiating Cue: The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.

THIS IS A TIME CRITICAL JPM Task Standard: The operator will align for Long Term Recirculation per EOP-ES-1.4, and align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.

Required Materials: None General

References:

EOP-ES-1.3 (Transfer to Cold Leg Recirculation), Rev 0 2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 3 of 18 Form ES-C-1 Job Performance Measure Worksheet EOP-ES-1.4 (Transfer to Long Term Recirculation), Rev 0 OMM-22 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Blank Copy of EOP-ES-1.4.

Time Critical Task: YES - Siemens fuel Analysis for LBLOCA, ESR 99- 00273 indicates that the operator must Restore Core cooling flow within 6 minutes when transferring to Piggy-Back Mode (Maximum of 6 minutes of no flow when transferring to the Piggy-Back Mode)

Validation Time: 10 minutes Critical Step Justification Step 3 This step is critical because placing the A RHR Pump Control Switch to STOP is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 4 This step is critical because placing the RHR-759A and 759B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 5 This step is critical because placing the SI-863B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 6 This step is critical because placing the SI-866A Control Switch to OPEN is OPEN is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 7 This step is critical because placing the SI-870A and B Control Switches to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 11 This step is critical because placing the A or C SI Pump Control Switch to START is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Alternate Path Critical Step Justification Step 10 This step is critical because placing the B RHR Pump Control Switch to START is necessary to align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 4 of 18 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ E as follows:
  • IOR diSISAAI201 f:CLOSE (RHR Loop Recirc SI-863A fails to OPEN)
2. Reset simulator to IC-28, (Cold Leg Recirculation).
3. Place in RUN, execute Scenario File 006_JPM_E and allow time to stabilize.
4. Perform the following:
  • Stop A Primary Water Pump and place in AUTO
  • CLOSE FCV-114A and place in AUTO
  • Place Controller FCV-114A in AUTO
5. Acknowledge alarms on RR-1 and APP-036.
6. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-604 (August, 2015).
2. Place Simulator in Run, acknowledge alarms on RR-1 and APP-036, and Freeze Simulator.
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when operator assumes the watch.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 5 of 18 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE: FOLDOUT for EOPES1.4 is in effect.

STEP 1: CHECK Condition Below ANY PRESENT APP001D4, RHR PIT A HIHI LEVEL ILLUMINATED OR ___ SAT APP001D5, RHR PIT B HIHI LEVEL ILLUMINATED OR EITHER RHR Pit level indication GREATER THAN 24 INCHES

___ UNSAT PERFORM the following:

MONITOR RHR Pit indications.

IF ANY of the RHR Pit level conditions noted occur, THEN GO TO EPP24, Isolation Of Leakage In The RHR Pump Pit.

GO TO Step 3.

(Step 1 and 1 RNO).

STANDARD: The operator reads the Note, and proceeds.

The operator reviews the Foldout Page Criteria.

The operator observes APP-001-D4 and D5 are extinguished, and that LI-615 A and B are both less than 24 inches; and determines that there is no RHR Pit leakage and proceeds to Step 3.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 6 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: DETERMINE Needed RHR Alignment:

CHECK RHR System alignment IN PIGGYBACK MODE

___ SAT OBSERVE the CAUTION prior to Step 5 AND GO TO Step 5.

(Step 3 and 3 RNO.)

___ UNSAT STANDARD: The operator observes SI-863A and B Green status lights are LIT, and Red status lights are OFF (Or equivalent) and determines that RHR is NOT in PIGGY-BACK Mode and proceeds to the Caution prior to Step 5.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Steps 5 through 8 must be performed without delay to minimize the time without flow through the core.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 7 of 18 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 3: ALIGN Equipment To Obtain The Following Conditions: STEP STOP ALL RHR Pumps (Step 5/5.a)

STANDARD: The operator reads the Caution, and proceeds. ___ SAT The operator places the A RHR Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light ___ UNSAT is OFF.

The operator observes the B RHR Pump Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: The operator will likely read through Steps 5-8 ahead of time before performing actions.

APP-001-A7, RHR HX LO FLOW, is an expected alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

TIME CRITICAL START TIME: ________

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 8 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: ALIGN Equipment To Obtain The Following Conditions: CRITICAL CLOSE RHR HX Discharge Valves STEP RHR759A RHR759B (Step 5/5.b) ___ SAT STANDARD: The operator places the RHR-759A Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light

___ UNSAT is OFF.

The operator places the RHR-759B Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 9 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: ALIGN Equipment To Obtain The Following Conditions: CRITICAL OPEN RHR Loop Recirc Valves STEP SI863A SI863B ___ SAT (Step 5/5.c)

STANDARD: The operator places the SI-863A Control Switch to OPEN and

___ UNSAT observes that the Green status light remains LIT and the Red status light remains OFF (Alternate Path - mitigated in subsequent steps).

The operator places the SI-863B Control Switch to OPEN and observes that the Red status light is LIT and the Green status light is OFF.

EXAMINERS CUE: If operator reports the failure of SI-863A to OPEN, acknowledge as the CRS.

EXAMINERS NOTE: The operator should not stop the procedure, the procedure is designed to subsequently mitigate the failure of SI-863A to OPEN.

The operator may place the SI-863A Control Switch back to CLOSE.

BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Opening SI866A AND SI866B, Hot Leg Injection Valves, with only one SI pump running will result in SI Pump runout.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 10 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: ALIGN For Hot Leg Recirculation: CRITICAL OPEN SI866A, LOOP 3 HOT LEG INJ Valve STEP (Step 6/6.a)

STANDARD: The operator reads the Caution, and proceeds. ___ SAT The operator places the key-operated SI-866A Control Switch to OPEN and observes that SI-866A Red status light is LIT and the ___ UNSAT Green status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 7: ALIGN For Hot Leg Recirculation: CRITICAL CLOSE BIT Outlet Valves: STEP SI870A SI870B (Step 6/6.b) ___ SAT STANDARD: The operator places the SI-870A Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light

___ UNSAT is OFF.

The operator places the SI-870B Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 11 of 18 Form ES-C-1 PERFORMANCE INFORMATION CAUTION: RHR759A AND RHR759B, RHR HX Discharge Valves, are closed. The RHR Pumps will run deadheaded AND are subject to damage UNTIL the SI pumps are started.

STEP 8: ESTABLISH Hot Leg Recirculation Flow:

CHECK RHR759A, RHR HX A DISCH Valve CLOSED ___ SAT (Step 7/7.a)

STANDARD: The operator reads the Caution, and proceeds.

___ UNSAT The operator observes the RHR-759A Green status light is LIT, and Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 9: ESTABLISH Hot Leg Recirculation Flow:

CHECK SI863A, RHR LOOP RECIRC Valve OPEN (Step 7/7.b)

___ SAT STANDARD: The operator observes the SI-863A Green status light is LIT and determines that SI-863A is CLOSED (Alternate Path), and proceeds to Step 7.b RNO.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator has previously attempted to OPEN this valve, and it failed to OPEN. This procedure will address the compensatory actions now.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 12 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 10: ESTABLISH Hot Leg Recirculation Flow: CRITICAL PERFORM the following: STEP CLOSE RHR759B, RHR HX B DISCH Valve.

OPEN SI863B, RHR LOOP RECIRC Valve. ___ SAT CLOSE SI863A, RHR LOOP RECIRC Valve.

START RHR Pump B.

GO TO Step 8.

(Step 7/7.b RNO) ___ UNSAT STANDARD: The operator observes the RHR-759B Green status light is LIT and the Red status light is OFF.

The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.

The operator places the SI-863A Control Switch in the CLOSE position and observes the Green status light is LIT and the Red status light is OFF.

The operator places the B RHR Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.

The operator proceeds to Step 8.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 13 of 18 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 11: START One SI Pump STEP (Step 8)

STANDARD: The operator places the A or C SI Pump Control Switch to ___ SAT START, and observes the Red status light is LIT and the Green status light is OFF.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

TIME CRITICAL STOP TIME: ________ (Less than 6 Minutes)

STEP 12: CHECK Indicated Flow On The Appropriate Flow Meters:

PATH FLOW METERS SI-866B FI-940, SI Hot Leg Header Flow FI-933, SI Loop 2 Hot Leg Flow ___ SAT SI-866A FI-940, SI Hot Leg Header Flow FI-932, SI Loop 3 Hot Leg Flow (Step 9)

___ UNSAT STANDARD: The operator observes FI-940 and determines flow to be 640-680 gpm.

The operator observes FI-932 and determines flow to be 580-600 gpm.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 14 of 18 Form ES-C-1 PERFORMANCE INFORMATION CAUTION: The operator should be sure that cavitation is taking place prior to transitioning to steps that attempt to mitigate screen blockage. The actions taken are beyond design basis AND should NOT be taken unless warranted. Stable indication on FI605 may also be used as an aid in determining if cavitation is present in subsequent steps when RHR759A OR RHR759B AND RHR 744A OR RHR744B are open.

STEP 13: CHECK RHR Pump Discharge Pressure STABLE PI602A PI602B ___ SAT (Step 10)

STANDARD: The operator reads the caution, and proceeds. ___ UNSAT The operator observes PI-602B to be 160 psig.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 15 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 14: DETERMINE If Flow Should Be Established To Cold Legs as follows:

CHECK RCS pressure LESS THAN 275 PSIG CHECK RHR Cold Leg Recirculation flow indicated in EOPES1.3, ___ SAT Transfer To Cold Leg Recirculation CHECK CV Sump Screen status HAS REMAINED CLEAR DURING RECIRCULATION

___ UNSAT CHECK ALL of the following AVAILABLE

  • FI605, RHR TOTAL FLOW
  • RHR759A AND RHR759B, RHR HX Discharge Valves
  • SI863A AND SI863B, RHR LOOP RECIRC Valves
  • RHR Pumps A AND B (Step 11a-d and 11.d RNO)

STANDARD: The operator observes PR-444 (or equivalent) to be 5 psig.

The operator recalls that 3000 gpm of flow existed in the Cold Legs before this procedure started.

The operator observes RHR discharge pressure to be steady at 150 psig (or equivalent), and determines that no RHR Pump cavitation is occurring.

The operator observes 0 gpm on FI-605.

The operator observes the RHR-759A Green status light is LIT, and the Red status light is OFF.

The operator observes the RHR-759B Green status light is LIT, and the Red status light is OFF.

The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.

The operator observes the SI-863A Green status light is LIT and the Red status light is OFF.

The operator recognizes that SI-863A is NOT available, and proceeds to Step 16.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 16 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 15: CHECK Time Since Hot Leg Recirculation Established GREATER THAN 16 HOURS WHEN 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> have elapsed, THEN GO TO Step 17. ___ SAT (Step 16 and 16 RNO)

STANDARD: The operator recognizes that the procedure must be stopped for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, and reports that the procedure must be placed on hold. ___ UNSAT EXAMINERS CUE: Another operator will continue with this procedure EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 17 of 18 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM E Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A large break LOCA has occurred.
  • The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
  • RHR Cold Leg Recirculation flow is 3000 gpm.

INITIATING CUE: The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.

THIS IS A TIME CRITICAL JPM NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM F Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM F (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Fill a Safety Injection Accumulator JPM No.: 2016 Systems - Control Room JPM F K/A

Reference:

006 A4.02 (4.0/3.8)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is at 100% power.
  • SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
  • You are the Licensed Dedicated Operator referred to in OP-202.

Initiating Cue: The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.

Task Standard: The operator will refill SI Accumulator C to reset the low level alarm without exceeding specified limits.

Required Materials: None General

References:

OP-202 (Safety Injection and Containment Vessel Spray System), Rev 98 APP-002 (Engineering Safeguards), Rev 70 2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: OP-202, Section 5.2.1 marked up as follows:

Step 5.2.1.1.a - Initialed Step 5.2.1.1.b Bullet 1 - Initialed Step 5.2.1.1.b Bullet 2 - NAd Step 5.2.1.1.c - NAd Step 5.2.1.1.d - Initialed Step 5.2.1.1.e (1) and (2) - NAd Time Critical Task: NO Validation Time: 8 minutes 2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 4 of 15 Form ES-C-1 Job Performance Measure Worksheet Critical Step Justification Step 2 This step is critical because placing the SI-869 Normal/Defeat switch in the NORMAL position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Control power must be aligned to the valve to allow for RTGB operation).

Step 4 This step is critical because placing the SI-869 control switch to the OPEN position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Open valve to align flowpath to SI Accumulator).

Step 5 This step is critical because placing an SI Pump control switch to the START position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Provides adequate flow and pressure to fill the SI Accumulator).

Step 7 This step is critical because placing the SI-851C control switch to the OPEN position, and then closing it within limits is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (align fill path to appropriate accumulator and to secure filling at desired level).

Step 8 This step is critical because placing the operating SI Pump control switch to STOP and returning it to the MID position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (secure fill source and prevent operating on recirculation for an extended period).

Step 10 This step is critical because placing the SI-869 control switch to the CLOSED position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (realign SI-869 to its normal Mode 1 alignment).

Step 11 This step is critical because placing the SI-869 Normal/Defeat switch in the DEFEAT position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (properly align SI-869 Control Power Defeat Switch as required for Mode 1).

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 5 of 15 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-5, 100% Power.
2. Lower the C SI Accumulator Level as follows:
  • OPEN SI-852C
  • WHEN APP-002-B4, SI ACCUM C HI/LO LVL, is LIT, CLOSE SI-852C
3. Place in RUN and allow time to stabilize.
4. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-605 (August, 2015).
2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
3. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Check open SI-856A, SI PUMP RECIRC and SI-856B, SI PUMP RECIRC (Steps 5.2.1.2.a and b).

___ SAT STANDARD: The operator observes SI-856A and B RED lights are LIT and the Green status lights are OFF.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator may use ERFIS to monitor SI Accumulator C level. (ERFIS: QP ACCUM C)

The Control Switches for these valves are located on the CV Sump Recirc Panel on the apron section of the RTGB below APP-002.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: ENSURE the Control Power Defeat switch for SI-869 is in the CRITICAL NORMAL position (Step 5.2.1.c) STEP STANDARD: The operator places the SI-869 NORMAL/DEFEAT key switch in ___ SAT the NORMAL position and observes the Amber status light is LIT.

EXAMINERS CUE: If the operator requests an AO check breaker status, ___ UNSAT report that all requested breakers are open.

EXAMINERS NOTE: Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.

BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE Based upon the numerous indications available to the Dedicated Operator of an SI actuation at the RTGB and the immediate response to isolate the SI Accumulator flowpath, an LCO declaration for SI Pump OR SI Flowpath Operability is NOT required.

The following step is a continuous action step which shall be performed when the stated condition is met.

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: IF an SI actuation is received during filling, THEN IMMEDIATELY CLOSE the applicable SI Accumulator makeup valve AND PERFORM Step 5.2.1.2.m to restore the SI System lineup. (Step 5.2.1.d) ___ SAT STANDARD: The operator reads the Notes, and proceeds.

___ UNSAT The operator reads step and acknowledges continuous actions step in the event of an SI actuation.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: Open SI-869, SI HOT LEG HDR. (Step 5.2.1.2.e) CRITICAL STEP STANDARD: The operator places the SI-869 Control Switch in the OPEN position and observes the Red status light LIT and the Green status light is ___ SAT OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Start an SI Pump. (Step 5.2.1.2.f) CRITICAL STEP STANDARD: The operator will make an announcement regarding the pump start.

___ SAT The operator places an SI Pump Control Switch in the START position and observes the Red status light is LIT and the Green status light is OFF.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: Starting the SI Pump will cause APP-002-C3, BIT HDR HI PRESS, to alarm (Expected). The operator may address the APP.

The announcement of the Pump start is NOT critical BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: If the cooling unit for the train of the SI pump started is NOT operable, the opposite train unit can be started by placing its AUTO/RUN switch on the power supply breaker to RUN.

STEP 6: ENSURE at least one SI Pump Area Cooling unit (HVH-6A OR HVH-6B OR both) is operating. (Step 5.2.1.2.g)

STANDARD: The operator reads the Note, and proceeds. ___ SAT The operator observes the HVH-6A Red status light is LIT and the Green status light is OFF if the A SI Pump is started.

___ UNSAT The operator observes the HVH-6B Red status light is LIT and the Green status light is OFF if the C SI Pump is started.

EXAMINERS CUE: NONE EXAMINERS NOTE: The non-operating HVH Unit Green status light is LIT.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION NOTE: The following are pressure and level limits/alarms for the SI Accumulators:

  • High Pressure Alarm 646 psig
  • Normal Operating Pressure 630 psig
  • High Level Alarm 75 percent
  • Low Level Alarm 67 percent CAUTION Filling the SI Accumulators can result in rapid indicated level changes due to the narrow span (approx. 14 inches) associated with the SI Accumulator level instruments and should be closely monitored.

STEP 7: IF SI Accumulator C is to be filled, THEN perform the following: CRITICAL (Step 5.2.1.2.j) STEP

1) Open SI-851C, MAKEUP.
2) Monitor the level and pressure of SI Accumulator C.
3) When desired level is obtained, then close SI-851C. ___ SAT STANDARD: The operator reads the Note and the Caution, and proceeds.

The operator places the SI-851C Control Switch to OPEN and ___ UNSAT observes the Red status light is LIT and the Green status light is OFF.

The operator observes LI-928 and PI-929 and LI-930 and PI-931 during filling.

When the accumulator level is > 67% and < 75% and accumulator pressure is > 614 psig and < 646 psig, the operator places the SI-851C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: APP-002-E4 will clear during the filling process.

It is acceptable if the C Accumulator Hi Level Annunciator (APP-002-E4) alarms during filling, as long as the TS LCO maximum level of 80.4% is NOT exceeded.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: Stop the operating SI Pump. (Step 5.2.1.2.k) CRITICAL STEP STANDARD: The operator places the operating SI Pump Control Switch in the STOP position and observes the Green status light is LIT and the ___ SAT Red status light is OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: APP-002-C3 will clear when the SI Pump is stopped.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 9: Verify both SI Pump Area Cooling units are OFF. (Step 5.2.1.2.l)

1) HVH-6A
2) HVH-6B

___ SAT STANDARD: The operator observes the HVH-6A Green status light is LIT and the Red status light is OFF.

The operator observes the HVH-6B Green status light is LIT and the ___ UNSAT Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 10: Close SI-869, SI HOT LEG HDR. (Step 5.2.1.2.m) STEP STANDARD: The operator places the SI-869 Control Switch in the CLOSE position and observes the Green status light LIT and the Red status ___ SAT light is OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: In Mode 1, 2 OR 3 the Control Power Defeat switch for SI-869 should be in the DEFEAT position. In Mode 5 OR 6 the Control Power Defeat switch for SI-869 should be in the NORMAL position. In Mode 4 the position of the Control Power Defeat switch for SI-869 is determined by GP-002 OR GP-007.

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: ENSURE the Control Power Defeat switch for SI-869 in the position CRITICAL determined by plant status. (Step 5.2.1.2.n) STEP STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator places the SI-869 NORMAL/DEFEAT key switch in the DEFEAT position and observes the Amber status light is OFF.

EXAMINERS CUE: NA ___ UNSAT EXAMINERS NOTE: Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.

BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM F Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100% power.
  • SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
  • You are the Licensed Dedicated Operator referred to in OP-202.

INITIATING CUE: The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM G Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM G (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Remove Source Range Channel N- JPM No.: 2016 Systems - Control 31 From Service Room JPM G K/A

Reference:

015 A4.03 (3.8/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
  • SR Channel N-31 has just failed low.

Initiating Cue:

  • The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
  • The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.

Task Standard: The operator will remove SR Channel N-31 from service IAW NI-5 of OWP-011.

Required Materials: None General

References:

OWP-011 (Nuclear Instrumentation), Rev 24 GP-003, Normal Plant Startup From Hot Shutdown to Critical, Rev 105 2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of OWP-11.

Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 2 This step is critical because removing NI-31 from ERFIS Scan is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.

Step 4 This step is critical because placing the Start Up Rate Channel Select Switch to the N32, N35 or N36 is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.

Step 5 This step is critical because placing the NI-31 Level Trip Bypass Switch to the BYPASS position is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-8, (47.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> tripped, Critical at 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />).
2. Place in RUN and allow time to stabilize.
3. Perform the following:
  • Rod Bank Select Switch to SBB
  • Withdrawal SBB rods to 225 Steps
  • Rod Bank Select Switch to M
  • Withdrawal CBA rods to 22 Steps
  • Place Audio Count Rate Selector in the N31 position
  • Place the Startup Rate Channel Select Switch in the N31 position
4. Insert Malfunction NIS01A, Final: 1 (SR N-31 fails LOW)
5. Acknowledge alarms and stabilize the plant.
6. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-606 (August, 2015).
2. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Obtain and review the procedure.

