ML17312A632: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:REFUEL ING OPERAT IONS a
  . 3/4.9.6    REFUELING MACHINE LIMITING CONDITION    FOR OPERATION 3.9.6    The refueling machine  shall  be used    for movement  of fuel assemblies  and shall  be OPERABLE with:
: a. A minimum  capacity of 3590  pou.>ds  and an overload cut  off limit.
APPLICABILITY: During movement        of fuel assemblies within the refueling cavity.
ACTION:
With the above requirements for the refueling machine not satisfied,              suspend use of the refue1ing machine from operations involving the movement              of fuel assemblies.
SURVEILLANCE RE UIREMENTS 4.9.6. 1  The  refueling  machine used for movement of fuel assemblies shall be demonstrated      OPERABLE  within 72 hours prior to the start of such operations by performing        load test of at least 3590 pounds and demonstrating an automatic d<<      ff a
1    1    1'1g        df    1  1    '-d I+5 cse rico  ddoc c 4 0(F (l rrl(P 9aoo020035 9soms PDR    ADQCK 05000529 i, P                  PDR PALO VERDE  UNIT 2                        3/4 9-6                        AMENDMENT NO.    ~76
 
U 4 i ~}}

Revision as of 07:55, 29 October 2019

Proposed Tech Specs,Revising TS 3/4.9.6 to Relocate Refueling Machine Overload Cut Off Limit from TS 3/4.9.6 to Plant UFSAR Per Criteria in 10CFR50.36 & Rev 1 of NUREG-1432 STS for C-E Plants.
ML17312A632
Person / Time
Site: Palo Verde 
Issue date: 03/26/1996
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17312A631 List:
References
RTR-NUREG-1432 NUDOCS 9604020035
Download: ML17312A632 (2)


Text

REFUEL ING OPERAT IONS a

. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:

a. A minimum capacity of 3590 pou.>ds and an overload cut off limit.

APPLICABILITY: During movement of fuel assemblies within the refueling cavity.

ACTION:

With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies.

SURVEILLANCE RE UIREMENTS 4.9.6. 1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing load test of at least 3590 pounds and demonstrating an automatic d<< ff a

1 1 1'1g df 1 1 '-d I+5 cse rico ddoc c 4 0(F (l rrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO. ~76

U 4 i ~