ML17312A632: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:REFUEL ING OPERAT IONS a | ||
. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with: | |||
: a. A minimum capacity of 3590 pou.>ds and an overload cut off limit. | |||
APPLICABILITY: During movement of fuel assemblies within the refueling cavity. | |||
ACTION: | |||
With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies. | |||
SURVEILLANCE RE UIREMENTS 4.9.6. 1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours prior to the start of such operations by performing load test of at least 3590 pounds and demonstrating an automatic d<< ff a | |||
1 1 1'1g df 1 1 '-d I+5 cse rico ddoc c 4 0(F (l rrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO. ~76 | |||
U 4 i ~}} | |||
Revision as of 07:55, 29 October 2019
| ML17312A632 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 03/26/1996 |
| From: | ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | |
| Shared Package | |
| ML17312A631 | List: |
| References | |
| RTR-NUREG-1432 NUDOCS 9604020035 | |
| Download: ML17312A632 (2) | |
Text
REFUEL ING OPERAT IONS a
. 3/4.9.6 REFUELING MACHINE LIMITING CONDITION FOR OPERATION 3.9.6 The refueling machine shall be used for movement of fuel assemblies and shall be OPERABLE with:
- a. A minimum capacity of 3590 pou.>ds and an overload cut off limit.
APPLICABILITY: During movement of fuel assemblies within the refueling cavity.
ACTION:
With the above requirements for the refueling machine not satisfied, suspend use of the refue1ing machine from operations involving the movement of fuel assemblies.
SURVEILLANCE RE UIREMENTS 4.9.6. 1 The refueling machine used for movement of fuel assemblies shall be demonstrated OPERABLE within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of such operations by performing load test of at least 3590 pounds and demonstrating an automatic d<< ff a
1 1 1'1g df 1 1 '-d I+5 cse rico ddoc c 4 0(F (l rrl(P 9aoo020035 9soms PDR ADQCK 05000529 i, P PDR PALO VERDE UNIT 2 3/4 9-6 AMENDMENT NO. ~76
U 4 i ~