(OWP-011, NI-5, Steps 1-7).

___ SAT STANDARD: The operator reviews Handout 1 and identifies that NI-5 must be addressed.

The operator verifies that Revision 24 is the latest revision (Initial

___ UNSAT Cue), and prints their name, signs and dates Step 1.

Operator reviews Steps 2-7.

EXAMINERS CUE: NONE EXAMINERS NOTE: The operator may use Green Dots to flag the expected annunciators.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Complete Step 8: CRITICAL REMOVE NI-31 from ERFIS SCAN: NIN0031A. STEP (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator selects F3 on ERFIS (Master Menu)

The operator selects ADMIN (Administrative Functions Menu)

___ UNSAT The operator selects DR (Del/Res Point From/To Scan or Alarm)

The operator depresses the DELETE SCAN pushbutton The operator enters Point I.D. NIN0031A EXAMINERS CUE: NONE EXAMINERS NOTE: This can be checked on ERFIS as follows:

Select F3 (Master Menu)

Select REAL (Real Time Data Menu)

Select DBO (Point Information/Value Display)

Enter NNI0031A Observe QUALITY to be DEL BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 3: Complete Step 8:

AUDIO COUNT RATE CHANNEL - CHANNEL SELECTOR Switch (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator pulls and rotates the Audio Count Rate Channel Selector Switch counter-clockwise to the N32 position, and initials the Selected to SR 32 block on the NI-5 Valve, Breaker, Switch Lineup.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This switch is on the Audio Count Rate Drawer BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: Complete Step 8: CRITICAL START UP RATE CHANNEL SELECT Switch

  • STEP (NI-5 Valve, Breaker, Switch Lineup).

STANDARD: The operator places the Start Up Rate Channel Select Switch to the

___ SAT N32; records the selected instrument in the NI block position, and initials the NI-5 Valve, Breaker, Switch Lineup.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: This switch is on the Comparator and Rate Drawer BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 5: Complete Step 8: CRITICAL LEVEL TRIP Switch STEP (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator places the NI-31 Level Trip Bypass Switch to the BYPASS position, and initials the NI-5 Valve, Breaker, Switch Lineup.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator will acknowledge APP-005-D4, NIS TRIP/DROP ROD BYPASS, as an expected alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: Complete Step 8:

NIS TRIP BYPASS NI-31 Status Light (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator observes the NI-31 LEVEL TRIP BYPASS status light is LIT and initials the NI-5 Valve, Breaker, Switch Lineup.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 7: Complete Step 8:

HIGH FLUX AT SHUTDOWN Switch (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator places the NI-High Flux At Shutdown Switch to the BLOCK position, and initials the NI-5 Valve, Breaker, Switch Lineup.

The operator signs and dates Step 8 of NI-5.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator will acknowledge APP-005-B1, HI FLUX AT SHUTDOWN ALARM BLOCK, as an expected alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM G Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
  • SR Channel N-31 has just failed low.

INITIATING CUE:

  • The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
  • The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM H Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM H (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 16 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Start a Reactor Coolant Pump JPM No.: 2016 Systems - Control Room JPM H K/A

Reference:

003 A4.03 (2.8/2.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
  • The A RCP is running.
  • It is intended to start the B RCP next.
  • It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.

Initiating Cue: The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.

Task Standard: The operator will start the B RCP IAW OP-101.

Required Materials: None 2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 3 of 16 Form ES-C-1 Job Performance Measure Worksheet General

References:

OP-101 (Reactor Coolant System and Reactor Coolant Pump Startup and Operation), Rev 74 AD-OP-ALL-1000 (Conduct of Operations) Rev 4 AOP-018 (Reactor Coolant Pump Abnormal Conditions), Rev 31 APP-001 (Miscellaneous NSSS), Rev 60 Technical Specification LCO 3.3.5 (Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation), Amendment 176 Handouts: Handout 1: Section 8.1 of OP-101 marked up through Step 8.1.1.2.y for this JPM.

Time Critical Task: NO Validation Time: 10 minutes NOTE: This JPM should be pre-briefed in the Briefing Room.

Critical Step Justification Step 2 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.aa.1&3 is necessary to start the B RCP IAW OP-101.

Step 3 This step is critical because placing the Bearing Lift Pump in the START position, and observing that the LIFT PRESSURE status light is LIT is necessary to start the B RCP IAW OP-101.

Step 6 This step is critical because after 2 minutes with the Bearing Oil Lift Pump running, placing the B RCP Control Switch to the START position is necessary to start the B RCP IAW OP-101.

Step 8 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.gg.1-6 is necessary to start the B RCP IAW OP-101.

Step 10 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.ii.1-6. is necessary to start the B RCP IAW OP-101.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 4 of 16 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ H as follows:
  • IRF EPSL007 f:DEFEAT
  • IRF EPSL008 f:DEFEAT
  • IRF EPSL007 f:NORMAL
  • IRF EPSL008 f:NORMAL
2. Reset simulator to IC-35, 0% Power, Mode 3 at NOP/NOT.
3. Place in RUN execute Scenario File 006_JPM_H, and allow time to stabilize.
4. Place PCV-455A in manual and close "B" Loop Spray Valve (PCV-455A).
5. Perform the actions of Section 8.1.1 of OP-101 up to Step 8.1.1.2.y.
6. Stabilize the plant.
7. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-607 (August, 2015).
2. Open Scenario File 006_JPM_H.

NOTE: Booth Instructor will need to operate Events 1-4 when contacted by the operator at JPM Steps 2, 8 & 10.

3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTES ITS LCO 3.3.5 allows bypassing Degraded Grid Protection when the Unit is NOT in Mode 1.

Conservative operating principles have determined that bypassing the Degraded Grid Protection will only be permitted when the Unit is NOT in Mode 1 OR Mode 2. (NCR 151422)

Degraded Grid Voltage Protection is limited to one hour in the DEFEAT position before it shall be returned to NORMAL. (NCR 151422)

STEP 1: IF required, THEN ENTER LCO 3.3.5 Action Statement due to bypassing Degraded Grid Protection, AND RECORD time.

(Step 8.1.1.2.z). ___ SAT STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator records the time in the block provided.

The operator informs the CRS that LCO 3.3.5 may need to be entered.

EXAMINERS CUE: As the CRS, acknowledge report.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 6 of 16 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 2: IF degraded grid protection is in service, THEN DEFEAT the STEP degraded grid voltage protection as follows:

  • On the front of Bus E-1, Cubicle 18A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position. ___ SAT
  • CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is ILLUMINATED.
  • On the front of Bus E-2, Cubicle 28A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the ___ UNSAT DEFEAT position.
  • CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is ILLUMINATED.

(Step 8.1.1.2.aa).

STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.aa.1&3.

The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is LIT and is an expected alarm.

The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is LIT and is an expected alarm.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: When directed, defeat Degraded Grid Protection on Bus E-1 RFI EPSL007, and report back as AO that Steps 8.1.1.2.aa.1 has been completed When directed, defeat Degraded Grid Protection on Bus E-2 RFI EPSL008, and report back as AO that Steps 8.1.1.2.aa.3 has been completed COMMENTS:

NOTE: Several starts / stops of the Bearing Oil Lift Pump may be required to prime the pump in a Motor where the Upper Reservoir has been drained and refilled.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 7 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: START the BRG LIFT PUMP AND CHECK the LIFT PRESSURE CRITICAL light ILLUMINATES. STEP (Step 8.1.1.2.bb).

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator places the Bearing Lift Pump B Control Switch in the START position, and observes the Red status light is LIT and the

___ UNSAT Green status light is OFF.

The operator observes that that the LIFT PRESSURE status light is LIT.

EXAMINERS CUE: If the operator addresses the CRS/SM about AOP-018 because of APP-001-E2, as the SM indicate that the performance of the procedure can be deferred.

EXAMINERS NOTE: APP-001-E2, RCP #1 SEAL LEAKOFF LO FLOW, alarms when the Bearing Oil Lift Pump is started.

This is because the pump start causes the B RCP shaft to be lifted affecting the #1 Seal on the B RCP, which will affect the #1 Seal Leakoff flows on the other RCPs.

The operator may address the APP, and may address AOP-018, Reactor Coolant Pump Abnormal Conditions. If so, a NOTE on the Entry Conditions to AOP-018 states that IF RCP#1 Seal Leakoff flow is below 1 gpm due to plant conditions known to affect leakoff flow, the SM may defer procedure entry provided the #1 Seal Leakoff flow remains above 0.8 gpm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: IF RCP Oil Reservoir level annunciator is NOT EXTINGUISHED, THEN REFER to the appropriate Annunciator Procedure.

(Step 8.1.1.2.cc).

___ SAT STANDARD: The operator observes that APP-001-E8, RCP B OIL RESERV HI/LO LVL, is EXTINGUISHED.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 5: NOTIFY RC that RCPs are to be started AND to monitor for changing radiological conditions.

(Step 8.1.1.2.dd). ___ SAT STANDARD: The operator contacts RC and makes notification.

___ UNSAT EXAMINERS CUE: As RC Supervisor, Acknowledge EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Only one Reactor Coolant Pump is to be started at a time.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: WHEN the Brg Lift Pump has operated for a minimum of 2 minutes, CRITICAL THEN START the Reactor Coolant Pump. STEP (Step 8.1.1.2.ee).

___ SAT STANDARD: The operator reads the Caution, and proceeds.

The operator will make a plant announcement prior to starting the RCP.

___ UNSAT After 2 minutes with the Bearing Oil Lift Pump running, the operator places the B RCP Control Switch to the START position, and observes the Red status light is LIT and the Green status light is OFF.

The operator will observe FI-424 at 118%. (Not Critical)

The operator will observe FI-425 at 118%. (Not Critical)

The operator will observe FI-426 at 117%. (Not Critical)

The operator will observe B RCP #1 Seal Leakoff on FR-154B to be 1.24 gpm. (Not Critical)

The operator will observe RCS pressure on PR-444 to be 360 psig.

(Not Critical)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: WHEN a minimum of 50 seconds has elapsed since the Reactor Coolant Pump was started, THEN STOP the BRG LIFT PUMP.

(Step 8.1.1.2.ff).

___ SAT STANDARD: After a minimum of 50 seconds with the B RCP Running, the operator places the Bearing Oil Lift Pump Control Switch to the STOP position, and observes the Green status light is LIT and the

___ UNSAT Red status light is OFF.

The operator observes that that the LIFT PRESSURE status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Do NOT Restore the Degraded Grid Voltage Protection to NORMAL until the Amber indicating light is Extinguished.

NOTE: The Degraded Grid Voltage keylock keys can NOT be removed from switches unless positioned to NORMAL.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 8: IF E-1 Degraded Grid Voltage Protection is to be returned to STEP NORMAL, THEN RESTORE as follows:

  • Momentarily DEPRESS the amber E-1 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES. ___ SAT
  • CHECK the amber E-1 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
  • PLACE E-1 DEGRADED GRID VOLTAGE key switch to NORMAL. ___ UNSAT
  • REMOVE key.
  • IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.3, E-1 Defeat Switch Contact Position Verification.
  • ENSURE Relay 27 contacts are RESET by performing the following:

o DEPRESS the TARGET RESET pushbutton for Relay 27/DVA-1 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for Relay 27/DVB-1 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for Relay 27/DVC-1 AND CHECK that the target flag indicates black.

  • CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.

(Step 8.1.1.2.gg.1-7).

STANDARD: The operator reads the Caution and Note, and proceeds.

The operator contacts AO and directs performance of Step 8.1.1.2.gg.1-6.

The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.

EXAMINERS CUE: If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: When directed, return Degraded Grid Protection on Bus E-1 to normal RFI EPSL007, and report back as AO that Steps 8.1.1.2.gg.1-6 have been completed COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time.

(Step 8.1.1.2.hh). ___ SAT STANDARD: The operator records the time in the block provided.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 10: IF E-2 Degraded Grid Voltage Protection is to be returned to CRITICAL NORMAL, THEN RESTORE as follows: STEP

  • Momentarily DEPRESS the amber E-2 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES. ___ SAT
  • CHECK the amber E-2 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
  • PLACE E-2 DEGRADED GRID VOLTAGE key switch to NORMAL. ___ UNSAT
  • REMOVE key.
  • IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.4, E-2 Defeat Switch Contact Position Verification.
  • ENSURE relay 27 contacts are RESET by performing the following:

o DEPRESS the TARGET RESET pushbutton for relay 27/DVA-2 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for relay 27/DVB-2 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for relay 27/DVC-2 AND CHECK that the target flag indicates black.

  • CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.

(Step 8.1.1.2.ii).

STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.ii.1-6.

The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.

EXAMINERS CUE: If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: When directed, return Degraded Grid Protection on Bus E-2 to normal RFI EPSL008, and report back as AO that Steps 8.1.1.2.ii.1-6 have been completed COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time. ___ SAT (Step 8.1.1.2.jj).

STANDARD: The operator records the time in the block provided.

___ UNSAT The operator informs the CRS that the LCO 3.3.5 Action Statement may be able to be exited.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM H Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
  • The A RCP is running.
  • It is intended to start the B RCP next.
  • It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.

INITIATING CUE: The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet In-Plant JPM I Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - In-Plant JPM I (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Locally Establish AFW Flow from JPM No.: 2016 Systems - In-the SDAFW Pump and Control S/G Plant JPM I Levels and Pressures K/A

Reference:

EPE 055 EA2.01 (3.4/3.7)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The Plant has experienced a loss of onsite and offsite power.
  • Wide range levels in all three SGs are 55%.
  • The SDAFW Pump has just been started.

Initiating Cue: The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.

Task Standard: The operator will control AFW flow to the Steam Generators and align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

EOP-ECA-0.0 (Loss of All AC Power), Rev 4 2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 3 of 11 Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Blank copy of Attachment 4 of EOP-ECA-0.0.

Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 1 This step is critical because throttling the SDAFW Pump Discharge Valves is necessary to control AFW flow to the Steam Generators IAW Attachment 4 of EOP-ECA-0.0.

Step 3 This step is critical because closing IA-297 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 4 This step is critical because opening SDN-13 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 5 This step is critical because closing SDN-29 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 6 This step is critical because opening SDN-28 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 7 This step is critical because opening IA-423 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE Flashlights AND ANY handtools needed are located with AOP/EOP/DSP Tool Kits.

The S/G Wide Range level indicators LI607A2, LI607B2, AND LI607C2 located in the Secondary Control Panel are powered from PP50 AND should always be available. These channels are credited in the SBO Coping Analysis.

CRITICAL STEP 1: Locally THROTTLE The Steam Driven AFW Pump Discharge STEP Valve(s) At The Secondary Control Panel Area To Maintain S/G WR Levels Between 60% AND 67%.

  • AFWV214A S/G A ___ SAT
  • AFWV214B S/G B
  • AFWV214C S/G C (Step 1) ___ UNSAT STANDARD: The operator reads the Notes, and proceeds.

The operator depresses the AFWV214A, 14B and 14C de-clutch lever and rotates handwheel counterclockwise to increase feedwater flow or clockwise to decrease feedwater flow.

AS-FOUND: All three valves are CLOSED (Stems fully inserted)

EXAMINERS CUE: After locating and describing how the three valves are operated, indicate that each valve has been De-Clutched and the handwheel rotated as needed to adjust feedwater flow When appropriate, indicate that each SG WR level is 64% and stable If the operator elects to OPEN the motor breakers for these valves, indicate that another operator will perform this action EXAMINERS NOTE: The operator may request that a second operator observe SG WR levels while the remainder of the Attachment is completed COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: OBSERVE NOTE Prior To Step 10 AND GO TO Step 10 (Step 2)

___ SAT STANDARD: The operator proceeds to Step 10.

___ UNSAT AS-FOUND: NA EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

NOTE IA297 is located at the southeast corner of the Pipe Jungle at an elevation between the feed AND steam lines.

CRITICAL STEP 3: CLOSE IA297, HDR STOP TO PORV STATION & MSIVS STEP (Step 10)

STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator rotates the IA-297 handwheel in the clockwise direction.

___ UNSAT AS-FOUND: OPEN (Stem Fully Withdrawn)

EXAMINERS CUE: The IA-297 handwheel will no longer turn in the clockwise direction and the stem is inserted EXAMINERS NOTE: Located at the SE corner of Pipe Jungle between the Feed & Steam lines elevation IA-297 is located in the overhead under a catwalk and the operator must climb an installed ladder, or proceed up the stairs to the top floor of the Turbine Building. However, the valve can be seen from below or above, and discussion of operation can take place from one of these two locations COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN13 is located at the Steam Dump Nitrogen Accumulator.

STEP 4: OPEN SDN13, NITROGEN BACK UP SUPPLY CRITICAL (Step 11) STEP STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator rotates the SDN-13 handwheel in the counter-clockwise direction.

___ UNSAT AS-FOUND: CLOSED (Stem Fully Inserted)

EXAMINERS CUE: The SDN-13 handwheel will no longer turn in the clockwise direction and the stem is inserted.

EXAMINERS NOTE: Located at the Steam Dump Nitrogen Accumulator COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN28 AND SDN29 are located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.

STEP 5: UNLOCK AND CLOSE SDN29, STEAM LINE PORV NITROGEN CRITICAL B/U TO IA TELLTALE DRAIN STEP (Step 12)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator unlocks and rotates the SDN-29 handwheel in the ___ UNSAT clockwise direction.

AS-FOUND: Locked OPEN (Stem Fully Withdrawn)

EXAMINERS CUE: The SDN-29 handwheel will no longer turn in the clockwise direction and the stem is inserted.

EXAMINERS NOTE: Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:

STEP 6: UNLOCK AND OPEN SDN28, NITROGEN BACKUP TO STEAM CRITICAL LINE PORVS STEP (Step 13)

STANDARD: The operator unlocks and rotates the SDN-28 handwheel in the ___ SAT counter-clockwise direction.

AS-FOUND: Locked CLOSED (Stem Fully Inserted) ___ UNSAT EXAMINERS CUE: The SDN-28 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.

EXAMINERS NOTE: Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: IA423 is located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.

STEP 7: UNLOCK AND OPEN IA423, NITROGEN TO STEAM LINE PORVS CRITICAL (Step 14) STEP STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator unlocks and rotates the IA-423 handwheel in the counter-clockwise direction.

___ UNSAT AS-FOUND: Locked CLOSED (Stem Fully Inserted)

EXAMINERS CUE: The IA-423 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.

EXAMINERS NOTE: Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:

STEP 8: NOTIFY The Control Room Of The Following:

  • S/G level is under control locally ___ SAT
  • The S/G Steam Line PORVs have N2 supplied for motive air (Step 15/15.a and b)

STANDARD: The operator contacts the Control Room and makes the ___ UNSAT notifications.

AS-FOUND: NA EXAMINERS CUE: As the CRS, acknowledge EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: When MCC5 is energized, the Control Room will feed S/G A AND S/G C.

STEP 9: WHEN Notified From The Control Room, THEN FEED S/G B To 67%

S/G Wide Range Level AND SECURE Feeding (Step 16)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator recognizes that this is a Continuous Action Step, and ___ UNSAT reports that the Attachment is complete.

AS-FOUND: NA EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - In-Plant JPM I Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The Plant has experienced a loss of onsite and offsite power.
  • Wide range levels in all three SGs are 55%.
  • The SDAFW Pump has just been started.

INITIATING CUE: The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet In-Plant JPM J Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - In-Plant JPM J (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Respond to a Loss of Instrument Air JPM No.: 2016 Systems - In-Plant JPM J K/A

Reference:

065 AA1.04 (3.5.3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • AOP-017, Loss Of Instrument Air, has been entered.
  • The Station Air Compressor is under clearance and disassembled
  • The Station Air Receiver is depressurized and vented.

Initiating Cue:

  • The CRS has directed you to perform AOP-017 Step 8.
  • The Outside AO is standing by to assist as needed.

Task Standard: The operator will start IA Compressors A and B and align their discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

AOP-017 (Loss of Instrument Air), Rev 43 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of AOP-017.

Time Critical Task: NO Validation Time: 14 minutes Critical Step Justification Step 6 This step is critical because placing the IA Compressor A & B Control Switches in MANUAL is necessary to start IA Compressors A and B in accordance with Step 8 of AOP-017.

