ML17320B011: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:Mr. Harold R. Dento ATTACHMENT TO AEP:NRC:0890 PROPOSED REVISION TO TECHNICAL SPECIFICATION PAGE 8404300026 84042'4 " | ||
PDR ADOCK P | |||
050003ih, PDR | |||
ka | |||
~- | |||
(' | |||
REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room. | |||
APPLICABILITY: MODE 6. | |||
ACTION: | |||
With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes.*The provisions of Specification 3.0.3 are not applicable. | |||
SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of: | |||
: a. A CHANNEL FUNCTIONAL TEST at least once per 7 days, and | |||
: b. A CHANNEL FUNCTIONAL TEST within 8 hours prior to the initial start of CORE ALTERATIONS, and | |||
: c. A CHANNEL CHECK at least once per 12 hours during CORE ALTERATIONS. | |||
*During the 1984 refueling outage only, removal of the last 30 assemblies is allowed with only one source range neutron flux monitor operating. | |||
D. C. COOK - UNIT 2 3/4 9-2}} | |||
Revision as of 06:24, 29 October 2019
| ML17320B011 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 04/24/1984 |
| From: | INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG |
| To: | |
| Shared Package | |
| ML17320B010 | List: |
| References | |
| NUDOCS 8404300026 | |
| Download: ML17320B011 (3) | |
Text
Mr. Harold R. Dento ATTACHMENT TO AEP:NRC:0890 PROPOSED REVISION TO TECHNICAL SPECIFICATION PAGE 8404300026 84042'4 "
PDR ADOCK P
050003ih, PDR
ka
~-
('
REFUELING OPERATIONS INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a minimum, two source range neutron flux monitors shall be operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.
APPLICABILITY: MODE 6.
ACTION:
With the requirements of the above specification not satisfied, immediately suspend all operations involving CORE ALTERATIONS or positive reactivity changes.*The provisions of Specification 3.0.3 are not applicable.
SURVEILLANCE RE UIREMENTS 4.9.2 Each source range neutron flux monitor shall be demonstrated OPERABLE by performance of:
- a. A CHANNEL FUNCTIONAL TEST at least once per 7 days, and
- b. A CHANNEL FUNCTIONAL TEST within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> prior to the initial start of CORE ALTERATIONS, and
- c. A CHANNEL CHECK at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> during CORE ALTERATIONS.
- During the 1984 refueling outage only, removal of the last 30 assemblies is allowed with only one source range neutron flux monitor operating.
D. C. COOK - UNIT 2 3/4 9-2