Step 8 This step is critical because rotating the IA3665 handwheel in the counter-clockwise direction is necessary to align the IA Compressors A and B discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE IA3821 is located on IA Dryer D.

Operator Aid 97OP35 to supply Station Air to Instrument Air is located in the Aux Bldg hallway on the Station Air Receiver.

STEP 1: DISPATCH Operator(s) To Perform The Following:

CHECK Station Air Compressor Available For Service:

SA1, STATION AIR TO RECEIVER OPEN ___ SAT AND Station Air Compressor Function Switch ON (Step 8/8.a)

___ UNSAT STANDARD: The operator reads the Notes, and proceeds.

The operator recognizes that SA-1 is OOS and proceeds to the RNO.

AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: OPEN SA1 AND PLACE the Station Air Compressor Function switch to ON.

IF the Station Air Compressor is still NOT available for service, THEN ___ SAT GO TO Step 8.d.

(Step 8.a RNO)

___ UNSAT STANDARD: The operator recognizes that SA-1 cannot be opened nor can the SAC Function Switch be placed to ON, and proceeds to Step 8.d.

AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 3: CHECK IA18, AIR DRYER "A" & "B" BYPASS OPEN (Step 8.d)

STANDARD: The operator observes IA-18, and (After Cue) proceeds to the Step ___ SAT 8.d RNO.

AS FOUND: IA-18 stem is fully inserted (Cue as needed) ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: OPEN IA18, AIR DRYER "A" & "B" BYPASS.

(Step 8.d RNO)

___ SAT STANDARD: The operator rotates the IA-18 handwheel in the counter-clockwise direction.

___ UNSAT AS FOUND: IA-18 stem is fully inserted (Cue as needed)

EXAMINERS CUE: After locating and describing how the valve would be opened, indicate that the stem is fully withdrawn.

EXAMINERS NOTE: NONE COMMENTS:

STEP 5: CHECK the following Compressors RUNNING

  • INST AIR COMP A
  • INST AIR COMP B ___ SAT (Step 8.e)

STANDARD: The operator observes the IA Compressor A Control Switch.

___ UNSAT The operator observes the IA Compressor B Control Switch.

AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: START the following compressors: CRITICAL

  • INST AIR COMP A STEP
  • INST AIR COMP B (Step 8.e RNO)

___ SAT STANDARD: The operator places the IA Compressor A Control Switch in MANUAL.

___ UNSAT The operator places the IA Compressor B Control Switch in MANUAL.

AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)

EXAMINERS CUE: After the IA Compressor Control Switches are placed in MANUAL indicate that the motor starts and the compressor is running EXAMINERS NOTE: NONE COMMENTS:

STEP 7: CHECK FCV1740, AIR DRYER HIGH DP FLOW CONTROL valve OPEN (Step 8.f)

___ SAT STANDARD: The operator observes FCV-1740.

AS FOUND: CLOSED (Cue as needed) ___ UNSAT EXAMINERS CUE: After locating and describing how the valve would be verified opened indicate the position indicator is down indicating closed.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: OPEN IA3665, AIR DRYER "A" & "B" BYPASS. CRITICAL (Step 8.f RNO) STEP STANDARD: The operator rotates the IA3665 handwheel in the counter- ___ SAT clockwise direction.

AS FOUND: CLOSED (Cue as needed) ___ UNSAT EXAMINERS CUE: After locating and describing how the valve would be opened indicate the valve has been rotated fully counter-clockwise (stem fully withdrawn)

EXAMINERS NOTE: NONE COMMENTS:

STEP 9: OPEN IA3821, INSTRUMENT AIR DRYER "D" BYPASS (Step 8.g)

STANDARD: The operator contacts the Outside AO and directs that IA-3821 be OPENED. ___ SAT AS FOUND: NA

___ UNSAT EXAMINERS CUE: As the Outside AO, indicate that IA-3821 is OPEN.

If the operator starts to proceed to IA-3821 (In Turbine Building), rather than call the Outside AO to re-position this valve, indicate that another operator will perform this action and terminate the JPM.

EXAMINERS NOTE: IA-3821 is located on the D IA dryer.

COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - In-Plant JPM J Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • AOP-017, Loss Of Instrument Air, has been entered.
  • The Station Air Compressor is under clearance and disassembled
  • The Station Air Receiver is depressurized and vented.

INITIATING CUE:

  • The CRS has directed you to perform AOP-017 Step 8.
  • The Outside AO is standing by to assist as needed.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet In-Plant JPM K Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - In-Plant JPM K (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 14 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Loss of North SW Header in the JPM No.: 2016 Systems - In-Auxiliary Building Plant JPM K K/A

Reference:

APE 062 AA2.01 (2.9/3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

Initial Conditions:

  • The plant is at 100% power.
  • The North SW header has ruptured inside the Auxiliary Building.

Initiating Cue: The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.

Task Standard: The operator will isolate the intact SW header from the ruptured header, isolate the leak, and align cooling water to critical loads IAW Attachment 6 of AOP-022.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

Flashlight Magnifying Glass General

References:

AOP-022 (Loss of Service Water), Rev 35 2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 3 of 14 Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Plant Drawing G-190199 (Service & Cooling Water Flow Diagram) Rev 72 Figure 9.2.1-1, Flow Diagram Service and Cooling Water, Rev 26 Handouts: Handout 1: Blank Copy of Attachment 6 of AOP-022.

Handout 2: Figure 9.2.1-1, Flow Diagram Service and Cooling Water, with the leak location marked.

Time Critical Task: NO Validation Time: 14 minutes Critical Step Justification Step 1 This step is critical because closing either SW-18 or SW-19 is necessary to isolate the ruptured header from intact header.

Step 2 This step is critical because closing SW-740 and SW-102 is necessary to isolate the ruptured header from intact header.

Step 4 This step is critical because placing Instrument Air Compressor B in OFF is necessary to prevent damage to the compressor.

Step 7 This step is critical because cross-connecting the Booster Pump Suction is necessary to isolate the leak and align cooling water to critical loads (SW-25 must be closed to prevent reinitiating the leak, SW-26 and SW-27 must be opened to supply cooling water to vital equipment, SW-503 must be closed to prevent reinitiating the leak and SW-200A must be opened to provide emergency make up to the IVSW Tank).

Step 9 This step is critical because Closing SW-53 and Opening SW-83 is necessary to align cooling water to critical loads (EDGs).

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 4 of 14 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

START TIME:

CAUTION Electrically rated boots and gloves must be worn in the Auxiliary Building where flooding is in progress.

NOTE Dielectric rubber boots and low voltage electrical gloves are available in the AOP/DSP/EOP Equipment storage Locker inside the Auxiliary Building.

STEP 1: Close One Of The Following Valves In The Auxiliary Building CRITICAL Hallway : STEP

  • SW-18, North & South Supply HDR X-Conn (Chain Operated)

OR

  • SW-19, North & South Supply HDR X-Conn (Chain Operated)

(Step 1)

___ SAT STANDARD: The operator pulls either the SW-18 or SW-19 chain operator to rotate valve handwheel in the clockwise direction, and observes the area for water.

___ UNSAT AS FOUND: Both Valves Are Open EXAMINERS CUE: The operator reads the Caution and Note, and proceeds.

After locating and describing how either valve would be closed then indicate the selected valve has been rotated full clockwise and the pointer indicates Closed.

IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.

EXAMINERS NOTE: The valve handwheels face opposite directions.

Ensure operator turns the selected handwheel via the chain in the proper direction.

COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 5 of 14 Form ES-C-1 PERFORMANCE INFORMATION NOTE SW-102 is located overhead East of CCW Pump B on top of horizontal header supported by adjustable pipe support.

STEP 2: Close The Following Valves In The CCW Pump Room: CRITICAL STEP

  • SW-740, CCW Heat Exchanger "B" Return
  • SW-102, HVH-7B Supply (Step 2)

STANDARD: The operator reads the Note, and proceeds. ___ SAT The operator rotates the SW-740 and SW-102 handwheels in the clockwise direction.

___ UNSAT AS FOUND: Both Valves Open (SW-740 Pointer Indicates POS 1 And SW-102 Stem Is Fully Withdrawn).

EXAMINERS CUE: After locating and describing how both valves would be closed, indicate the valves have been rotated full clockwise, the SW-740 pointer indicates Closed and the SW-102 stem is fully inserted.

EXAMINERS NOTE: SW-102 is located overhead east of CCW Pump B on top of horizontal header supported by adjustable pipe support.

SW-102 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.

COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 6 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Notify Control Room Personnel That Steps 1 And 2 of Attachment 6 Are Complete (Step 3) ___ SAT STANDARD: The operator contacts the Control Room and reports Steps 1 and 2 of Attachment 6 are complete.

___ UNSAT AS FOUND: NONE EXAMINERS CUE: When contacted, as CRS then acknowledge the report from the operator EXAMINERS NOTE: NONE COMMENTS:

STEP 4: Place Instrument Air Compressor B Control Switch In The OFF CRITICAL Position STEP (Step 4)

STANDARD: The operator places the Instrument Air Compressor B Control Switch in OFF position

___ SAT AS FOUND: IA Compressor B Control Switch is in AUTO EXAMINERS CUE: After locating and describing how the B IA compressor would be placed in OFF indicate the ___ UNSAT Control Switch has been rotated to the middle position OFF.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 7 of 14 Form ES-C-1 PERFORMANCE INFORMATION CAUTION Subsequent actions to cross-connect cooling water to plant components should not be performed if the leak will be reinitiated.

NOTE SW-53, North Supply HDR To "B" TRN Components In Aux Bldg, is located in Auxiliary Building hallway, midway between Instrument Air Dryers A and B, above third cable tray.

STEP 5: Check leak location - Downstream of SW-53.

(Step 5)

STANDARD: The operator reads the caution and Note, and proceeds.

The operator uses the SW flow diagram marked with the leak ___ SAT location (Handout 2), and observes the area for water and determines leak is NOT Downstream of SW-53; and goes to step 5 RNO which directs the operator to Step 9

___ UNSAT AS FOUND: NONE EXAMINERS CUE: IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 8 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: Check Leak Location - Upstream of SW-25, North HDR Supply To SW Booster Pump (Step 9)

___ SAT STANDARD: The operator determines the leak is upstream of SW-25.

AS FOUND: NONE

___ UNSAT EXAMINERS CUE: IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.

EXAMINERS NOTE: NONE COMMENTS:

NOTE

  • SW Booster Pump B may be operated as required after the suction path is established from the South Service Water Header.
  • Closing SW-503, SW Pump Supply To IVSW Tank, also isolates SW to the Penetration Coolers.

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 9 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Cross-Connect SW Booster Pump Suction Supply As Follows: CRITICAL

a. Close SW-25, North HDR Supply To SW Booster Pumps STEP
b. Open SW-26, SW Booster Pump Suction Cross-Connect
c. Open SW-27, SW Booster Pump Suction Cross-Connect
d. Close SW-503, SW Pump Supply To IVSW Tank
e. Open SW-200A, SWBP "A" TO IVSW Tank Supply (Step 10) ___ SAT STANDARD: The operator reads the Notes, and proceeds.

___ UNSAT The operator rotates the T-handle locking device counter-clockwise on SW-25, and rotates the handwheel clockwise.

The operator rotates the T-handle locking device counter-clockwise on SW-26, and rotates the handwheel counter-clockwise.

The operator rotates the T-handle locking device counter-clockwise on SW-27, and rotates the handwheel counter-clockwise.

The operator rotates the SW-503 handwheel clockwise.

The operator rotates the SW-200A handwheel counter-clockwise.

AS FOUND: SW-25 & SW-503, OPEN SW-26, SW-27 & SW-200A, CLOSED EXAMINERS CUE: After locating and describing how each valve would be operated then indicate the selected valve has been rotated full counter-clockwise and the stem is fully withdrawn for the OPEN valves and rotated full clockwise with the stem fully inserted for the CLOSED valves SW-26 and 200A is located above the A SW Booster Pump.

SW-503 is located above the vent duct above the B SW Booster Pump, and requires a ladder.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 10 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: Notify Control Room Personnel That Step 10 Is Complete And SW Has Been Cross-Connected To Supply SW Booster Pump B (Step 11)

___ SAT STANDARD: The operator contacts the Control Room and reports SW has been cross-connected to supply SW Booster Pump B.

___ UNSAT AS FOUND: NONE EXAMINERS CUE: When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE: NONE COMMENTS:

NOTE

  • A ladder is required for access to SW-53, North Supply HDR To "B" TRN Components In Aux BLDG.

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 11 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Cross-Connect Service Water Supply To EDGs AS Follows: CRITICAL STEP

a. Close SW-53
b. Open SW-83 (Step 12)

STANDARD: The operator reads the Notes, and proceeds. ___ SAT The operator rotates the SW-53 handwheel in the clockwise direction.

___ UNSAT The operator rotates the SW-83 handwheel in the counter-clockwise direction.

AS FOUND: SW-53 is OPEN, SW-83 is CLOSED EXAMINERS CUE: After locating and describing how each valve would be operated indicate that the SW-53 handwheel has been rotated full clockwise and the stem is fully inserted, and that the SW-83 handwheel has been rotated full counter-clockwise with the stem fully withdrawn.

EXAMINERS NOTE: SW-53 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.

There is a label identifying the location of SW-53 on the vent duct above the walkway between the IA Dryers A and B.

SW-83 is located in the A EDG Vault Room. This room requires Control Room/WCCS permission to enter the room. The examiner will either need to get permission to enter, or open the door and observe the valve without entering the room (The valve can be seen from the open doorway).

COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 12 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 10: Notify Control Room Personnel That SW Has Been Cross-Connected To Supply The Following Equipment:

  • Instrument Air Compressor B ___ SAT
  • HVH-6B
  • HVH-8B (Step 13)

___ UNSAT STANDARD: The operator contacts the Control Room and reports that SW has been cross-connected to supply the above equipment AS FOUND: NONE EXAMINERS CUE: When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE: NONE COMMENTS:

STEP 11: Notify Control Room Personnel That Attachment 6 Is Complete (Step 14)

STANDARD: The operator contacts the control room and reports that Attachment ___ SAT 6 is complete AS FOUND: NONE

___ UNSAT EXAMINERS CUE: When contacted, as CRS acknowledge that Attachment 6 is complete EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 13 of 14 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - In-Plant JPM K Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100% power.
  • The North SW header has ruptured inside the Auxiliary Building.

INITIATING CUE: The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM A Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM A (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 22 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Operation With High Switchyard JPM No.: 2016 Systems - Control Voltage Room JPM A (Alternate Path)

K/A

Reference:

062 A2.08 (2.7/3.0)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • Plant is at 100% power.
  • Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
  • You are the BOP.
  • D IAC is in service with A and B IACs in AUTO.
  • The DSDG is secured and aligned for AUTO.
  • The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.

Initiating Cue: The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 3 of 22 Form ES-C-1 Job Performance Measure Worksheet Task Standard: The operator will transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3) in an effort to lower Switchyard Voltage; and when Breaker 50/20 fails to automatically OPEN, the operator will manually open it per AOP-31. Ultimately, the voltage on 480V Bus E-2 will be lowered to less than 502 volts.

Required Materials: None General

References:

AOP-031 (Operation with High Switchyard Voltage), Rev 15 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Control Room Copy of AOP-031 marked up for this JPM to Step 21.

Time Critical Task: NO Validation Time: 11 minutes Critical Step Justification Step 21 This step is critical because inserting the synchroscope key into 4 KV TIES Synchroscope Key Switch is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).

Step 22 This step is critical because placing the Synchroscope Switch to the BUS 3 & 4 position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).

Step 24 This step is critical because momentarily placing the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position is necessary to transfer 4KV Bus 4 & 5 from the UAT to the SUT (via 4KV Bus 3).

Alternate Path Critical Step Justification Step 27 This step is critical because depressing the THINK pushbutton and placing the control switch for BKR 52/20 to the OPEN (TRIP) position is necessary to manually open Breaker 52/20.

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 4 of 22 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ A as follows:
  • ICO V4160B4BRK20 f:TRIP_FAIL, (Breaker 52/20 Fails to Auto OPEN)
  • IMF EPS09 f:239.25, (Overvoltage on Bus E-2; > 506 Volts, due to High Switchyard Voltage)
  • (Conditional) $006_52_20_TRIP DCO V4160B4BRK20 (Remove Breaker 52/20 failure on Control Switch to TRIP)
2. Reset simulator to IC-5, 100% Power.
3. Place in RUN and allow time to stabilize.
4. Execute Scenario File 006_JPM_ A
5. Ensure that the following components are aligned:
  • C Charging Pump is RUNNING
  • HVH-3 and HVH-4 are RUNNING
  • HVA-1B is RUNNING
  • HVH-5B is OFF
  • HVE-2B is OFF
6. Call up QP E1E2 at the BOP Desk.
7. Perform the actions of AOP-31 up to Step 21.
8. Stabilize the plant.
9. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-600 (July, 2015).
2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
3. Call up QP E1E2 at the BOP Desk.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 5 of 22 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Check Emergency Bus E-2 Voltage - Greater than 505 Volts (Step 21).

___ SAT STANDARD: The operator observes ERFIS (QP E1E2) and recognizes that Bus E-2 Voltage is approximately 506.5 volts.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: Transferring the following safety related components will cause voltage to rise. This step is designed to protect components.

STEP 2: Check Instrument Air as follows:

a. Check Instrument Air Compressor B - Running in Manual

___ SAT (Step 22.a.)

RNO: Go to Step 23

___ UNSAT STANDARD: The operator reads the Note, and proceeds.

The operator recognizes that Instrument Air Compressor B is in AUTO as stated in the Initial Cue. The operator addresses the RNO.

EXAMINERS CUE: If the operator requests status of IAC B, remind the operator that the Cue sheet stated that IACs A and B were in AUTO.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the AO, as the AO, report that IAC A and B are in AUTO.

COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 6 of 22 Form ES-C-1 PERFORMANCE INFORMATION NOTE: For conditions where it may not be possible to reduce emergency bus voltages below 505 volts AND running of the EDG is required to ensure that the EDG is operable, testing of the EDG may be performed with concurrence from the system engineer if the system engineer determines that such testing does not constitute a long term degradation risk.

STEP 3: Check EDG B Status as Follows:

a. Check Main Generator - ON LINE (Step 23.a.)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that

___ UNSAT the Main Generator is ON Line.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: Check EDG B Status as Follows:

b. Check EMERGENCY DIESEL GENERATOR B - RUNNING (Step 23.b.)

___ SAT STANDARD: The operator observes the B EDG Green OFF status light is LIT and concludes that the B EDG is NOT running.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 7 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Check EDG B Status as Follows:

b. RNO: Postpone EDG B testing while in the AOP. Go to Step
24. Check EMERGENCY DIESEL GENERATOR B - RUNNING ___ SAT (Step 23.b. RNO)

STANDARD: The operator proceeds to Step 24. ___ UNSAT EXAMINERS CUE: If the operator informs the CRS to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the System Engineer to postpone EMERGENCY DIESEL GENERATOR B testing while in this procedure, acknowledge as the System Engineer.

COMMENTS:

STEP 6: Log the Time That Any of the Following Equipment Is OR Was Running Above 505 Volts.

  • INSTRUMENT AIR COMPRESSOR B
  • EDG B PRE-LUBE OIL PUMP ___ SAT
  • Fuel Oil Transfer Pump B (Step 24)

STANDARD: The operator recognizes that NONE of these components are ___ UNSAT running.

EXAMINERS CUE: Inform operator that another operator will track the run times.

EXAMINERS NOTE: The B IAC is in AUTO and the B EDG is NOT RUNNING.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 8 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Check Load On Emergency Bus E HAS BEEN RAISED USING STEP 18.

(Step 25)

Go to Step 27 ___ SAT (Step 25 RNO)

STANDARD: The operator recognizes that load on Emergency Bus E-1 has NOT been raised based on information given in the Initial Cue. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This would have been completed in Step 18 of AOP-031, which was bypassed.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 8: Raise Load On Emergency BUS E-2 As Follows:

a. Check Charging Pump C - Running

___ SAT (Step 27.a)

STANDARD: The operator observes the C Charging Pump Red status light is LIT and the Green status light is OFF (Or equivalent) and concludes ___ UNSAT that Charging Pump C is running.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 9 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Raise Load On Emergency BUS E-2 As Follows:

b. Verify CV RECIRC FANS - RUNNING

- HVH-3

___ SAT

- HVH-4 (Step 27.b)

___ UNSAT STANDARD: The operator observes the HVH-3 Red ON status light is LIT and concludes that HVH-3 is running.

The operator observes the HVH-4 Red ON status light is LIT and concludes that HVH-4 is running.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 10: Check CONT RM AIR HANDLING HVA-1B - RUNNING (Step 27.c)

___ SAT STANDARD: The operator observes the HVA-1B Red ON status light is LIT and concludes that HVH-1B is running.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 10 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: Check CRDM COOLING FAN, HVH-5B - RUNNING (Step 27.d)

___ SAT STANDARD: The operator observes the HVH-5B Green OFF status light is LIT and concludes that HVH-5B is NOT RUNNING, and proceeds to the RNO. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 12: Transfer CRDM COOLING FANS as follows:

1. Start HVH-5B
2. Stop HVH-5A (Step 27.d RNO)

___ SAT STANDARD: The operator places the HVH-5B control switch to START and observes the Red status light is LIT and the Green status light is OFF.

___ UNSAT The operator places the HVH-5A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: E-2 Voltage should lower to approx. 506.3 Volts.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 11 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 13: Check AUX BLDG EXH FAN, HVE-2B - RUNNING (Step 27.e)

___ SAT STANDARD: The operator observes the HVE-2B Green OFF status light is LIT and concludes that HVE-2B is NOT running, and proceeds to the RNO.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 14: Transfer AUX BLDG EXH FANs as follows:

1) Start HVE-2B
2) Stop HVE-2A (Step 27.e RNO)

___ SAT STANDARD: The operator places the HVE-2B control switch to START and observes the Red status light is LIT and the Green status light is ___ UNSAT OFF.

The operator places the HVE-2A control switch to STOP and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: E-2 Voltage should lower to approx. 506.2 Volts.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 12 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 15: Check RHR - IN SERVICE.

(Step 27. f)

___ SAT STANDARD: The operator recognizes that the plant is in Mode 1 and determines that RHR is NOT is IN SERVICE. The operator addresses the RNO and proceeds to Step 28.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 16: Check Emergency BUS E-2 Voltage - GREATER THAN 505 VOLTS (Step 28)

___ SAT STANDARD: The operator observes Bus E-2 Voltage on ERFIS to be greater than 505 Volts (506.2 volts).

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 13 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 17: Check DSDG Status As Follows:

a. Check Main Generator - ON LINE (Step 29.a)

___ SAT STANDARD: The operator observes the 52/8 and 52/9 Red status lights are LIT and Green status lights are OFF (or equivalent), and concludes that the Main Generator is ON Line. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 18: Check DSDG Status As Follows:

b. Check DSDG - RUNNING (Step 29.b)

___ SAT STANDARD: The operator recognizes that DSDG is secured and aligned for AUTO as stated in the Initial Cue. The operator addresses the ___ UNSAT RNO.

EXAMINERS CUE: If the operator requests status of the DSDG, remind the operator that the Cue sheet stated that the DSDG was secured and aligned for AUTO.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the AO, as the AO, report that the DSDG is secured and aligned for AUTO.

COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 14 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 19: Check DSDG Status As Follows:

b. RNO: Postpone DSDG testing while in this AOP. Go to Step 30.

(Step 29.b RNO)

___ SAT STANDARD: The operator proceeds to step 30.

___ UNSAT EXAMINERS CUE: If operator informs the CRS to postpone DSDG testing while in this procedure, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: If the operator contacts the System Engineer to postpone DSDG testing while in this procedure, acknowledge as the System Engineer.

COMMENTS:

STEP 20: Check 4KV BUS 3-4 TIE, BKR 52 OPEN (Step 30)

___ SAT STANDARD: The operator observes 4KV BUS 3-4 TIE, BKR 52-19 Green status light is LIT and Red status light is OFF, and determines that BKR 52-19 IS OPEN. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52-19 indicates OPEN (TRIP) by GREEN light lit.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 15 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 21: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

a. Insert the Synchroscope Key into 4 KV TIES Synchroscope Key Switch

___ SAT (Step 31.a)

STANDARD: The operator inserts the synchroscope key into 4 KV TIES ___ UNSAT Synchroscope Key Switch.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 22: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

b. Place the Synchroscope Switch to the BUS 3 & 4 position (Step 31.b) ___ SAT STANDARD: The operator rotates the Synchroscope Switch clockwise to the BUS 3 & 4 position. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 16 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 23: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:

___ SAT

c. Verify the Synchroscope comes to approximately the 12 oclock position.

(Step 31.c)

___ UNSAT STANDARD: The operator observes that the Synchroscope is pointing to the 12 oclock position.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 24: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

d. Momentarily place the Control Switch for 4KV BUS 3-4 TIE, BKR 52/19 to the CLOSE position.

___ SAT (Step 31.d)

STANDARD: The operator momentarily places the control switch for BKR 52/19 ___ UNSAT to the CLOSE position.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 17 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 25: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:

___ SAT

e. Check BKR 52/19 - CLOSED (Step 31.e)

___ UNSAT STANDARD: The operator observes that the BKR 52/19 Red status light is LIT and the Green status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52-19 indicates CLOSED with RED light lit.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 26: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as follows:

___ SAT

f. Check UNIT AUX TO 4 KV BUS 4 BKR, 52/20 - OPEN (Step 31.f)

___ UNSAT STANDARD: The operator observes that the BKR 52/20 Red status light has remained LIT and the Green status light has remained OFF; and concludes that BKR 52/20 has remained in the CLOSED position (Alternate Path). The operator will address the RNO.

EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52/20 indicates CLOSED with RED light lit.

BKR 52/20 should have automatically opened when BKR 52/19 was CLOSED (A failure has prevented it from doing so).

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 18 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 27: Transfer 4160V BUS 4 to the STARTUP TRANSFORMER as CRITICAL follows: STEP

f. RNO: Perform the following
  • Simultaneously depress the THINK pushbutton AND ___ SAT place the control switch for BKR 52/20 to the OPEN position.

(Step 31.f RNO)

___ UNSAT STANDARD: The operator simultaneously depresses the THINK pushbutton and places the control switch for BKR 52/20 to the OPEN (TRIP) position, and observes that the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: BKR 52/20 indicates OPEN (TRIP) with GREEN light lit. When this occurs Bus E-2 voltage will drop to 484.8 volts.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 19 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 28: Place the 4 KV TIES Synchroscope Key Switch to the mid position.

(Step 31.g)

STANDARD: The operator rotates the Synchroscope Switch counter-clockwise to

___ SAT the mid position.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 29: Check the following:

  • Emergency BUS E-1 Voltage - LESS THAN 505 VOLTS AND
  • Emergency BUS E-2 Voltage - LESS THAN 505 VOLTS (Step 32) ___ SAT STANDARD: The operator observes that Bus E-1 voltage is 488.9 volts.

___ UNSAT The operator observes that Bus E-2 voltage is 484.8 volts.

EXAMINERS CUE: When operator identifies that BOTH Bus E-1 and E-2 are less than 505 VOLTS inform the operator that this completes the JPM.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 20 of 22 Form ES-C-1 PERFORMANCE INFORMATION STEP 30: Check Voltage as Follows: (Continuous Action Step)

  • APP-036-E3, SUT PRI OVER/UNDER VOLTAGE -

EXTINGUISHED AND

  • WEST 115KV BUS VOLTAGE - LESS THAN 119 KV ___ SAT AND
  • Emergency BUS E-1 Voltage - LESS THAN 502 VOLTS AND ___ UNSAT
  • Emergency BUS E-2 Voltage - LESS THAN 502 VOLTS (Step 33)

STANDARD: The operator observes that APP-036-E3 is DARK.

The operator observes that WEST 115KV BUS VOLTAGE is 18.8 KV.

The operator observes that Bus E-1 voltage is 488.9 volts.

The operator observes that Bus E-2 voltage is 484.8 volts.

EXAMINERS CUE: When operator identifies that BOTH Bus E-1 and E-2 are less than 502 VOLTS inform the operator that this completes the JPM.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Page 21 of 22 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM A Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM A NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • Plant is at 100% power.
  • Due to abnormal conditions on the Grid, 480V Bus E-2 currently exceeds 505 Volts.
  • You are the BOP.
  • D IAC is in service with A and B IACs in AUTO.
  • The DSDG is secured and aligned for AUTO.
  • The Load on Emergency Bus E-1 has NOT been altered since entering this AOP.

INITIATING CUE: The CRS has directed you to continue with AOP-031 until 480V Bus E-2 voltage is restored to less than 505 Volts.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM B Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM B (Rev_011216) NUREG 1021, Revision 10

Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Transfer From the FRV Bypass JPM No.: 2016 Systems - Control Valves to the FRVs Room JPM B (Alternate Path)

K/A

Reference:

059 A4.08 (3.2/2.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress with reactor power approximately 19%.
  • A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
  • The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
  • The Turbine is at 1800 RPM (Not synched to the Grid).
  • You are the operator assigned to control S/G water level.
  • Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.

Initiating Cue: The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.

Task Standard: The operator will place the C Feed Reg Valve in AUTO, and then take manual control of the B Feed Reg Valve and stabilize the B S/G level when it is determined that the B Feed Reg Valve has failed to control the B S/G level in AUTO.

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet Required Materials: None General

References:

GP-005 (Power Operation), Rev 128 AOP-010 (Main Feedwater/Condensate Malfunction), Rev 33 Handouts: Handout 1: Section 6.4 of GP-005 marked up for this JPM through Step 6.12.d for A and B FRVs.

Handout 2: Blank copy of AOP-010 Time Critical Task: NO Validation Time: 12 minutes NOTE: This JPM should be pre-briefed in the Briefing Room.

Critical Step Justification Step 2 This step is critical because adjusting the output of the FCV-499 controller is necessary to place the C Feed Reg Valve in AUTO.

Step 3 This step is critical because depressing the AUTO pushbutton on the FCV-498 controller is necessary to place the C Feed Reg Valve in AUTO.

Step 4 This step is critical because rotating the FCV-499 controller adjust knob counter-clockwise until the controller is at 0% is necessary to place the C Feed Reg Valve in AUTO.

Alternate Path Critical Step Justification Step 5 or 7 This step is critical because placing the FCV-488 controller in MANUAL and stabilizing the B S/G level is necessary to take manual control of the B Feed Reg Valve and stabilize the B S/G level.

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-3, 16% Power, Turbine Ready for Synch
2. Place in RUN.
3. Perform the following:
  • Adjust FRV Bypasses to 60-90% OPEN.
  • Override CLOSED FCV-1446 (1CFW094 f:normal)
4. Ensure the following:
  • Rx power is between 17-20%
  • Tavg is between 551-555°F
  • The C FRV Bypass Valve OPEN with 60-90% output demand
  • The C S/G level is within 2-4% of programmed level (39%)
  • The A and B FRV Controllers are in AUTO
  • The C FRV Controller is in MANUAL
  • FCV-1446 indicates SHUT
5. Insert $006_FRV_BYPASS IMF CFW17B d:5 r:90 f:0 (5 seconds after FCV-499 (C Feed Reg Bypass Valve) OPEN indication extinguishes)
6. Identify APP-003-D4, TAVE/TREF DEV, and an expected alarm (Green Dot)
7. Place Green Dots on all other LIT annunciators (Expected alarms)
8. Acknowledge alarms and stabilize plant.
9. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-601 (January, 2016).
2. Open Scenario File 006_JPM_B.
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE Section 6.4 Step 12 is a continuous action step that should be performed whenever plant conditions require Feedwater flow through the FRVs and conditions are suitable or automatic S/G water level control.

Feedwater Regulating Valves should be transferred to automatic control one at a time.

FCV-1446 (Condensate Recirc) is controlled by FS-1446 (Cond Pmp Recirc VLV Flow Switch). FS-1446 is set to open FCV-1446 at a flow of 1050 gpm with the valve closing at a Condensate System flow of 4200 gpm flow through the GS Condenser and SGBD Heat Exchangers.

The Push Button to reset FS-1446 is located in the same enclosure as FS-1446 which is located approximately 15 feet northwest of FCV-1446 on a concrete column.

STEP 1: WHEN Reactor Power is 15% to 20%, OR the Feedwater Regulating Bypass Valves are 60% to 90% demand signal, THEN shift each Feedwater Regulating Valve to AUTO as follows: ___ SAT

  • IF FCV-1446 (Condenser Recirc) does NOT indicate SHUT, THEN.

(Step 12/12.a).

___ UNSAT STANDARD: The operator reads the Notes, and proceeds.

The operator observes reactor power on NR-45 (or equivalent) to be 18%, and proceeds.

The operator observes that FCV-499 Controller output to be between 60-90%, and proceeds.

The operator observes the FCV-1446 Green status light is LIT and Red status light is OFF, and recognizes that this Step is NOT Applicable, and proceeds.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION NOTE With the Turbine not yet loaded, S/G Program Level will be approximately 39% based on First Stage Pressure.

STEP 2: Ensure Feed Flow is trending with Steam Flow and S/G Levels are CRITICAL within 1% of program level. STEP (Step 12.b).

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator observes C S/G Feed Flow is trending with Steam Flow, and that C S/G level is NOT within 1% of programmed level. ___ UNSAT The operator adjusts the output of the FCV-499 controller as needed to adjust the feed flow trend and/or C S/G level within 1% of programmed level.

EXAMINERS CUE: APP-003-D4, which is an expected alarm, may alarm during this time. If so, state that the OATC will address this alarm.

It may be necessary to provide this cue throughout the JPM.

EXAMINERS NOTE: S/G programmed level is 39%.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Depress the Auto pushbutton on the FRV controller. CRITICAL (Step 12.c) STEP STANDARD: The operator observes that C S/G level is within 1% of programmed level. ___ SAT The operator depresses the AUTO pushbutton on the FCV-498 controller, and observes the White AUTO light is LIT. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 4: IF ANY Feedwater Regulating Bypass Valve is NOT closed, THEN STEP slowly close it (Step 12.c.1)

___ SAT STANDARD: The operator observes FCV-499 to be OPEN, and rotates the controller adjust knob counter-clockwise, and observes the controller output move toward 0%.

___ UNSAT The operator observes the FCV-498 Red and Green status light is LIT, and the controller output start to rise from 0%.

EXAMINERS CUE: S/G level may drop as much as 5% while the FRV adjusts automatically, and this may result in an APP-006 deviation alarm (This is normal and expected).

However, the operator may take action per AOP-010, and place the FRV controller in MANUAL.

If so, when the C S/G level is under the operators control, report as I&C that troubleshooting has been conducted (Using time compression), and it has been determined that the FCV-498 controller is operating properly.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Ensure each FRV in AUTO is maintaining programmed S/G level. CRITICAL (Step 12.d) STEP STANDARD: The operator observes that C S/G level is stabilized and concludes that the C FRV (FCV-498) is maintaining programmed S/G level in ___ SAT AUTO.

The operator observes one or more of the following:

  • B Feed flow as indicated on FR-488 starts to lower ___ UNSAT
  • B S/G level as indicated on FR-488 starts to lower
  • FCV-488 controller output starts to lower
  • FCV-488 Green status light is LIT, Red status light is OFF
  • APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL (Alternate Path)

The operator depresses the MANUAL pushbutton on the FCV-488 controller, and observes the White AUTO light is Extinguished; and the B S/G is stabilized (i.e. under the operator control). (If so, Terminate JPM)

OR The operator addresses AOP-010. (If so, continue to subsequent Steps)

EXAMINERS CUE: If the operator addresses AOP-010, provide the operator with a copy of Handout 2, and continue.

EXAMINERS NOTE: 5 seconds after the C FRBV is closed the B FRV controller will fail causing FCV-488 to CLOSE.

The operator is expected to take manual control of FCV-488 using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.); or by entering AOP-010. If the operator addresses AOP-010, continue.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: CHECK FRVs OPERATING PROPERLY (MANUAL OR AUTO):

FCV478 FCV488 FCV498 ___ SAT (AOP-010 Step 1)

___ UNSAT STANDARD: The operator observes one or more of the following:

  • B Feed flow as indicated on FR-488 starts to lower
  • B S/G level as indicated on FR-488 starts to lower
  • FCV-488 controller output starts to lower
  • FCV-488 Green status light is LIT, Red status light is OFF
  • APP-006-E1, S/G B NAR RANGE LO/LO-LO LEVEL The operator proceeds to Step 1 RNO.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 7: PERFORM the following: CRITICAL ENSURE FRV for affected S/G(s) in manual control. STEP ATTEMPT to stabilize S/G level using FRV and/or FRV Bypass Valves by matching steam flow with feed flow.

STOP any load change in progress.

If unable to control S/G level, THEN TRIP the reactor and GO TO ___ SAT EOPE0, Reactor Trip Or Safety Injection.

(AOP-010 Step 1 RNO)

___ UNSAT STANDARD: The operator places FCV-498 controller in MANUAL and stabilizes the B S/G level.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: CHECK Reactor Trip Setpoint BEING APPROACHED (AOP-010 Step 2)

___ SAT STANDARD: The operator observes that the B S/G level is stabilized.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 9: IF a reactor trip setpoint is approached, THEN TRIP the reactor and GO TO EOPE0, Reactor Trip Or Safety Injection.

GO TO Step 4. ___ SAT (AOP-010 Step 2 RNO)

STANDARD: The operator observes that the B S/G level is stabilized. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM B Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM B NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress with reactor power approximately 19%.
  • A and B S/G levels are being controlled with the Feed Reg Valves operating in AUTO.
  • The C S/G level is being controlled manually on both the Feed Reg Valve and the Feed Reg Bypass Valve.
  • The Turbine is at 1800 RPM (Not synched to the Grid).
  • You are the operator assigned to control S/G water level.
  • Annunciator APP-003-D4, TAVE/TREF DEV, is an expected alarm.

INITIATING CUE: The CRS has directed you to transfer the C S/G level control to the Main Feedwater Regulating Valve in accordance with Step 6.4.12 of GP-005, Power Operation.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM C Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM C (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 17 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Restore PRT to Normal Operating JPM No.: 2016 Systems - Control Conditions Room JPM C (Alternate Path)

K/A

Reference:

007 A1.01 (2.9/3.1)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.

Initial Conditions:

  • The plant is at 100% power.
  • APP-003-D3, PRT HI/LO LEVEL, has alarmed.
  • The cause of the low level is known leakage from the PRT to the RCDT.
  • PRT level is stable at 67%.

Initiating Cue:

  • The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
  • All of the prerequisites of Section 4.0 are complete.

Task Standard: The operator will refill the PRT in accordance with Section 8.2.2 of OP-103; and then diagnose and relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.

Required Materials: None General

References:

OP-103 (Pressurizer Relief Tank Control System), Rev 21 2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 3 of 17 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of OP-103 Time Critical Task: NO Validation Time: 10 minutes NOTE: This JPM should be pre-briefed in the briefing room.

Critical Step Justification Step 2 This step is critical because placing a PW Pump control switch to START is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 3 This step is critical because placing the RC-519C control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 4 This step is critical because placing the RC-519A and B control switch to OPEN is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 9 This step is critical because placing the RC-519A and B control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Step 10 This step is critical because placing the RC-519C control switch to CLOSE is necessary to refill the PRT in accordance with Section 8.2.2 of OP-103.

Alternate Path Critical Step Justification Step 15 This step is critical because cycling RC-519C open and closed is necessary to relieve the hydraulic lock on RC-519B in accordance with Section 8.4.1 of OP-103.

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 4 of 17 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ C as follows:
  • IOR doRCSAAO212d e:006_RC_519AB_OPEN f:ON (Over-Ride RC-519B to OPEN when Switch taken to OPEN)
  • IOR do CNMAOO086J e:006_519AB_OPEN f:OFF (Over-Ride RC-519A/B CIV Indication to OFF)

To be inserted after RC-519C is CLOSED during Initial Fill of PRT (JPM Step 12)

  • $006_RC_519C_OPEN DOR doRCSAAO212D (Removes Over-Ride for RC-519B when RC-519C is OPEN)
  • $600_RC_519C_OPEN DOR doCNMAOO086J (Removes Over-Ride on RC-519A/B CIV Indication)
2. Reset simulator to IC-5, 100% Power.
3. Place in RUN, execute Scenario File 006_JPM_C and allow time to stabilize.
4. Drain PRT to 67% (Open RC-523 until PRT level 67% and Close RC-523.
5. Verify PRT conditions as follows: 103°F temperature, 67% level and 3 psig pressure.
6. Stabilize the plant.
7. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-602 (July, 2015).
2. Scenario File 006_JPM_ C NOTE: Booth Instructor verify that two additional overrides are available to be inserted at Step 11 of this JPM.
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 5 of 17 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM) and Handout 1.

START TIME:

NOTE:

PRT temperatures of greater than 120°F should be reduced by alternately adding Primary Water to the PRT and draining the PRT. (SER 93-007)

Maximum cooling effect can be achieved by leaving the added Primary Water in the PRT for at least 10 minutes prior to draining. (SER 93-007)

STEP 1: Verify the following initial conditions are satisfied:

a. All prerequisites of Section 4.0 are complete
b. Pressurizer Relief Tank level is less than 80%. ___ SAT
c. Draining the PRT is NOT in progress.

(Step 8.2.2.1)

STANDARD: The operator reads the Notes, and proceeds. ___ UNSAT The operator Verifies all initial conditions satisfied (Initial Cue).

EXAMINERS CUE: If asked, section 4.0 prerequisites are complete.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 6 of 17 Form ES-C-1 PERFORMANCE INFORMATION CAUTION Operating two Primary Water Pumps can cause inadvertent filling of the RCS if the RCS is depressurized and vented through a PORV when two Primary Water Pumps are operating. Water may makeup to the RCS via the PRT spargers if the PRT is filled faster than it can vent.

STEP 2: Verify a Primary Water Pump is OPERATING. CRITICAL (Step 8.2.2.2) STEP STANDARD: The operator reads the Caution, and proceeds.

___ SAT The operator observes the A and B Primary Water Pump Green status lights are LIT and the Red status lights are OFF, and determines that neither PW Pump is RUNNING.

___ UNSAT The operator places the A Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.

OR The operator places the B Primary Water Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: The A Primary Water Pump is in AUTO, set-up for Auto Makeup.

The operator may start either the A or the B Primary Water Pump.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 7 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Open RC-519C, PW TO PRT ISO CRITICAL (Step 8.2.2.3) STEP STANDARD: The operator places the RC-519C Control Switch to OPEN and observes the Red status light is LIT and the Green status light is OFF. ___ SAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE ___ UNSAT BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: Open RC-519A & B, PW TO CV ISO CRITICAL (Step 8.2.2.4) STEP STANDARD: The operator places and HOLDS the RC-519A & B Control Switch to OPEN and observes the Red status lights are LIT and the Green status ___ SAT lights are OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 8 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Monitor PRT for rising level (Step 8.2.2.5)

STANDARD: The operator observes rising PRT level on LI-470 or ERFIS. ___ SAT EXAMINERS CUE: NONE EXAMINERS NOTE: The normal PRT Level band is 70-80%. ___ UNSAT It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 6: IF the expected rise in level does NOT occur, THEN stop filling AND investigate.

(Step 8.2.2.6)

___ SAT STANDARD: The operator observes rising PRT level on LI-470 or ERFIS.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: The normal PRT Level band is 70-80%.

It is expected that APP-003-C3, PRT HI PRESS, is an expected alarm during this evolution.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 9 of 17 Form ES-C-1 PERFORMANCE INFORMATION NOTE: Increasing PRT level will cause PRT pressure to rise, possibly to the high pressure alarm setpoint of 5 psig.

STEP 7: Recognize/report PRT Hi Pressure alarm (APP-003 C3) received.

Monitors PRT pressure and reports value and that it is an expected alarm due to filling ___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator checks PRT pressure >5 psig due to filling, informs the ___ UNSAT CRS it is an expected alarm EXAMINERS CUE: As CRS, acknowledge report EXAMINERS NOTE: This is an expected alarm as the procedure note states. It is not expected that the operator will address the alarm and/or condition until after filling is completed. If the operator does address this alarm, if it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 10 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: WHEN PRT level is between 70% and 80%, THEN perform the following:

a. Stop the Primary Water Pump
b. Verify one Primary Water pump is in AUTO. ___ SAT (Step 8.2.2.7a&b)

STANDARD: If the A Primary Water Pump was previously started, the operator places the A Primary Water Pump Control Switch to STOP and ___ UNSAT observes the Green status light is LIT and the Red status light is OFF.

The operator places the A Primary Water Pump Control Switch to AUTO.

OR If the B Primary Water Pump was previously started, the operator places the B Primary Water Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 11 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Close RC-519A & B CRITICAL (Step 8.2.2.7c) STEP STANDARD: The operator places and holds the RC-519A & B Control Switch to CLOSE and observes the RC-519A Green status light is LIT and the ___ SAT Red status light is OFF.

The operator observes that the RC-519B Red and Green status lights are LIT (Alternate Path - Mitigated in a later Step). ___ UNSAT The operator reports to the CRS that RC-519B has not fully CLOSED.

EXAMINERS CUE: As CRS, acknowledge report If a request is made to cycle RC-519A & B to attempt to verify RC-519B operation, as CRS then respond no do not cycle the valve EXAMINERS NOTE: A single Control Switch controls both valves BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 10: Close RC-519C CRITICAL (Step 8.2.2.7d) STEP STANDARD: The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF. ___ SAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE ___ UNSAT BOOTH OPERATOR CUE: Insert the last two commands IAW 006_JPM_C File to remove over-rides once RC-519C is closed.

COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 12 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: IF PRT level is greater than or equal to 83% OR PRT temperature is greater than 120°F, THEN lower the PRT level in accordance with the appropriate Section of this procedure, Draining the PRT When Pressurizer Temperature is Greater Than Or Equal to 200°F OR ___ SAT Draining the PRT When Pressurizer Temperature is Less Than 200°F. (Step 8.2.2.8)

STANDARD: The operator observes PRT level on LI-470 (or ERFIS) is <83% and ___ UNSAT PRT temperature on TI-471 (or ERFIS) is <120°F EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 12: IF RC-519A or RC-519B do NOT fully close, THEN relieve the hydraulic lock in accordance with the Relieving Hydraulic Lock on RC-519A AND RC-519B Section of this procedure (Alternate Path - RC-519B Hydraulic Lock has previously occurred and is Mitigated Here). ___ SAT (Step 8.2.2.9)

STANDARD: The operator reviews the OP-103 Table Of Contents and determines that Section 8.4.1 is required, and proceeds to this section. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: If the operator addresses APP-003-C3 prior to addressing the hydraulic lock, when it decided to vent the PRT to reduce pressure, state that Another Operator will address this alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 13 of 17 Form ES-C-1 PERFORMANCE INFORMATION NOTE: The RCS System Engineer WILL need to be NOTIFIED WHEN the following section is PERFORMED to relieve hydraulic lock on RC-519A AND RC-519B for Engineering Trending Purposes.

STEP 13: Relieving Hydraulic Lock on RC-519A AND RC-519B:

Verify the following initial conditions are satisfied:

a. RC-519A & B, PW TO CV ISO, control switch is in the CLOSE position and one OR both valves indicate in mid position. ___ SAT (Step 8.4.1.a)

STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator observes the RC-519A Green status light is LIT and the Red status light is OFF.

The operator observes the RC-519B Red and Green status lights are LIT.

EXAMINERS CUE: If the operator notifies the CRS or the System Engineer, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 14 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 14: Verify the Post Accident Sampling System is NOT in operation.

(Step 8.4.1.b)

STANDARD: Operator verifies PASS is not operating ___ SAT EXAMINERS CUE: If asked about the status of this system, ask the operator what they would expect the status to be in the current plant condition. THEN, indicate that the ___ UNSAT system is as expected.

EXAMINERS NOTE: The PASS is ONLY operated under accident conditions, which do NOT exist.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 15: IF RC-519B is indicating in mid position, THEN cycle RC-519C, PW CRITICAL TO PRT ISO STEP (Step 8.4.2)

STANDARD: The operator places the RC-519C Control Switch to OPEN and ___ SAT observes the Red status light is LIT and the Green status light is OFF.

The operator places the RC-519C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF. ___ UNSAT The operator observes the RC-519B Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: If the operator informs the CRS of the valve position change, acknowledge as the CRS.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 15 of 17 Form ES-C-1 PERFORMANCE INFORMATION STEP 16: IF RC-519A is indicating in mid position, THEN perform the following:

a. Verify neither Primary Water Pump is OPERATING.
b. Close breaker 15 on Power Panel 27.
c. Open HCV-4176, CDT ISOLATION. ___ SAT
d. Open HCV-4174, PZR RELIEF TANK ISOLATION.
e. Close HCV-4176, CDT ISOLATION.
f. Close HCV-4174, PZR RELIEF TANK ISOLATION.
g. Open breaker 15 on Power Panel 27. ___ UNSAT (Step 8.4.1.3)

STANDARD: The operator recognizes the sub-steps under Section 8.4.1.3 are not applicable and annotates the steps with N/A EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: Power Panel 27 is located on the west side of the PASS panel.

STEP 17: IF RC-519A OR RC-519B is still indicating mid position, THEN declare the valve out of service AND refer to ITS LCO 3.6.3.

(Step 8.4.1.4)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator recognizes this step is N/A and marks it N/A

___ UNSAT EXAMINERS CUE: Inform the operator you will have another operator restore PRT pressure to normal EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Page 16 of 17 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM C Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM C NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100% power.
  • APP-003-D3, PRT HI/LO LEVEL, has alarmed.
  • The cause of the low level is known leakage from the PRT to the RCDT.
  • PRT level is stable at 67%.

INITIATING CUE:

  • The CRS has directed you to restore PRT level to normal IAW OP-103, Pressurizer Relief Tank Control System.
  • All of the prerequisites of Section 4.0 are complete.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM D Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM D (Rev_011216) NUREG 1021, Revision 10

Appendix C Page 2 of 13 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Reactor Startup with Ejected Control JPM No.: 2016 Systems - Control Rod Room JPM D (Alternate Path)

K/A

Reference:

001 A1.06 (4.1/4.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is stabilized at 2% power.
  • The RCS is at normal operating temperature and pressure.
  • A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
  • You are the OATC.
  • The BOP is temporarily outside the Control Room.

Initiating Cue: The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.

Task Standard: The operator will start to raise reactor power to 3-5%. Then, the operator will manually trip the reactor, attempt to manually actuate Safety Injection and manually start SI Pumps in response to an ejected rod.

Required Materials: None General

References:

GP-003 (Normal Plant Startup From Hot Shutdown to Critical), Rev 105 2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 3 of 13 Form ES-C-1 Job Performance Measure Worksheet APP-004 (First Out Reactor Trips), Rev 18 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 AOP-001 (Malfunction of Reactor Control System), Rev 33 AOP-016 (Excessive Primary Plant Leakage), Rev 23 AOP-019 (Malfunction of RCS Pressure Control), Rev 20 EOP-E-0 (Reactor Trip or Safety Injection), Rev 6 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Section 8.4 of GP-003 marked up for this JPM to Step 8.4.7.

Time Critical Task: NO Validation Time: 5 minutes NOTE: This JPM should be pre-briefed in the Briefing Room.

Critical Step Justification Step 1 This step is critical because placing the Manual Rod Control Switch to the OUT position is necessary to raise and then stabilize power between 3-5%.

Step 2 This step is critical because pressing one of two Rx Trip pushbuttons is necessary to manually trip the reactor.

Step 8 This step is critical because pressing BOTH SI pushbuttons is necessary to manually attempt to actuate SI.

Alternate Path Critical Step Justification Step 9 This step is critical because placing the A and the C SI Pump Control Switches to START is necessary to manually start SI Pumps in response to an ejected rod.

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 4 of 13 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ D as follows:
  • IMF SIS01A, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
  • IMF SIS01B, f:FAIL_TO_INITIATE, (SI Train A Fails to AUTO/MANUAL actuate)
  • IMF RPS01A f:FAILURE_TO_OPEN, AUTO
  • IMF RPS01B f:FAILURE_TO_OPEN, AUTO
  • Event 1: $006_ROD_OUT_ARMED IMF CRF05A d:5 f:2000, H-8 (Ejected Control Rod)
2. Reset simulator to IC-1, 10-8amps IR and raise power to 2% and stabilize.
3. Place in RUN, execute Scenario File 006_JPM_D and allow time to stabilize.
4. Ensure actions of GP-003 up to Step 8.4.7 are complete.
5. Stabilize the plant.
6. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-603 (August, 2015).
2. Scenario File 006_JPM_ D
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 5 of 13 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: ADJUST control rods as necessary to achieve the following while CRITICAL continuing with this procedure: STEP RCS Tavg between 547°F and 551°F ___ SAT Reactor Power 3% to less than or equal to 5%.

(Step 8.4.8).

___ UNSAT STANDARD: The operator places the Manual Rod Control Switch to the OUT position to raise reactor power between 3-5%, and Tavg between 547°F and 551°F.

The operator will observe that an event unrelated to the reactor startup is occurring.

EXAMINERS CUE: NONE EXAMINERS NOTE: An Ejected Rod will occur shortly after the rod withdrawal has commenced.

Shortly afterwards, the following indications will be available to the operator:

  • SUR is positive and rising
  • Neutron flux is rising
  • RCS pressure is lowering
  • Pzr level is lowering
  • Charging Pump speed is rising COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 6 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Diagnose LOCA and manually trip Rx CRITICAL STEP STANDARD: The operator observes RTGB alarms and indications and manually trips the Rx by pressing one of two Rx Trip pushbuttons. ___ SAT The operator proceeds to EOP-E-0.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator may address one or more APPs, enter AOP-001, AOP-016, or AOP-019.

The operator may manually trip the reactor based on Attachment 3, Control Band and Trip Limit Guidance, of OMM-022, Emergency Operating Procedures Users Guide.

Since the first four actions of EOP-E-0 are Immediate Actions, the operator will likely NOT address the procedure (EOP-E-0) until the Immediate Actions are complete.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 7 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: CHECK Reactor Trip:

Reactor Trip AND Bypass Breakers OPEN Rod position indicators FULLY INSERTED Rod Bottom Lights ILLUMINATED ___ SAT Neutron Flux LOWERING (EOP-E-0 Step 1)

___ UNSAT STANDARD: The operator observes parameters and determines that the Rx is tripped.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: CHECK Turbine Trip:

Both Turbine Stop Valves CLOSED All MSR Purge AND Shutoff Valves CLOSED ___ SAT (EOP-E-0 Step 2)

STANDARD: The operator observes parameters and determines that the Turbine ___ UNSAT is tripped.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 8 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: CHECK Power To AC EMERGENCY BUSSES:

CHECK Bus E1 OR E2 AT LEAST ONE ENERGIZED CHECK Bus E1 AND E2 BOTH ENERGIZED (EOP-E-0 Step 3) ___ SAT STANDARD: The operator observes E-1/E-2 bus voltage and determines that both E-1 and E-2 are energized. ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 6: CHECK SI Status:

CHECK if SI is actuated:

SI annunciators ANY ILLUMINATED ___ SAT OR SI equipment AUTO STARTED (EOP-E-0 Step 4/4.a)

___ UNSAT STANDARD: The operator observes SI annunciators are LIT, and proceeds.

EXAMINERS CUE: NONE EXAMINERS NOTE: If the SI annunciators are not lit, the operator will perform the step 4.a RNO (It is expected that the criteria to automatically actuate safety injection will either occur or be close to occurring during the performance of this step).

SI equipment will NOT auto start.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 9 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: CHECK BOTH trains of SI actuated:

SI Pumps TWO RUNNING RHR Pumps BOTH RUNNING ___ SAT (EOP-E-0 Step 4.b)

STANDARD: The operator observes the A and C SI Pumps Green status lights ___ UNSAT are LIT, and Red status lights are EXTINGUISHED.

The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED The operator proceeds to the RNO.

EXAMINERS CUE: NONE EXAMINERS NOTE: SI equipment will NOT auto start.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 10 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: Manually ACTUATE SI by depressing BOTH SI pushbuttons.

(EOP-E-0 Step 4.b RNO) CRITICAL STEP STANDARD: The operator presses BOTH SI pushbuttons. ___ SAT The operator observes the A and C SI Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.

___ UNSAT The operator observes the A and B RHR Pumps Green status lights are LIT, and Red status lights are EXTINGUISHED.

(Alternate Path).

EXAMINERS CUE: NONE EXAMINERS NOTE: Upon completion of the EOP-E-0 Immediate Actions the operator may obtain EOP-E-0 and verify the Immediate Actions, BEFORE proceeding.

If so, the operator will likely review the EOP-E-0 Foldout Page, as well.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 11 of 13 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Manually start both SI Pumps. CRITICAL (Step 5.3.1.c of OMM-022) STEP

___ SAT STANDARD: The operator places the A SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.

___ UNSAT The operator places the C SI Pump Control Switch to Start and observes the Red status lights are LIT, and Green status lights are EXTINGUISHED.

EXAMINERS CUE: NONE EXAMINERS NOTE: This action may be taken at the time that the operator realizes that the manual SI actuation pushbuttons have failed to start the SI equipment using the guidance for Prompt and Prudent actions in OMM-022, Step 5.3.1.c. (Prompt action is necessary to prevent the deterioration of plant conditions or components to a possibly unsafe or unstable level. If time permits, approval from the SM/CRS shall be obtained. Factors to consider include: complexity of action, potential for damage from common cause, etc. Examples include: Failure of automatic systems to perform or respond correctly.)

If the operator addresses EOP-E-0 to verify the Immediate Actions upon completion of Step 4, and the SI Pumps have NOT been started, the operator will address Attachment 1 (With the BOP out of the Control Room) and manually start the SI Pumps (Step 1 and Step 1 RNO).

BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Page 12 of 13 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM D Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM D NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is stabilized at 2% power.
  • The RCS is at normal operating temperature and pressure.
  • A plant startup is in progress IAW GP-003, Normal Plant Startup From Hot Shutdown to Critical, and complete through Step 8.4.7.
  • You are the OATC.
  • The BOP is temporarily outside the Control Room.

INITIATING CUE: The CRS has directed you to pull control rods to stabilize reactor power between 3-5% by continuing with Step 8.4.8 of GP-003.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM E Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM E (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 18 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Transfer to Long Term Recirculation JPM No.: 2016 Systems -

Control Room JPM E (Alternate Path)

K/A

Reference:

EPE 011 EA1.11 (4.2/4.2)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A large break LOCA has occurred.
  • The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
  • RHR Cold Leg Recirculation flow is 3000 gpm.

Initiating Cue: The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.

THIS IS A TIME CRITICAL JPM Task Standard: The operator will align for Long Term Recirculation per EOP-ES-1.4, and align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.

Required Materials: None General

References:

EOP-ES-1.3 (Transfer to Cold Leg Recirculation), Rev 0 2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 3 of 18 Form ES-C-1 Job Performance Measure Worksheet EOP-ES-1.4 (Transfer to Long Term Recirculation), Rev 0 OMM-22 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Blank Copy of EOP-ES-1.4.

Time Critical Task: YES - Siemens fuel Analysis for LBLOCA, ESR 99- 00273 indicates that the operator must Restore Core cooling flow within 6 minutes when transferring to Piggy-Back Mode (Maximum of 6 minutes of no flow when transferring to the Piggy-Back Mode)

Validation Time: 10 minutes Critical Step Justification Step 3 This step is critical because placing the A RHR Pump Control Switch to STOP is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 4 This step is critical because placing the RHR-759A and 759B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 5 This step is critical because placing the SI-863B Control Switch to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 6 This step is critical because placing the SI-866A Control Switch to OPEN is OPEN is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 7 This step is critical because placing the SI-870A and B Control Switches to CLOSE is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Step 11 This step is critical because placing the A or C SI Pump Control Switch to START is necessary to align for Long Term Recirculation per EOP-ES-1.4.

Alternate Path Critical Step Justification Step 10 This step is critical because placing the B RHR Pump Control Switch to START is necessary to align only the B RHR Pump for operation when it is determined that SI-863A has failed to OPEN.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 4 of 18 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ E as follows:
  • IOR diSISAAI201 f:CLOSE (RHR Loop Recirc SI-863A fails to OPEN)
2. Reset simulator to IC-28, (Cold Leg Recirculation).
3. Place in RUN, execute Scenario File 006_JPM_E and allow time to stabilize.
4. Perform the following:
  • Stop A Primary Water Pump and place in AUTO
  • CLOSE FCV-114A and place in AUTO
  • Place Controller FCV-114A in AUTO
5. Acknowledge alarms on RR-1 and APP-036.
6. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-604 (August, 2015).
2. Place Simulator in Run, acknowledge alarms on RR-1 and APP-036, and Freeze Simulator.
3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when operator assumes the watch.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 5 of 18 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE: FOLDOUT for EOPES1.4 is in effect.

STEP 1: CHECK Condition Below ANY PRESENT APP001D4, RHR PIT A HIHI LEVEL ILLUMINATED OR ___ SAT APP001D5, RHR PIT B HIHI LEVEL ILLUMINATED OR EITHER RHR Pit level indication GREATER THAN 24 INCHES

___ UNSAT PERFORM the following:

MONITOR RHR Pit indications.

IF ANY of the RHR Pit level conditions noted occur, THEN GO TO EPP24, Isolation Of Leakage In The RHR Pump Pit.

GO TO Step 3.

(Step 1 and 1 RNO).

STANDARD: The operator reads the Note, and proceeds.

The operator reviews the Foldout Page Criteria.

The operator observes APP-001-D4 and D5 are extinguished, and that LI-615 A and B are both less than 24 inches; and determines that there is no RHR Pit leakage and proceeds to Step 3.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 6 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: DETERMINE Needed RHR Alignment:

CHECK RHR System alignment IN PIGGYBACK MODE

___ SAT OBSERVE the CAUTION prior to Step 5 AND GO TO Step 5.

(Step 3 and 3 RNO.)

___ UNSAT STANDARD: The operator observes SI-863A and B Green status lights are LIT, and Red status lights are OFF (Or equivalent) and determines that RHR is NOT in PIGGY-BACK Mode and proceeds to the Caution prior to Step 5.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Steps 5 through 8 must be performed without delay to minimize the time without flow through the core.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 7 of 18 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 3: ALIGN Equipment To Obtain The Following Conditions: STEP STOP ALL RHR Pumps (Step 5/5.a)

STANDARD: The operator reads the Caution, and proceeds. ___ SAT The operator places the A RHR Pump Control Switch to STOP and observes the Green status light is LIT and the Red status light ___ UNSAT is OFF.

The operator observes the B RHR Pump Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: The operator will likely read through Steps 5-8 ahead of time before performing actions.

APP-001-A7, RHR HX LO FLOW, is an expected alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

TIME CRITICAL START TIME: ________

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 8 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: ALIGN Equipment To Obtain The Following Conditions: CRITICAL CLOSE RHR HX Discharge Valves STEP RHR759A RHR759B (Step 5/5.b) ___ SAT STANDARD: The operator places the RHR-759A Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light

___ UNSAT is OFF.

The operator places the RHR-759B Control Switch to CLOSE and observes that the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 9 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: ALIGN Equipment To Obtain The Following Conditions: CRITICAL OPEN RHR Loop Recirc Valves STEP SI863A SI863B ___ SAT (Step 5/5.c)

STANDARD: The operator places the SI-863A Control Switch to OPEN and

___ UNSAT observes that the Green status light remains LIT and the Red status light remains OFF (Alternate Path - mitigated in subsequent steps).

The operator places the SI-863B Control Switch to OPEN and observes that the Red status light is LIT and the Green status light is OFF.

EXAMINERS CUE: If operator reports the failure of SI-863A to OPEN, acknowledge as the CRS.

EXAMINERS NOTE: The operator should not stop the procedure, the procedure is designed to subsequently mitigate the failure of SI-863A to OPEN.

The operator may place the SI-863A Control Switch back to CLOSE.

BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Opening SI866A AND SI866B, Hot Leg Injection Valves, with only one SI pump running will result in SI Pump runout.

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 10 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: ALIGN For Hot Leg Recirculation: CRITICAL OPEN SI866A, LOOP 3 HOT LEG INJ Valve STEP (Step 6/6.a)

STANDARD: The operator reads the Caution, and proceeds. ___ SAT The operator places the key-operated SI-866A Control Switch to OPEN and observes that SI-866A Red status light is LIT and the ___ UNSAT Green status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 7: ALIGN For Hot Leg Recirculation: CRITICAL CLOSE BIT Outlet Valves: STEP SI870A SI870B (Step 6/6.b) ___ SAT STANDARD: The operator places the SI-870A Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light

___ UNSAT is OFF.

The operator places the SI-870B Control Switch to CLOSE, and observes that the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 11 of 18 Form ES-C-1 PERFORMANCE INFORMATION CAUTION: RHR759A AND RHR759B, RHR HX Discharge Valves, are closed. The RHR Pumps will run deadheaded AND are subject to damage UNTIL the SI pumps are started.

STEP 8: ESTABLISH Hot Leg Recirculation Flow:

CHECK RHR759A, RHR HX A DISCH Valve CLOSED ___ SAT (Step 7/7.a)

STANDARD: The operator reads the Caution, and proceeds.

___ UNSAT The operator observes the RHR-759A Green status light is LIT, and Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 9: ESTABLISH Hot Leg Recirculation Flow:

CHECK SI863A, RHR LOOP RECIRC Valve OPEN (Step 7/7.b)

___ SAT STANDARD: The operator observes the SI-863A Green status light is LIT and determines that SI-863A is CLOSED (Alternate Path), and proceeds to Step 7.b RNO.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator has previously attempted to OPEN this valve, and it failed to OPEN. This procedure will address the compensatory actions now.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 12 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 10: ESTABLISH Hot Leg Recirculation Flow: CRITICAL PERFORM the following: STEP CLOSE RHR759B, RHR HX B DISCH Valve.

OPEN SI863B, RHR LOOP RECIRC Valve. ___ SAT CLOSE SI863A, RHR LOOP RECIRC Valve.

START RHR Pump B.

GO TO Step 8.

(Step 7/7.b RNO) ___ UNSAT STANDARD: The operator observes the RHR-759B Green status light is LIT and the Red status light is OFF.

The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.

The operator places the SI-863A Control Switch in the CLOSE position and observes the Green status light is LIT and the Red status light is OFF.

The operator places the B RHR Pump Control Switch to START and observes the Red status light is LIT and the Green status light is OFF.

The operator proceeds to Step 8.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 13 of 18 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 11: START One SI Pump STEP (Step 8)

STANDARD: The operator places the A or C SI Pump Control Switch to ___ SAT START, and observes the Red status light is LIT and the Green status light is OFF.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

TIME CRITICAL STOP TIME: ________ (Less than 6 Minutes)

STEP 12: CHECK Indicated Flow On The Appropriate Flow Meters:

PATH FLOW METERS SI-866B FI-940, SI Hot Leg Header Flow FI-933, SI Loop 2 Hot Leg Flow ___ SAT SI-866A FI-940, SI Hot Leg Header Flow FI-932, SI Loop 3 Hot Leg Flow (Step 9)

___ UNSAT STANDARD: The operator observes FI-940 and determines flow to be 640-680 gpm.

The operator observes FI-932 and determines flow to be 580-600 gpm.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 14 of 18 Form ES-C-1 PERFORMANCE INFORMATION CAUTION: The operator should be sure that cavitation is taking place prior to transitioning to steps that attempt to mitigate screen blockage. The actions taken are beyond design basis AND should NOT be taken unless warranted. Stable indication on FI605 may also be used as an aid in determining if cavitation is present in subsequent steps when RHR759A OR RHR759B AND RHR 744A OR RHR744B are open.

STEP 13: CHECK RHR Pump Discharge Pressure STABLE PI602A PI602B ___ SAT (Step 10)

STANDARD: The operator reads the caution, and proceeds. ___ UNSAT The operator observes PI-602B to be 160 psig.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 15 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 14: DETERMINE If Flow Should Be Established To Cold Legs as follows:

CHECK RCS pressure LESS THAN 275 PSIG CHECK RHR Cold Leg Recirculation flow indicated in EOPES1.3, ___ SAT Transfer To Cold Leg Recirculation CHECK CV Sump Screen status HAS REMAINED CLEAR DURING RECIRCULATION

___ UNSAT CHECK ALL of the following AVAILABLE

  • FI605, RHR TOTAL FLOW
  • RHR759A AND RHR759B, RHR HX Discharge Valves
  • SI863A AND SI863B, RHR LOOP RECIRC Valves
  • RHR Pumps A AND B (Step 11a-d and 11.d RNO)

STANDARD: The operator observes PR-444 (or equivalent) to be 5 psig.

The operator recalls that 3000 gpm of flow existed in the Cold Legs before this procedure started.

The operator observes RHR discharge pressure to be steady at 150 psig (or equivalent), and determines that no RHR Pump cavitation is occurring.

The operator observes 0 gpm on FI-605.

The operator observes the RHR-759A Green status light is LIT, and the Red status light is OFF.

The operator observes the RHR-759B Green status light is LIT, and the Red status light is OFF.

The operator observes the SI-863B Red status light is LIT and the Green status light is OFF.

The operator observes the SI-863A Green status light is LIT and the Red status light is OFF.

The operator recognizes that SI-863A is NOT available, and proceeds to Step 16.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 16 of 18 Form ES-C-1 PERFORMANCE INFORMATION STEP 15: CHECK Time Since Hot Leg Recirculation Established GREATER THAN 16 HOURS WHEN 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> have elapsed, THEN GO TO Step 17. ___ SAT (Step 16 and 16 RNO)

STANDARD: The operator recognizes that the procedure must be stopped for 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br />, and reports that the procedure must be placed on hold. ___ UNSAT EXAMINERS CUE: Another operator will continue with this procedure EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Page 17 of 18 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM E Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM E NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A large break LOCA has occurred.
  • The plant is currently on Cold Leg Recirculation IAW EOP-ES-1.3, Transfer to Cold Leg Recirculation.
  • RHR Cold Leg Recirculation flow is 3000 gpm.

INITIATING CUE: The CRS has directed you to transfer to Long Term Recirculation IAW EOP-ES-1.4, Transfer to Long Term Recirculation.

THIS IS A TIME CRITICAL JPM NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM F Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM F (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 15 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Fill a Safety Injection Accumulator JPM No.: 2016 Systems - Control Room JPM F K/A

Reference:

006 A4.02 (4.0/3.8)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The plant is at 100% power.
  • SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
  • You are the Licensed Dedicated Operator referred to in OP-202.

Initiating Cue: The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.

Task Standard: The operator will refill SI Accumulator C to reset the low level alarm without exceeding specified limits.

Required Materials: None General

References:

OP-202 (Safety Injection and Containment Vessel Spray System), Rev 98 APP-002 (Engineering Safeguards), Rev 70 2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 3 of 15 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: OP-202, Section 5.2.1 marked up as follows:

Step 5.2.1.1.a - Initialed Step 5.2.1.1.b Bullet 1 - Initialed Step 5.2.1.1.b Bullet 2 - NAd Step 5.2.1.1.c - NAd Step 5.2.1.1.d - Initialed Step 5.2.1.1.e (1) and (2) - NAd Time Critical Task: NO Validation Time: 8 minutes 2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 4 of 15 Form ES-C-1 Job Performance Measure Worksheet Critical Step Justification Step 2 This step is critical because placing the SI-869 Normal/Defeat switch in the NORMAL position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Control power must be aligned to the valve to allow for RTGB operation).

Step 4 This step is critical because placing the SI-869 control switch to the OPEN position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Open valve to align flowpath to SI Accumulator).

Step 5 This step is critical because placing an SI Pump control switch to the START position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (Provides adequate flow and pressure to fill the SI Accumulator).

Step 7 This step is critical because placing the SI-851C control switch to the OPEN position, and then closing it within limits is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (align fill path to appropriate accumulator and to secure filling at desired level).

Step 8 This step is critical because placing the operating SI Pump control switch to STOP and returning it to the MID position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (secure fill source and prevent operating on recirculation for an extended period).

Step 10 This step is critical because placing the SI-869 control switch to the CLOSED position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (realign SI-869 to its normal Mode 1 alignment).

Step 11 This step is critical because placing the SI-869 Normal/Defeat switch in the DEFEAT position is necessary to refill SI Accumulator C to reset the low level alarm without exceeding specified limits (properly align SI-869 Control Power Defeat Switch as required for Mode 1).

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 5 of 15 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-5, 100% Power.
2. Lower the C SI Accumulator Level as follows:
  • OPEN SI-852C
  • WHEN APP-002-B4, SI ACCUM C HI/LO LVL, is LIT, CLOSE SI-852C
3. Place in RUN and allow time to stabilize.
4. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-605 (August, 2015).
2. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
3. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 6 of 15 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Check open SI-856A, SI PUMP RECIRC and SI-856B, SI PUMP RECIRC (Steps 5.2.1.2.a and b).

___ SAT STANDARD: The operator observes SI-856A and B RED lights are LIT and the Green status lights are OFF.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator may use ERFIS to monitor SI Accumulator C level. (ERFIS: QP ACCUM C)

The Control Switches for these valves are located on the CV Sump Recirc Panel on the apron section of the RTGB below APP-002.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 7 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: ENSURE the Control Power Defeat switch for SI-869 is in the CRITICAL NORMAL position (Step 5.2.1.c) STEP STANDARD: The operator places the SI-869 NORMAL/DEFEAT key switch in ___ SAT the NORMAL position and observes the Amber status light is LIT.

EXAMINERS CUE: If the operator requests an AO check breaker status, ___ UNSAT report that all requested breakers are open.

EXAMINERS NOTE: Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.

BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE Based upon the numerous indications available to the Dedicated Operator of an SI actuation at the RTGB and the immediate response to isolate the SI Accumulator flowpath, an LCO declaration for SI Pump OR SI Flowpath Operability is NOT required.

The following step is a continuous action step which shall be performed when the stated condition is met.

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 8 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: IF an SI actuation is received during filling, THEN IMMEDIATELY CLOSE the applicable SI Accumulator makeup valve AND PERFORM Step 5.2.1.2.m to restore the SI System lineup. (Step 5.2.1.d) ___ SAT STANDARD: The operator reads the Notes, and proceeds.

___ UNSAT The operator reads step and acknowledges continuous actions step in the event of an SI actuation.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 4: Open SI-869, SI HOT LEG HDR. (Step 5.2.1.2.e) CRITICAL STEP STANDARD: The operator places the SI-869 Control Switch in the OPEN position and observes the Red status light LIT and the Green status light is ___ SAT OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 9 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 5: Start an SI Pump. (Step 5.2.1.2.f) CRITICAL STEP STANDARD: The operator will make an announcement regarding the pump start.

___ SAT The operator places an SI Pump Control Switch in the START position and observes the Red status light is LIT and the Green status light is OFF.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: Starting the SI Pump will cause APP-002-C3, BIT HDR HI PRESS, to alarm (Expected). The operator may address the APP.

The announcement of the Pump start is NOT critical BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: If the cooling unit for the train of the SI pump started is NOT operable, the opposite train unit can be started by placing its AUTO/RUN switch on the power supply breaker to RUN.

STEP 6: ENSURE at least one SI Pump Area Cooling unit (HVH-6A OR HVH-6B OR both) is operating. (Step 5.2.1.2.g)

STANDARD: The operator reads the Note, and proceeds. ___ SAT The operator observes the HVH-6A Red status light is LIT and the Green status light is OFF if the A SI Pump is started.

___ UNSAT The operator observes the HVH-6B Red status light is LIT and the Green status light is OFF if the C SI Pump is started.

EXAMINERS CUE: NONE EXAMINERS NOTE: The non-operating HVH Unit Green status light is LIT.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 10 of 15 Form ES-C-1 PERFORMANCE INFORMATION NOTE: The following are pressure and level limits/alarms for the SI Accumulators:

  • High Pressure Alarm 646 psig
  • Normal Operating Pressure 630 psig
  • High Level Alarm 75 percent
  • Low Level Alarm 67 percent CAUTION Filling the SI Accumulators can result in rapid indicated level changes due to the narrow span (approx. 14 inches) associated with the SI Accumulator level instruments and should be closely monitored.

STEP 7: IF SI Accumulator C is to be filled, THEN perform the following: CRITICAL (Step 5.2.1.2.j) STEP

1) Open SI-851C, MAKEUP.
2) Monitor the level and pressure of SI Accumulator C.
3) When desired level is obtained, then close SI-851C. ___ SAT STANDARD: The operator reads the Note and the Caution, and proceeds.

The operator places the SI-851C Control Switch to OPEN and ___ UNSAT observes the Red status light is LIT and the Green status light is OFF.

The operator observes LI-928 and PI-929 and LI-930 and PI-931 during filling.

When the accumulator level is > 67% and < 75% and accumulator pressure is > 614 psig and < 646 psig, the operator places the SI-851C Control Switch to CLOSE and observes the Green status light is LIT and the Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: APP-002-E4 will clear during the filling process.

It is acceptable if the C Accumulator Hi Level Annunciator (APP-002-E4) alarms during filling, as long as the TS LCO maximum level of 80.4% is NOT exceeded.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 11 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: Stop the operating SI Pump. (Step 5.2.1.2.k) CRITICAL STEP STANDARD: The operator places the operating SI Pump Control Switch in the STOP position and observes the Green status light is LIT and the ___ SAT Red status light is OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: APP-002-C3 will clear when the SI Pump is stopped.

BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 9: Verify both SI Pump Area Cooling units are OFF. (Step 5.2.1.2.l)

1) HVH-6A
2) HVH-6B

___ SAT STANDARD: The operator observes the HVH-6A Green status light is LIT and the Red status light is OFF.

The operator observes the HVH-6B Green status light is LIT and the ___ UNSAT Red status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 12 of 15 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 10: Close SI-869, SI HOT LEG HDR. (Step 5.2.1.2.m) STEP STANDARD: The operator places the SI-869 Control Switch in the CLOSE position and observes the Green status light LIT and the Red status ___ SAT light is OFF.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

NOTE: In Mode 1, 2 OR 3 the Control Power Defeat switch for SI-869 should be in the DEFEAT position. In Mode 5 OR 6 the Control Power Defeat switch for SI-869 should be in the NORMAL position. In Mode 4 the position of the Control Power Defeat switch for SI-869 is determined by GP-002 OR GP-007.

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 13 of 15 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: ENSURE the Control Power Defeat switch for SI-869 in the position CRITICAL determined by plant status. (Step 5.2.1.2.n) STEP STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator places the SI-869 NORMAL/DEFEAT key switch in the DEFEAT position and observes the Amber status light is OFF.

EXAMINERS CUE: NA ___ UNSAT EXAMINERS NOTE: Key switch for SI-869 is located in the rear of the RTGB on the ECCS VALVES CONTROL POWER DEFEAT PANEL.

BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Page 14 of 15 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM F Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM F NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100% power.
  • SI ACCUM C HI/LO LVL (APP-002-E4) alarm has been received and actions have been reviewed by the RO.
  • You are the Licensed Dedicated Operator referred to in OP-202.

INITIATING CUE: The CRS has briefed and directed you to fill SI Accumulator C to reset the low level alarm IAW OP-202, Section 5.2.1.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM G Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM G (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Remove Source Range Channel N- JPM No.: 2016 Systems - Control 31 From Service Room JPM G K/A

Reference:

015 A4.03 (3.8/3.9)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
  • SR Channel N-31 has just failed low.

Initiating Cue:

  • The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
  • The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.

Task Standard: The operator will remove SR Channel N-31 from service IAW NI-5 of OWP-011.

Required Materials: None General

References:

OWP-011 (Nuclear Instrumentation), Rev 24 GP-003, Normal Plant Startup From Hot Shutdown to Critical, Rev 105 2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of OWP-11.

Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 2 This step is critical because removing NI-31 from ERFIS Scan is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.

Step 4 This step is critical because placing the Start Up Rate Channel Select Switch to the N32, N35 or N36 is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.

Step 5 This step is critical because placing the NI-31 Level Trip Bypass Switch to the BYPASS position is necessary to remove SR Channel N-31 from service IAW NI-5 of OWP-011.

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Reset simulator to IC-8, (47.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> tripped, Critical at 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />).
2. Place in RUN and allow time to stabilize.
3. Perform the following:
  • Rod Bank Select Switch to SBB
  • Withdrawal SBB rods to 225 Steps
  • Rod Bank Select Switch to M
  • Withdrawal CBA rods to 22 Steps
  • Place Audio Count Rate Selector in the N31 position
  • Place the Startup Rate Channel Select Switch in the N31 position
4. Insert Malfunction NIS01A, Final: 1 (SR N-31 fails LOW)
5. Acknowledge alarms and stabilize the plant.
6. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-606 (August, 2015).
2. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

STEP 1: Obtain and review the procedure.

(OWP-011, NI-5, Steps 1-7).

___ SAT STANDARD: The operator reviews Handout 1 and identifies that NI-5 must be addressed.

The operator verifies that Revision 24 is the latest revision (Initial

___ UNSAT Cue), and prints their name, signs and dates Step 1.

Operator reviews Steps 2-7.

EXAMINERS CUE: NONE EXAMINERS NOTE: The operator may use Green Dots to flag the expected annunciators.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: Complete Step 8: CRITICAL REMOVE NI-31 from ERFIS SCAN: NIN0031A. STEP (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator selects F3 on ERFIS (Master Menu)

The operator selects ADMIN (Administrative Functions Menu)

___ UNSAT The operator selects DR (Del/Res Point From/To Scan or Alarm)

The operator depresses the DELETE SCAN pushbutton The operator enters Point I.D. NIN0031A EXAMINERS CUE: NONE EXAMINERS NOTE: This can be checked on ERFIS as follows:

Select F3 (Master Menu)

Select REAL (Real Time Data Menu)

Select DBO (Point Information/Value Display)

Enter NNI0031A Observe QUALITY to be DEL BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 3: Complete Step 8:

AUDIO COUNT RATE CHANNEL - CHANNEL SELECTOR Switch (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator pulls and rotates the Audio Count Rate Channel Selector Switch counter-clockwise to the N32 position, and initials the Selected to SR 32 block on the NI-5 Valve, Breaker, Switch Lineup.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: This switch is on the Audio Count Rate Drawer BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: Complete Step 8: CRITICAL START UP RATE CHANNEL SELECT Switch

  • STEP (NI-5 Valve, Breaker, Switch Lineup).

STANDARD: The operator places the Start Up Rate Channel Select Switch to the

___ SAT N32; records the selected instrument in the NI block position, and initials the NI-5 Valve, Breaker, Switch Lineup.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: This switch is on the Comparator and Rate Drawer BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 5: Complete Step 8: CRITICAL LEVEL TRIP Switch STEP (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator places the NI-31 Level Trip Bypass Switch to the BYPASS position, and initials the NI-5 Valve, Breaker, Switch Lineup.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator will acknowledge APP-005-D4, NIS TRIP/DROP ROD BYPASS, as an expected alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: Complete Step 8:

NIS TRIP BYPASS NI-31 Status Light (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator observes the NI-31 LEVEL TRIP BYPASS status light is LIT and initials the NI-5 Valve, Breaker, Switch Lineup.

EXAMINERS CUE: NONE

___ UNSAT EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 7: Complete Step 8:

HIGH FLUX AT SHUTDOWN Switch (NI-5 Valve, Breaker, Switch Lineup).

___ SAT STANDARD: The operator places the NI-High Flux At Shutdown Switch to the BLOCK position, and initials the NI-5 Valve, Breaker, Switch Lineup.

The operator signs and dates Step 8 of NI-5.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: The operator will acknowledge APP-005-B1, HI FLUX AT SHUTDOWN ALARM BLOCK, as an expected alarm.

BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM G Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM G NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress in accordance with GP-003, Normal Plant Startup From Hot Shutdown to Critical.
  • SR Channel N-31 has just failed low.

INITIATING CUE:

  • The CRS has directed you to remove SR Channel N-31 from service IAW OWP-011, Nuclear Instrumentation.
  • The latest Revision of OWP-011 has been verified to be Rev 24, and the associated Work Request is 16-02.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet SIM JPM H Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - Control Room JPM H (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 16 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Start a Reactor Coolant Pump JPM No.: 2016 Systems - Control Room JPM H K/A

Reference:

003 A4.03 (2.8/2.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: Actual Performance: X Classroom Simulator X Plant READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
  • The A RCP is running.
  • It is intended to start the B RCP next.
  • It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.

Initiating Cue: The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.

Task Standard: The operator will start the B RCP IAW OP-101.

Required Materials: None 2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 3 of 16 Form ES-C-1 Job Performance Measure Worksheet General

References:

OP-101 (Reactor Coolant System and Reactor Coolant Pump Startup and Operation), Rev 74 AD-OP-ALL-1000 (Conduct of Operations) Rev 4 AOP-018 (Reactor Coolant Pump Abnormal Conditions), Rev 31 APP-001 (Miscellaneous NSSS), Rev 60 Technical Specification LCO 3.3.5 (Loss of Power (LOP) Diesel Generator (DG) Start Instrumentation), Amendment 176 Handouts: Handout 1: Section 8.1 of OP-101 marked up through Step 8.1.1.2.y for this JPM.

Time Critical Task: NO Validation Time: 10 minutes NOTE: This JPM should be pre-briefed in the Briefing Room.

Critical Step Justification Step 2 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.aa.1&3 is necessary to start the B RCP IAW OP-101.

Step 3 This step is critical because placing the Bearing Lift Pump in the START position, and observing that the LIFT PRESSURE status light is LIT is necessary to start the B RCP IAW OP-101.

Step 6 This step is critical because after 2 minutes with the Bearing Oil Lift Pump running, placing the B RCP Control Switch to the START position is necessary to start the B RCP IAW OP-101.

Step 8 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.gg.1-6 is necessary to start the B RCP IAW OP-101.

Step 10 This step is critical because contacting the AO and directing the performance of Step 8.1.1.2.ii.1-6. is necessary to start the B RCP IAW OP-101.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 4 of 16 Form ES-C-1 Job Performance Measure Worksheet SIMULATOR OPERATIONAL GUIDELINES

1. Construct Scenario File 006_JPM_ H as follows:
  • IRF EPSL007 f:DEFEAT
  • IRF EPSL008 f:DEFEAT
  • IRF EPSL007 f:NORMAL
  • IRF EPSL008 f:NORMAL
2. Reset simulator to IC-35, 0% Power, Mode 3 at NOP/NOT.
3. Place in RUN execute Scenario File 006_JPM_H, and allow time to stabilize.
4. Place PCV-455A in manual and close "B" Loop Spray Valve (PCV-455A).
5. Perform the actions of Section 8.1.1 of OP-101 up to Step 8.1.1.2.y.
6. Stabilize the plant.
7. Freeze the Simulator.

OR

1. Reset Simulator to Temporary Snap IC-607 (August, 2015).
2. Open Scenario File 006_JPM_H.

NOTE: Booth Instructor will need to operate Events 1-4 when contacted by the operator at JPM Steps 2, 8 & 10.

3. Perform Attachment 2 (Simulator Setup For Exams) of TAP-411.
4. Place Simulator in Run when Operator assumes the watch.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 5 of 16 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTES ITS LCO 3.3.5 allows bypassing Degraded Grid Protection when the Unit is NOT in Mode 1.

Conservative operating principles have determined that bypassing the Degraded Grid Protection will only be permitted when the Unit is NOT in Mode 1 OR Mode 2. (NCR 151422)

Degraded Grid Voltage Protection is limited to one hour in the DEFEAT position before it shall be returned to NORMAL. (NCR 151422)

STEP 1: IF required, THEN ENTER LCO 3.3.5 Action Statement due to bypassing Degraded Grid Protection, AND RECORD time.

(Step 8.1.1.2.z). ___ SAT STANDARD: The operator reads the Note, and proceeds.

___ UNSAT The operator records the time in the block provided.

The operator informs the CRS that LCO 3.3.5 may need to be entered.

EXAMINERS CUE: As the CRS, acknowledge report.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 6 of 16 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 2: IF degraded grid protection is in service, THEN DEFEAT the STEP degraded grid voltage protection as follows:

  • On the front of Bus E-1, Cubicle 18A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the DEFEAT position. ___ SAT
  • CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is ILLUMINATED.
  • On the front of Bus E-2, Cubicle 28A, INSTALL key in the DEGRADED GRID VOLTAGE keylock switch AND PLACE in the ___ UNSAT DEFEAT position.
  • CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is ILLUMINATED.

(Step 8.1.1.2.aa).

STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.aa.1&3.

The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is LIT and is an expected alarm.

The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is LIT and is an expected alarm.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: When directed, defeat Degraded Grid Protection on Bus E-1 RFI EPSL007, and report back as AO that Steps 8.1.1.2.aa.1 has been completed When directed, defeat Degraded Grid Protection on Bus E-2 RFI EPSL008, and report back as AO that Steps 8.1.1.2.aa.3 has been completed COMMENTS:

NOTE: Several starts / stops of the Bearing Oil Lift Pump may be required to prime the pump in a Motor where the Upper Reservoir has been drained and refilled.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 7 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: START the BRG LIFT PUMP AND CHECK the LIFT PRESSURE CRITICAL light ILLUMINATES. STEP (Step 8.1.1.2.bb).

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator places the Bearing Lift Pump B Control Switch in the START position, and observes the Red status light is LIT and the

___ UNSAT Green status light is OFF.

The operator observes that that the LIFT PRESSURE status light is LIT.

EXAMINERS CUE: If the operator addresses the CRS/SM about AOP-018 because of APP-001-E2, as the SM indicate that the performance of the procedure can be deferred.

EXAMINERS NOTE: APP-001-E2, RCP #1 SEAL LEAKOFF LO FLOW, alarms when the Bearing Oil Lift Pump is started.

This is because the pump start causes the B RCP shaft to be lifted affecting the #1 Seal on the B RCP, which will affect the #1 Seal Leakoff flows on the other RCPs.

The operator may address the APP, and may address AOP-018, Reactor Coolant Pump Abnormal Conditions. If so, a NOTE on the Entry Conditions to AOP-018 states that IF RCP#1 Seal Leakoff flow is below 1 gpm due to plant conditions known to affect leakoff flow, the SM may defer procedure entry provided the #1 Seal Leakoff flow remains above 0.8 gpm.

BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 8 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: IF RCP Oil Reservoir level annunciator is NOT EXTINGUISHED, THEN REFER to the appropriate Annunciator Procedure.

(Step 8.1.1.2.cc).

___ SAT STANDARD: The operator observes that APP-001-E8, RCP B OIL RESERV HI/LO LVL, is EXTINGUISHED.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

STEP 5: NOTIFY RC that RCPs are to be started AND to monitor for changing radiological conditions.

(Step 8.1.1.2.dd). ___ SAT STANDARD: The operator contacts RC and makes notification.

___ UNSAT EXAMINERS CUE: As RC Supervisor, Acknowledge EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Only one Reactor Coolant Pump is to be started at a time.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 9 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: WHEN the Brg Lift Pump has operated for a minimum of 2 minutes, CRITICAL THEN START the Reactor Coolant Pump. STEP (Step 8.1.1.2.ee).

___ SAT STANDARD: The operator reads the Caution, and proceeds.

The operator will make a plant announcement prior to starting the RCP.

___ UNSAT After 2 minutes with the Bearing Oil Lift Pump running, the operator places the B RCP Control Switch to the START position, and observes the Red status light is LIT and the Green status light is OFF.

The operator will observe FI-424 at 118%. (Not Critical)

The operator will observe FI-425 at 118%. (Not Critical)

The operator will observe FI-426 at 117%. (Not Critical)

The operator will observe B RCP #1 Seal Leakoff on FR-154B to be 1.24 gpm. (Not Critical)

The operator will observe RCS pressure on PR-444 to be 360 psig.

(Not Critical)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 10 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: WHEN a minimum of 50 seconds has elapsed since the Reactor Coolant Pump was started, THEN STOP the BRG LIFT PUMP.

(Step 8.1.1.2.ff).

___ SAT STANDARD: After a minimum of 50 seconds with the B RCP Running, the operator places the Bearing Oil Lift Pump Control Switch to the STOP position, and observes the Green status light is LIT and the

___ UNSAT Red status light is OFF.

The operator observes that that the LIFT PRESSURE status light is OFF.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

CAUTION: Do NOT Restore the Degraded Grid Voltage Protection to NORMAL until the Amber indicating light is Extinguished.

NOTE: The Degraded Grid Voltage keylock keys can NOT be removed from switches unless positioned to NORMAL.

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 11 of 16 Form ES-C-1 PERFORMANCE INFORMATION CRITICAL STEP 8: IF E-1 Degraded Grid Voltage Protection is to be returned to STEP NORMAL, THEN RESTORE as follows:

  • Momentarily DEPRESS the amber E-1 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES. ___ SAT
  • CHECK the amber E-1 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
  • PLACE E-1 DEGRADED GRID VOLTAGE key switch to NORMAL. ___ UNSAT
  • REMOVE key.
  • IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.3, E-1 Defeat Switch Contact Position Verification.
  • ENSURE Relay 27 contacts are RESET by performing the following:

o DEPRESS the TARGET RESET pushbutton for Relay 27/DVA-1 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for Relay 27/DVB-1 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for Relay 27/DVC-1 AND CHECK that the target flag indicates black.

  • CHECK annunciator APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.

(Step 8.1.1.2.gg.1-7).

STANDARD: The operator reads the Caution and Note, and proceeds.

The operator contacts AO and directs performance of Step 8.1.1.2.gg.1-6.

The operator observes APP-010-F5, DEGRADED GRID E-1 PROT BYPD, is EXTINGUISHED.

EXAMINERS CUE: If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: When directed, return Degraded Grid Protection on Bus E-1 to normal RFI EPSL007, and report back as AO that Steps 8.1.1.2.gg.1-6 have been completed COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 12 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time.

(Step 8.1.1.2.hh). ___ SAT STANDARD: The operator records the time in the block provided.

___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 13 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 10: IF E-2 Degraded Grid Voltage Protection is to be returned to CRITICAL NORMAL, THEN RESTORE as follows: STEP

  • Momentarily DEPRESS the amber E-2 DEGRADED GRID TRIP SIGNAL light cover AND CHECK the light ILLUMINATES. ___ SAT
  • CHECK the amber E-2 DEGRADED GRID TRIP SIGNAL light is EXTINGUISHED.
  • PLACE E-2 DEGRADED GRID VOLTAGE key switch to NORMAL. ___ UNSAT
  • REMOVE key.
  • IF all three RCPs have been placed in service, THEN NOTIFY I&C to perform Attachment 10.4, E-2 Defeat Switch Contact Position Verification.
  • ENSURE relay 27 contacts are RESET by performing the following:

o DEPRESS the TARGET RESET pushbutton for relay 27/DVA-2 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for relay 27/DVB-2 AND CHECK that the target flag indicates black.

o DEPRESS the TARGET RESET pushbutton for relay 27/DVC-2 AND CHECK that the target flag indicates black.

  • CHECK annunciator APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.

(Step 8.1.1.2.ii).

STANDARD: The operator contacts AO and directs performance of Step 8.1.1.2.ii.1-6.

The operator observes APP-010-F6, DEGRADED GRID E-2 PROT BYPD, is EXTINGUISHED.

EXAMINERS CUE: If the operator asks the CRS about leaving the Degraded Grid Voltage Protection in effect until after the C RCP is started, direct the operator to continue with the procedure as written.

EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: When directed, return Degraded Grid Protection on Bus E-2 to normal RFI EPSL008, and report back as AO that Steps 8.1.1.2.ii.1-6 have been completed COMMENTS:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 14 of 16 Form ES-C-1 PERFORMANCE INFORMATION STEP 11: IF an Action Statement has been entered due to bypassing Degraded Grid Protection, THEN NOTIFY the CRS/SM of exiting the Action Statement AND RECORD time. ___ SAT (Step 8.1.1.2.jj).

STANDARD: The operator records the time in the block provided.

___ UNSAT The operator informs the CRS that the LCO 3.3.5 Action Statement may be able to be exited.

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE BOOTH OPERATOR CUE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Page 15 of 16 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - Control Room JPM H Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - Control Room JPM H NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • A plant startup is in progress in accordance with GP-002, Cold Shutdown to Hot Sub-Critical at No-Load Tavg.
  • The A RCP is running.
  • It is intended to start the B RCP next.
  • It is intended to bypass the Degraded Grid Protection prior to the RCP start and return it to service after the RCP is started per OP-101, and an AO is standing by to assist in this process.

INITIATING CUE: The CRS has directed you to start the B Reactor Coolant Pump by continuing with Step 8.1.1.2.z of OP-101.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet In-Plant JPM I Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - In-Plant JPM I (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 11 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Locally Establish AFW Flow from JPM No.: 2016 Systems - In-the SDAFW Pump and Control S/G Plant JPM I Levels and Pressures K/A

Reference:

EPE 055 EA2.01 (3.4/3.7)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • The Plant has experienced a loss of onsite and offsite power.
  • Wide range levels in all three SGs are 55%.
  • The SDAFW Pump has just been started.

Initiating Cue: The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.

Task Standard: The operator will control AFW flow to the Steam Generators and align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

EOP-ECA-0.0 (Loss of All AC Power), Rev 4 2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 3 of 11 Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Handouts: Handout 1: Blank copy of Attachment 4 of EOP-ECA-0.0.

Time Critical Task: NO Validation Time: 7 minutes Critical Step Justification Step 1 This step is critical because throttling the SDAFW Pump Discharge Valves is necessary to control AFW flow to the Steam Generators IAW Attachment 4 of EOP-ECA-0.0.

Step 3 This step is critical because closing IA-297 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 4 This step is critical because opening SDN-13 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 5 This step is critical because closing SDN-29 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 6 This step is critical because opening SDN-28 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

Step 7 This step is critical because opening IA-423 is necessary to align the Nitrogen System to the SG PORVs IAW Attachment 4 of EOP-ECA-0.0.

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 4 of 11 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE Flashlights AND ANY handtools needed are located with AOP/EOP/DSP Tool Kits.

The S/G Wide Range level indicators LI607A2, LI607B2, AND LI607C2 located in the Secondary Control Panel are powered from PP50 AND should always be available. These channels are credited in the SBO Coping Analysis.

CRITICAL STEP 1: Locally THROTTLE The Steam Driven AFW Pump Discharge STEP Valve(s) At The Secondary Control Panel Area To Maintain S/G WR Levels Between 60% AND 67%.

  • AFWV214A S/G A ___ SAT
  • AFWV214B S/G B
  • AFWV214C S/G C (Step 1) ___ UNSAT STANDARD: The operator reads the Notes, and proceeds.

The operator depresses the AFWV214A, 14B and 14C de-clutch lever and rotates handwheel counterclockwise to increase feedwater flow or clockwise to decrease feedwater flow.

AS-FOUND: All three valves are CLOSED (Stems fully inserted)

EXAMINERS CUE: After locating and describing how the three valves are operated, indicate that each valve has been De-Clutched and the handwheel rotated as needed to adjust feedwater flow When appropriate, indicate that each SG WR level is 64% and stable If the operator elects to OPEN the motor breakers for these valves, indicate that another operator will perform this action EXAMINERS NOTE: The operator may request that a second operator observe SG WR levels while the remainder of the Attachment is completed COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 5 of 11 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: OBSERVE NOTE Prior To Step 10 AND GO TO Step 10 (Step 2)

___ SAT STANDARD: The operator proceeds to Step 10.

___ UNSAT AS-FOUND: NA EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

NOTE IA297 is located at the southeast corner of the Pipe Jungle at an elevation between the feed AND steam lines.

CRITICAL STEP 3: CLOSE IA297, HDR STOP TO PORV STATION & MSIVS STEP (Step 10)

STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator rotates the IA-297 handwheel in the clockwise direction.

___ UNSAT AS-FOUND: OPEN (Stem Fully Withdrawn)

EXAMINERS CUE: The IA-297 handwheel will no longer turn in the clockwise direction and the stem is inserted EXAMINERS NOTE: Located at the SE corner of Pipe Jungle between the Feed & Steam lines elevation IA-297 is located in the overhead under a catwalk and the operator must climb an installed ladder, or proceed up the stairs to the top floor of the Turbine Building. However, the valve can be seen from below or above, and discussion of operation can take place from one of these two locations COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 6 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN13 is located at the Steam Dump Nitrogen Accumulator.

STEP 4: OPEN SDN13, NITROGEN BACK UP SUPPLY CRITICAL (Step 11) STEP STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator rotates the SDN-13 handwheel in the counter-clockwise direction.

___ UNSAT AS-FOUND: CLOSED (Stem Fully Inserted)

EXAMINERS CUE: The SDN-13 handwheel will no longer turn in the clockwise direction and the stem is inserted.

EXAMINERS NOTE: Located at the Steam Dump Nitrogen Accumulator COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 7 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: SDN28 AND SDN29 are located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.

STEP 5: UNLOCK AND CLOSE SDN29, STEAM LINE PORV NITROGEN CRITICAL B/U TO IA TELLTALE DRAIN STEP (Step 12)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator unlocks and rotates the SDN-29 handwheel in the ___ UNSAT clockwise direction.

AS-FOUND: Locked OPEN (Stem Fully Withdrawn)

EXAMINERS CUE: The SDN-29 handwheel will no longer turn in the clockwise direction and the stem is inserted.

EXAMINERS NOTE: Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:

STEP 6: UNLOCK AND OPEN SDN28, NITROGEN BACKUP TO STEAM CRITICAL LINE PORVS STEP (Step 13)

STANDARD: The operator unlocks and rotates the SDN-28 handwheel in the ___ SAT counter-clockwise direction.

AS-FOUND: Locked CLOSED (Stem Fully Inserted) ___ UNSAT EXAMINERS CUE: The SDN-28 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.

EXAMINERS NOTE: Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 8 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: IA423 is located at the southeast corner of the Pipe Jungle on the Mezzanine Deck.

STEP 7: UNLOCK AND OPEN IA423, NITROGEN TO STEAM LINE PORVS CRITICAL (Step 14) STEP STANDARD: The operator reads the Note, and proceeds.

___ SAT The operator unlocks and rotates the IA-423 handwheel in the counter-clockwise direction.

___ UNSAT AS-FOUND: Locked CLOSED (Stem Fully Inserted)

EXAMINERS CUE: The IA-423 handwheel will no longer turn in the counter-clockwise direction and the stem is withdrawn.

EXAMINERS NOTE: Located at the SE Corner of the Pipe Jungle on the Mezzanine Deck COMMENTS:

STEP 8: NOTIFY The Control Room Of The Following:

  • S/G level is under control locally ___ SAT
  • The S/G Steam Line PORVs have N2 supplied for motive air (Step 15/15.a and b)

STANDARD: The operator contacts the Control Room and makes the ___ UNSAT notifications.

AS-FOUND: NA EXAMINERS CUE: As the CRS, acknowledge EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 9 of 11 Form ES-C-1 PERFORMANCE INFORMATION NOTE: When MCC5 is energized, the Control Room will feed S/G A AND S/G C.

STEP 9: WHEN Notified From The Control Room, THEN FEED S/G B To 67%

S/G Wide Range Level AND SECURE Feeding (Step 16)

___ SAT STANDARD: The operator reads the Note, and proceeds.

The operator recognizes that this is a Continuous Action Step, and ___ UNSAT reports that the Attachment is complete.

AS-FOUND: NA EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Page 10 of 11 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - In-Plant JPM I Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - In-Plant JPM I NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The Plant has experienced a loss of onsite and offsite power.
  • Wide range levels in all three SGs are 55%.
  • The SDAFW Pump has just been started.

INITIATING CUE: The CRS has directed you to locally perform Attachment 4, Local Control Of S/G Level And Pressure, of EOP-ECA-0.0.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet In-Plant JPM J Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - In-Plant JPM J (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 10 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Respond to a Loss of Instrument Air JPM No.: 2016 Systems - In-Plant JPM J K/A

Reference:

065 AA1.04 (3.5.3.4)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

Initial Conditions:

  • AOP-017, Loss Of Instrument Air, has been entered.
  • The Station Air Compressor is under clearance and disassembled
  • The Station Air Receiver is depressurized and vented.

Initiating Cue:

  • The CRS has directed you to perform AOP-017 Step 8.
  • The Outside AO is standing by to assist as needed.

Task Standard: The operator will start IA Compressors A and B and align their discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

General

References:

AOP-017 (Loss of Instrument Air), Rev 43 OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 3 of 10 Form ES-C-1 Job Performance Measure Worksheet Handouts: Handout 1: Blank Copy of AOP-017.

Time Critical Task: NO Validation Time: 14 minutes Critical Step Justification Step 6 This step is critical because placing the IA Compressor A & B Control Switches in MANUAL is necessary to start IA Compressors A and B in accordance with Step 8 of AOP-017.

Step 8 This step is critical because rotating the IA3665 handwheel in the counter-clockwise direction is necessary to align the IA Compressors A and B discharge to supply air to the Instrument Air Header in accordance with Step 8 of AOP-017.

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 4 of 10 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Candidate with Initial Conditions/Cue (Last Page of this JPM), and Handout 1.

START TIME:

NOTE IA3821 is located on IA Dryer D.

Operator Aid 97OP35 to supply Station Air to Instrument Air is located in the Aux Bldg hallway on the Station Air Receiver.

STEP 1: DISPATCH Operator(s) To Perform The Following:

CHECK Station Air Compressor Available For Service:

SA1, STATION AIR TO RECEIVER OPEN ___ SAT AND Station Air Compressor Function Switch ON (Step 8/8.a)

___ UNSAT STANDARD: The operator reads the Notes, and proceeds.

The operator recognizes that SA-1 is OOS and proceeds to the RNO.

AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 5 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 2: OPEN SA1 AND PLACE the Station Air Compressor Function switch to ON.

IF the Station Air Compressor is still NOT available for service, THEN ___ SAT GO TO Step 8.d.

(Step 8.a RNO)

___ UNSAT STANDARD: The operator recognizes that SA-1 cannot be opened nor can the SAC Function Switch be placed to ON, and proceeds to Step 8.d.

AS FOUND: SA-1 Red Tagged CLOSED, SAC Function Switch is Red tagged OFF (Cue as needed)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

STEP 3: CHECK IA18, AIR DRYER "A" & "B" BYPASS OPEN (Step 8.d)

STANDARD: The operator observes IA-18, and (After Cue) proceeds to the Step ___ SAT 8.d RNO.

AS FOUND: IA-18 stem is fully inserted (Cue as needed) ___ UNSAT EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 6 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 4: OPEN IA18, AIR DRYER "A" & "B" BYPASS.

(Step 8.d RNO)

___ SAT STANDARD: The operator rotates the IA-18 handwheel in the counter-clockwise direction.

___ UNSAT AS FOUND: IA-18 stem is fully inserted (Cue as needed)

EXAMINERS CUE: After locating and describing how the valve would be opened, indicate that the stem is fully withdrawn.

EXAMINERS NOTE: NONE COMMENTS:

STEP 5: CHECK the following Compressors RUNNING

  • INST AIR COMP A
  • INST AIR COMP B ___ SAT (Step 8.e)

STANDARD: The operator observes the IA Compressor A Control Switch.

___ UNSAT The operator observes the IA Compressor B Control Switch.

AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)

EXAMINERS CUE: NONE EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 7 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: START the following compressors: CRITICAL

  • INST AIR COMP A STEP
  • INST AIR COMP B (Step 8.e RNO)

___ SAT STANDARD: The operator places the IA Compressor A Control Switch in MANUAL.

___ UNSAT The operator places the IA Compressor B Control Switch in MANUAL.

AS FOUND: Both IA Compressors are stopped, with their local control switches in AUTO (Cue as needed)

EXAMINERS CUE: After the IA Compressor Control Switches are placed in MANUAL indicate that the motor starts and the compressor is running EXAMINERS NOTE: NONE COMMENTS:

STEP 7: CHECK FCV1740, AIR DRYER HIGH DP FLOW CONTROL valve OPEN (Step 8.f)

___ SAT STANDARD: The operator observes FCV-1740.

AS FOUND: CLOSED (Cue as needed) ___ UNSAT EXAMINERS CUE: After locating and describing how the valve would be verified opened indicate the position indicator is down indicating closed.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 8 of 10 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: OPEN IA3665, AIR DRYER "A" & "B" BYPASS. CRITICAL (Step 8.f RNO) STEP STANDARD: The operator rotates the IA3665 handwheel in the counter- ___ SAT clockwise direction.

AS FOUND: CLOSED (Cue as needed) ___ UNSAT EXAMINERS CUE: After locating and describing how the valve would be opened indicate the valve has been rotated fully counter-clockwise (stem fully withdrawn)

EXAMINERS NOTE: NONE COMMENTS:

STEP 9: OPEN IA3821, INSTRUMENT AIR DRYER "D" BYPASS (Step 8.g)

STANDARD: The operator contacts the Outside AO and directs that IA-3821 be OPENED. ___ SAT AS FOUND: NA

___ UNSAT EXAMINERS CUE: As the Outside AO, indicate that IA-3821 is OPEN.

If the operator starts to proceed to IA-3821 (In Turbine Building), rather than call the Outside AO to re-position this valve, indicate that another operator will perform this action and terminate the JPM.

EXAMINERS NOTE: IA-3821 is located on the D IA dryer.

COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Page 9 of 10 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - In-Plant JPM J Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - In-Plant JPM J NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • AOP-017, Loss Of Instrument Air, has been entered.
  • The Station Air Compressor is under clearance and disassembled
  • The Station Air Receiver is depressurized and vented.

INITIATING CUE:

  • The CRS has directed you to perform AOP-017 Step 8.
  • The Outside AO is standing by to assist as needed.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 10

Appendix C Job Performance Measure Form ES-C-1 Worksheet In-Plant JPM K Developed By: ______________________________ Date: ___________

Instructor/Developer Concurred By: ______________________________ Date: ___________

Line Superintendent/Supervisor SRO Approved By: ______________________________ Date: ___________

Superintendent/Supervisor Training 2016 Systems - In-Plant JPM K (Rev_011116) NUREG 1021, Revision 10

Appendix C Page 2 of 14 Form ES-C-1 Job Performance Measure Worksheet Facility: HB Robinson Task No.:

Task Title: Loss of North SW Header in the JPM No.: 2016 Systems - In-Auxiliary Building Plant JPM K K/A

Reference:

APE 062 AA2.01 (2.9/3.5)

Examinee: NRC Examiner:

Facility Evaluator: Date:

Method of testing:

Simulated Performance: X Actual Performance:

Classroom Simulator Plant X READ TO THE EXAMINEE I will explain the initial conditions, which steps to simulate or discuss, and provide initiating cues. When you complete the task successfully, the objective for this Job Performance Measure will be satisfied.

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

Initial Conditions:

  • The plant is at 100% power.
  • The North SW header has ruptured inside the Auxiliary Building.

Initiating Cue: The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.

Task Standard: The operator will isolate the intact SW header from the ruptured header, isolate the leak, and align cooling water to critical loads IAW Attachment 6 of AOP-022.

Required Materials: PPE (Hardhat, Safety Glasses, Hearing Protection, Safety Shoes etc.)

Flashlight Magnifying Glass General

References:

AOP-022 (Loss of Service Water), Rev 35 2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 3 of 14 Form ES-C-1 Job Performance Measure Worksheet OMM-022 (Emergency Operating Procedures Users Guide), Rev 45 Plant Drawing G-190199 (Service & Cooling Water Flow Diagram) Rev 72 Figure 9.2.1-1, Flow Diagram Service and Cooling Water, Rev 26 Handouts: Handout 1: Blank Copy of Attachment 6 of AOP-022.

Handout 2: Figure 9.2.1-1, Flow Diagram Service and Cooling Water, with the leak location marked.

Time Critical Task: NO Validation Time: 14 minutes Critical Step Justification Step 1 This step is critical because closing either SW-18 or SW-19 is necessary to isolate the ruptured header from intact header.

Step 2 This step is critical because closing SW-740 and SW-102 is necessary to isolate the ruptured header from intact header.

Step 4 This step is critical because placing Instrument Air Compressor B in OFF is necessary to prevent damage to the compressor.

Step 7 This step is critical because cross-connecting the Booster Pump Suction is necessary to isolate the leak and align cooling water to critical loads (SW-25 must be closed to prevent reinitiating the leak, SW-26 and SW-27 must be opened to supply cooling water to vital equipment, SW-503 must be closed to prevent reinitiating the leak and SW-200A must be opened to provide emergency make up to the IVSW Tank).

Step 9 This step is critical because Closing SW-53 and Opening SW-83 is necessary to align cooling water to critical loads (EDGs).

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 4 of 14 Form ES-C-1 PERFORMANCE INFORMATION (Critical Steps are identified as such in right-hand column)

Provide Operator with Initial Conditions/Cue (Last Page of this JPM), and Handouts 1-2.

START TIME:

CAUTION Electrically rated boots and gloves must be worn in the Auxiliary Building where flooding is in progress.

NOTE Dielectric rubber boots and low voltage electrical gloves are available in the AOP/DSP/EOP Equipment storage Locker inside the Auxiliary Building.

STEP 1: Close One Of The Following Valves In The Auxiliary Building CRITICAL Hallway : STEP

  • SW-18, North & South Supply HDR X-Conn (Chain Operated)

OR

  • SW-19, North & South Supply HDR X-Conn (Chain Operated)

(Step 1)

___ SAT STANDARD: The operator pulls either the SW-18 or SW-19 chain operator to rotate valve handwheel in the clockwise direction, and observes the area for water.

___ UNSAT AS FOUND: Both Valves Are Open EXAMINERS CUE: The operator reads the Caution and Note, and proceeds.

After locating and describing how either valve would be closed then indicate the selected valve has been rotated full clockwise and the pointer indicates Closed.

IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.

EXAMINERS NOTE: The valve handwheels face opposite directions.

Ensure operator turns the selected handwheel via the chain in the proper direction.

COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 5 of 14 Form ES-C-1 PERFORMANCE INFORMATION NOTE SW-102 is located overhead East of CCW Pump B on top of horizontal header supported by adjustable pipe support.

STEP 2: Close The Following Valves In The CCW Pump Room: CRITICAL STEP

  • SW-740, CCW Heat Exchanger "B" Return
  • SW-102, HVH-7B Supply (Step 2)

STANDARD: The operator reads the Note, and proceeds. ___ SAT The operator rotates the SW-740 and SW-102 handwheels in the clockwise direction.

___ UNSAT AS FOUND: Both Valves Open (SW-740 Pointer Indicates POS 1 And SW-102 Stem Is Fully Withdrawn).

EXAMINERS CUE: After locating and describing how both valves would be closed, indicate the valves have been rotated full clockwise, the SW-740 pointer indicates Closed and the SW-102 stem is fully inserted.

EXAMINERS NOTE: SW-102 is located overhead east of CCW Pump B on top of horizontal header supported by adjustable pipe support.

SW-102 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.

COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 6 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 3: Notify Control Room Personnel That Steps 1 And 2 of Attachment 6 Are Complete (Step 3) ___ SAT STANDARD: The operator contacts the Control Room and reports Steps 1 and 2 of Attachment 6 are complete.

___ UNSAT AS FOUND: NONE EXAMINERS CUE: When contacted, as CRS then acknowledge the report from the operator EXAMINERS NOTE: NONE COMMENTS:

STEP 4: Place Instrument Air Compressor B Control Switch In The OFF CRITICAL Position STEP (Step 4)

STANDARD: The operator places the Instrument Air Compressor B Control Switch in OFF position

___ SAT AS FOUND: IA Compressor B Control Switch is in AUTO EXAMINERS CUE: After locating and describing how the B IA compressor would be placed in OFF indicate the ___ UNSAT Control Switch has been rotated to the middle position OFF.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 7 of 14 Form ES-C-1 PERFORMANCE INFORMATION CAUTION Subsequent actions to cross-connect cooling water to plant components should not be performed if the leak will be reinitiated.

NOTE SW-53, North Supply HDR To "B" TRN Components In Aux Bldg, is located in Auxiliary Building hallway, midway between Instrument Air Dryers A and B, above third cable tray.

STEP 5: Check leak location - Downstream of SW-53.

(Step 5)

STANDARD: The operator reads the caution and Note, and proceeds.

The operator uses the SW flow diagram marked with the leak ___ SAT location (Handout 2), and observes the area for water and determines leak is NOT Downstream of SW-53; and goes to step 5 RNO which directs the operator to Step 9

___ UNSAT AS FOUND: NONE EXAMINERS CUE: IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 8 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 6: Check Leak Location - Upstream of SW-25, North HDR Supply To SW Booster Pump (Step 9)

___ SAT STANDARD: The operator determines the leak is upstream of SW-25.

AS FOUND: NONE

___ UNSAT EXAMINERS CUE: IF asked if any water is observed on the ground in the AUX BLDG Hallway near the SW Booster Pumps, say YES.

EXAMINERS NOTE: NONE COMMENTS:

NOTE

  • SW Booster Pump B may be operated as required after the suction path is established from the South Service Water Header.
  • Closing SW-503, SW Pump Supply To IVSW Tank, also isolates SW to the Penetration Coolers.

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 9 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 7: Cross-Connect SW Booster Pump Suction Supply As Follows: CRITICAL

a. Close SW-25, North HDR Supply To SW Booster Pumps STEP
b. Open SW-26, SW Booster Pump Suction Cross-Connect
c. Open SW-27, SW Booster Pump Suction Cross-Connect
d. Close SW-503, SW Pump Supply To IVSW Tank
e. Open SW-200A, SWBP "A" TO IVSW Tank Supply (Step 10) ___ SAT STANDARD: The operator reads the Notes, and proceeds.

___ UNSAT The operator rotates the T-handle locking device counter-clockwise on SW-25, and rotates the handwheel clockwise.

The operator rotates the T-handle locking device counter-clockwise on SW-26, and rotates the handwheel counter-clockwise.

The operator rotates the T-handle locking device counter-clockwise on SW-27, and rotates the handwheel counter-clockwise.

The operator rotates the SW-503 handwheel clockwise.

The operator rotates the SW-200A handwheel counter-clockwise.

AS FOUND: SW-25 & SW-503, OPEN SW-26, SW-27 & SW-200A, CLOSED EXAMINERS CUE: After locating and describing how each valve would be operated then indicate the selected valve has been rotated full counter-clockwise and the stem is fully withdrawn for the OPEN valves and rotated full clockwise with the stem fully inserted for the CLOSED valves SW-26 and 200A is located above the A SW Booster Pump.

SW-503 is located above the vent duct above the B SW Booster Pump, and requires a ladder.

EXAMINERS NOTE: NONE COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 10 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 8: Notify Control Room Personnel That Step 10 Is Complete And SW Has Been Cross-Connected To Supply SW Booster Pump B (Step 11)

___ SAT STANDARD: The operator contacts the Control Room and reports SW has been cross-connected to supply SW Booster Pump B.

___ UNSAT AS FOUND: NONE EXAMINERS CUE: When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE: NONE COMMENTS:

NOTE

  • A ladder is required for access to SW-53, North Supply HDR To "B" TRN Components In Aux BLDG.

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 11 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 9: Cross-Connect Service Water Supply To EDGs AS Follows: CRITICAL STEP

a. Close SW-53
b. Open SW-83 (Step 12)

STANDARD: The operator reads the Notes, and proceeds. ___ SAT The operator rotates the SW-53 handwheel in the clockwise direction.

___ UNSAT The operator rotates the SW-83 handwheel in the counter-clockwise direction.

AS FOUND: SW-53 is OPEN, SW-83 is CLOSED EXAMINERS CUE: After locating and describing how each valve would be operated indicate that the SW-53 handwheel has been rotated full clockwise and the stem is fully inserted, and that the SW-83 handwheel has been rotated full counter-clockwise with the stem fully withdrawn.

EXAMINERS NOTE: SW-53 is located in the overhead will require a ladder to manipulate. A ladder is located on the south wall of the CCW Pump Room.

There is a label identifying the location of SW-53 on the vent duct above the walkway between the IA Dryers A and B.

SW-83 is located in the A EDG Vault Room. This room requires Control Room/WCCS permission to enter the room. The examiner will either need to get permission to enter, or open the door and observe the valve without entering the room (The valve can be seen from the open doorway).

COMMENTS:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 12 of 14 Form ES-C-1 PERFORMANCE INFORMATION STEP 10: Notify Control Room Personnel That SW Has Been Cross-Connected To Supply The Following Equipment:

  • Instrument Air Compressor B ___ SAT
  • HVH-6B
  • HVH-8B (Step 13)

___ UNSAT STANDARD: The operator contacts the Control Room and reports that SW has been cross-connected to supply the above equipment AS FOUND: NONE EXAMINERS CUE: When contacted, as CRS acknowledge the report from the operator EXAMINERS NOTE: NONE COMMENTS:

STEP 11: Notify Control Room Personnel That Attachment 6 Is Complete (Step 14)

STANDARD: The operator contacts the control room and reports that Attachment ___ SAT 6 is complete AS FOUND: NONE

___ UNSAT EXAMINERS CUE: When contacted, as CRS acknowledge that Attachment 6 is complete EXAMINERS NOTE: NONE COMMENTS:

Terminating Cue: Evaluation on this JPM is complete.

STOP TIME:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Page 13 of 14 Form ES-C-1 VERIFICATION OF COMPLETION Job Performance Measure No.: 2016 Systems - In-Plant JPM K Examinees Name:

Date Performed:

Facility Evaluator:

Number of Attempts:

Time to Complete:

Question Documentation:

Result: SAT UNSAT Examiners Signature: Date:

2016 Systems - In-Plant JPM K NUREG 1021, Revision 10

Appendix C Form ES-C-1 JPM CUE SHEET INITIAL CONDITIONS:

  • The plant is at 100% power.
  • The North SW header has ruptured inside the Auxiliary Building.

INITIATING CUE: The CRS has directed you to isolate the leak IAW Attachment 6 of AOP-022.

NOTE: No plant equipment should be operated during the performance of this JPM. All actions must be SIMULATED.

NUREG 1021, Revision 10